Simplified Acquisition of Base Engineering Requirements (SABER)
MQNA 17-1008
Repair Airfield Ramp Lights
20 May 2020
USAFE
Lajes Field, Azores, Portugal
765th Air Base Squadron
APO AE 09720
STATEMENT OF WORK
Project title: Repair Airfield Ramp Lights Location: Lajes Field Project number: MQNA 17-1008 Facility: Airfield Ramp Lighting System
1. General:
The contractor shall provide all plant labor, materials, tools, equipment, transportation, supervision and personnel necessary to accomplish the work described in this statement of work and attached drawings to replace all existing blue feeder switches.
Work is located at the Airfield and Rua dos Aviadores, Lajes Field, Azores, Portugal and shall be performed in accordance with this Statement of Work (SOW), Project Drawings and Lajes Field Facilities Excellence Standards.
1.1. Design Requirements:
The contractor shall provide a Design Development Submittal in accordance with FC1-300-09N Navy and Marine Corps Design Procedures. The design shall include at least the following requirements:
1.1.1. Basis of Design: Provide a narrative summarizing, explaining and documenting the concept design results. Narrative shall be provided as follows:
1.1.1.1. Civil. Summarize the civil design parameters, and major features of the design.
1.1.1.2. Structural. Address the selected structural foundation and framing systems considered that meets criteria and is cost effective. Summarize the structural design parameters and major features of the design.
1.1.1.3. Electrical. Summarize the electrical design parameters and the major features of the design. Address voltage, routing, and reliability of primary services; connected and demand load; normal/essential/emergency electrical systems; lighting systems;
and energy conservation features.
1.1.1.4. Commissioning. Summarize the Commissioning Plan and process to achieve the required commissioning of all commissioned systems.
1.1.1.5. Assumptions. Provide a listing of any and all assumptions made pertaining to this project.
1.1.1.6. Construction Phasing. Develop and provide one overall workable phasing plan.
This phasing plan shall describe major elements of the work and any impacts on or by the Government. The phasing plan shall include the scope and timing sequence of each identifiable phase or major activity with required precedents, procurement, Government move durations, commissioning, and outfitting. Each phase shall be described in terms of the work involved and what work has to come before and after the phase. Phasing elements affecting the Government but not the contractor, such as Government only actions, should be determined and documented.
1.1.2. Concept Design Drawings: Concept design drawings describing a 35% design effort shall be provided as follows:
1.1.2.1. Civil (Site). Show location of all buildings, existing and proposed structures, final master plan of the site, and landscaping.
1.1.2.2. Structural. Include foundation plan for all structures, showing dimensions, arrangements, elevations, locations referred to a column line grid system, type of foundation and foundation obstructions. Include the layout of all parts, including but not limited to, slabs, footings, piers, grade beams, and piles, showing all foundation features of the design. Show the layout of system, including, but not limited to, beams, joists, and stringers. Show typical details of construction, indicating the connection and relationship between major components of the structural system. Show general sizes, location and arrangement of all significant features of the vertical framing system, such as columns, and beams.
1.1.2.3. Electrical. Show placement and location of electrical light fixtures, and distribution equipment. Provide single line diagrams of the electrical system. Provide lighting, power, and any special systems plans. Include the grounding system and lightning protection design and additional risers.
1.1.2.4. Construction Phasing. Provide a graphic “node” diagram (not a bar chart or time-scaled bar chart) to show the relationships established in the phasing narrative. The graphic representation of the phasing plan in the contract documents should not indicate durations (numerical or graphical), except for the contractually established durations such as Owner moves. Individual phase durations should be considered only in developing the Government’s proposed overall contract duration. This phasing plan should not be confused with the requirement to determine the overall constructability and construction timeline that may involve a more detailed milestone chart. The phasing should be coordinated and documented in the design drawings either as a segregated set with all engineering disciplines addressed or have associated drawings within each discipline. A separate overall phasing plan shall be developed for the Government’s use only to inform, educate, and track Government actions. It should include interaction of Government activities such as move times, swing space durations, and Government outfitting and training activities. This plan shall further delineate the coordination of required actions of the Government that are not a part of the contractor’s responsibility or contract.
1.1.2.5. Technical Calculations. Provide conceptual level calculations for all engineering systems being proposed.
1.1.3. Bill of Quantities:
1.1.3.1. Provide an in-depth bill of quantities calculation consisting of position number, description, quantity, and supporting rationale for each line item.
2. Scope of work:
2.1 Demolition work
2.1.1 LP #01 #02 #25
2.1.1.1 Bare metal blast existing bollards (5 Ea. - approx. 5 S.F. each);
2.1.1.2 Remove and dispose existing pole crossarms and brackets (3 Ea.);
2.1.1.3 Remove and dispose existing structure supporting control box (1 Ea.);
2.1.1.4 Remove and dispose existing junction boxes at pole top (2 Ea.);
2.1.1.5 Remove and dispose lamp ballasts (20 Ea.);
2.1.1.6 Bare metal blast existing transformer enclosure (1 Ea. - approx. 45 S.F.);
2.1.1.7 Remove existing red obstruction lights (2 Ea.);
2.1.1.8 Cut conduits (from control box to transformer and pole) above ground level to connect new galvanized steel plastic coated conduits (approx. 8 L.F.).
2.1.2 LP #03 #04 #07 #10 #11 #12 #13 #16 #18 #19 #20 #22 #24 #26
2.1.2.1 Bare metal blast existing bollards (6 Ea. - approx. 5 S.F. each);
2.1.2.2 Remove and dispose existing pole crossarms and brackets (3 Ea.);
2.1.2.3 Remove and dispose existing structure supporting control box (1 Ea.);
2.1.2.4 Remove and dispose existing junction boxes at pole top (2 Ea.);
2.1.2.5 Remove and dispose lamp ballasts (20 Ea.);
2.1.2.6 Bare metal blast existing transformer enclosure (1 Ea. - approx. 45 S.F.);
2.1.2.7 Remove existing red obstruction lights (2 Ea.);
2.1.2.8 Cut conduits (from control box to transformer and pole) above ground level to connect new galvanized steel plastic coated conduits (approx. 8 L.F.).
