Attachment 4 788-MM26-0003 Existing Well Enclosure to be Refreshed.pdf
PDF 8 MB Posted
- Solicitation number
- 36C78626B0021_1
About this file
This document is a collection of photographs depicting well pump equipment at two different locations that require standardization and refresh. The images show Well Pump #2 in its current actual condition, along with detailed views of pump components, control systems, piping configurations, and monitoring equipment.
The documentation indicates that Well Pumps #2 and #3 are similar in appearance but located at different sites. According to the accompanying text, the intent is to refresh both locations to match each other in appearance and functionality. All existing equipment that is not in active use must be removed, and all existing equipment is to be replaced per the Statement of Work (SOW). The photographs provide visual reference for the current state of the installations, including the enclosure structures, storage tanks, pump assemblies, control boxes (including a Flowwise Pro Control Box model CBP10-2), pressure gauges, water meters, electrical infrastructure, and monitoring systems. These images serve as baseline documentation for the modernization project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CEMATGWilliA Text Box Well Pump 2&3 are very similar in appearance but in two different locations. The intent is to refresh both locations to match. Any equipment not in use is to be removed. All existing equipment is to be replaced per the SOW.
CEMATGWilliA Text Box Well Pump #2 Actual
| IMG_0645r |
| IMG_0659r |
| IMG_0660r |
| IMG_0661r |
| IMG_0662r |
| IMG_0663r |
| IMG_0664r |
| IMG_0665r |
| IMG_0666r |
| IMG_0667r |
| IMG_0668r |
| IMG_0669r |
File details come from the government source that posted it. Updated .