Attachment 3 - Supplemental SOW.pdf
PDF 108 KB Posted
- Attached to
- PEPRO Communications Shelter - Mt. Hood NF
- Solicitation number
- 12760425Q0051
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Supplementary Statement of Work (SOW) detailing the requirements for installing a new communications shelter at the Barlow District Office in Dufur, Oregon. The contractor is responsible for completely removing the existing 90' tower and telecommunications shelter, including demolition, debris disposal at Columbia Ridge Commercial Landfill, and potential asbestos testing. The scope of work includes supplying and installing a new primary wire and messenger cable for the 20A commercial power supply, disconnecting power from the existing shelter, and re-establishing the connection to the new shelter using the same overhead route. The new shelter will be equipped with a weather head connecting to an external power filter box, serving as the entry point for commercial power.
The project requires the contractor to obtain construction bonding and appropriate insurance, with specific instructions to remove the tower steel to grade, backfill with 2" minus aggregate, and ensure no damage occurs to remaining structures or equipment during the demolition process. The contractor will be responsible for any repairs resulting from the removal of the existing infrastructure. The telecommunications circuit component is noted as not applicable, indicating a focused scope of work primarily centered on the physical infrastructure replacement and power connection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Shelter Request Form - Mt.HoodBarlow.pdf | ||
| Supplemental SOW_v2.pdf | ||
| Competition Requirements_Redacted.pdf | ||
| Attachment 2 - Performance Work Statement.pdf | ||
| 12760425Q0051.pdf | ||
| Attachment 1 - Bill of Materials.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7.1 Supplementary Statement of Work (SOW)
The contractor must provide all materials and services for work required to complete the installation of a new communications shelter at the Barlow District Office. The site is located at 780 NE Court Street, Dufur, OR 97021. The contractor will be required to obtain construction bonding and requisite insurance sufficient to support the construction and/or demolition, as applicable. The work provided by the contractor shall satisfy the following:
7.1.1 Demolition of Existing Tower & Shelter
A. The removal of existing 90’ tower and telecommunications shelter will be done in a way that no damage will occur to remaining structures/equipment.
B. Any damage caused by the removal of the structure will be the responsibility of the contractor to repair.
C. All tower steel will be removed to grade and backfill with 2” minus aggregate as necessary.
D. Disposal of all demolition debris is the responsibility of the contractor and shall be discarded in accordance with state, federal environmental regulations as applicable.
E. Tower and shelter debris should be disposed of at Columbia Ridge Commercial Landfill & Recycling located at 18177 Cedar Springs Ln, Arlington, OR 97812 otherwise the contractor shall be required to perform an asbestos test on the debris to certify that there are no asbestos contaminated materials being disposed of.
7.1.2 Commercial Power
A. The existing shelter receives its commercial power supply from a 20A breaker located in the circuit breaker panel of the adjacent building. This power supply is transmitted overhead and terminates in the circuit breaker panel within the telecommunications shelter.
B. The contractor is tasked with supplying a new primary wire and messenger cable. These should be appropriately sized for the 20A service that powers the existing telecommunications shelter.
C. The contractor’s responsibilities also include disconnecting the commercial power from the existing shelter and re-establishing the connection to the new shelter using the same overhead route.
D. The new shelter will be equipped with a weather head that connects to the external power filter box. This connection point will serve as the entry point for commercial power into the new shelter.
7.1.3 Telecommunications Circuit
Not Applicable.