2.1.3 LP #05
2.1.3.1 Bare metal blast existing bollards (3 Ea. - approx. 5 S.F. each);
2.1.3.2 Remove and dispose existing pole crossarms and brackets (3 Ea.);
2.1.3.3 Remove and dispose existing structure supporting control box (1 Ea.);
2.1.3.4 Remove and dispose existing junction boxes at pole top (2 Ea.);
2.1.3.5 Remove and dispose lamp ballasts (20 Ea.);
2.1.3.6 Bare metal blast existing transformer enclosure (1 Ea. - approx. 45 S.F.);
2.1.3.7 Remove existing red obstruction lights (2 Ea.);
2.1.3.8 Cut conduits (from control box to transformer and pole) above ground level to connect new galvanized steel plastic coated conduits (approx. 8 L.F.).
2.1.4 LP #06 #08 #14 #17
2.1.4.1 Bare metal blast existing bollards (6 Ea. - approx. 5 S.F. each);
2.1.4.2 Remove and dispose existing pole crossarms and brackets (3 Ea.);
2.1.4.3 Remove and dispose existing structure supporting control box (1 Ea.);
2.1.4.4 Remove and dispose existing junction boxes at pole top (2 Ea.);
2.1.4.5 Remove and dispose lamp ballasts (20 Ea.);
2.1.4.6 Bare metal blast existing transformer enclosure (1 Ea. - approx. 45 S.F.);
2.1.4.7 Remove existing red obstruction lights (2 Ea.);
2.1.4.8 Remove and dispose old camera control box (1 Ea.);
2.1.4.9 Cut conduit from old camera control box to above floor level (approx. 4 L.F.);
2.1.4.10 Cut conduits (from control box to transformer and pole) above ground level to connect new galvanized steel plastic coated conduits (approx. 8 L.F.).
2.1.5 LP #09
2.1.5.1 Bare metal blast existing bollards (6 Ea. - approx. 5 S.F. each);
2.1.5.2 Remove and dispose existing pole crossarms and brackets (3 Ea.);
2.1.5.3 Remove and dispose existing structure supporting control box (1 Ea.);
2.1.5.4 Remove and dispose existing junction boxes at pole top (2 Ea.);
2.1.5.5 Remove and dispose lamp ballasts (20 Ea.);
2.1.5.6 Bare metal blast existing transformer enclosure (1 Ea. - approx. 45 S.F.);
2.1.5.7 Remove existing red obstruction lights (2 Ea.);
2.1.5.8 Demolish existing decorative wall (approx. 140 S.F.);
2.1.5.9 Cut conduits (from control box to transformer and pole) above ground level to connect new galvanized steel plastic coated conduits (approx. 8 L.F.).
2.1.6 LP #15 #21
2.1.6.1 Bare metal blast existing bollards (4 Ea. - approx. 5 S.F. each);
2.1.6.2 Remove and dispose existing pole crossarms and brackets (3 Ea.);
2.1.6.3 Remove and dispose existing structure supporting control box (1 Ea.);
2.1.6.4 Remove and dispose existing junction boxes at pole top (2 Ea.);
2.1.6.5 Remove and dispose lamp ballasts (20 Ea.);
2.1.6.6 Bare metal blast existing transformer enclosure (1 Ea. - approx. 45 S.F.);
2.1.6.7 Remove existing red obstruction lights (2 Ea.);
2.1.6.8 Cut conduits (from control box to transformer and pole) above ground level to connect new galvanized steel plastic coated conduits (approx. 8 L.F.).
2.1.7 LP #23
2.1.7.1 Remove and dispose existing pole crossarms and brackets (3 Ea.);
2.1.7.2 Remove and dispose existing structure supporting control box (1 Ea.);
2.1.7.3 Remove and dispose existing junction boxes at pole top (2 Ea.);
2.1.7.4 Remove and dispose lamp ballasts (20 Ea.);
2.1.7.5 Bare metal blast existing transformer enclosure (1 Ea. - approx. 45 S.F.);
2.1.7.6 Remove existing red obstruction lights (2 Ea.);
2.1.7.7 Cut conduits (from control box to transformer and pole) above ground level to connect new galvanized steel plastic coated conduits (approx. 8 L.F.).
Demolition - General notes
Two poles next to each other shall not be turned off at the same time - contractor shall plan accordingly.
Use appropriate equipment and techniques for demolition or removal work in order to avoid damages on surrounding area. Phasing plan shall be discussed in order to keep power interruption times as minimum and keep facilities functions operational.
No material shall be left on the Airfield without being properly secured and signalized.
2.2 New work
2.2.1 LP #01 #02 #25
2.2.1.1 Build new concrete pad around pole area to match existing transformer pad height (approx. 300 S.F.);
2.2.1.2 Paint existing bollards yellow and black – one (1) zinc prime and two (2) epoxy top coats (5 Ea. - approx. 5 S.F. each);
2.2.1.3 Install two (2) new galvanized steel crossarms (approx. 20 L.F. each) – install matching existing;
2.2.1.4 Install one (1) new galvanized steel crossarms (approx. 13 L.F.) – install matching existing;
2.2.1.5 Build new galvanized steel supporting structure for control box (1 Ea.) – structure shall be base plated and chemically anchored to concrete pad;
2.2.1.6 Install new IP66 junction boxes at pole top (2 Ea.);
2.2.1.7 Install new lamp ballasts (20 Ea.);
2.2.1.8 Install new cable AWG#12 from terminal box at top of pole to ballasts (approx. 255
L.F.);
2.2.1.9 Paint existing transformer enclosure - one (1) zinc prime and two (2) epoxy top coats
(1 Ea. - approx. 45 S.F.);
2.2.1.10 Install new LED red obstruction double lights and supporting fitting (2 Ea.);
2.2.1.11 Install and connect new galvanized steel plastic coated conduits from control box to transformer and pole existing conduits above floor level (approx. 8 L.F.);
