This document is a schedule of materials submittals for the Install Electrical Service for B10571 solicitation issued by the Department of the Air Force Pacific Air Forces. The schedule outlines 33 required submittals including plans for quality control, safety, staging, environmental protection, borrow materials, concrete mixes, and product data for transformers, disconnect switches, electrical equipment, fencing and gates. Key due dates are specified for submittals including 15 days after award for the environmental protection plan, prior to construction for safety and staging plans, and prior to use of materials for borrow gradations and mix designs. The schedule provides lines for tracking receipt and approval of submittals with suspense dates for review and follow up on re-submittals as needed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA500023R00280001 SF 30.pdf | ||
| Attachment 7 - Question and Answers.pdf | ||
| Attachment 1 - Statement of Work (Amended).pdf | ||
| Attachment 3 - Specifications.pdf | ||
| Attachment 5 - LIQDG.pdf | ||
| Attachment 6 - DBA Wage Determination.pdf | ||
| Solicitation - FA500023R0028.pdf | ||
| Attachment 1 - Statement of Work.pdf | ||
| Attachment 2 - Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
FXSB 23-1031
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT PREFERENCE, TYPE OF
SUBMITTAL
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
D R
A W
IN
G
S
P
LA
N
M S
D S
M A
N F'
R R
E C
O M
M E
N D
A
TI
O N
S
R E
Q U
E S
T
LE
TT
E
R
C A
TA
LO
G D
A
TA
R E
P O
R
TS
O
TH
E R
D A
TA
TE
S
T R
E S
U
LT
S
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTIN
G
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE DATE
FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL
FINAL APPROVAL REMARKS
1 Section 01000, para 1.2 Green Procurement Plan
1 After award and prior to precon
MACC Parent Contract
2 Section 01000, para 6.8 AF Form 66
1 14 days after
NTP
MACC Parent Contract
3 Section 01000, para 4.7.4 AF Form 3064
1 15 days prior to starting work
MACC Parent Contract
4 Section 01100, para 3.3 Safety Plan
1 Prior to start of work
MACC Parent Contract
5 Section 01100, para 4.3 Staging Site Plan
1 Prior to start of work
MACC Parent Contract
6 Section 01100, para 7.1 Contractor Contact number
Prior to start of work
MACC Parent Contract
7 Section 01100, para 16.2 Utility Outage Request
1 21 days prior to scheduled outage
MACC Parent Contract
8 Section 01100, para 16.8 Form 3 (Dig permit)
10 days prior to start of construction
MACC Parent Contract
9 Section 01300, para 1.1 Start of Work Notice
21 days prior to start of construction
MACC Parent Contract
10 Section 01300, para 1.3 Pre-final Inspection Notice
1 10 days prior to inspection date
MACC Parent Contract
11 Section 01300, para 1.5 Final Inspection Notice
1 5 days prior to inspection date
MACC Parent Contract
12 Section 01300, para 2.1
DD 1354
1 Complete by Final Inspection
MACC Parent Contract
13 Section 01300, para 2.1 O&M Manuals
1 Complete by Final Inspection
MACC Parent Contract
14 Section 01300, para 2.1 As-Built Drawings
Complete by 30 days after Final inspection
MACC Parent Contract
15 Section 01400, para 2.2 Quality Control Plan
1 Max 20 days after award
MACC Parent Contract
16 Section 01400, para 2.9 Quality Control Documentation
1 24 hours after test
MACC Parent Contract
INSTALL ELECTRICAL SERVICE B10571
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT PREFERENCE, TYPE OF
SUBMITTAL
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
D R
A W
IN
G
S
P
LA
N
M S
D S
M A
N F'
R R
E C
O M
M E
N D
A
TI
O N
S
R E
Q U
E S
T
LE
TT
E
R
C A
TA
LO
G D
A
TA
R E
P O
R
TS
O
TH
E R
D A
TA
TE
S
T R
E S
U
LT
S
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTIN
G
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE DATE
FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL
FINAL APPROVAL REMARKS
INSTALL ELECTRICAL SERVICE B10571
17 Section 01500, para 2.1
EPP
1 15 days after award
MACC Parent Contract
18 Section 01500, para 5.1
ESCP/SWPPP
1 Prior to start of construction
MACC Parent Contract
19 Section 103 Radioactive Usage Request
1 60 days prior to use
MACC Parent Contract
20 Section 01500, para 8.3 Spill Prevention plan
1 Prior to start of construction
MACC Parent Contract
21 Section 01500, para 9.4
NOI
1 Upon receipt from ADEC
MACC Parent Contract
22 Section 01500, para 9.5
NOT
1 Upon completion MACC Parent Contract
Section 203 & 703-2.07 Borrow, Typa A, Gradation and Proctor
1 1 1 Prior to start of construction
Section 401 & 703 HMA Product Data 1 1 1 Prior to start of construction
Section 501, 608, & 711 Concrete Mix Designs 1 1 1 Prior to start of construction
Section 503 & 709 Reinforcing Steel material 1 1 1 Prior to start of construction
Section 705 Concrete Joint Product Data 1 1 1 Prior to start of construction
Sheet E-0 Transformer and Pad 1 1 1 Prior to start of construction
Sheet E-0 Disconnect Switch and Panel 1 1 1 Prior to start of construction
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT PREFERENCE, TYPE OF
SUBMITTAL
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
D R
A W
IN
G
S
P
LA
N
M S
D S
M A
N F'
R R
E C
O M
M E
N D
A
TI
O N
S
R E
Q U
E S
T
LE
TT
E
R
C A
TA
LO
G D
A
TA
R E
P O
R
TS
O
TH
E R
D A
TA
TE
S
T R
E S
U
LT
S
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTIN
G
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE DATE
FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL
FINAL APPROVAL REMARKS
INSTALL ELECTRICAL SERVICE B10571
Sheet E-0 Electrical Product Data 1 1 1 Prior to start of construction
Section 607 & 710 Chain Link Fence 1 1 1 Prior to start of construction
Section 607 & 710 Pedestrian Gate 1 1 1 Prior to start of construction
AF66e.XLS