Attachment 4 - AF 66.pdf

PDF 62 KB Posted

Attached to
AMENDED_Install Electrical Service for B10571 Federal contract opportunity
Solicitation number
FA500023R0028
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document is a schedule of materials submittals for the Install Electrical Service for B10571 solicitation issued by the Department of the Air Force Pacific Air Forces. The schedule outlines 33 required submittals including plans for quality control, safety, staging, environmental protection, borrow materials, concrete mixes, and product data for transformers, disconnect switches, electrical equipment, fencing and gates. Key due dates are specified for submittals including 15 days after award for the environmental protection plan, prior to construction for safety and staging plans, and prior to use of materials for borrow gradations and mix designs. The schedule provides lines for tracking receipt and approval of submittals with suspense dates for review and follow up on re-submittals as needed.

View the file

Other files for this federal contract opportunity

Other files attached to AMENDED_Install Electrical Service for B10571, newest first.
File Type Posted
Solicitation Amendment FA500023R00280001 SF 30.pdf PDF
Attachment 7 - Question and Answers.pdf PDF
Attachment 1 - Statement of Work (Amended).pdf PDF
Attachment 3 - Specifications.pdf PDF
Attachment 5 - LIQDG.pdf PDF
Attachment 6 - DBA Wage Determination.pdf PDF
Solicitation - FA500023R0028.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 2 - Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

FXSB 23-1031

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT PREFERENCE, TYPE OF

SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

D R

A W

IN

G

S

P

LA

N

M S

D S

M A

N F'

R R

E C

O M

M E

N D

A

TI

O N

S

R E

Q U

E S

T

LE

TT

E

R

C A

TA

LO

G D

A

TA

R E

P O

R

TS

O

TH

E R

D A

TA

TE

S

T R

E S

U

LT

S

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTIN

G

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE DATE

FOLLOW-UP

DATE CONTRACTOR

NOTIFIED

CONTRACTOR RE-

SUBMITTAL

FINAL APPROVAL REMARKS

1 Section 01000, para 1.2 Green Procurement Plan

1 After award and prior to precon

MACC Parent Contract

2 Section 01000, para 6.8 AF Form 66

1 14 days after

NTP

MACC Parent Contract

3 Section 01000, para 4.7.4 AF Form 3064

1 15 days prior to starting work

MACC Parent Contract

4 Section 01100, para 3.3 Safety Plan

1 Prior to start of work

MACC Parent Contract

5 Section 01100, para 4.3 Staging Site Plan

1 Prior to start of work

MACC Parent Contract

6 Section 01100, para 7.1 Contractor Contact number

Prior to start of work

MACC Parent Contract

7 Section 01100, para 16.2 Utility Outage Request

1 21 days prior to scheduled outage

MACC Parent Contract

8 Section 01100, para 16.8 Form 3 (Dig permit)

10 days prior to start of construction

MACC Parent Contract

9 Section 01300, para 1.1 Start of Work Notice

21 days prior to start of construction

MACC Parent Contract

10 Section 01300, para 1.3 Pre-final Inspection Notice

1 10 days prior to inspection date

MACC Parent Contract

11 Section 01300, para 1.5 Final Inspection Notice

1 5 days prior to inspection date

MACC Parent Contract

12 Section 01300, para 2.1

DD 1354

1 Complete by Final Inspection

MACC Parent Contract

13 Section 01300, para 2.1 O&M Manuals

1 Complete by Final Inspection

MACC Parent Contract

14 Section 01300, para 2.1 As-Built Drawings

Complete by 30 days after Final inspection

MACC Parent Contract

15 Section 01400, para 2.2 Quality Control Plan

1 Max 20 days after award

MACC Parent Contract

16 Section 01400, para 2.9 Quality Control Documentation

1 24 hours after test

MACC Parent Contract

INSTALL ELECTRICAL SERVICE B10571

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT PREFERENCE, TYPE OF

SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

D R

A W

IN

G

S

P

LA

N

M S

D S

M A

N F'

R R

E C

O M

M E

N D

A

TI

O N

S

R E

Q U

E S

T

LE

TT

E

R

C A

TA

LO

G D

A

TA

R E

P O

R

TS

O

TH

E R

D A

TA

TE

S

T R

E S

U

LT

S

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTIN

G

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE DATE

FOLLOW-UP

DATE CONTRACTOR

NOTIFIED

CONTRACTOR RE-

SUBMITTAL

FINAL APPROVAL REMARKS

INSTALL ELECTRICAL SERVICE B10571

17 Section 01500, para 2.1

EPP

1 15 days after award

MACC Parent Contract

18 Section 01500, para 5.1

ESCP/SWPPP

1 Prior to start of construction

MACC Parent Contract

19 Section 103 Radioactive Usage Request

1 60 days prior to use

MACC Parent Contract

20 Section 01500, para 8.3 Spill Prevention plan

1 Prior to start of construction

MACC Parent Contract

21 Section 01500, para 9.4

NOI

1 Upon receipt from ADEC

MACC Parent Contract

22 Section 01500, para 9.5

NOT

1 Upon completion MACC Parent Contract

Section 203 & 703-2.07 Borrow, Typa A, Gradation and Proctor

1 1 1 Prior to start of construction

Section 401 & 703 HMA Product Data 1 1 1 Prior to start of construction

Section 501, 608, & 711 Concrete Mix Designs 1 1 1 Prior to start of construction

Section 503 & 709 Reinforcing Steel material 1 1 1 Prior to start of construction

Section 705 Concrete Joint Product Data 1 1 1 Prior to start of construction

Sheet E-0 Transformer and Pad 1 1 1 Prior to start of construction

Sheet E-0 Disconnect Switch and Panel 1 1 1 Prior to start of construction

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT PREFERENCE, TYPE OF

SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

D R

A W

IN

G

S

P

LA

N

M S

D S

M A

N F'

R R

E C

O M

M E

N D

A

TI

O N

S

R E

Q U

E S

T

LE

TT

E

R

C A

TA

LO

G D

A

TA

R E

P O

R

TS

O

TH

E R

D A

TA

TE

S

T R

E S

U

LT

S

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTIN

G

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE DATE

FOLLOW-UP

DATE CONTRACTOR

NOTIFIED

CONTRACTOR RE-

SUBMITTAL

FINAL APPROVAL REMARKS

INSTALL ELECTRICAL SERVICE B10571

Sheet E-0 Electrical Product Data 1 1 1 Prior to start of construction

Section 607 & 710 Chain Link Fence 1 1 1 Prior to start of construction

Section 607 & 710 Pedestrian Gate 1 1 1 Prior to start of construction

AF66e.XLS