2.2.1.12 Reinstall existing light fixtures - match existing location and keep photometry exactly the same (20 Ea.).
2.2.2 LP #03 #04 #07 #10 #11 #12 #13 #14 #16 #17 #18 #19 #20 #22 #24 #26
2.2.2.1 Build new concrete pad around pole area to match existing transformer pad height (approx. 300 S.F.);
2.2.2.2 Paint existing bollards yellow and black – one (1) zinc prime and two (2) epoxy top coats (6 Ea. - approx. 5 S.F. each);
2.2.2.3 Install two (2) new galvanized steel crossarms (approx. 20 L.F. each) – install matching existing;
2.2.2.4 Install one (1) new galvanized steel crossarms (approx. 13 L.F.) – install matching existing;
2.2.2.5 Build new galvanized steel supporting structure for control box (1 Ea.) – structure shall be base plated and chemically anchored to concrete pad;
2.2.2.6 Install new IP66 junction boxes at pole top (2 Ea.);
2.2.2.7 Install new lamp ballasts (20 Ea.);
2.2.2.8 Install new cable AWG#12 from terminal box at top of pole to ballasts (approx. 255
L.F.);
2.2.2.9 Paint existing transformer enclosure - one (1) zinc prime and two (2) epoxy top coats
(1 Ea. - approx. 45 S.F.);
2.2.2.10 Install new LED red obstruction double lights and supporting fitting (2 Ea.);
2.2.2.11 Install and connect new galvanized steel plastic coated conduits from control box to transformer and pole existing conduits above floor level (approx. 8 L.F.);
2.2.2.12 Reinstall existing light fixtures - match existing location and keep photometry exactly the same (20 Ea.).
2.2.3 LP #05
2.2.3.1 Build new concrete pad around pole area to match existing transformer pad height (approx. 300 S.F.);
2.2.3.2 Paint existing bollards yellow and black – one (1) zinc prime and two (2) epoxy top coats (3 Ea. - approx. 5 S.F. each);
2.2.3.3 Install two (2) new galvanized steel crossarms (approx. 20 L.F. each) – install matching existing;
2.2.3.4 Install one (1) new galvanized steel crossarms (approx. 13 L.F.) – install matching existing;
2.2.3.5 Build new galvanized steel supporting structure for control box (1 Ea.) – structure shall be base plated and chemically anchored to concrete pad;
2.2.3.6 Install new IP66 junction boxes at pole top (2 Ea.);
2.2.3.7 Install new lamp ballasts (20 Ea.);
2.2.3.8 Install new cable AWG#12 from terminal box at top of pole to ballasts (approx. 255
L.F.);
2.2.3.9 Paint existing transformer enclosure - one (1) zinc prime and two (2) epoxy top coats
(1 Ea. - approx. 45 S.F.);
2.2.3.10 Install new LED red obstruction double lights and supporting fitting (2 Ea.);
2.2.3.11 Install and connect new galvanized steel plastic coated conduits from control box to transformer and pole existing conduits above floor level (approx. 8 L.F.);
2.2.3.12 Reinstall existing light fixtures - match existing location and keep photometry exactly the same (20 Ea.).
2.2.4 LP #06 #08 #14 #17
2.2.4.1 Build new concrete pad around pole area to match existing transformer pad height (approx. 300 S.F.);
2.2.4.2 Paint existing bollards yellow and black – one (1) zinc prime and two (2) epoxy top coats (6 Ea. - approx. 5 S.F. each);
2.2.4.3 Install two (2) new galvanized steel crossarms (approx. 20 L.F. each) – install matching existing;
2.2.4.4 Install one (1) new galvanized steel crossarms (approx. 13 L.F.) – install matching existing;
2.2.4.5 Build new galvanized steel supporting structure for control box (1 Ea.) – structure shall be base plated and chemically anchored to concrete pad;
2.2.4.6 Install new IP66 junction boxes at pole top (2 Ea.);
2.2.4.7 Install new lamp ballasts (20 Ea.);
2.2.4.8 Install new cable AWG#12 from terminal box at top of pole to ballasts (approx. 255
L.F.);
2.2.4.9 Paint existing transformer enclosure - one (1) zinc prime and two (2) epoxy top coats
(1 Ea. - approx. 45 S.F.);
2.2.4.10 Install new LED red obstruction double lights and supporting fitting (2 Ea.);
2.2.4.11 Install and connect new galvanized steel plastic coated conduits from control box to transformer and pole existing conduits above floor level (approx. 8 L.F.);
2.2.4.12 Close old camera connection conduit with threaded cap (1 Ea.);
2.2.4.13 Reinstall existing light fixtures - match existing location and keep photometry
2.2.5 LP #09
2.2.5.1 Build new concrete pad around pole area to match existing transformer pad height (approx. 300 S.F.);
2.2.5.2 Paint existing bollards yellow and black – one (1) zinc prime and two (2) epoxy top coats (4 Ea. - approx. 5 S.F. each);
2.2.5.3 Install two (2) new bollards to match existing (2 Ea. – approx. 5S.F. each). Paint yellow and black.
2.2.5.4 Install two (2) new galvanized steel crossarms (approx. 20 L.F. each) – install matching existing;
2.2.5.5 Install one (1) new galvanized steel crossarms (approx. 13 L.F.) – install matching existing;
2.2.5.6 Build new galvanized steel supporting structure for control box (1 Ea.) – structure shall be base plated and chemically anchored to concrete pad;
2.2.5.7 Install new IP66 junction boxes at pole top (2 Ea.);
2.2.5.8 Install new lamp ballasts (20 Ea.);
2.2.5.9 Install new cable AWG#12 from terminal box at top of pole to ballasts (approx. 255
L.F.);
2.2.5.10 Paint existing transformer enclosure - one (1) zinc prime and two (2) epoxy top coats (1 Ea. - approx. 45 S.F.);
2.2.5.11 Install new LED red obstruction double lights and supporting fitting (2 Ea.);
2.2.5.12 Install and connect new galvanized steel plastic coated conduits from control box to transformer and pole existing conduits above floor level (approx. 8 L.F.);
