This is a Phasing Plan drawing for a federal construction project at the Veterans Health Administration (VA) John Cochran Division in St. Louis, Missouri. The project, titled "EHRM Training and Admin Space Support," encompasses renovation and new construction work across four phases. Phase 1 involves construction of new training rooms (rooms 301-304); Phase 2 requires renovation of existing north training rooms (rooms 126-142); Phase 3 covers renovation of existing south training rooms (rooms 123-125, 014, 118-120); and Phase 4 involves renovation of corridors, data center, and office spaces. The drawing is dated May 13, 2022, issued for bid, and prepared by Spur Design, LLC (SPUR #: 1794.12) with project number 657-21-702JC and building number NRL 04 73BGJ.

The contractor must coordinate precise construction phasing with the VA before commencing work and minimize disturbance to areas outside the scope. Phases 1, 3, and 4 are to be scheduled for completion on the same date where possible to minimize building closure, and Phase 3 cannot begin until Phase 2 is completed and returned to VA use. Work must be completed outside normal business hours where applicable. The facility is fully sprinklered. Consulting firms include Stand Structural Engineering, Inc. (structural), Poole Fire Protection, Inc. (fire protection), Riverfront Safety & Health (environmental), and Force Protect (physical security), with mechanical, electrical, plumbing, and technology engineering provided by Spur Design.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

DN

EB.2EB.1 EC.4 ED.7 EF.1 EG.5

EG.1 EH.2

E3.1 E3.1

E0.1 E0.1

E5.9

E7

E8 E8

EK

EJ.5EHEG.7EBEA

EC ED EE EF EG EJ

E1E1

E2E2

E3E3

E4

E5

E6

E4.7

E3.6

E2.3

E1.6

EJ.9

E5.3

EG.9

EXISTING

EX TRAINING

EX TRAINING

EX TRAINING

EX TRAINING

EX STORAGE

EX STORAGE

EX STORAGE

EX STORAGE

EX TRAINING

EX TRAINING

EX TRAINING

EX STORAGE

EX STORAGE

EX STORAGE

EX TLT

EX TLT

BREAKROOM

EXISTING

EXISTING CHAPEL

EX OFFICE

015D

EX CONSULT

015B

EX OFFICE

015C

EXISTING

EXISTING

EXISTING

EX TLT

EX TLT

EXISTING

101EXISTING

EXISTING

EXISTING

115 EXISTING

H110

E X

C O

R R

ID

O

R

H

EX CORRIDOR

H107

C O

R R

ID

O

R

H

CORRIDOR

H105

EXISTING

H104

CORRIDOR

H108

EX LIBRARY

EXISTING

EX DATA

OFFICE

OFFICE

EXISTING

EXISTING

109 EXISTING

112A

EX STAIRS

UNISEX TLT

TRAINING

TRAINING

TRAINING

C O

R R

ID

O

R

STORAGE

ELEC

CORRIDOR

H108

CORRIDOR

PHASE 1: NEW TRAINING ROOMS

PHASE 2: RENOVATE EXISTING NORTH TRAINING ROOMS

NOT IN SCOPE

PHASING PLAN LEGEND

PHASE 3: RENOVATE EXISTING SOUTH TRAINING ROOMS

PHASE 4: RENOVATE CORRIDOR, DATA, AND OFFICES

WORK TO BE COMPLETED OUTSIDE NORMAL BUSINESS HOURS

1. GENERAL CONTRACTOR TO COORDINATE PRECISE CONSTRUCTION PHASING WITH VA

BEFORE COMMENCING WORK.

2. CONTRACTOR TO MINIMIZE DISTURBANCE OF AREAS OUTSIDE OF SCOPE.

3. CONTRACTOR SHALL SCHEDULE PHASES TO MINIMIZE BUILDING CLOSURE, PHASES 1, 3,

AND 4 SHALL BE SCHEDULED TO COMPLETE AT THE SAME DATE WHERE POSSIBLE.

4. PHASE 3 SHALL NOT BEGIN UNTIL PHASE 2 HAS BEEN COMPLETED AND RETURNED TO VA

USE.

PHASING PLAN GENERAL NOTES

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. AR2012034754 EXP. 12/31/2022

ENGR REG. NO. PE2014031351 EXP. 12/31/2022

STRUCTURAL ENGINEER

STAND STRUCTURAL ENGINEERING, INC.

