This is a Sealed Bid Solicitation (Invitation for Bid) for construction repair work at the Minneapolis Air Reserve Station. The solicitation number is FA663326Q00010001, issued on March 18, 2026, by the Air Force (FA6633) at 760 Military Highway, Building 801, Minneapolis, Minnesota.
The project, titled "Repair Doors and EIFS, B755," requires the contractor to provide all professional services, supervision, labor, materials, and equipment necessary to complete repairs to Building 755. Specific work includes: repairing Exterior Insulation and Finish System (EIFS) cracks, holes, voids, and joints; replacing the main entrance door operators, sensors, and controls; removing and brick-infilling one double door; replacing a single door with frame, hardware, and accessories; relocating an exterior sign and conduit; and rerouting tank level alarm conduit to the interior. The contract is structured as a firm fixed-price arrangement for one lot. A mandatory site visit is scheduled for April 2, 2026, at 10:00 AM CST at Building 860, 2nd Floor, Contracting Conference Room 229; all attendees require prior Entry Access List (EAL) clearance. Sealed offers are due by 3:00 PM local time on April 15, 2026. The contractor must begin performance within 10 calendar days of award and complete all work within 120 calendar days. Performance and payment bonds are required, with bonds to be submitted within 10 days of award. This is a 100% Small Business Set-Aside under NAICS code 236220, with a size standard of $45,000,000 in average annual revenue. Award will be made to the lowest priced responsible offeror whose offer is responsive to solicitation terms and deemed best value to the government. Evaluation will be based on price only, with quotes accepted on an all-or-none basis; partial quotes will not be accepted.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 Offer Due 4-30-26 Amendment FA663326Q00010003.pdf | ||
| Offer Due Date 4-30-26 Amendment - FA663326Q00010003.pdf | ||
| SF 30 Offer Due Date Amendment FA663326Q00010002.pdf | ||
| Attachment 1 B755 Statement Of Work (SOW).pdf | ||
| Attachment 5 20260302 Wage Determination.pdf | ||
| Attachment 4 B755 Submittal Register.xlsx | XLSX spreadsheet | |
| Attachment 2 B755 Specifications.pdf | ||
| Attachment 3 B755 Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION
NUMBER
FA663326Q00010001
2. TYPE OF SOLICITATION
SEALED BID (IFB) INVITATION
FOR BID
NEGOTIATED (RFP) REQUEST
FOR PROPOSAL
3. DATE ISSUED
18 Mar 2026
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
QJKL250008
7. ISSUED BY CODE: FA6633
FA6633 934 AG LGC
760 MILITARY HWY BLDG 801, CP 612 713 1560
MINNEAPOLIS, MN 55450-2100
UNITED STATES
CALEB ANDERSON, Email: caleb.anderson.15@us.af.mil Telephone: 612-713-1433 Karen Gillen, Email: karen.gillen@us.af.mil Telephone: 783-1427
8. ADDRESS OFFER TO
F5G3LC 934 LGC
AF BPN NO MILSBILLS PROCESSES, 760 MILITARY HWY BLDG 801
MINNEAPOLIS, MN 55450-2100
UNITED STATES
9. FOR
INFORMATION
CALL:
a. NAME
CALEB ANDERSON
b. TELEPHONE NUMBER (include area code) (NO COLLECT CALLS) 612-713-1433
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10.THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
Project Title: Repair Doors and EIFS, B755 Project Location: 760 Military Hwy, Building 755 Minneapolis, Minnesota 55450
Contractor shall provide all supervision, labor, materials and equipment necessary to fully meet all requirements of the Statement of Work, Construction Specifications, Construction Drawings and all other Contract Documents related to and/or titled: Repair Doors and EIFS, B755 at the Minneapolis Air Reserve Station, Minneapolis Minnesota.
The task descriptions of the primary work to be completed.
*Exterior Insulation and Finish System (EIFS): Repair EIFS cracks, holes, voids, joints, and similar damages and apply new finish coat.
*Repair doors: Includes replacement of main entrance door operators, sensors, and controls; removal and brick infill of one double door; and replacement of a single door, frame, hardware, and accessories.
*Relocate sign: remove sign and exterior conduit and mount new sign in designated location.