2.2.5.13 Reinstall existing light fixtures - match existing location and keep photometry exactly the same (20 Ea.).
2.2.6 LP #15 #21
2.2.6.1 Build new concrete pad around pole area to match existing transformer pad height (approx. 300 S.F.);
2.2.6.2 Paint existing bollards yellow and black – one (1) zinc prime and two (2) epoxy top coats (4 Ea. - approx. 5 S.F. each);
2.2.6.3 Install two (2) new galvanized steel crossarms (approx. 20 L.F. each) – install matching existing;
2.2.6.4 Install one (1) new galvanized steel crossarms (approx. 13 L.F.) – install matching existing;
2.2.6.5 Build new galvanized steel supporting structure for control box (1 Ea.) – structure shall be base plated and chemically anchored to concrete pad;
2.2.6.6 Install new IP66 junction boxes at pole top (2 Ea.);
2.2.6.7 Install new lamp ballasts (20 Ea.);
2.2.6.8 Install new cable AWG#12 from terminal box at top of pole to ballasts (approx. 255
L.F.);
2.2.6.9 Paint existing transformer enclosure - one (1) zinc prime and two (2) epoxy top coats
(1 Ea. - approx. 45 S.F.);
2.2.6.10 Install new LED red obstruction double lights and supporting fitting (2 Ea.);
2.2.6.11 Install and connect new galvanized steel plastic coated conduits from control box to transformer and pole existing conduits above floor level (approx. 8 L.F.);
2.2.6.12 Reinstall existing light fixtures - match existing location and keep photometry
2.2.7 LP #23
2.2.7.1 Install two (2) new galvanized steel crossarms (approx. 20 L.F. each) – install matching existing;
2.2.7.2 Install one (1) new galvanized steel crossarms (approx. 13 L.F.) – install matching existing;
2.2.7.3 Build new galvanized steel supporting structure for control box (1 Ea.) – structure shall be base plated and chemically anchored to concrete pad;
2.2.7.4 Install new IP66 junction boxes at pole top (2 Ea.);
2.2.7.5 Install new lamp ballasts (20 Ea.);
2.2.7.6 Install new cable AWG#12 from terminal box at top of pole to ballasts (approx. 255
L.F.);
2.2.7.7 Paint existing transformer enclosure - one (1) zinc prime and two (2) epoxy top coats
(1 Ea. - approx. 45 S.F.);
2.2.7.8 Install new LED red obstruction double lights and supporting fitting (2 Ea.);
2.2.7.9 Install and connect new galvanized steel plastic coated conduits from control box to transformer and pole existing conduits above floor level (approx. 8 L.F.);
2.2.7.10 Reinstall existing light fixtures - match existing location and keep photometry exactly the same (20 Ea.).
New work - General notes:
Concrete pads shall be reinforced with AQ50 mesh. Build contraction joint to separate all concrete pads, new and existing.
Crossarms galvanized steel shall be sized in accordance with UFC 3-301-01 Structural Engineering, to support winds up to 177 km/h (110 mph) without trembling.
Obstruction Lights need to be replaced making sure that no pole is left without these at the end of working day.
Phasing plan shall be discussed in order to keep airfield functions operational maximum time possible.
No material shall be left on the Airfield without being properly secured and signalized.
3. Submittals:
3.1. The Contractor shall submit requested data for all items listed in the included Submittal Register. All submittal items must be approved prior to beginning any work. Documents to be submitted may include lists of materials, operating and maintenance instructions, manufacturer’s descriptive and technical literature, brochures, catalog cuts, performance data, spare parts data, shop drawings, diagrams, color samples, and other materials as appropriate.
According to SAF/AQC Memorandum from 1 April 2016, all submittals must be provided in electronic form starting 1st October of 2016. Furthermore, all contract actions shall be signed digitally.
3.2. Materials will be approved based on the manufacturer’s published data meeting the requirements listed in the SOW.
3.3. Underwriters Laboratories Inc.: Labels or printed documentation will be accepted as evidence that the materials conform to the applicable standards of the agency. In lieu of the labels or listing, the contractor may submit a statement from a recognized, adequately equipped testing agency indicating that the materials comply with all contract requirements.
3.4. Non-Underwriter’s Laboratories Inc. Requirements: For other materials specified to conform to Non UL publications, manufacturer’s statement indicating complete compliance with the applicable specifications or standard (Fed. Spec. Military Spec., or standard of the American Society for Testing and Materials, National Electrical Manufacturers, etc.) are acceptable.
3.5. Contractor is responsible for completing DD Form 1354 (Transfer and Acceptance of Military Real Property) and submitting it to the 765th Contracting Flight as a submittal item prior to the final inspection
4. Coordination with Government activities:
4.1. If it becomes necessary to interrupt work activities due to construction, permission to do so must be requested in writing to the CO twenty-one (21) days in advance.
4.2. The contractor shall request street closings, both partial and/or total, twenty-one (21) days prior to the closing.
4.3. Work in conjunction with this contract which requires utility outages which will affect (as determined by the CO) normal activities in the building, construction area, or other work areas, shall be performed by the contractor at a time other than regular work periods of the organization occupying the facility or area.
4.4. Temporary construction for facilities used by the contractor for preventing interruption of normal work activity or loss of utilities shall be subject to approval of 765 ABS/CEN through the CO.
4.5. Utility Outages:
4.5.1. The contractor shall coordinate all utility outages with the using agency through the CO or his representative prior to the outage. Services shall not be interrupted until receipt of approval of proposed hours and dates from the 765 ABS/CEN through the CO. All work shall be arranged to ensure that the outage will be of minimum duration. The contractor will provide notice to the CO, in writing, not less than twenty-one (21) working days prior to the required outage or as determined by the CO. No response to the outage/interruption request shall be considered as disapproval for the outage/interruption. In the event of a scheduled utility outage being canceled by the Government, notification shall be given to the contractor at least 24 hours in advance of the time for the outage to start and the contractor waives his right to any claim for equitable adjustment or increased cost of performance under this contract as a result of this cancellation. Once a utility outage is arranged and work begun, work must go on continuously until the affected utilities are restored to the affected facility.
4.5.2. The contractor’s Interruption and Outage Requests shall include specific location of interruption/outage, hours and dates of interruption/outage, services affected by the interruption/outage.
4.5.3. Water Mains. Operation of valves on water mains will be by Government personnel only.
When shut-off of water lines interrupts service to fire hydrants or fire sprinkler systems, the contractor shall contact the CO and arrange his operations to have sufficient personnel available to restore service without delay in the event of an emergency as determined by the 765 ABS/CEF Fire Prevention Office.