8234 ROBINSON ST,

OVERLAND PARK, KS 66204

(913) 214-2169

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

ENVIRONMENTAL

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/1

/2

:2

:4

A

M

PHASING PLAN

NRL 04 73BGJ

ISSUE FOR BID

EHRM TRAINING AND ADMIN

SPACE SUPPORT

05/13/2022

657-21-702JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD

ST. LOUIS, MO 63106

GI101

SPUR #: 1794.12

No. REVISION DESCRIPTION DATE

N

1/8" = 1'-0"

LEVEL 1 - PHASING PLAN1

VHASTLALEXAC2

Polygon

VHASTLALEXAC2

Polygon

VHASTLALEXAC2

Polygon

VHASTLALEXAC2

Callout

COMPLETE WORK

VHASTLALEXAC2

Callout

NO WORK COMPLETE

VHASTLALEXAC2

Callout

WORK PARTIALLY COMPLETE

DN

DN

EB.2EB.1 EC.4 ED.7 EF.1 EG.5

EG.1 EH.2

E3.1 E3.1

E0.1 E0.1

E5.9

E7

E8 E8

EK

EJ.5EHEG.7EBEA

EC ED EE EF EG EJ

E1E1

E2E2

E3E3

E4

E5

E6

E4.7

E3.6

E2.3

E1.6

EJ.9

E5.3

EG.9

EXISTING

EX TRAINING

EX TRAINING

EX TRAINING

EX TRAINING

EX STORAGE

EX STORAGE

EX STORAGE

EX STORAGE

EX TRAINING

EX TRAINING

EX TRAINING

EX STORAGE

EX STORAGE

EX STORAGE

EX TLT

EX TLT

BREAKROOM

EXISTING

EXISTING CHAPEL

EX OFFICE

015D

EX CONSULT

015B

EX OFFICE

015C

EXISTING

EXISTING

EXISTING

EX TLT

EX TLT

EXISTING

101EXISTING

EXISTING

EXISTING

115 EXISTING

H110

E X

C O

R R

ID

O

R

H

EX CORRIDOR

H107

C O

R R

ID

O

R

H

CORRIDOR

H105

EXISTING

H104

CORRIDOR

H108

EX LIBRARY

EXISTING

EX DATA

OFFICE

OFFICE

EXISTING

EXISTING

109 EXISTING

112A

EX STAIRS

UNISEX TLT

TRAINING

TRAINING

TRAINING

C O

R R

ID

O

R

STORAGE

ELEC

CORRIDOR

H108

CORRIDOR

PHASE 1: NEW TRAINING ROOMS

PHASE 2: RENOVATE EXISTING NORTH TRAINING ROOMS

NOT IN SCOPE

PHASING PLAN LEGEND

PHASE 3: RENOVATE EXISTING SOUTH TRAINING ROOMS

PHASE 4: RENOVATE CORRIDOR, DATA, AND OFFICES

WORK TO BE COMPLETED OUTSIDE NORMAL BUSINESS HOURS

1. GENERAL CONTRACTOR TO COORDINATE PRECISE CONSTRUCTION PHASING WITH VA

BEFORE COMMENCING WORK.

2. CONTRACTOR TO MINIMIZE DISTURBANCE OF AREAS OUTSIDE OF SCOPE.

3. CONTRACTOR SHALL SCHEDULE PHASES TO MINIMIZE BUILDING CLOSURE, PHASES 1, 3,

AND 4 SHALL BE SCHEDULED TO COMPLETE AT THE SAME DATE WHERE POSSIBLE.

4. PHASE 3 SHALL NOT BEGIN UNTIL PHASE 2 HAS BEEN COMPLETED AND RETURNED TO VA

USE.

PHASING PLAN GENERAL NOTES

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. AR2012034754 EXP. 12/31/2022

ENGR REG. NO. PE2014031351 EXP. 12/31/2022

STRUCTURAL ENGINEER

STAND STRUCTURAL ENGINEERING, INC.

8234 ROBINSON ST,

OVERLAND PARK, KS 66204

(913) 214-2169

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

ENVIRONMENTAL

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/1

/2

:2

:4

A

M

PHASING PLAN

NRL 04 73BGJ

ISSUE FOR BID

EHRM TRAINING AND ADMIN

SPACE SUPPORT

05/13/2022

657-21-702JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD

ST. LOUIS, MO 63106

GI101

SPUR #: 1794.12

No. REVISION DESCRIPTION DATE

N

1/8" = 1'-0"

