This specification document outlines the passenger elevator modernization requirements for the State Capitol Building in Denver, Colorado, prepared by the State of Colorado Office of the State Architect under Project 2025-088M24. The modernization project addresses two passenger elevators serving four floors (Ground, 1st, 2nd, and 3rd) with a travel distance of approximately 60 feet. The work encompasses comprehensive upgrades including replacement of original Otis gearless DC hoist machines with new permanent magnet AC gearless machines, installation of an MCE iBox Two Car Group microprocessor control system, and implementation of new ReGen VVVF motor drive units with transformers as required. Additional components include new Hollister-Whitney governors, GAL hoistway door equipment, TLS limit switches, Elsco roller guides, new car door operators with bronze door panels, and updated signal fixtures with A17.1 2019-compliant controls. The specification requires retention of existing bronze hoistway door panels, car and counterweight buffers, and car safeties where feasible, while modernizing all mechanical and electrical systems to current code standards.

The specifications detail extensive modernization across machine room, hoistway, car, cab, pit, and signal fixture components, with provisions for dual hall pushbutton stations at each floor, firefighters' key switch at the first floor, directional hall lanterns, and emergency power indicators throughout the system. The document explicitly states that if discrepancies exist between this summary and the full technical specifications, or if items are not included in this summary, the complete body of technical specifications should take precedence. No pricing information, contract term, bid deadlines, or award dates are provided in this specification summary document.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Colorado – State Capitol Building 200 East Colfax Avenue

Passenger Elevator Modernization Specifications Denver, CO 80203

State of Colorado – Office of the State Architect - State Buildings Program February 27, 2025

Project: 2025-088M24 – Modernize Passenger Elevators – State Capitol Building

2.01 PASSENGER ELEVATOR SCHEDULE/EQUIPMENT SUMMARY (1)

State Capitol Building Existing After Modernization

Description:

Speed/Capacity 500 FPM @ 2,500 Lbs. 500 FPM @ 2,500 Lbs.

Stops/Openings Four (4) Four (4) Floor Marking: G, *1, 2, 3

Travel: Approximately 60 feet Contractor to verify

Operation Duplex Operation Microprocessor – Two (2) Car Group

Machine Room:

Gearless Hoist Machine, Bedplate, Deflector

Sheave, and Hoist Cables

Remove the original Otis Gearless DC Hoist Machines, and install new Permanent Mag-net AC Gearless Hoist Machine, Bed Plate, Machine Room mounted 1:1 Double Wrap

Deflector Sheave, w/ Main and Auxiliary Brake Assembly. Install new Hoist Cables. (5 –

½ Hoist Cables)

Controller Install new MCE iBox Two Car Group microprocessor control system.

Power Conversion Provide new "ReGen" VVVF Motor Drive Unit and Transformers, if required.

Governors Install new Hollister-Whitney Governors, Governor Cable and Tension Sheave.

Hoistway:

Hoistway door equipment Install new GAL or approved equal hoistway door tracks, hanger rollers, closers, inter-locks, pickup rollers, retainers, door gibs, and fire stops.

Hoistway Doors, Entrances and Sills

Clean, polish, and retain the existing Bronze Hoistway Door Panels, Entrances, and Sills.

Hoistway limit switches Install new TLS Slowdown, ETS, and Limit Switches.

Car & Cwt Rails Realign as needed for smooth/quiet ride.

Wiring/Duct Install new traveling cables, hoistway wiring, and machine room wiring.

Car & Cwt. Roller Guides Install new Elsco Type “A” Tandem Car Roller Guides. Install new Elsco Type “D”

Counterweight Roller Guides.

Car Safeties Retain the existing Hollister-Whitney Type “B” Safeties & Linkages.

Car:

Car-top-control Provide new

Door Operator Install new GAL – MOVFE Linear or approved equal Car Door Operators.

Car Door Panels Install new #4 satin finish Bronze Car Door Panels, Header, Tracks, Hanger Rollers, and

Gate Switch. Support Car Door Operator from the Car Top, not the Car Sling.

Door Protective Device Provide new Janus 3D or approved equal.

Top of Car Railing Provide per current code

Cab: . new Front Return Panel, Strike Jamb, and Transon. Clean and polish Car Door Sill. Retain the existing elevator cab interiors. Provide new Cab Protective Pads and Pad Hooks.

Pit:

Stop Switch Provide in compliance with code.

Buffers Clean, refurbish and retain the existing Car and Counterweight Buffers.

Signal Fixtures

Car Operating Panel Provide new Main COP. A17.1 2019 compliant. Provide Digital PI’s. Install Dual Car

Lanterns

Hall PB Station

Dual Hall Push Button

Riser (North & South)

Install new A17.1 - 2019 compliant LED illuminated Hall Pushbutton fixtures and Posi-tion Indicator at each floor. At the 1st floor install new three (3) position Firefighters’ key switch, Phase I Operating Instructions, “Communication Failure" indicator light, Buzzer, and Key Switch. Provide an Emergency Power indicator light.

Combo Hall PI & Lanterns

“Opposite Elevator Arriv-ing” notification

Above each entrance, install a new combination Directional Hall Lantern and “Opposite

Elevator Arriving” light and Gong on each Car and at each floor.

Hoistway Access Switch Provide Top and Bottom Hoistway Access per code

(1) Summary is just a brief outline to give general scope of work. If a discrepancy exists between the summary and body of the technical specifications, or if an item is not included in the summary, the body of the technical specifications should take precedence.