4.5.4. Fire Protection System. When interruption of electrical power affects a fire protection system service, the contractor shall notify the CO twenty-one (21) working days before making such interruptions and shall restore service prior to leaving the job site each day.
5. Government furnished materials:
Government will not provide any material.
6. General Information:
6.1. Hauling. All demolition debris becomes the property of the contractor, unless otherwise stated in the scope of work, and must be disposed of by the contractor in accordance with local and US regulations. All material hauled by the contractor shall be contained, tied, or enclosed to prevent leaking, spilling, or blowing.
6.2. Transportation routes. The contractor shall ensure all debris or dirt is promptly removed from any transportation route if such debris is spilled, blown, or leaked from hauling equipment and vehicles. All dirt and mud caused by tracks of hauling equipment will be removed by the contractor within one hour of notification by the Government. Transportation route must be pre coordinated to avoid Airfield Foreign Object Debris (FOD).
6.3. Disposal. All demolition collected by the contractor shall be disposed of in an authorized landfill or transfer station. No disposal is allowed on the sites. Materials to be turned over to DLA-DS will be transported and dropped by contractor upon coordination with Construction Management and Contracting Office.
6.4. Workmanship. Materials shall be installed in accordance with recommendations of the manufacturer to conform to the contract document. The installation shall be done in accordance with manufacturer’s recommendations by personnel qualified to perform the work.
6.5. Warranty. The contractor shall provide a written warranty agreeing to repair or replace materials and services when damages resulted from poor workmanship within one (1) calendar year to begin at Government acceptance of work.
6.6. Safety. The contractor shall be responsible for all means and methods as they relate to safety and shall comply with all safety requirements as outlined in the EM-385-1-1 Safety and Health Requirements manual. The contractor shall also abide by any local Portuguese safety requirements if more stringent than the EM-385-1-1.
7. Miscellaneous:
7.1. Distances, dimensions, exact location and other details must be field verified in order to assure proper installation and conformity with applicable standards, prior to the order of materials and/or execution of the project;
7.2. Work shall be conducted with minimum disruption to operations and occupants of existing facility and/or property;
7.3. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remains;
7.4. Site restoration. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than those which existed before new work started.
7.5. Requests for power or water outages must be made to the Government at least twenty one (21) calendar days in advance.
8. PERIOD OF PERFORMANCE:
8.1. Contractor is required to complete project within one hundred and eighty (180) calendar days including material acquisition after issue of Notice to Proceed.
9. Reference:
9.1. Drawings: As supplied in attachment.
END OF STATEMENT OF WORK
T-11612B
T-751
T-705
T-706
T-701
T-708
T-709
T-
T-715 T-716
T-717
D-703
D-701
T-722
T-11612A
T-607
T-606
T-605
T-611
T-610 T-609
T-608T-612
T-640
T-604
T-
T-
7 T-750
T-615T-619
T-
T-
T-624 056
T-660
T-627
T-628
T-629
T-630
D-702 D-706C-602
C-603
C-604
C-915C-918
C-916
T-
T-
T-929
T-240
T-100
G-210G-209G-208G-204G-202
G-203
G-211
G-212
G-206
G-
G-205
G-207
T-121
T-122
T-169
T-167
T-166
T-183
T-120
T-114
T-134
T-164
T-163
T-162
T-112
T-125
T-126
T-128
T-110
T-135 T-131
T-130
T-144
T-146
T-155
T-152
T-181
G-811
263-266
G-803
267-270
271-274
275-278
9-
9-
9-
G-
C-812116
104 103
T-400
T-
T-307 T-333
T-305
T-
T-300
T-306
T-416 T-323
T-324
T-326
T-319
T-310 T-
T-320
T-325
T-315
T-321
T-316
T-
T-203
T-202
T-206
T-209 T-211
T-210
T-205
T-207
T-208
T-260
T-262
T-216
T-213
T-214
T-
T-
C-
C-
B-
B-
A-24
A-3 A-10
A-1
A-7
A-
A-19
C-
C-
C-
C-
C-75
C-77C-78
C-
C-
C-
T-234
T-294
T-238
D-1
T-1312
T-1313
T-
T-1308
T-1303
T-1307
T-1304 T-1302
T-1300
T-1420
T-1311
T-1427
T-39
T-1410
T-1411
T-1412
T-
T-1422
T-1
T-1
T-1408
T-
T-1405
T-1404T-1403T-1402T-1401
T-233 T-237
T-1560
T-
T-1554
T-1
T-1553
T-1551
T-1548
T-1547
T-1
T-1
T-1
6 T-1
T-1535
T-1536
T-1538
T-1542
T-1540
T-1534
T-1508
T-1510
T-1506
T-1507
T-1
T-1
T-
T-1533
T-1539
T-1543
T-
T-1
T-1
T-1
T-1
T-1502
T-1504
T-170
T-1566
T-1568
T-1570
T-1571
T-1565
T-
T-1569
T-1572
T-1562
T-1561T-1564
T-1563
T-1555
T-1558
T-1573
T-
T-
T-418
T-
T-426
T-425
T-415
T-459
T-482 T-314
T-414
T-500
T-502
T-504T-503
T-521
T-520
T-588T-587
T-585
T-584T-583
T-582
T-581
T-506
T-538
T-561
G-
285283-284234-236
235-237 287-288
246-248
245-247
230228
227 229 231 233
244242240238
110111
C-002
C-007
C-702
147-151
C-318
C-814
123-122 121-120 C-005
C-01114
T-920
T-923
125-124127-126
128-133
134-136 137-138