*Tank Level Alarm Conduit: remove exterior conduit and reroute new conduit on the interior of the facility
Per 52.237-1:
The government has scheduled a site visit for:
Thursday 2 April 2026 at 10:00 AM (CST) Participants will meet at:
Minneapolis Air Reserve Station Building 860 2nd Floor Contracting Conference Room 229 - and move to the site from there.
Please note:
All persons attending the Site Visit are required have prior clearance for access to the facility via an Entry Access List (EAL).
There are no exceptions. Contact Caleb Anderson at caleb.anderson.15@us.af.mil for an EAL template to complete and return.
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving 10 120 award, notice to proceed. This performance period is mandatory negotiable. (See ). FAR 52.211-10
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) 1 03:00 PM local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes 15 Apr 2026 containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. 10
Computer generated. STANDARD FORM 1442 (REV. 12/2022) Prescribed by GSA-FAR (48CFR) 53.236-1(d)
Created On:
18 Mar 2026, 14:32 PM Central Daylight Time
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED
STATES CODE AT
10 U.S.C 3204(a) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document
Contractor agrees to furnish and return copies to issuing office.)
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
Computer generated. STANDARD FORM 1442 (REV. 12/2022) BACK
Section A - Solicitation/Contract Form FY26 F6247 F5G855 AF9 934CE - QJKL 25-0008 Repair Doors & EIFS, B755
NAICS: 236220
Size Standard: USD 45,000,000.00 Annual receipts
Small Business Type: Small Business Set Aside Percent: 100
Product Service Code: Y1AZ
FA663326Q00010001
Section B - Supplies or Services & Prices or Costs Additional Information/Notes
Item Supplies / Services Quantity Unit Unit Price Amount
QJKL 25-0008, Repair Doors & EIFS, B755 FY26 QJKL 25-0008 Repair Doors and
EIFS B755.
Contractor shall provide all professional services, permits, supervision, labor, materials, and equipment necessary to fully meet all requirements of the Statement of Work, Construction Specifications, Construction Drawings and all other Contract Documents related to and/or titled, Repair Doors and EIFS in B755, at the Minneapolis Air Reserve Station, Minneapolis, Minnesota.
The performed tasks shall be based on the project description, other data furnished in the Statement of Work, and information covered during the Pre-Construction meeting. THE SCOPE OF THIS PROJECT INCLUDES THE REPAIR OF DOORS and EIFS, Building 755.
Product Service Code: Y1AZ Firm Fixed Price
Product Type Code: Y1AZ Product Service Code: Y1AZ Pricing Arrangement: Firm Fixed Price
1 Lot
Section C - Description/Specifications/Statement of Work FY26 F6247 F5G855 AF9 QJKL-25-0008 Repair B755 Doors and Exterior Insulation and Finish (EIFS)
Requirements Project Title: Repair Doors and EIFS, B755 Project Location: 760 Military Hwy, Building 755 Minneapolis, Minnesota 55450
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.246-12 Inspection of Construction. Aug 1996 Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F5G855 CountryCode: USA
934 CE
AF BPN NO MILSBILLS PROCESSES, 760 MILITARY HWY BLDG 744
MINNEAPOLIS, MN 55450
UNITED STATES
Chad Dauwalter Email: chad.dauwalter@us.af.mil Telephone: 6127131952
Section F - Deliveries or Performance Overall Contract Delivery Period
Line Item Delivery Schedule Quantity Address and POC
Delivery Schedule From date of lead time event to completion of performance 120 Calendar Days Date of Notice to Proceed Receipt
1 Lot Place of Performance DoDAAC: F5G855 CountryCode: USA
934 CE
AF BPN NO MILSBILLS PROCESSES, 760 MILITARY HWY BLDG 744
MINNEAPOLIS, MN 55450
UNITED STATES
Chad Dauwalter Email: chad.dauwalter@us.af.mil Telephone: 6127131952
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Electronic invoicing.
Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before WAWF training.
submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol. WAWF methods of document submission.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract WAWF payment instructions.
or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
N/A
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
_Construction and Facilities Management Invoice
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment Document routing.
requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC F87700
Issue By DoDAAC FA6633
Admin DoDAAC F5G3LC
Inspect By DoDAAC F5G855
Ship To Code ____
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) F5G3LC
Service Acceptor (DoDAAC) F5G3LC
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the Payment request.
payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Caleb Anderson 612-713-1433 caleb.anderson.15@us.af.mil OR Karen Gillen 612-713-1427 karen.gillen@us.af.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
1. REQUIRED INSURANCE (IAW FAR 28.306(b)) 52.228-5 Insurance--Work on a Government Installation. Reference FAR Clause 52.228-5, entitled "Insurance--Work on a Government Installation" the Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract:
A. Workmen's Compensation and Employer's Liability Insurance: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage.
Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
B. General Liability: Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy; only applicable to construction services where work is being performed consistently on base.
C. Automobile Liability Insurance: This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
2. BONDS Pursuant to 40 U.S.C. 3132, for construction contracts greater than $35,000, but not greater than $150,000, the contracting officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives:
(i) A payment bond or
(ii) An irrevocable letter of credit (ILC)
(iii) A tripartite escrow agreement establishes the terms of payment under the contract and of resolution of disputes among the parties. The Government makes payments to the contractor's escrow account, and the escrow agent distributes the payments in accordance with the agreement or triggers the disputes resolution procedures if required. shall. The prime contractor establishes an escrow account in a federally insured financial institution and enters into a tripartite escrow agreement with the financial institution, as escrow agent, and all of the suppliers of labor and material. The escrow agreement
(iv) Certificates of deposit. The contractor deposits certificates of deposit from a federally insured financial institution with the contracting officer, in an acceptable form, executable by the contracting officer.
(v) A deposit of the types of security listed in (v) See FAR 52.228-13 Contracting Officer selected: A Payment Bond or Irrevocable letter of credit (ILC).
3. RIGHTS AND OBLIGATIONS:
The rights and obligations of the parties to this contract shall be subject to and governed by the provisions of this contract, To the extent of any inconsistency between this contract, the provisions of this contract shall control.
4. PROVISIONS ON CONTRACTING OFFICER'S AUTHORITY:
No person other than a Contracting Officer shall have authority to modify the terms and conditions of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this agreement and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment.
5. DESIGNATION OF TECHNICAL REPRESENTATIVE:
The Base Civil Engineer or their authorized technical representative of the Contracting Officer shall be identified for the purpose of technical surveillance for the contract.
This clause in no way authorizes anyone other than the Contracting Officer to direct changes in terms and conditions of the contract/task orders.
6. AVOIDANCE OF ORGANIZATIONAL CONFLICTS OF INTEREST
Any contractor, subcontractor associated, affiliated or a consultant to the design contractor who furnished the design information and/or specifications for a specification for a specific project shall not be allowed to furnish such services or items as required by the construction contract for that project either as a prime contractor, subcontractor, or supplier.
7. REPLACEMENT OF KEY PERSONNEL
The contractor shall employ the key professional personnel and maintain the subcontractors and/or consultants identified in their SF 1413 submission to perform the services required under this contract. No substitution will be made without the advance written approval of the Contracting Officer, after the Government's review of the proposed replacement's experience and qualifications submitted by the contractor with explanation of the necessity for the change. No increase in discipline rates will be allowed when contractor personnel and/or subcontractor/consultant substitution is authorized.
8. SUBMISSION OF SCHEDULE OF MATERIAL SUBMITTALS (AF66 Excel version) The Prime contractor shall be responsible to submit complete listing of all items listed in AF 66 Excel Form for the submittals contemplated by clause herein titled "FAR 52.236-5, Material and Workmanship" to be submitted utilizing AF Form 3000, "Material Approval Submittal".
