This solicitation notice seeks proposals for the Mizpah Campground Aquatic Organism Passage construction project. The purpose of the project is to construct an aquatic organism passage to restore access to Mizpah Campground located near Empire, Colorado. The scope of work includes installing traffic control signs, a stream-flow diversion system, a precast box culvert, structural backfill and embankment, surface aggregate, object markers, and seeding. It also requires felling and placing dead trees on the upstream floodplain. The period of performance is estimated from March 1, 2023 to November 30, 2023. Interested parties must monitor the System for Award Management website for solicitation amendments and submit responses to this notice. The estimated magnitude of construction is between $500,000 and $1,000,000.

View the file

Other files

File Type Posted
221121 Additional QAs.pdf PDF
1240LT23R0001_Amend1.pdf PDF
221019 Site Visit Sign in Sheet.xlsx XLSX spreadsheet
221019 QandA Site Visit.docx DOCX document
Attachment 1 - Wage Determination CO20220006.pdf PDF
Attachment 4 - Specifications.docx DOCX document
Attachment 5 - DesignSummary 02062011.pdf PDF
1240LT23R0001.pdf PDF
Attachment 2 - Plans and Drawings_Updated.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES

ON FEDERAL HIGHWAY PROJECTS

Specification List

Project Name: Mizpah culvert Replacement, Arapahoe-Roosevelt National Forest Specification Number

Title
Date Prepared: 2/11 (Latest Revision Date)
101
Terms, format, and definitions
2003
SCR 101
Terms, format, and definitions
02/11
102
Bid, Award, and Execution of Contract
2003
SCR 102
Bid, Award, and Execution of Contract
02/11
103
Scope of Work
2003
SCR 103
Scope of Work
02/11
104
Control of Work
2003
SCR 104
Control of Work
02/11
105
Control of Material
2003
SCR 105
Control of Material
02/11
106
Acceptance of Work
2003
SCR106
Acceptance of Work
02/11
107
Legal Relations and Responsibilities to the Public
2003
SCR 107
Legal Relations and Responsibilities to the Public
02/11
108
Prosecution and Progress
2003
SCR 108
Prosecution and Progress
02/11
109
Measurement and Payment
2003
SCR 109
Measurement and Payment
02/11
151
Mobilization
2003
152
Construction Surveying and Staking
2003
SCR 152
Construction Surveying and Staking
02/11
153
Contractor Quality Control
2003
SCR 153
Contractor Quality Control
02/11
SCR 154
Contractor Sampling and Testing
02/11
155
Schedules for Construction Contracts
2003
SCR 155
Schedules for Construction Contracts
02/11
156
Public Traffic
2003
SCR 156
Public Traffic
02/11
157
Soil Erosion Control
2003
SCR 157
Soil Erosion Control
02/11
201
Clearing and Grubbing
2003
SCR 201
Clearing and Grubbing
02/11
203
Removal of Structures and Obstructions
2003
SCR 203
Removal of Structures and Obstructions
02/11
SCR 204
Excavation and Embankment
02/11
208
Structure Excavation and Backfill for Select Major Structures
2003
SCR 208
Structure Excavation and Backfill for Select Major Structures
02/11
209
Structure Excavation and Backfill
2003
251
Riprap
2003
SCR 251
Riprap
02/11
252
Special Rock Embankment and Rock Buttress
2003
301
Untreated Aggregate Courses
2003
SCR 301
Untreated Aggregate Courses
02/11
SCR 320
Stockpiled Aggregates
02/11
552
Structural Concrete
2003
SCR 552
Structural Concrete
02/11
554
Reinforcing Steel
2003
SCR 554
Reinforcing Steel
02/11
SCR 590
Precast Concrete Structures
02/11
625
Turf Establishment
2003
SCR 625
Turf Establishment
02/11
633
Permanent Traffic Control
2003
635
Temporary Traffic Control
2003
SCR 635
Temporary Traffic Control
02/11
SCR 648
Stream Simulation
02/11
SCR 703
Aggregate
02/11
SCR 704
Soil
02/11
SCR 705
Rock
02/11
SCR 709
Reinforcing Steel and Wire Rope
02/11
SCR 714
Geotextile and Geocomposite Drain Material
02/11

Note: All of the specifications cited are applicable to this project. The Special Contract Requirements (SCR) are included with this solicitation. The other Specifications are within the 2003 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. Other specifications referred to within these specifications (even though not specifically listed herein) are also fully applicable to this project.