T-770
T-740
T-769
T-767
T-772
T-768
A-909
A-910
A-908
T-857
225223
217215
211209
208206
207205
202 204
T-576
T-575
T-574
T-573
T-572
T-594
F-006
T-
T-578
T-566
T-569
T-570
T-571
T-579
T-
T-
T-
T-
T-
T-567 T-560
3-
9-
E-010
A-907
E-810
E-502 E-502
E-004
E-818
E-820
E-809
E-808
E-807
E-
E-912
SE
TH
MES
VH
C0
CA
RT
TO
S0
SE
TH
T-824 T-823
T-857
T-8
T-928
T-
T-
T-
T-11613A
T-917
T-11613BT-918
T-830
T-871
T-860
T-866
T-8
T-816
T-8
T-8
T-8
T-8
T-8
T-8 46 T-837
T-845
T-815
T-853 T-836
T-
T-800
T-69002
T-827
T-812
T-802 T-807 T-805 T-822
T-811
T-810
T-
T-
T-1431
T-1420
T-1427
T-1424
T-1423
T-
T-234
T-
T-1429
T-1400
T-1428
T-1
T-1306
T-1305
T-1303
T-1302
T-1301
T-872
T-1425
T-1426
T-773
M1340
M1330
M1350
M1360
M1380
M1410 M1400
M1310M1320
M1300
M1390
M1370
M1385
M1295
M1305
M1335
M1290
M1280
M1285
M1284
M1270
M1260
HV
S130
M1250
M1240
M1220
M1230
M1210
M1200
M1180
M1190
M1170
M1160
M1150
M1140
M1130
M1120
M1110
M1100
M1090
M1070
M1080
M1060
HV
S060
M1050
M1040
M1030
M1020
M1010
M1000
EMH1
US Air Forces in Europe
LAJES FIELD, AZORES, PORTUGAL
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
Repair Airfield Ramp Lights
Telmo Aguiar
Telmo Aguiar
N/A
21 February 2020
MQNA 17-1008
T-81241
LAJES FIELD, AZORES, PORTUGAL
US Air Forces in Europe
COVER
Cover Sheet
AutoCAD SHX Text
T-LP01
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
T-LP02
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
T-LP03
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
T-LP04
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
T-LP05
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
T-LP06
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP07
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
T-LP08
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP09
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LP01
AutoCAD SHX Text
LP02
AutoCAD SHX Text
LP03
AutoCAD SHX Text
LP04
AutoCAD SHX Text
LP05
AutoCAD SHX Text
LP06
AutoCAD SHX Text
LP07
AutoCAD SHX Text
LP08
AutoCAD SHX Text
LP09
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP10
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP11
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
T-LP12
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
T-LP13
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP14
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP15
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP16
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
T-LP17
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP18
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
T-LP19
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP20
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
T-LP21
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
T-LP22
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP23
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
T-LP24
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP25
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP26
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
LP10
AutoCAD SHX Text
LP11
AutoCAD SHX Text
LP12
AutoCAD SHX Text
LP13
AutoCAD SHX Text
LP14
AutoCAD SHX Text
LP15
AutoCAD SHX Text
LP16
AutoCAD SHX Text
LP17
AutoCAD SHX Text
LP18
AutoCAD SHX Text
LP19
AutoCAD SHX Text
LP20
AutoCAD SHX Text
LP21
AutoCAD SHX Text
LP22
AutoCAD SHX Text
LP23
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
LP24
AutoCAD SHX Text
LP25
AutoCAD SHX Text
LP26
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text h
AutoCAD SHX Text t
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text U.
AutoCAD SHX Text S.
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text
ATLANTIC
AutoCAD SHX Text
AMERICA
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AFRICA
AutoCAD SHX Text
AZORES
AutoCAD SHX Text
OCEAN
AutoCAD SHX Text N
AutoCAD SHX Text
EUROPE
AutoCAD SHX Text
AZORES
AutoCAD SHX Text
PICO
AutoCAD SHX Text
FAIAL
AutoCAD SHX Text
FLORES
AutoCAD SHX Text
CORVO
AutoCAD SHX Text
SÃO MIGUEL
AutoCAD SHX Text
SANTA MARIA
AutoCAD SHX Text
GRACIOSA
AutoCAD SHX Text
TERCEIRA
AutoCAD SHX Text
SÃO JORGE
AutoCAD SHX Text N
AutoCAD SHX Text
TERCEIRA
AutoCAD SHX Text
PRAIA DA VITORIA
AutoCAD SHX Text
LAJES FIELD
AutoCAD SHX Text
SITE LOCATION
AutoCAD SHX Text
ANGRA DO HEROISMO
AutoCAD SHX Text N
AutoCAD SHX Text DRAWING LIST: E-001 ELECTRICAL SYMBOLS AND ABBREVIATIONS ELECTRICAL SYMBOLS AND ABBREVIATIONS E-100 OVERALL SITE PLAN OVERALL SITE PLAN E-101 PARTIAL SITE PLAN PARTIAL SITE PLAN E-102 PARTIAL SITE PLAN PARTIAL SITE PLAN E-103 PARTIAL SITE PLAN PARTIAL SITE PLAN E-104 PARTIAL SITE PLAN PARTIAL SITE PLAN E-105 PARTIAL SITE PLAN PARTIAL SITE PLAN E-106 PARTIAL SITE PLAN PARTIAL SITE PLAN E-107 PARTIAL SITE PLAN PARTIAL SITE PLAN E-501 ELECTRICAL DETAILS ELECTRICAL DETAILS E-502 ELECTRICAL DETAILSELECTRICAL DETAILS
US Air Forces in Europe
LAJES FIELD, AZORES, PORTUGAL
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
Repair Airfield Ramp Lights