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-13 System for Award Management-Maintenance. (Deviation) Feb 2026 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation) Feb 2026
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation) Feb 2026 52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation) Feb 2026 52.213-4 Terms and Conditions-Simplified Acquisitions (Noncommercial). (Deviation) Feb 2026 52.219-3 Notice of HUBZone Set-Aside or Sole-Source Award. (Deviation) Feb 2026 52.219-6 Notice of Total Small Business Set-Aside. (Deviation) Feb 2026 52.219-27 Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business
(SDVOSB) Concerns Eligible Under the SDVOSB Program. (Deviation) Feb 2026
52.219-30 Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program. (Deviation)
Feb 2026
52.222-50 Combating Trafficking in Persons. (Deviation) Feb 2026 52.223-5 Pollution Prevention and Right-to-Know Information. May 2024 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-8 Discounts for Prompt Payment. Feb 2002 52.232-23 Assignment of Claims. May 2014 52.232-27 Prompt Payment for Construction Contracts. Jan 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-3 Protest after Award. (Deviation) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation) Feb 2026 52.236-5 Material and Workmanship. (Deviation) Feb 2026 52.236-7 Permits and Responsibilities. (Deviation) Feb 2026 52.236-17 Layout of Work. (Deviation) Feb 2026 52.240-91 Security Prohibitions and Exclusions. (Deviation) Feb 2026 52.242-14 Suspension of Work. Apr 1984 52.243-5 Changes and Changed Conditions. (Deviation) Feb 2026 52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation) Feb 2026 52.246-21 Warranty of Construction. Mar 1994 52.249-4 Termination for Convenience of the Government (Services) (Short Form). Apr 1984 52.253-1 Computer Generated Forms. (Deviation) Feb 2026
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024 252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services. Jan 2023 252.222-7002 Compliance with Local Labor Laws (Overseas). Jun 1997 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023 252.232-7010 Levies on Contract Payments. Dec 2006 252.233-7001 Choice of Law (Overseas). Jun 1997 252.236-7005 Airfield Safety Precautions. Dec 1991 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations. Oct 2010 252.247-7023 Transportation of Supplies by Sea. Oct 2024
FAR Clauses Incorporated by Full Text
52.228-13 Alternative Payment Protections. (Jul 2000)
Alternative Payment Protections (July 2000)
(a) The Contractor shall submit one of the following payment protections:
A Payment Bond or Irrevocable Letter of Credit (ILC) (b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within days of contract award.10
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
(End of clause)
52.232-5 Payments under Fixed-Price Construction Contracts. (May 2014)
Payments under Fixed-Price Construction Contracts (May 2014)
(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.
(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor's request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract under the contract.
(iv) A listing of the amounts previously paid to each such subcontractor under the contract.
(v) Additional supporting data in a form and detail required by the Contracting Officer.
(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if-
(i) Consideration is specifically authorized by this contract; and
(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.
(c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that-
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
____ (Name)
____ (Title)
____ (Date)
(d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-
(1) Notify the Contracting Officer of such performance deficiency; and
(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8 thday after the date of receipt of the unearned amount until-
(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.
(e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
(f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as-
(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.
(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
(h) Final payment. The Government shall pay the amount due the Contractor under this contract after-
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of1940 (31 U.S.C.3727 and 41 U.S.C.6305).
(i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in FAR subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.
(j) Interest computation on unearned amounts. In accordance with 31 U.S.C.3903(c)(1), the amount payable under paragraph (d)(2) of this clause shall be-
(1) Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to the date the Contractor receives the unearned amount; and
(2) Deducted from the next available payment to the Contractor.
(End of clause)
52.252-2 Clauses Incorporated by Reference. (Feb 1998)
Clauses Incorporated By Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
___www.acquisition.gov_
(End of clause)
52.252-6 Authorized Deviations in Clauses. (Nov 2020)
Authorized Deviations in Clauses (Nov 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of clause)
DFARS Clauses Incorporated by Full Text
252.236-7001 Contract Drawings and Specifications. (Aug 2000)
CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall-
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
QJKL-25-0008 B755 Drawings & Specifications _____
(End of clause)
Supplemental Clauses Incorporated by Full Text
5352.201-9101 AFRC Ombudsman (Jul 2023)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Ms. Amy York, AFRC/PKO, 555 Robins Parkway, Suite 263, Robins AFB GA 31098. Comm: 478-327-1614. Email: amy.york.1@us.af.mil. Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the contracting officer.
(End of clause)
5352.223-9000 Elimination of Use of Class I Ozone Depleting Substances (ODS) (Jun 2024)
(a) Contractors shall not:
(1) Provide any service or product with any specification, standard, drawing, or other document that requires the use of a Class I ODS in the test, operation, or maintenance of any system, subsystem, item, component, or process; or
(2) Provide any specification, standard, drawing, or other document that establishes a test, operation, or maintenance requirement that can only be met by use of a Class I ODS as part of this contract/order.
