Attachment 3 - Schedule of Material Submittals (AF66).pdf

PDF 125 KB Posted

Attached to
Repair Water Towers and Ladders B738 & B3475 (GAFB)
Solicitation number
FA303025Q0013
Issued by

About this file

This is a Schedule of Material Submittals (AF Form 66) for Project Number 1145749 "Repair Water Towers and Ladders" at buildings B738 and B3475. The document outlines required contractor submittals and their timing requirements.

The submittal schedule lists 16 required items including a Work Management Plan, Manufacturer's Catalog Data, warranties, Safety Plan with Fall Protection, Construction Plan, Quality Control Plan, Progress Schedule, BALs, Materials and Products documentation, Paints, Construction Waste Management Form, photographs/videos of work phases, test reports, checklists, certifications, Work Clearance Request Form 103, and Welding/Cutting/Brazing documentation. Timing requirements are specified with codes: (a) as soon as possible but no later than start of construction, (b) within 7 calendar days after Task Order NTP, (c) prior to start of demo/construction, (d) prior to installation, (e) prior to final inspection, and (f) no later than 15 days after project completion. The form includes columns for tracking submittal dates, approvals, and contractor notifications, though these fields are not filled in.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRA

CT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

Part 1, 1.6 Work Management Plan 1 a FIO

Part 1, 1.11 Manufacturers Catalog Data

1 1 d GA

Para 1, 11.1 Manufacturers Warranty 1 e FIO

Part 1, 1.11.2 Contractors Warranty 1 e FIO

Part 1. 1.14 Safety Plan, to include Fall Protection 1 a GA

Part 1, 1.15 Construction Plan 1 c FIO

Part 1, 1.16 Quality Control Plan 1 a FIO

Part 1, 1.17 Progress Schedule 1 a GA

9 Part 1, 1.23 BALs 1 a,c FIO

Part 2, 2.1.2 Materials and Products 1 1 a,d GA

11 Part 2, 2.1.2.2 Paints 1 1 a,d GA

Part 3, 3.3 Demo, Construction Waste Mgmnt Form

1 e GA

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

PROJECT NUMBER: 1145749

SA

MP

LE

S

Repair Water Towers and Ladders, B738, B3475

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION DATE REMARKS

DATE

RECEIVED IN

CON-

TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FORM66.xls

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRA

CT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

PROJECT NUMBER: 1145749

SA

MP

LE

S

Repair Water Towers and Ladders, B738, B3475

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION DATE REMARKS

DATE

RECEIVED IN

CON-

TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

Part 3, 3.2, B738, Phase 3, Line 16, Photographs \ Video

1 e GA

Part 3, 3.2, B738, Phase 4, Line 19, Test Reports, Checklists, Certifications 1 e FIO

Part 3, 3.2, B3475, Phase 3, Line 13, Photographs \ Video

1 e GA

Part 3, 3.2, B3475, Phase 4, Line 16, Test Reports, Checklists, Certifications 1 e FIO

Part 4, 4.1.1 Work Clearance Request, Form

1 a GA

Part 4, 4.4 Welding, Cutting, Brazing 1 1 c GA

AF Form 66

(a) As soon as possible but NLT start of construction

(b) NLT 7 Calendar Days after Task Order NTP

(c) Prior to Start of Demo/Construction

(d) Prior to Installation

(e) Prior to Final Inspection

(f) As soon as possible but NLT 15 days after project completion