This is a Schedule of Items attachment detailing the line items and quantities for the NFSR 141 Rehabilitation and Maintenance Project under Solicitation Number 127EAX26R0008 issued by the Gila National Forest, Department of Agriculture Forest Service. The project covers National Forest System Road 141 from milepost 0.69 to milepost 18.81, with a base contract scope and eleven optional items.

The base contract includes mobilization, centerline staking, quality control, clearing and grubbing across 18.14 miles, removal of four pipe culverts, subexcavation with and without geogrid totaling 20,519 square yards, placement of riprap (Class 2 and Class 6), 22,620 tons of aggregate base with grading, ditch reconditioning for 18.14 miles, full depth reclamation of 116,670.44 square yards, 18,935 tons of 3-inch asphalt concrete with PG 64-22 binder, installation of corrugated metal pipes in various diameters (18-inch through 36-inch) totaling 1,035 linear feet, cleaning and reconditioning of culverts, installation of gates and cattleguards, delineators, sign systems, temporary traffic control for 2,500 hours, and pavement markings covering 46,469 linear feet. Optional items #1 through #8 provide aggregate surface course applications at various milepost segments ranging from 2,070 to 9,810 tons, optional item #9 includes dust palliative application over 9.34 miles, and optional items #10 and #11 specify fog seal and chip seal applications for the first 8.8 miles. All pay items currently show zero unit costs, indicating that pricing information will be provided by contractors in their proposals.

View the file

Other files for this federal contract opportunity

Other files attached to NFSR 141 Paving Project, newest first.
File Type Posted
NFSR 141 Bre Bid Questions attendees.docx DOCX document
Rd 141 Road Log 7-21-2021.pdf PDF
127EAX26R0008 00001.pdf PDF
Attachment 7 - Wage Determination.pdf PDF
Attachment 4 - Drawings.pdf PDF
Attachment 2 - Specifications.docx DOCX document
Attachment 1 - Statement of Work.docx DOCX document
Attachment 6 - Fire Plan.docx DOCX document
127EAX26R0008 - NFSR 141 Paving Project.pdf PDF
Attachment 5 - Maps.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI

RESERVE RANGER DISTRICT / GILA NATIONAL FOREST / CONSTRUCTION

PROJECT TITLE: 0306 NFSR 141 REHABILITATION AND MAINTENANCE

PROJECTNFSR 141 Rehabilitation and Maintenance
UNITGila National Forest
SOLICITATION #127EAX26R0008
CONTRACTOR NAME
CONTRACTOR POC
POC EMAIL
SAM UEI #
Base - FSR 141 MP 0.00 TO MP 18.143
Pay ItemDescriptionQuantityUnit of IssueUnit CostTotal

15101 Mobilization 1 LS $0.00

Pay Item Description Quantity Unit of Issue Unit Cost Total

15250Centerline Reference Stakes, tolerance per plans8.80MILE$0.00
15301Contractor Quality Control1.00LS$0.00
15401Contractor Testing1.00LS$0.00
20103Clearing and Grubbing, dispose per 203.05(f) Scattering18.14MILE$0.00
20302Removal of Pipe Culvert, Disposal 203.05(a) remove from project, compaction per sec 209.104.00EA$0.00
20450ASubexcavation, 204.11(a) Compact Placement Method 12389.00SY$0.00
20450BSubexcavation with Geogrid, 204.11(a) Compact Placement Method 118130.00SY$0.00
20451SITE 1 - Roadway Excavation1.00LS$0.00
25101APlaced RipRap, Class 2 as noted on plan sheet (on site), Acceptance Method A300.00CY$0.00
25101BPlaced RipRap, Class 6 as noted on plan sheet (on site), Acceptance Method A140.00CY$0.00
30104Aggregate Base, Grading 3/4" minus (FSSS 703.05), Compaction D (FSSS 301.05)22620.00TON$0.00
30301Ditch Reconditioning18.14MILE$0.00
30450Full Depth Reclamation 6"- 304.07(a) Compaction Method 1116670.44SY$0.00
403013" Asphalt Concrete, Type II, ½” max aggregate size, PG 64-22 binder18935.00TON$0.00
60201A18" CMP, min 16ga. (0.064") steel, compaction method 6155.00LF$0.00
60201B24" CMP, min 16ga. (0.064") steel, compaction method 6840.00LF$0.00
60201C30" CMP, min 16ga. (0.064") steel, compaction method 620.00LF$0.00
60201D36" CMP, min 16ga. (0.064") steel, compaction method 620.00LF$0.00
60250A24" CMP, min 16ga. (0.064") steel 22.5° Elbow1.00EA$0.00
60250B30" CMP, min 16ga. (0.064") steel 22.5° Elbow1.00EA$0.00
60250C36" CMP, min 16ga. (0.064") steel 22.5° Elbow1.00EA$0.00
60708ACleaning Culvert in Place (general cleaning)167.00EA$0.00
60708BCleaning Culvert in Place (pressure flushing)4.00EA$0.00
60710Reconditioning Drainage Structure, Culvert14.00EA$0.00
61902Gate, 28' steel double lane gate2.00EA$0.00
63308Delineator Type 2 (culverts)200.00EA$0.00
63301Sign System - includes 1 post, hardware and sign(s)87.00EA$0.00
63311Remove and Dispose Existing Sign System110.00EA$0.00
63506Temporary Traffic Control, Flagger Persons2500.00HR$0.00
63508Temporary Traffic Control, Electronic Sign Board8.00Month$0.00
63402Pavement Markings Type B - Solid White (4" outside edge)46469.00LF$0.00
61903Install 22.5' steel HS-20 cattleguard2.00EA$0.00
Base Subtotal$0.00
TOTAL BASE WITH MOB$0.00