(b) For the purposes of Department of the Air Force policy, the following products that are pure (i.e., they meet the relevant product specification identified in AFI 32-7086) are Class I ODSs:
(1) Halons: 1011, 1202, 1211, 1301, and 2402;
(2) Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC-115, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R-502, and R-503; and
(3) Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.
[NOTE: Material that uses one or more of these Class I ODSs as minor constituents do not meet the Department of the Air Force definition of a Class I ODS.]
(End of clause)
5352.223-9001 Health and Safety on Government Installations (Jul 2023)
(a) In performing work under this contract on a Government installation, the contractor shall:
(1) Take all reasonable steps and precautions to prevent accidents and preserve the health and safety of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
(2) Take such additional immediate precautions as the contracting officer may reasonably require for health and safety purposes.
(b) The contracting officer may, by written order, direct Air Force Occupational Safety and Health (AFOSH) Standards and/or health/safety standards as may be required in the performance of this contract and any adjustments resulting from such direction will be in accordance with the Changes clause of this contract.
(c) Any violation of these health and safety rules and requirements, unless promptly corrected as directed by the contracting officer, shall be grounds for termination of this contract in accordance with the Default clause of this contract.
(End of clause)
5352.242-9000 Contractor Access to Air Force Installations (Jun 2024)
(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Department of the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing.
When reporting to the registration office, (Security Forces Pass & ID Bldg. 906) the authorized contractor individual(s) must conform to the following requirements:
1. All persons requesting access must provide a REAL ID Act compliant credential (AFMAN 31-113, paragraph 3.1.)
2. All persons and their property are subject to inspection, IAW Internal Security Act of 1950 (50 U.S.C. 797, Sec.21) and the Code of Federal Regulation Title 32 Sec 809a.2.
3. Contractors are not authorized escort authority. (AFMAN 31-113, paragraph 6.5.2.) The organization requesting the project will provide escorts.
4. Dangerous weapons or destructive devices are not allowed. Firearm permits and conceal/carry permits are not exempt. (IDP, Annex C, Appendix 1, Tab L, paragraph 4.9.) The majority of this installation is federal exclusive jurisdiction which overrides state, county or local weapons permits.
5. Driving a vehicle on military installations is a privilege granted by the installation commander (AFI 31-218 Chap 2). All operators must be able to produce, on request, proof of insurance and a valid driver's license. produce, on request, proof of insurance and a valid driver's license to obtain a vehicle pass.
(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Integrated Defense and DODMAN5200.02_AFMAN16-1405 Air Force Personnel Security Program citing the appropriate paragraphs as applicable.
(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
(f) The contractor shall provide an after-hours contact number or after-hours email in the Emergency Mass Notification System (EMNS) for each of their personnel, whose normal place of duty is on a DoD installation or within a DoD facility. The contractor shall comply with any additional requirements in DAFMAN 10-206 for emergency operational reporting. Foreign Nationals may participate and may remove themselves from the Emergency Mass Notification System at any time. To update information, personnel can access the globe icon on their system desktop screens and choose the "Access Self-Service" option.
(g) Failure to comply with these requirements may result in withholding of final payment.
(End of clause)
Section J - List of Attachments
Number Attachment Name Attachment Description Reference Identifier Date Line Item
02 Attachment 2 B755 Specifications Specification 03 Mar
03 Attachment 3 B755 Drawings Drawings 03 Mar
04 Attachment 4 B755 Submittal Register Submittal Register 03 Mar
Attachment 5 20260302 Wage Determination
Wage Determination 02 Mar
Attachment 1 B755 Statement Of Work
(SOW)
Statement of Work 03 Mar
Section K - Representations, Certification, & Other Statements
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.240-90 Security Prohibitions and Exclusions Representations and Certifications. (Deviation) Feb 2026
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.203-7005 Representation Relating to Compensation of Former DoD Officials. Sep 2022 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls. Oct 2016 252.225-7055 Representation Regarding Business Operations with the Maduro Regime. May 2022 252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region-Representation. Jun 2023
FAR Clauses Incorporated by Full Text
52.229-11 Tax on Certain Foreign Procurements-Notice and Representation. (Jun 2020)
Tax on Certain Foreign Procurements-Notice and Representation (Jun 2020)
(a) Definitions. As used in this provision-
Foreign person means any person other than a United States person.
