221121 Additional QAs.pdf
PDF 121 KB Posted
- Attached to
- Mizpah Campground Aquatic Organism Passage
- Solicitation number
- 1240LT23R0001
About this file
This document provides details for the Mizpah Campground Aquatic Organism Passage construction project solicitation. The purpose of the project is to construct an aquatic organism passage to restore access to Mizpah Campground near Empire, Colorado. The solicitation seeks proposals for labor, materials and equipment to install a stream flow diversion system, excavate and construct footings, construct the channel bed and banks within a precast box culvert structure, install structural backfill and embankment, and perform seeding, planting and final site work. Additional work includes felling and placing dead trees on the upstream floodplain. The estimated value of construction is between $500,000 and $1,000,000. Interested contractors must register with the System for Award Management and submit responses by the solicitation closing date of March 1, 2023. The period of performance is from an estimated start date of March 1, 2023 through November 30, 2023. The soliciting agency is the USDA Forest Service Rocky Mountain Region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240LT23R0001_Amend1.pdf | ||
| Attachment 3 - Specification List.docx | DOCX document | |
| 221019 Site Visit Sign in Sheet.xlsx | XLSX spreadsheet | |
| 221019 QandA Site Visit.docx | DOCX document | |
| Attachment 1 - Wage Determination CO20220006.pdf | ||
| Attachment 4 - Specifications.docx | DOCX document | |
| Attachment 5 - DesignSummary 02062011.pdf | ||
| 1240LT23R0001.pdf | ||
| Attachment 2 - Plans and Drawings_Updated.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mizpah Campground AOP – 1240LT23R0001
Additional Questions and Answers
11/21/2022
1. Is there an opportunity to receive the CAD files for this project?
- The CAD files are not available.
2. Is a second site visit being offered?
- A second site visit is not planned.
3. Can a company visit the area and do a walk through without escort?
- Pending weather, the site could be walked to and accessed on your own.
4. Do we have to use biodegradable hydraulic oil? Can we use an oil boom instead??
- Biodegradable hydraulic oil is required per contract specifications.
5. Can an additional line item be added for a temporary crossing?
- Costs for temporary crossing should be included in existing line items. A temporary by pass plan shall be submitted and approved before work starts.
6. The hand sketch drawings show 3 options (bottomless, abutments/precast, and conspan. Is pricing required on all 3?
- You need to provide pricing on the structure in the bid items, specifications and signed plan set. The sketches were only included as some of the info may be helpful in footing design.
7. The onsite study has hand sketches and notes. The notes show debris on the gravel banks.
Will additional debris removal be needed that is not showing in the specs?
- No, the sketches were done in 2011. There is no longer significant debris on the bank. Any remaining debris should be minor and go under Item 20806.
8. For the water diversion, can the existing structure be used while setting the new bridge so that the flow is only disturbed one time?
- The least amount of diversion and disturbance is best. A dewatering plan is a required submittal for approval before work is started. The planned constructed structure is a bottomless culvert not a bridge. There is currently no existing structure in place.