Attachment 4 788-MM26-0003 Existing Well Enclosure to be Refreshed.pdf

PDF 8 MB Posted

Attached to
Well-Septic Repairs and installation at the Florida National Cemetery
Solicitation number
36C78626B0021_1
Issued by

About this file

This document is a collection of photographs depicting well pump equipment at two different locations that require standardization and refresh. The images show Well Pump #2 in its current actual condition, along with detailed views of pump components, control systems, piping configurations, and monitoring equipment.

The documentation indicates that Well Pumps #2 and #3 are similar in appearance but located at different sites. According to the accompanying text, the intent is to refresh both locations to match each other in appearance and functionality. All existing equipment that is not in active use must be removed, and all existing equipment is to be replaced per the Statement of Work (SOW). The photographs provide visual reference for the current state of the installations, including the enclosure structures, storage tanks, pump assemblies, control boxes (including a Flowwise Pro Control Box model CBP10-2), pressure gauges, water meters, electrical infrastructure, and monitoring systems. These images serve as baseline documentation for the modernization project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CEMATGWilliA Text Box Well Pump 2&3 are very similar in appearance but in two different locations. The intent is to refresh both locations to match. Any equipment not in use is to be removed. All existing equipment is to be replaced per the SOW.

CEMATGWilliA Text Box Well Pump #2 Actual

IMG_0645r
IMG_0659r
IMG_0660r
IMG_0661r
IMG_0662r
IMG_0663r
IMG_0664r
IMG_0665r
IMG_0666r
IMG_0667r
IMG_0668r
IMG_0669r

File details come from the government source that posted it. Updated .