Attachment 3 Technical Volume Checklist.pdf

PDF 29 KB Posted

Attached to
J061--GENERATOR MAINTENANCE
Solicitation number
36C25626Q1336
Issued by

About this file

This is a Technical Acceptability Checklist for Volume I (Technical) submissions in support of an Lowest Price Technically Acceptable (LPTA) evaluation for a generator maintenance contract.

The solicitation requires offerors to provide comprehensive technical documentation and demonstrate capability across seven key areas. Under Technical Understanding and Work Requirements, offerors must address quarterly and annual preventive maintenance, inspections, testing, service reporting, and documentation per OEM procedures; detail annual load-bank testing approach for 13 non-paralleling generators compliant with NFPA-110 and Joint Commission requirements; confirm capability to remotely start and stop four backup generators in Buildings 92–95 annually; and acknowledge coverage of Table-1 equipment and Phillips Tank Management System (TMS), noting any exclusions such as Kohler proprietary hardware/software. Key Personnel Qualifications and Certifications require technicians to meet minimum qualifications of technical trade school training (≥1 year) and ≥5 years of institutional/industrial generator experience, provide OEM factory authorization/certification for relevant brands (Kohler, Cummins-Onan, Caterpillar, John Deere), and clearly identify key personnel with defined roles and responsibilities. Service Response Capability must demonstrate 24/7 emergency corrective maintenance availability and adherence to response times of 4-hour acknowledgement, 14-hour on-site arrival, and 48-hour restoration absent extenuating circumstances. Required Technical Submittals include PM service report templates (quarterly and annual), generator inspection checklists, oil/coolant analysis reports, Confined Space Entry Plans (if applicable) per 29 CFR 1910.146, and Lockout/Tagout plans (if applicable). Additional requirements include signed VAAR 852.219-75 Limitations on Subcontracting Certification, compliance narrative, three relevant past performance references within 3 years with complete contact information, and administrative documentation: SDVOSB VetCert proof, current SAM registration screenshot, and UEI, CAGE, and Tax ID information. All items must be marked as either "Included" or "N/A" and submitted with Volume I of the proposal.

View the file

Other files

File Type Posted
36C25626Q1336 0002.pdf PDF
36C25626Q1336 0001.pdf PDF
Attachment 1 Wage Determination 2015 5147 Harrison County MS Rev 31.pdf PDF
36C25626Q1336.docx DOCX document
Attachment 2 List of Past Performance Refernces.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Acceptability Checklist — Volume I (Technical) Complete and return this checklist with Volume I. Mark Included or N/A for each item. This checklist supports LPTA evaluation for technical acceptability.

A. Technical Understanding and Work Requirements

Technical approach addresses Quarterly and Annual PM, inspections, testing, service Included N/A reporting, and documentation in accordance with OEM procedures.

Annual load-bank testing approach for the 13 non-paralleling generators, including compliance Included N/A with NFPA-110 and Joint Commission requirements.

Capability to remotely start and stop the four backup generators in Buildings 92–95 Included N/A

(performed annually).

Acknowledgement of Table-1 equipment and Phillips Tank Management System (TMS) Included N/A coverage; note exclusions (e.g., Kohler proprietary hardware/software).

B. Key Personnel Qualifications and Certifications

Technicians meet minimum qualifications: technical trade school training (≥1 year) and ≥5 Included N/A years of institutional/industrial generator experience.

OEM factory authorization/certification provided for relevant brands (e.g., Kohler, Included N/A

Cummins-Onan, Caterpillar, John Deere).

Key personnel identified with roles and responsibilities clearly defined. Included N/A

C. Service Response Capability

Commitment to 24/7 emergency corrective maintenance availability. Included N/A

Adherence to required response times: 4-hour acknowledgement, 14-hour on-site, and Included N/A

48-hour restoration (absent extenuating circumstances).

D. Required Technical Submittals (Include Samples/Templates)

PM service report templates (Quarterly & Annual). Included N/A

Generator inspection checklist template. Included N/A

Oil/coolant analysis report template. Included N/A

Confined Space Entry Plan (if applicable) compliant with 29 CFR 1910.146. Included N/A

Lockout/Tagout (LOTO) plan (if applicable). Included N/A

E. Limitations on Subcontracting Compliance

Signed VAAR 852.219-75 Limitations on Subcontracting Certification included in Volume III. Included N/A

Brief narrative explaining how the offeror will comply with subcontracting limitations during Included N/A contract performance.

F. Past Performance

Three recent (within 3 years) and relevant past performance references submitted for similar Included N/A generator maintenance contracts.

Each reference includes: customer name; contract/order number; period of performance; POC Included N/A name/title; phone; email.

G. Administrative Completeness

Proof of active SDVOSB VetCert status provided. Included N/A

Current SAM registration screenshot (no exclusions). Included N/A

UEI, CAGE, and Tax ID included in Volume III. Included N/A

Completed SF 1449 signature blocks (17a, 17b, 30a–c) included. Included N/A

Comments (optional):

Offeror Attestation

Offeror Name UEI CAGE

Authorized Representative Title Date

By signing, the offeror affirms the Technical Volume is complete and aligns with the solicitation and SOW requirements.Signature (type name)

A1_inc: Off
A1_na: Off
A2_inc: Off
A2_na: Off
A3_inc: Off
A3_na: Off
A4_inc: Off
A4_na: Off
B1_inc: Off
B1_na: Off
B2_inc: Off
B2_na: Off
B3_inc: Off
B3_na: Off
C1_inc: Off
C1_na: Off
C2_inc: Off
C2_na: Off
D1_inc: Off
D1_na: Off
D2_inc: Off
D2_na: Off
D3_inc: Off
D3_na: Off
D4_inc: Off
D4_na: Off
D5_inc: Off
D5_na: Off
E1_inc: Off
E1_na: Off
E2_inc: Off
E2_na: Off
F1_inc: Off
F1_na: Off
F2_inc: Off
F2_na: Off
G1_inc: Off
G1_na: Off
G2_inc: Off
G2_na: Off
G3_inc: Off
G3_na: Off
G4_inc: Off
G4_na: Off
comments:
offeror_name:
uei:
cage:
auth_rep:
title:
date:
signature:

File details come from the government source that posted it. Updated .