About this file
This is a Phasing Plan drawing for a federal construction project at the Veterans Health Administration (VA) John Cochran Division in St. Louis, Missouri. The project, titled "EHRM Training and Admin Space Support," encompasses renovation and new construction work across four phases. Phase 1 involves construction of new training rooms (rooms 301-304); Phase 2 requires renovation of existing north training rooms (rooms 126-142); Phase 3 covers renovation of existing south training rooms (rooms 123-125, 014, 118-120); and Phase 4 involves renovation of corridors, data center, and office spaces. The drawing is dated May 13, 2022, issued for bid, and prepared by Spur Design, LLC (SPUR #: 1794.12) with project number 657-21-702JC and building number NRL 04 73BGJ.
The contractor must coordinate precise construction phasing with the VA before commencing work and minimize disturbance to areas outside the scope. Phases 1, 3, and 4 are to be scheduled for completion on the same date where possible to minimize building closure, and Phase 3 cannot begin until Phase 2 is completed and returned to VA use. Work must be completed outside normal business hours where applicable. The facility is fully sprinklered. Consulting firms include Stand Structural Engineering, Inc. (structural), Poole Fire Protection, Inc. (fire protection), Riverfront Safety & Health (environmental), and Force Protect (physical security), with mechanical, electrical, plumbing, and technology engineering provided by Spur Design.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
DN
EB.2EB.1 EC.4 ED.7 EF.1 EG.5
EG.1 EH.2
E3.1 E3.1
E0.1 E0.1
E5.9
E7
E8 E8
EK
EJ.5EHEG.7EBEA
EC ED EE EF EG EJ
E1E1
E2E2
E3E3
E4
E5
E6
E4.7
E3.6
E2.3
E1.6
EJ.9
E5.3
EG.9
EXISTING
EX TRAINING
EX TRAINING
EX TRAINING
EX TRAINING
EX STORAGE
EX STORAGE
EX STORAGE
EX STORAGE
EX TRAINING
EX TRAINING
EX TRAINING
EX STORAGE
EX STORAGE
EX STORAGE
EX TLT
EX TLT
BREAKROOM
EXISTING
EXISTING CHAPEL
EX OFFICE
015D
EX CONSULT
015B
EX OFFICE
015C
EXISTING
EXISTING
EXISTING
EX TLT
EX TLT
EXISTING
101EXISTING
EXISTING
EXISTING
115 EXISTING
H110
E X
C O
R R
ID
O
R
H
EX CORRIDOR
H107
C O
R R
ID
O
R
H
CORRIDOR
H105
EXISTING
H104
CORRIDOR
H108
EX LIBRARY
EXISTING
EX DATA
OFFICE
OFFICE
EXISTING
EXISTING
109 EXISTING
112A
EX STAIRS
UNISEX TLT
TRAINING
TRAINING
TRAINING
C O
R R
ID
O
R
STORAGE
ELEC
CORRIDOR
H108
CORRIDOR
PHASE 1: NEW TRAINING ROOMS
PHASE 2: RENOVATE EXISTING NORTH TRAINING ROOMS
NOT IN SCOPE
PHASING PLAN LEGEND
PHASE 3: RENOVATE EXISTING SOUTH TRAINING ROOMS
PHASE 4: RENOVATE CORRIDOR, DATA, AND OFFICES
WORK TO BE COMPLETED OUTSIDE NORMAL BUSINESS HOURS
1. GENERAL CONTRACTOR TO COORDINATE PRECISE CONSTRUCTION PHASING WITH VA
BEFORE COMMENCING WORK.
2. CONTRACTOR TO MINIMIZE DISTURBANCE OF AREAS OUTSIDE OF SCOPE.
3. CONTRACTOR SHALL SCHEDULE PHASES TO MINIMIZE BUILDING CLOSURE, PHASES 1, 3,
AND 4 SHALL BE SCHEDULED TO COMPLETE AT THE SAME DATE WHERE POSSIBLE.
4. PHASE 3 SHALL NOT BEGIN UNTIL PHASE 2 HAS BEEN COMPLETED AND RETURNED TO VA
USE.
PHASING PLAN GENERAL NOTES
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. AR2012034754 EXP. 12/31/2022
ENGR REG. NO. PE2014031351 EXP. 12/31/2022
STRUCTURAL ENGINEER
STAND STRUCTURAL ENGINEERING, INC.
