Attachment 4 - 52.212-1 Addendum.pdf
PDF 69 KB Posted
- Attached to
- Fort Irwin Internal Tank Inspection SP POL CMP Federal contract opportunity
- Solicitation number
- W9128F25QA042
About this file
This document is a 52.212-1 Addendum providing instructions for quoters responding to a federal contract opportunity for tank inspection services at Fort Irwin. The solicitation requires quoters to submit three key components: 1) Technical Capability, including the inspector's certification and one-page resume, 2) Experience, demonstrating three completed projects within the past five years with specific capability requirements (such as disposing of unacceptable fuel, cleaning tanks, performing API 653 inspections, and installing new wiper seals), and 3) Pricing, which must be submitted separately and inclusive of all work specified in the Performance Work Statement (PWS). The document explicitly notes that funds are currently not available for award, and no contract will be issued until funding is secured.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP-POL-CMP-INSPECT-FY25-IRW (PO 35) Tank 338- 52.212-1 Addendum
(o) Instructions for quoters for evaluation purposes:
1. Technical Capability – The quoter shall provide the inspector’s certification, and one page resume for the inspector proposed to perform the work.
2. Experience – The quoter shall provide three previous projects completed as experiential references of projects completed within the past five (5) years. Experience consists of projects completed as a prime contractor or projects complete as a qualified subcontractor that have the capabilities to perform this work. If performance of any work is to be completed by a subcontractor, the quoter shall identify the work to be completed and the experience of the subcontractor. Unfinished projects or projects awarded, but where work has not yet commenced, will not be considered. These references shall be equal to or similar in scope and complexity of this requirement. Example projects shall contain evidence of the quoter’s experience in:
1. ___ draining fuel
2. _X_ disposing of unacceptable fuel
3. _X_ cleaning the tank
4. ___ the performance of an STI inspection
5. _X_ the performance of an API 653 inspection
6. ___ the performance of an API 570 inspection
7. _X_ the installation of new wiper seals
8. ___ the creation of a strapping chart
The contractor shall provide dates of performance and pertinent information to demonstrate how they are comparable to this requirement in size and complexity. The contractor shall include points of contact, titles, telephone numbers, and email addresses (if available) for all references.
3. Price – The quote shall be inclusive of all costs to perform the work specified in the PWS. In the event of an arithmetic discrepancy between the unit price and the CLIN subtotal, or contract total, the unit price will prevail. Pricing must be submitted separate from the experience and technical capability submissions.
4. Funds are not presently available for the award of this action. No award will be made until funds are available.
File details come from the government source that posted it. Updated .