Telmo Aguiar
Telmo Aguiar
N/A
21 February 2020
MQNA 17-1008
T-81241
E-100
Overal Site Plan
AutoCAD SHX Text
EXISTING UNDERGROUND LINE -
AutoCAD SHX Text %%uPLAN SYMBOLS:
AutoCAD SHX Text
AutoCAD SHX Text %%uABBREVIATIONS:
AutoCAD SHX Text %%uONE-LINE SYMBOLS:
AutoCAD SHX Text
TRANSFORMER (3 PHASE PAD MOUNTED)
AutoCAD SHX Text
SECTIONALIZING PEDESTAL (JUNCTION BOX)
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
CIRCUIT BREAKER
AutoCAD SHX Text
SWITCH (XXXA DENOTES AMPACITY OF THE SWITCH)
AutoCAD SHX Text
FUSE
AutoCAD SHX Text
KEY NOTE
AutoCAD SHX Text
MAINTENANCE HOLE
AutoCAD SHX Text J
AutoCAD SHX Text
EXISTING OVERHEAD LINE
AutoCAD SHX Text
EXISTING FEEDER
AutoCAD SHX Text
CONTRACTOR FURNISHED
AutoCAD SHX Text
GOVERNMENT FURNISHED
AutoCAD SHX Text
JUNCTION BOX
AutoCAD SHX Text
UNDERGROUND PRIMARY
AutoCAD SHX Text
UNDERGROUND PRIMARY - DIRECT BURIED
AutoCAD SHX Text
UNDERGROUND SECONDARY
AutoCAD SHX Text
CF
AutoCAD SHX Text
GF
AutoCAD SHX Text J
AutoCAD SHX Text
UP
AutoCAD SHX Text
UPDB
AutoCAD SHX Text
US
AutoCAD SHX Text %%uREFERENCE SYMBOLS:
AutoCAD SHX Text
CONTRACTOR INSTALLED
AutoCAD SHX Text
CI
AutoCAD SHX Text
ALTERNATING CURRENT
AutoCAD SHX Text
AC
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
AFF
AutoCAD SHX Text
AMPERE
AutoCAD SHX Text A
AutoCAD SHX Text
ALUMINUM
AutoCAD SHX Text
AL
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
BOT
AutoCAD SHX Text
CONDUIT
AutoCAD SHX Text C
AutoCAD SHX Text
CIRCUIT BREAKER
AutoCAD SHX Text
CB
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONC
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
DET
AutoCAD SHX Text
DWG
AutoCAD SHX Text
ELECTRICAL METALLIC TUBING
AutoCAD SHX Text
EMT
AutoCAD SHX Text
ELECTRIC OR ELECTRICAL
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
EQUIP
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXIST
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
FL OR FLR
AutoCAD SHX Text
GOVERNMENT INSTALLED
AutoCAD SHX Text
GI
AutoCAD SHX Text
GROUND
AutoCAD SHX Text
GND
AutoCAD SHX Text
KILOVOLT AMPERES
AutoCAD SHX Text
KVA
AutoCAD SHX Text
KV
AutoCAD SHX Text
KILOVOLT
AutoCAD SHX Text
KILOWATT
AutoCAD SHX Text
KW
AutoCAD SHX Text
LP
AutoCAD SHX Text
LIGHT POLE
AutoCAD SHX Text
MAINTENANCE HOLE
AutoCAD SHX Text
MH
AutoCAD SHX Text
METER
AutoCAD SHX Text
MAX
AutoCAD SHX Text M
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
MIN
AutoCAD SHX Text
MISC
AutoCAD SHX Text
MISCELLANEOUS
AutoCAD SHX Text
MOUNTED
AutoCAD SHX Text
MTD
AutoCAD SHX Text
NORTH
AutoCAD SHX Text N
AutoCAD SHX Text
NEMA
AutoCAD SHX Text
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
NO OR #
AutoCAD SHX Text
PHASE
AutoCAD SHX Text PH OR %%c
AutoCAD SHX Text
PVC
AutoCAD SHX Text
POLYVINYL-CHLORIDE
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
PVMT
AutoCAD SHX Text
RIGID GALVANIZED STEEL CONDUIT
AutoCAD SHX Text
RGSC
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
SECT
AutoCAD SHX Text
SHT
AutoCAD SHX Text
SHEET
AutoCAD SHX Text T.O.C.
AutoCAD SHX Text
TOP OF CONCRETE
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
TYP
AutoCAD SHX Text
UNLESS NOTED OTHERWISE
AutoCAD SHX Text
UNO
AutoCAD SHX Text
WITH
AutoCAD SHX Text W/
AutoCAD SHX Text
XFMR
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
DISCONNECT SWITCH
AutoCAD SHX Text ALL PRIMARY CABLE SHALL BE REUSED. ALL CABLES SHALL REMAIN IN EXISTING DUCT, UNLESS NOTED OTHERWISE. BUILDING POWER OUTAGES RELATED TO THIS WORK SHALL BE COORDINATED WITH AND APPROVED IN ADVANCE BY THE CONTRACTING OFFICER'S REPRESENTATIVE. ALL CABINETS, ENCLOSURES, HOUSINGS SHALL BE OF HIGHLY CORROSION-RESISTANT AND WET-LOCATION RATED MATERIALS AND FINISHES.
AutoCAD SHX Text %%uGENERAL NOTES:
AutoCAD SHX Text 1.
AutoCAD SHX Text 2.
AutoCAD SHX Text 3.
AutoCAD SHX Text
(CABLE & CONDUIT TO REMAIN)
AutoCAD SHX Text
SW
AutoCAD SHX Text
TRANSFORMER (1 PHASE PAD MOUNTED)
AutoCAD SHX Text M100
AutoCAD SHX Text
AutoCAD SHX Text
(NUMBER INDICATES POLE NUMBER)
AutoCAD SHX Text
MEDIUM-VOLTAGE SWITCHGEAR
AutoCAD SHX Text
(NUMBER INDICATES MAINTENANCE HOLE NUMBER)
AutoCAD SHX Text
CLAM-SHELL MAINTENANCE HOLE
AutoCAD SHX Text
(NUMBER INDICATES MAINTENANCE HOLE NUMBER)
AutoCAD SHX Text M100
AutoCAD SHX Text
POWER POLE -
AutoCAD SHX Text
XXXA
AutoCAD SHX Text
LF
LINEAL FEET
T-11612B
T-
T-751
T-705
T-706
T-701
T-708
T-709
T-
T-715 T-716
T-717
D-703
D-701
T-722
T-11612A
T-607
T-606
T-605
T-611
T-610 T-609
T-608 T-612
T-640
T-604
T-
T-
7 T-750 T-704 T-725
T-615T-619
T-
T-
T-624 056
T-660
T-627
T-628
T-629
T-630
D-702 D-706C-602
C-603
C-604
C-915C-918
C-916
T-
T-
T-929
T-252
T-
T-257
T-248T-247
T-
T-
T-240
T-100
G-210G-209G-208G-204G-202
G-203
G-211
G-212
G-206
G-
G-205
G-207
T-121
T-122
T-169
T-167
T-166
T-183
T-120
T-114
T-134
T-164
T-163
T-162
T-112
T-125
T-126
T-128
T-110
T-135 T-131
T-130
T-144
T-146
T-155
T-152
T-181
G-811
263-266
G-803
267-270
271-274
275-278
9-
9-
9-
G-
C-812116
104 103
T-400
T-
T-307 T-333
T-305
T-
T-300
T-306
T-416 T-323
T-324
T-326
T-319
T-310 T-