8234 ROBINSON ST,
OVERLAND PARK, KS 66204
(913) 214-2169
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
ENVIRONMENTAL
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/1
/2
:2
:4
A
M
PHASING PLAN
NRL 04 73BGJ
ISSUE FOR BID
EHRM TRAINING AND ADMIN
SPACE SUPPORT
05/13/2022
657-21-702JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD
ST. LOUIS, MO 63106
GI101
SPUR #: 1794.12
No. REVISION DESCRIPTION DATE
N
1/8" = 1'-0"
LEVEL 1 - PHASING PLAN1
VHASTLALEXAC2
Polygon
VHASTLALEXAC2
Polygon
VHASTLALEXAC2
Polygon
VHASTLALEXAC2
Callout
COMPLETE WORK
VHASTLALEXAC2
Callout
NO WORK COMPLETE
VHASTLALEXAC2
Callout
WORK PARTIALLY COMPLETE
DN
DN
EB.2EB.1 EC.4 ED.7 EF.1 EG.5
EG.1 EH.2
E3.1 E3.1
E0.1 E0.1
E5.9
E7
E8 E8
EK
EJ.5EHEG.7EBEA
EC ED EE EF EG EJ
E1E1
E2E2
E3E3
E4
E5
E6
E4.7
E3.6
E2.3
E1.6
EJ.9
E5.3
EG.9
EXISTING
EX TRAINING
EX TRAINING
EX TRAINING
EX TRAINING
EX STORAGE
EX STORAGE
EX STORAGE
EX STORAGE
EX TRAINING
EX TRAINING
EX TRAINING
EX STORAGE
EX STORAGE
EX STORAGE
EX TLT
EX TLT
BREAKROOM
EXISTING
EXISTING CHAPEL
EX OFFICE
015D
EX CONSULT
015B
EX OFFICE
015C
EXISTING
EXISTING
EXISTING
EX TLT
EX TLT
EXISTING
101EXISTING
EXISTING
EXISTING
115 EXISTING
H110
E X
C O
R R
ID
O
R
H
EX CORRIDOR
H107
C O
R R
ID
O
R
H
CORRIDOR
H105
EXISTING
H104
CORRIDOR
H108
EX LIBRARY
EXISTING
EX DATA
OFFICE
OFFICE
EXISTING
EXISTING
109 EXISTING
112A
EX STAIRS
UNISEX TLT
TRAINING
TRAINING
TRAINING
C O
R R
ID
O
R
STORAGE
ELEC
CORRIDOR
H108
CORRIDOR
PHASE 1: NEW TRAINING ROOMS
PHASE 2: RENOVATE EXISTING NORTH TRAINING ROOMS
NOT IN SCOPE
PHASING PLAN LEGEND
PHASE 3: RENOVATE EXISTING SOUTH TRAINING ROOMS
PHASE 4: RENOVATE CORRIDOR, DATA, AND OFFICES
WORK TO BE COMPLETED OUTSIDE NORMAL BUSINESS HOURS
1. GENERAL CONTRACTOR TO COORDINATE PRECISE CONSTRUCTION PHASING WITH VA
BEFORE COMMENCING WORK.
2. CONTRACTOR TO MINIMIZE DISTURBANCE OF AREAS OUTSIDE OF SCOPE.
3. CONTRACTOR SHALL SCHEDULE PHASES TO MINIMIZE BUILDING CLOSURE, PHASES 1, 3,
AND 4 SHALL BE SCHEDULED TO COMPLETE AT THE SAME DATE WHERE POSSIBLE.
4. PHASE 3 SHALL NOT BEGIN UNTIL PHASE 2 HAS BEEN COMPLETED AND RETURNED TO VA
USE.
PHASING PLAN GENERAL NOTES
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. AR2012034754 EXP. 12/31/2022
ENGR REG. NO. PE2014031351 EXP. 12/31/2022
STRUCTURAL ENGINEER
STAND STRUCTURAL ENGINEERING, INC.
8234 ROBINSON ST,
OVERLAND PARK, KS 66204
(913) 214-2169
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
ENVIRONMENTAL
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/1
/2
:2
:4
A
M
PHASING PLAN
NRL 04 73BGJ
ISSUE FOR BID
EHRM TRAINING AND ADMIN
SPACE SUPPORT
05/13/2022
657-21-702JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD
ST. LOUIS, MO 63106
GI101
SPUR #: 1794.12
No. REVISION DESCRIPTION DATE
N
1/8" = 1'-0"
LEVEL 1 - PHASING PLAN1
VHASTLALEXAC2
Polygon
VHASTLALEXAC2
Callout
COMPLETED WORK
VHASTLALEXAC2
Callout
TO-DO REPLACE FLOOR; PAINT WALLS; INSTALL DATA; INSTALL ELEC. OUTLETS
VHASTLALEXAC2
Callout
COMPLETE: FLOORS & DATA PULLED
TO-DO: TERMINATE DATA AT OUTLETS & PAINT/FINISH WALLS
VHASTLALEXAC2
Polygon
VHASTLALEXAC2
Callout
TO-DO: PAINT/REPLACE FINISH ON STAIRS, FLOORS, RAILINGS, & WALLS
VHASTLALEXAC2
Polygon
VHASTLALEXAC2
Polygon
