Attachment 3 - SOW.pdf
PDF 183 KB Posted
- Attached to
- Z2DA--FY27 EHRM | 657-21-702JC EHRM Training And Administrative Space Construction - St Louis John Cochran
- Solicitation number
- 36C77627B0001
About this file
This is a Statement of Work for construction upgrades at the VA Saint Louis Health Care System – John Cochran Division in support of the Electronic Health Record Modernization (EHRM) program. The project, identified as 657-21-702JC, involves renovation and infrastructure upgrades on the first floor of Building 2, encompassing training and administrative spaces. The work comprises three phases totaling approximately 5,330 square feet of construction and renovation.
Phase 2 addresses four North Training Rooms (139, 140, 141, 142) at approximately 2,000 square feet, requiring upgraded power and data infrastructure along with new flooring and wall finishes. Phase 3 encompasses three South Training Rooms (126, 127, 128) at approximately 1,800 square feet with similar infrastructure and finish upgrades, plus a 130-square-foot breakroom renovation including new casework, sink, and cold-water tie-in for an ice machine. Phase 4 includes renovation of an approximately 1,400-square-foot corridor with new finishes, upgrades to two offices (approximately 150 square feet each) with infrastructure and finish improvements, and upgrades to an existing data closet with new finishes, an additional server rack installation, and replacement of the existing mini-split HVAC unit. A critical specification change requires all power and data drops to be wall-mounted per revised drawings EP101 and TN101, with no floor-mounted outlets permitted. The contractor must provide all necessary supervision, labor, tools, materials, equipment, and testing while complying with project specifications, VA Technical Information Library standards, local and national codes, Infection Control Risk Assessment requirements, and Interim Life Safety Measures. Project drawings and specifications take precedence over this Statement of Work in case of conflicts.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
VA St. Louis Health Care System – John Cochran Division 657-21-702JC – EHRM Training and Admin Space Support
14 November 2025
Summary of Scope:
The VA Saint Louis Health Care System – John Cochran Division requires a construction contractor to perform upgrades in support of the Electronic Health Record Modernization (EHRM) program. The construction area is located on the first floor of Building 2 and includes both training and administrative spaces.
This project includes the execution of Phases 2, 3, and 4 of the associated design plans. See “PHASE PLAN DETAILS” for work areas.
Phase 2 addresses the North Training Rooms (Rooms 139, 140, 141, 142), totaling approximately 2,000 square feet. Work includes upgraded power and data infrastructure and new flooring and wall finishes.
Phase 3 addresses the South Training Rooms (Rooms 126, 127, 128), totaling approximately 1,800 square feet. Work includes upgraded power and data infrastructure and new flooring and wall finishes.
Additionally, Phase 3 includes the renovation of a 130-square-foot breakroom, with new floor and wall finishes, casework, a new sink, and a cold-water tie-in for an ice machine.
Phase 4 addresses multiple areas: renovation of an approximately 1,400-square-foot corridor with new floor and wall finishes; upgrades to two offices (approximately 150 square feet each) with upgraded power and data infrastructure and new flooring and wall finishes; and upgrades to an existing data closet, including new floor and wall finishes, installation of an additional server rack with associated equipment, and replacement of the existing mini-split HVAC unit.
Note: Phase 1 is excluded from this scope, as it was completed under a separate contract.
Note: All power and data drops originally indicated as floor-mounted shall now be wall-mounted, as shown on revised drawings EP101 and TN101. Installation must match these updated sheet details; no floor-mounted outlets are permitted.
General Criteria:
The scope of work includes, but is not limited to general construction, alterations, mechanical and electrical work, utility systems, demolition and removal of existing structures, associated appurtenances, and other items necessary for project completion. All work shall be performed in accordance with the terms and conditions of the solicitation/contract, project specifications and drawings, applicable VA Technical Information Library (TIL) standards, and all relevant local and national codes.
The contractor shall provide all necessary supervision, labor, tools, materials, equipment, transportation, and testing required to complete the work. Prior to beginning construction, the contractor shall conduct site investigations to fully understand existing conditions and any limitations that may impact the work.
The project drawings and specifications provide detailed guidance on the following:
Permitted working hours for construction activities Designated areas for contractor equipment and material storage Infection Control Risk Assessment (ICRA) requirements and containment measures Interim Life Safety Measures (ILSM)
Note: This Statement of Work (SOW) serves as a general outline and does not represent a comprehensive summary of all required tasks. In the event of a conflict between this SOW and the project drawings or specifications, the drawings and specifications shall take precedence.