Attachment 3 - Salient Characteristics.pdf
PDF 76 KB Posted
- Attached to
- 31 MXS JP-8 Fuel Tanks
- Solicitation number
- FA568224Q8047
About this file
This document is the Salient Characteristics for CLIN 0001 - Three (3) JP8 Fuel Tanks under the federal contract opportunity FA568224Q8047 for the 31st Maintenance Squadron (31 MXS). The key requirements include: 1) Demolition of the existing fuel tanks, including disconnecting the power line and dismantling the existing pump; 2) New tank construction, which involves installing a new JP8 tank, access ladder, internal lining, support saddles, drain collection gutter, stainless steel level indicator, floating suction arm, electronic level indicator, and leak detection device; 3) Reconnecting the existing power line to the new pump; and 4) Transporting and unloading the new tanks at Aviano Air Base. The contractor must have the technical expertise to properly install the new fuel tanks in compliance with local regulations and industry standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| ASHE 20-1089_Drawings_Final.pdf | ||
| 20240603_132850.jpg | JPG image | |
| 20240603_132459.jpg | JPG image | |
| 20240603_132437.jpg | JPG image | |
| 20240603_132834.jpg | JPG image | |
| Large JP8 Tank.png | PNG image | |
| 20240603_132507.jpg | JPG image | |
| 300-gallon-eco.png | PNG image | |
| 20240603_132452.jpg | JPG image | |
| 20240603_132530.jpg | JPG image | |
| FA568224Q8047 COMBINED SYNOPSIS.pdf | ||
| Attachment 4 - Statement of Work - Amended.pdf | ||
| Questions and Answers.pdf | ||
| Questions and Answers.docx | DOCX document | |
| Attachment 1 - Provisions and Clauses.pdf | ||
| Attachment 2 - 52.212-1 Instructions to Offerors.pdf | ||
| FA568224Q8047 COMBINED SYNOPSIS.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SALIENT CHARACTERISTICS
ITEM DESCRIPTION:
CLIN 0001 – Three (3) JP8 Fuel Tanks
DEMOLTION (Removal):
1) Dismantle the 220V power line from pump on the existing tank.
2) Dismantle existing pump, to be re used.
3) Supply a new JP8 tank in conformity to local regulations and IATA directives.
NEW CONSTRUCTION (Installation):
1) Collect half-well (possible spills) welded around the manhole including internal and external cladding.
2) Install access ladder (with non-slip steps) service/operating landing obtained from grating 1,000 x 500 mm and railing (in compliance with HSE directives).
3) Install professional internal lining (Interline 984 C) suitable to receive the JP8 storage liquid;
application like from supplier data sheet; after internal sandblasting SA grade 2 ½.
4) Install support saddles in compliance with UNI-EN 12285-1 Class A with an inclination of 1.5% towards the manhole.
5) Weld double-walled drain collection gutter on the lower axis of the tanks - near the manhole -including the relevant pipe for water collection / takeaway.
6) Graduate metric rod in AISI 304 stainless steel including kick plate welded on the lower Axis.
7) 2” floating suction arm that allows extraction only clean liquid "not contaminated by solid particles”, including assembly inside the tank.
8) Install electronic level indicator - management system continuous level in the tank.
9) Install leak detection device type SGB - to be fitted outside EXX zone - pressure model - with mounting kit.
10) Install stickers in waterproof and weatherproof design.
11) Supervise the installation and brief of start-up coaching.
12) Transport costs to Aviano Air base including unloading at the foot of the truck.
13) Re connect existing power line to existing pump.