Specified Federal procurement payment means any payment made pursuant to a contract with a foreign contracting party that is for goods, manufactured or produced, or services provided in a foreign country that is not a party to an international procurement agreement with the United States. For purposes of the prior sentence, a foreign country does not include an outlying area.
United States person as defined in 26 U.S.C. 7701(a)(30) means
(1) A citizen or resident of the United States;
(2) A domestic partnership;
(3) A domestic corporation;
(4) Any estate (other than a foreign estate, within the meaning of 26 U.S.C. 701(a)(31)); and
(5) Any trust if-
(i) A court within the United States is able to exercise primary supervision over the administration of the trust; and
(ii) One or more United States persons have the authority to control all substantial decisions of the trust.
(b) Unless exempted, there is a 2 percent tax of the amount of a specified Federal procurement payment on any foreign person receiving such payment. See 26 U.S.C.
5000C and its implementing regulations at 26 CFR 1.5000C-1 through 1.5000C-7.
(c) Exemptions from withholding under this provision are described at 26 CFR 1.5000C-1(d)(5) through (7). The Offeror would claim an exemption from the withholding by using the Department of the Treasury Internal Revenue Service Form W-14, Certificate of Foreign Contracting Party Receiving Federal Procurement Payments, available via the internet at www.irs.gov/w14. Any exemption claimed and self-certified on the IRS Form W-14 is subject to audit by the IRS. Any disputes regarding the imposition and collection of the 26 U.S.C. 5000C tax are adjudicated by the IRS as the 26 U.S.C. 5000C tax is a tax matter, not a contract issue. The IRS Form W-14 is provided to the acquiring agency rather than to the IRS.
(d) For purposes of withholding under 26 U.S.C. 5000C, the Offeror represents that
(1) It [ ] is [ ] is not a foreign person; and
(2) If the Offeror indicates "is" in paragraph (d)(1) of this provision, then the Offeror represents that-I am claiming on the IRS Form W-14 [ ] a full exemption, or [ ] partial or no exemption [Offeror shall select one] from the excise tax.
(e) If the Offeror represents it is a foreign person in paragraph (d)(1) of this provision, then-
(1) The clause at FAR 52.229-12, Tax on Certain Foreign Procurements, will be included in any resulting contract; and
(2) The Offeror shall submit with its offer the IRS Form W-14. If the IRS Form W-14 is not submitted with the offer, exemptions will not be applied to any resulting contract and the Government will withhold a full 2 percent of each payment.
(f) If the Offeror selects "is" in paragraph (d)(1) and "partial or no exemption" in paragraph (d)(2) of this provision, the Offeror will be subject to withholding in accordance with the clause at FAR 52.229-12, Tax on Certain Foreign Procurements, in any resulting contract.
(g) A taxpayer may, for a fee, seek advice from the Internal Revenue Service (IRS) as to the proper tax treatment of a transaction. This is called a private letter ruling. Also, the IRS may publish a revenue ruling, which is an official interpretation by the IRS of the Internal Revenue Code, related statutes, tax treaties, and regulations. A revenue ruling is the conclusion of the IRS on how the law is applied to a specific set of facts. For questions relating to the interpretation of the IRS regulations go to https:// www.irs.gov/help/tax-law-questions.
(End of provision)
DFARS Clauses Incorporated by Full Text
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services- Representation.
(May 2021)
PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES-REPRESENTATION (MAY 2021)
The Offeror is not required to complete the representation in this provision if the Offeror has represented in the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation, that it "does not provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument."
(a) Definitions. "Covered defense telecommunications equipment or services," "covered mission," "critical technology," and "substantial or essential component," as used in this provision, have the meanings given in the 252.204-7018 clause, Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services, of this solicitation.
(b) Prohibition. Section 1656 of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L. 115-91) prohibits agencies from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless a waiver is granted.
(d) Representation. If in its annual representations…