This document is a Questions and Answers (Q&A) amendment for RFP #1232SA25R0041, a renovation project for Room P111 at the U.S. National Poultry Research Center in Athens, GA. The amendment addresses 16 contractor queries covering various technical aspects of the project, including personnel roles, HVAC equipment removal, fire alarm systems, painting requirements, door frame specifications, and infrastructure details.
Key clarifications include: dual roles for project superintendents are permissible, a contract-specific safety plan is required, existing freezers must remain operational in the same general area, door frames should have a 4" head to conform with existing CMU wall modules, no sprinkler work is needed, and specific attachments were referenced for service sink details, hardware specifications, and painting specifications. The Q&A provides critical technical guidance for contractors bidding on or executing the renovation project, ensuring clarity on various construction and design elements.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP# 1232SA25R0041 - Renovation of B1, Room P111, U.S. National Poultry Research Center (Athens, GA)
Amendment # 0004
Questions and Answers
1. In executing this project, can one superintendent fulfill the supervision, safety, and QAQC roles?
a. ANSWER: Dual roles are permissible so long as contractor personnel meet the requirements described in clause C.7 EMPLOYEE REQUIREMENTS.
2. Are contractors required to issue a contract specific QA/QC Plan?
a. ANSWER: No, however QA/QC must comply with the project specifications.
3. Are contractors required to issue a contract specific Safety Plan?
a. ANSWER: Yes, see Attachment 3 - Statement of Work, section 3.
4. Is this project tax exempt?
a. ANSWER: Information regarding contractor tax liability in Georgia is found at https://dor.georgia.gov/taxes
5. Drawing AD101, Note 1 states, “Remove existing HVAC equipment.” During the site visit, we did not see any HVAC equipment to be removed. Could you please confirm what equipment is to be removed, if it has not already been taken out?
a. ANSWER: (Reference drawing MD101) HVAC unit shown in room P121 has been removed. Items referenced in Note 3 and 4 have been removed. Other HVAC on this drawing page marked for demolition remains and will need to be removed.
6. What is the make and model of the existing fire alarm system?
a. ANSWER: Honeywell Notifier
7. The finish schedule shows to paint all existing metal elements of the ceiling including the existing ceiling deck. Should all new HVAC and conduit also be painted after installation?
a. ANSWER: All must be painted.
8. Confirm if 1-1/2" furring channels can be used at plumbing walls to allow for installation of insulated 1/2" plumbing lines. The current wall cavity at 7/8" furring + 5/8" sheetrock is not wide enough.
a. ANSWER: Furring is Acceptable
9. The vent pipe is called out at 2". Can this be reduced to 1-1/2" to fit within the wall cavity? If reduction of pipe size is not allowed, can this piping be installed outside of the wall cavity or within a furred out wall?
a. ANSWER: Prefer the pipe be concealed in a furred wall.
10. The service sink waste connection detail #6/P-601 shows the 2” waste line terminating at the top of the existing floor drain with no hard connection or air gap above. Please provide a code compliant detail for this connection.
a. ANSWER: See Attachment 10 Service Sink Details
11. Please provide the 08 71 00 specification information for Hardware Sets #1 & #2.
a. ANSWER: See Attachment 11 08 71 00 Specification
12. On AD-101 the architectural drawings show that there are (3) ”Existing freezers to remain, protect during construction”, and on and A-101, (3) “Existing freezers to remain”. These freezers are in the way of completing new wall framing as well as resinous floor systems. Do these freezers truly need to remain in the space which would hinder fully completing the work, or can they be relocated out of the space during construction? If they are relocated, is this something the Owner wants to coordinate relocation or storage for or the Contractor?
a. ANSWER: The freezers are in use and need to remain in operation and in the same general area.
13. Door 103 has designated a 2” metal frame identified in the plans at Corridor P101. The door head detail 6/A-201 shows the corridor wall as being an existing 8” CMU wall. Please confirm that door frame B should have a 4” head on it to conform to existing CMU block modules. Please verify if this door and frame should have any fire rating.
a. ANSWER: 4” head to conform with existing wall. No fire rating required.
14. Please confirm there is no sprinkler work required on this project. Our existing photos show existing sprinkler systems in place but there is no mention of this in the specifications or drawings.
a. ANSWER: No Sprinkler work is required.
15. There are no paint types, coatings or substrates called out for painting in the paint specification. Will we be provided this information or are we expected to propose these? We are trying to determine what areas receive epoxy paint ($) and if we’re using a latex paint or other elsewhere.
a. ANSWER: See Attachment 12 Painting Specification Section 09 90 00
16. Please confirm if data lines at 7/8” wall furring requires a conduit pathway or not.
a. ANSWER: Conduit not required. Recommendation would be to either use a low voltage mounting bracket and let the cables be loose behind the wall and possibly utilizing an angled connector plate to help with the cable bend.