OPTIONAL ITEMS

#1 - Full Depth Reclamation milepost 9.47-18.81
Pay ItemDescriptionQuantityUnit of IssueUnit CostTotal

30450 Full Depth Reclamation 6"- 304.07(a) Compaction Method 1 115068.87 SY $0.00

#2 - milepost 9.47-13.21 (includes curves 12-17 and first 16 intersections)
Pay ItemDescriptionQuantityUnit of IssueUnit CostTotal

30116A Aggregate Surface Course, Grading per FSSS Table 703-3, 4" Compaction D (FSSS 301.05) 9810 TON $0.00

#3 - milepost 13.21 -14 (includes curves 18 & 19 and no intersections)
Pay ItemDescriptionQuantityUnit of IssueUnit CostTotal

30116B Aggregate Surface Course, Grading per FSSS Table 703-3, 4" Compaction D (FSSS 301.05) 2070 TON $0.00

#4 - milepost 14-15 (includes curve 20 and 1 intersection)
Pay ItemDescriptionQuantityUnit of IssueUnit CostTotal

30116C Aggregate Surface Course, Grading per FSSS Table 703-3, 4" Compaction D (FSSS 301.05) 2590 TON $0.00

#5 - milepost 15-16 (includes curve 21 and 2 intersections)
Pay ItemDescriptionQuantityUnit of IssueUnit CostTotal

30116D Aggregate Surface Course, Grading per FSSS Table 703-3, 4" Compaction D (FSSS 301.05) 2610 TON $0.00

#6 - milepost 16-17 (includes curves 22, 23 & 24 and 2 intersections)
Pay ItemDescriptionQuantityUnit of IssueUnit CostTotal

30116E Aggregate Surface Course, Grading per FSSS Table 703-3, 4" Compaction D (FSSS 301.05) 2660 TON $0.00

#7 - milepost 17-18 (includes curves 25, 26, 27 & 28 and 1 intersection)
Pay ItemDescriptionQuantityUnit of IssueUnit CostTotal

30116F Aggregate Surface Course, Grading per FSSS Table 703-3, 4" Compaction D (FSSS 301.05) 2650 TON $0.00

#8 - milepost 18-18.81 (includes curves 29 & 30 and 2 intersections)
Pay ItemDescriptionQuantityUnit of IssueUnit CostTotal

30116G Aggregate Surface Course, Grading per FSSS Table 703-3, 4" Compaction D (FSSS 301.05) 2129 TON $0.00

#9 - milepost 9.47-18.81
Pay ItemDescriptionQuantityUnit of IssueUnit CostTotal

31201 Dust Palliative Application, Type per 725.02(d)-Lignosulfonate, Method 2 9.34 MILE $0.00

#10 - milepost 0.69-9.47
Pay ItemDescriptionQuantityUnit of IssueUnit CostTotal

40601 Fog Seal - Bituminous Flush Coat (0.12g/sy) CSS-1H 51 TON $0.00

#11 - milepost 0.69-9.47
Pay ItemDescriptionQuantityUnit of IssueUnit CostTotal

40702 Chip Seal, Type 1C with CRS-2P (0.42 gal/sy) 103264 SY $0.00

TOTAL OPTIONS $0.00

TOTAL BASE + OPTIONS $0.00

File details come from the government source that posted it. Updated .