LEVEL 1 - PHASING PLAN1

VHASTLALEXAC2

Polygon

VHASTLALEXAC2

Callout

COMPLETED WORK

VHASTLALEXAC2

Callout

TO-DO REPLACE FLOOR; PAINT WALLS; INSTALL DATA; INSTALL ELEC. OUTLETS

VHASTLALEXAC2

Callout

COMPLETE: FLOORS & DATA PULLED

TO-DO: TERMINATE DATA AT OUTLETS & PAINT/FINISH WALLS

VHASTLALEXAC2

Polygon

VHASTLALEXAC2

Callout

TO-DO: PAINT/REPLACE FINISH ON STAIRS, FLOORS, RAILINGS, & WALLS

VHASTLALEXAC2

Polygon

VHASTLALEXAC2

Polygon

VHASTLALEXAC2

Callout

TO-DO: REPLACE FLOOR &

PAINT WALLS

VHASTLALEXAC2

Polygon

VHASTLALEXAC2

Callout

REPLACE FLOOR; PAINT WALLS; INSTALL DATA; INSTALL ELEC. OUTLETS

VHASTLALEXAC2

Polygon

VHASTLALEXAC2

Polygon

VHASTLALEXAC2

Callout

COMPLETE: FLOOR DEMOLISHED

TO-DO: TERMINATE DATA AT OUTLETS & PAINT/FINISH WALLS & FLOORS

VHASTLALEXAC2

Callout

COMPLETE: DRYWALL, CASEWORK, FINISHES DEMOLISHED

TO-DO: INSTALL DRYWALL, FINISHES, EQUIPMENT

VHASTLALEXAC2

Polygon

VHASTLALEXAC2

Callout

TO-DO: INSTALL HVAC EQUIPMENT, TELECOM EQUIPMENT

VHASTLALEXAC2

Polygon

DN

DN

EB.2EB.1 EC.4 ED.7 EF.1 EG.5

EG.1 EH.2

E3.1 E3.1

E0.1 E0.1

E5.9

E7

E8 E8

EK

EJ.5EHEG.7EBEA

EC ED EE EF EG EJ

E1E1

E2E2

E3E3

E4

E5

E6

E4.7

E3.6

E2.3

E1.6

EJ.9

E5.3

EG.9

EXISTING

EX TRAINING

EX TRAINING

EX TRAINING

EX TRAINING

EX STORAGE

EX STORAGE

EX STORAGE

EX STORAGE

EX TRAINING

EX TRAINING

EX TRAINING

EX STORAGE

EX STORAGE

EX STORAGE

EX TLT

EX TLT

BREAKROOM

EXISTING

EXISTING CHAPEL

EX OFFICE

015D

EX CONSULT

015B

EX OFFICE

015C

EXISTING

EXISTING

EXISTING

EX TLT

EX TLT

EXISTING

101EXISTING

EXISTING

EXISTING

115 EXISTING

H110

E X

C O

R R

ID

O

R

H

EX CORRIDOR

H107

C O

R R

ID

O

R

H

CORRIDOR

H105

EXISTING

H104

CORRIDOR

H108

EX LIBRARY

EXISTING

EX DATA

OFFICE

OFFICE

EXISTING

EXISTING

109 EXISTING

112A

EX STAIRS

UNISEX TLT

TRAINING

TRAINING

TRAINING

C O

R R

ID

O

R

STORAGE

ELEC

CORRIDOR

H108

CORRIDOR

PHASE 1: NEW TRAINING ROOMS

PHASE 2: RENOVATE EXISTING NORTH TRAINING ROOMS

NOT IN SCOPE

PHASING PLAN LEGEND

PHASE 3: RENOVATE EXISTING SOUTH TRAINING ROOMS

PHASE 4: RENOVATE CORRIDOR, DATA, AND OFFICES

WORK TO BE COMPLETED OUTSIDE NORMAL BUSINESS HOURS

1. GENERAL CONTRACTOR TO COORDINATE PRECISE CONSTRUCTION PHASING WITH VA

BEFORE COMMENCING WORK.

2. CONTRACTOR TO MINIMIZE DISTURBANCE OF AREAS OUTSIDE OF SCOPE.

3. CONTRACTOR SHALL SCHEDULE PHASES TO MINIMIZE BUILDING CLOSURE, PHASES 1, 3,

AND 4 SHALL BE SCHEDULED TO COMPLETE AT THE SAME DATE WHERE POSSIBLE.

4. PHASE 3 SHALL NOT BEGIN UNTIL PHASE 2 HAS BEEN COMPLETED AND RETURNED TO VA

USE.

PHASING PLAN GENERAL NOTES

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. AR2012034754 EXP. 12/31/2022

ENGR REG. NO. PE2014031351 EXP. 12/31/2022

STRUCTURAL ENGINEER

STAND STRUCTURAL ENGINEERING, INC.

8234 ROBINSON ST,

OVERLAND PARK, KS 66204

(913) 214-2169

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

ENVIRONMENTAL

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/1

/2

:2

:4

A

M

PHASING PLAN

NRL 04 73BGJ

ISSUE FOR BID

EHRM TRAINING AND ADMIN

SPACE SUPPORT

05/13/2022

657-21-702JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD

ST. LOUIS, MO 63106

GI101

SPUR #: 1794.12

No. REVISION DESCRIPTION DATE

N

1/8" = 1'-0"

LEVEL 1 - PHASING PLAN1

VHASTLALEXAC2

Area Measurement

1944.71 sq ft�

VHASTLALEXAC2

Area Measurement

808.01 sq ft�

VHASTLALEXAC2

Area Measurement

530.68 sq ft

VHASTLALEXAC2

Area Measurement

473.23 sq ft

VHASTLALEXAC2

Area Measurement

123.09 sq ft

VHASTLALEXAC2

Area Measurement

1313.62 sq ft

VHASTLALEXAC2

Area Measurement

147.32 sq ft

VHASTLALEXAC2

Area Measurement

141.62 sq ft

VHASTLALEXAC2

Area Measurement

111.40 sq ft

Phasing - Areas Complete.pdf
Phasing - Areas Complete - Copy.pdf
Phasing Plan (657-21-702JC).pdf

File details come from the government source that posted it. Updated .