Renovation of B1, Room P111, U. S. National Poultry Research Center (Athens, GA)
Solicitation number
1232SA25R0041
Issued by

About this file

This Statement of Work details a renovation project for Building 1, Room P111 at the U.S. National Poultry Research Center in Athens, Georgia. The comprehensive renovation includes demolition, cleaning and painting, HVAC equipment addition, new partition walls and doors, power and lighting installation, air compressor setup, and new sink installation. The project must be completed within 180 days of the notice to proceed, with work performed Monday through Friday during standard business hours, and will require minimal disruption to the facility's ongoing research operations.

Key contractor requirements include submitting a Site-Specific Safety Plan, providing weekly project reports, maintaining a superintendent on-site during renovation work, protecting existing property, adhering to all applicable building codes, and offering a one-year guarantee on all work. Contractors must be registered in the System for Award Management (SAM), verify all site dimensions before beginning work, coordinate closely with facility representatives, and ensure all workers have valid identification for site entry. The project will be inspected by a government representative, with inspections scheduled at least two days in advance.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Agricultural Research Service

STATEMENT OF WORK

Renovation of B1, Room P111

U.S. National Poultry Research Center 950 College Station Road

Athens, Georgia 30605

1. Scope of Work

The contractor shall provide all professional services necessary to renovate Building 1, Room P111 as described in the drawings.

The contractor shall include all services and field labor, equipment (including cranes, rigging and material handling equipment), materials, testing and personal protective equipment necessary to perform the work.

Equipment and services provided by the Government for contractor use are listed below:

- Restroom facilities

1.1 Base Bid

The contractor shall provide a detailed proposal and cost breakdown for the entire project as specified in the project drawings and specifications.

1.2 Site Visit

Contractors are strongly encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.

Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid.

2. Codes and Standards

Applicable Codes and Standards apply and are not limited to the following

ANSI - American National Standards Institute.

ASME - American Society of Mechanical Engineers.

NEC - National Electrical Code, NFPA 72.

OSHA - Occupational Safety and Health Administration ADA – Americans with Disabilities Act

All work must meet Local, State and Federal codes, and latest IBC codes.

3. Project Summary

Building 1, room P111 will be renovated as detailed in the project specifications and drawings.

1) Demolition

2) Cleaning and painting

3) Addition of new HVAC equipment

4) Construction of new partition wall(s) and doors

5) Installation of power, lighting and communications

6) Installation of air compressor

7) Installation of new sinks

The facility will be occupied during construction activities. All work shall be scheduled in advance and coordinated with the facility representative to minimize the disruption to traffic, daily operations and research programs.

4. Safety

The contractor will submit a Site Safety Specific Plan (SSSP) in industry recognizable format to the Contracting Officer within 14 days of contract award. The Government shall review the SSSP prior to the start any construction activities.

Safety and health matters, as they relate to the work, are the exclusive responsibility of the contractor.

The contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions that may be required by law or local authorities for the protection and security of the grounds, facilities, and personnel.

5. Contractor Requirements

The contractor shall provide a complete and func onal installa on, including all labor, supervision, tools, materials, equipment, apparatus, transporta on, rigging and other equipment and services necessary to accomplish the work in accordance with the intent and meaning of this statement of work.

The project work shall be performed per the following guidelines:

1) Contractor will verify all dimensions and site conditions prior to beginning work.

2) The contractor shall always be responsible for protecting his work and ensuring the safety of his crew and ARS employees.

3) Contractor shall remove and dispose of all construction related materials from all work areas daily and remove these waste materials from the site weekly.

4) Contractor is required to manage the project and consult with the Government prior to beginning all work.

5) Contractor shall perform work in a manner that minimizes the impact to daily opera ons of the facility and its workers. The building will be occupied during construc on work.

6) Contractor will provide weekly reports of status and work performed.

7) Contractor must have a superintendent on the jobsite when crews are performing the renova on work

8) All workers must present valid ID to enter property

9) All work is to be performed according with building codes, ordinances and laws of the Authority having jurisdiction on the project. When the requirements of the building codes, ordinances, and laws conflict with any other part of the building codes, ordinances and laws, the most restrictive requirement shall prevail.

6. Material Submittals

Submittals and O&M documentation must be provided for all materials used on this project.

7. Pre-Construction Submittals

Contractor’s Site Specific Safety Plan (SSSP) must be provided to and approved by USDA before installation can begin.

8. Damage to Property:

The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired to pre-damaged condition to the satisfaction of the USDA.

9. Inspection and Acceptance A government representative shall inspect and approve the work. The Contractor shall schedule inspection a minimum of 2 days in advance.

10. Period of Performance

The completion of this project shall not exceed 180 days from date of notice to proceed. A request for time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.

10.1 Work Hours:

Generally, contractor work hours shall be Monday through Friday, 7:00 A.M. to 4:30 P.M. except on Government holidays for most of the installation work. Tie-in or other work requiring outages will be performed after hours (pre-arranged at least 48 hours in advance).

Any changes to work schedule shall be submitted to Contracting Officer for written approval prior to the schedule change.

11. Guaranty

The contractor shall provide and submit a single guarantee stating that all portions of the work are in accordance with Contract requirements. Guarantee all work against faulty and improper material and workmanship for a period of one (1) year from date of final acceptance by the USDA, except where manufacturer guarantees or warranties are for longer terms. The contractor shall correct any deficiencies which occur during the guarantee period within 24 hours after notification.