VHASTLALEXAC2
Callout
TO-DO: REPLACE FLOOR &
PAINT WALLS
VHASTLALEXAC2
Polygon
VHASTLALEXAC2
Callout
REPLACE FLOOR; PAINT WALLS; INSTALL DATA; INSTALL ELEC. OUTLETS
VHASTLALEXAC2
Polygon
VHASTLALEXAC2
Polygon
VHASTLALEXAC2
Callout
COMPLETE: FLOOR DEMOLISHED
TO-DO: TERMINATE DATA AT OUTLETS & PAINT/FINISH WALLS & FLOORS
VHASTLALEXAC2
Callout
COMPLETE: DRYWALL, CASEWORK, FINISHES DEMOLISHED
TO-DO: INSTALL DRYWALL, FINISHES, EQUIPMENT
VHASTLALEXAC2
Polygon
VHASTLALEXAC2
Callout
TO-DO: INSTALL HVAC EQUIPMENT, TELECOM EQUIPMENT
VHASTLALEXAC2
Polygon
DN
DN
EB.2EB.1 EC.4 ED.7 EF.1 EG.5
EG.1 EH.2
E3.1 E3.1
E0.1 E0.1
E5.9
E7
E8 E8
EK
EJ.5EHEG.7EBEA
EC ED EE EF EG EJ
E1E1
E2E2
E3E3
E4
E5
E6
E4.7
E3.6
E2.3
E1.6
EJ.9
E5.3
EG.9
EXISTING
EX TRAINING
EX TRAINING
EX TRAINING
EX TRAINING
EX STORAGE
EX STORAGE
EX STORAGE
EX STORAGE
EX TRAINING
EX TRAINING
EX TRAINING
EX STORAGE
EX STORAGE
EX STORAGE
EX TLT
EX TLT
BREAKROOM
EXISTING
EXISTING CHAPEL
EX OFFICE
015D
EX CONSULT
015B
EX OFFICE
015C
EXISTING
EXISTING
EXISTING
EX TLT
EX TLT
EXISTING
101EXISTING
EXISTING
EXISTING
115 EXISTING
H110
E X
C O
R R
ID
O
R
H
EX CORRIDOR
H107
C O
R R
ID
O
R
H
CORRIDOR
H105
EXISTING
H104
CORRIDOR
H108
EX LIBRARY
EXISTING
EX DATA
OFFICE
OFFICE
EXISTING
EXISTING
109 EXISTING
112A
EX STAIRS
UNISEX TLT
TRAINING
TRAINING
TRAINING
C O
R R
ID
O
R
STORAGE
ELEC
CORRIDOR
H108
CORRIDOR
PHASE 1: NEW TRAINING ROOMS
PHASE 2: RENOVATE EXISTING NORTH TRAINING ROOMS
NOT IN SCOPE
PHASING PLAN LEGEND
PHASE 3: RENOVATE EXISTING SOUTH TRAINING ROOMS
PHASE 4: RENOVATE CORRIDOR, DATA, AND OFFICES
WORK TO BE COMPLETED OUTSIDE NORMAL BUSINESS HOURS
1. GENERAL CONTRACTOR TO COORDINATE PRECISE CONSTRUCTION PHASING WITH VA
BEFORE COMMENCING WORK.
2. CONTRACTOR TO MINIMIZE DISTURBANCE OF AREAS OUTSIDE OF SCOPE.
3. CONTRACTOR SHALL SCHEDULE PHASES TO MINIMIZE BUILDING CLOSURE, PHASES 1, 3,
AND 4 SHALL BE SCHEDULED TO COMPLETE AT THE SAME DATE WHERE POSSIBLE.
4. PHASE 3 SHALL NOT BEGIN UNTIL PHASE 2 HAS BEEN COMPLETED AND RETURNED TO VA
USE.
PHASING PLAN GENERAL NOTES
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. AR2012034754 EXP. 12/31/2022
ENGR REG. NO. PE2014031351 EXP. 12/31/2022
STRUCTURAL ENGINEER
STAND STRUCTURAL ENGINEERING, INC.
8234 ROBINSON ST,
OVERLAND PARK, KS 66204
(913) 214-2169
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
ENVIRONMENTAL
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/1
/2
:2
:4
A
M
PHASING PLAN
NRL 04 73BGJ
ISSUE FOR BID
EHRM TRAINING AND ADMIN
SPACE SUPPORT
05/13/2022
657-21-702JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD
ST. LOUIS, MO 63106
GI101
SPUR #: 1794.12
No. REVISION DESCRIPTION DATE
N
1/8" = 1'-0"
LEVEL 1 - PHASING PLAN1
VHASTLALEXAC2
Area Measurement
1944.71 sq ft�
VHASTLALEXAC2
Area Measurement
808.01 sq ft�
VHASTLALEXAC2
Area Measurement
530.68 sq ft
VHASTLALEXAC2
Area Measurement
473.23 sq ft
VHASTLALEXAC2
Area Measurement
123.09 sq ft
VHASTLALEXAC2
Area Measurement
1313.62 sq ft
VHASTLALEXAC2
Area Measurement
147.32 sq ft
VHASTLALEXAC2
Area Measurement
141.62 sq ft
VHASTLALEXAC2
Area Measurement
111.40 sq ft
| Phasing - Areas Complete.pdf |
| Phasing - Areas Complete - Copy.pdf |
| Phasing Plan (657-21-702JC).pdf |