Attachment 3 - Statement of Work.pdf

PDF 881 KB Posted

Attached to
Guardmount Lockers
Solicitation number
FA460825QC033
Issued by

About this file

The provided document is a Statement of Work (SOW) for locker installation at Barksdale Air Force Base (BAFB) for the 2nd Security Forces Squadron (2 SFS). The project involves removing 290 existing lockers measuring 24"W x 24"D x 36"H and installing 600 new lockers sized 15"W x 18"D x 36"H in the Guardmount Room of Building 6000. The work is necessitated by a manpower increase and the need for Defenders to have dedicated storage for their duty gear and equipment.

The contract requires completion within 60 days after receipt of order, with work performed during normal business hours (0800-1600), excluding weekends and federal holidays. Security requirements mandate contractor coordination with 2 SFS, including background checks and visitor pass procedures. The installation must maintain adequate space between locker rows for personnel movement and locker access, with potential layout adjustments coordinated with 2 SFS. This is a small business set-aside contract under NAICS code 337215, with a size standard of 500 employees.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement Of Work Locker Installation

1200 Chappie James Dr., Barksdale AFB( BAFB), LA 71110, Building 6000, Guardmount Room

SCOPE / DESCRIPTION OF SERVICES: The work covered by these requirements consists of furnishing all plans, materials, labor, equipment, and performing all operations to remove/install new lockers in the 2 SFS Guardmount Room.

DELIVERY AND INSTALLATION: Sixty (60) Days AOR.

BACKGROUND: The 2 SFS is undergoing a manpower increase due to a new mission arriving at BAFB. 2 SFS Defenders are required to have a significant amount of duty gear/equipment to perform base defense. Each Defender needs a locker to store their duty gear/equipment.

LOCATION: 1200 Chappie James Dr., Bldg 6000 Guardmount Room, located at BAFB, LA

HOURS OF OPERATIONS. Normal hours of operation for this contract are between the hours of 0800 and 1600. The contractor shall perform the services required under this contract during this time excluding Saturdays, Sundays, and Federal Holidays.

REQUIRMENTS (OVERVIEW): The work covered under this Statement of Work shall consist of furnishing all material, labor, and equipment in performing all operations necessary to remove/install lockers. The lockers must be installed on top of the existing floor, without structural modifications or hinderance to arming operations within the layout of the room. There must be adequate space between locker rows for Defenders to move freely and for lockers to be opened adjacent.

• Remove existing lockers - 290 @ 24”W x 24”D x 36”H (*see page 2 for current layout)

• Install 600 lockers @ 15”W x 18”D x 36”H (Note: This layout may be adjusted by the contractor with

2 SFS coordination and input)

FA460825QC033

Attachment 3

SECURITY REQUIREMENTS: Coordination for entry to BAFB must be completed between 2 SFS and contractor. Contractor must pass a background check prior to being issued a visitor pass. If contractor is not an American citizen, this process needs to be initiated NLT 30 days in advance. The contractor should contact 2 SFS Police Services at (318) 456-1384 or (318) 456-4407, for further information and coordination.

*Current guardmount room and locker layout

FA460825QC033

Attachment 3