T-320
T-325
T-315
T-321
T-316
T-
T-203
T-202
T-206
T-209 T-211
T-210
T-205
T-207
T-208
T-260
T-262
T-216
T-213
T-214
T-
T-
C-
C-
B-
B-
A-24
A-3 A-10
A-1
A-7
A-
A-19
C-
C-
C-
C-
C-75
C-77C-78
C-
C-
C-
T-234
T-294
T-238
D-1
T-1312
T-1313
T-
T-1308
T-1303
T-1307
T-1306
T-1
T-1304 T-1302
T-1300
T-1420
T-1311
T-1310
T-1419
T-1418
T-1309
T-1427
T-39
T-40
T-1410
T-1411
T-1412
T-1413
T-1414
T-1415
T-1416
T-1417
T-1424T-
T-1422 T-1421
T-1
T-1
T-1408
T-
T-1405
T-1404T-1403T-1402T-1401
T-233 T-237
T-1560
T-
T-1554
T-1
T-1553
T-1551
T-1548
T-1547
T-1
T-1
T-1
6 T-1
T-1535
T-1536
T-1538
T-1542
T-1540
T-1534
T-1508
T-1510
T-1506
T-1507
T-1
T-1
T-
T-1533
T-1539
T-1543
T-
T-1
T-1
T-1
T-1
T-1502
T-1504
T-170
T-1566
T-1568
T-1570
T-1571
T-1565
T-
T-1569
T-1572
T-1562
T-1561T-1564
T-1563
T-1555
T-1558
T-1573
T-
T-
T-418
T-
T-426
T-425
T-415
T-459
T-482 T-314
T-414
T-500
T-502
T-504T-503
T-521
T-520
T-588T-587
T-585
T-584T-583
T-582
T-581
T-506
T-538
T-561
G-
285283-284234-236
235-237 287-288
246-248
245-247
230228
227 229 231 233
244242240238
110111
C-002
C-007
C-702
147-151
C-318
C-814
123-122 121-120 C-005
C-01114
T-920
T-923
125-124127-126
128-133
134-136 137-138
T-770
T-740
T-769
T-767
T-772
T-768
A-909
A-910
A-908
T-857
225223
217215
211209
208206
207205
202 204
T-576
T-575
T-574
T-573
T-572
T-594
F-006
T-
T-578
T-566
T-569
T-570
T-571
T-579
T-
T-
T-
T-
T-
T-567 T-560
3-
9-
E-010
A-907
E-810
E-502 E-502
E-004
E-818
E-820
E-809
E-808
E-807
E-
E-912
SE
TH
MES
VH
C0
CA
RT
TO
S0
SE
TH
T-824
T-823
T-857
T-8
T-928
T-
T-
T-
T-11613A
T-917
T-11613BT-918
T-830
T-9
T-871
T-860
T-866
T-8
T-816
T-8
T-8
T-8
T-8
T-8
T-8 46 T-837
T-845
T-815
T-853 T-836
T-
T-800
T-69002
T-827
T-812
T-802 T-807 T-805 T-822
T-811
T-810
T-
T-
T-1431
T-1420
T-1427
T-1424
T-1423
T-
T-234
T-
T-1410
T-AF1
T-703
T-1429
T-1400
T-1428
T-1
T-1306
T-1303
T-1302
T-872
T-1425
T-1426
LAJESSUBSTATION
T-773
M1340
M1330
M1350
M1360
M1380
M1410 M1400
M1310M1320
M1300
M1390
H1414
T924
10KVA
M1370
M1385
H1412
M1295
M1305
M1335
M1290
M1280
M1285
M1284
M1270
M1260
HV
S130
M1250
M1240
M1220
M1230
M1210
M1200
M1180
M1190
M1170
M1160
M1150
M1140
M1130
M1120
M1110
M1100
M1090
M1070
M1080
M1060
HV
S060
M1050
M1040
M1030
M1020
M1010
M1000
EMH1
US Air Forces in Europe
LAJES FIELD, AZORES, PORTUGAL
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
Repair Airfield Ramp Lights
Telmo Aguiar
Telmo Aguiar
N/A
21 February 2020
MQNA 17-1008
T-81241
E-100
Overal Site Plan
SHT. E-107SHT. E-106SHT. E-105SHT. E-104SHT. E-103
SHT. E-102SHT. E-101
AutoCAD SHX Text
T-LP01
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
T-LP02
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
T-LP03
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
T-LP04
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
T-LP05
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
T-LP06
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP07
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
T-LP08
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP09
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LP01
AutoCAD SHX Text
LP02
AutoCAD SHX Text
LP03
AutoCAD SHX Text
LP04
AutoCAD SHX Text
LP05
AutoCAD SHX Text
LP06
AutoCAD SHX Text
LP07
AutoCAD SHX Text
LP08
AutoCAD SHX Text
LP09
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP10
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP11
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
T-LP12
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
T-LP13
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP14
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP15
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP16
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
T-LP17
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP18
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
T-LP19
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP20
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
T-LP21
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
T-LP22
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP23
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
T-LP24
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP25
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T-LP26
AutoCAD SHX Text
25KVA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
LP10
AutoCAD SHX Text
LP11
AutoCAD SHX Text
LP12
AutoCAD SHX Text
LP13
AutoCAD SHX Text
LP14
AutoCAD SHX Text
LP15
AutoCAD SHX Text
LP16
AutoCAD SHX Text
LP17
AutoCAD SHX Text
LP18
AutoCAD SHX Text
LP19
AutoCAD SHX Text
LP20
AutoCAD SHX Text
LP21
AutoCAD SHX Text
LP22
AutoCAD SHX Text
LP23
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
LP24
AutoCAD SHX Text
LP25
AutoCAD SHX Text
LP26
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
M1350
M1360
M1380
M1410 M1400
M1390
M1370
M1385
US Air Forces in Europe
LAJES FIELD, AZORES, PORTUGAL
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
Repair Airfield Ramp Lights
Telmo Aguiar
Te…