Attachment_3-Quote_Schedule.docx

DOCX document 19 KB Posted

Attached to
Mold remediation, Merritt Island NWR
Solicitation number
140FF027Q0053
Issued by
Not on record

About this file

This is a Quote Schedule for mold remediation services at Merritt Island National Wildlife Refuge Fire Office. The contract period of performance runs from contract award through September 30, 2027. The scope includes seven primary tasks: remediation of East and West Office North Walls, West Office West Wall, Attic Remediation, HVAC Remediation and Flex-Duct Removal, Temporary Humidity Control and Drying, Cleaning and Antimicrobial Treatment, and Mold-Remediation Turnover Condition, along with a final Contractor Remediation Report. Each task is listed as a single line item with a quantity of one.

The contractor is responsible for providing all labor, supervision, licenses, materials, equipment, containment, temporary controls, transportation, disposal, testing support, and incidentals necessary to complete the mold remediation scope. Notably, the contractor is explicitly excluded from performing reconstruction, replacement finishes, permanent moisture-source correction, window work, ceiling repair, plumbing repair, roofing work, or permanent HVAC replacement. This is a 100% Small Business Set Aside solicitation issued as Request for Quotation 140FF027Q0053 under FAR Parts 12 and 13 by the U.S. Fish and Wildlife Service, with NAICS code 562910 (Remediation Services) and a small business size standard of $25 Million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mold Remediation Services Merritt Island National Wildlife Refuge Fire Office Quote Schedule Period of performance: Contract award – September 30, 2027

Description
Job
Total

Task 6.1 East and West Office North Walls

Task 6.2 West Office West Wall

Task 6.3 Attic Remediation

Task 6.4 HVAC Remediation and Flex-Duct Removal

Task 6.5 Temporary Humidity Control and Drying

Task 6.6 Cleaning and Antimicrobial Treatment

Task 6.7 Mold-Remediation Turnover Condition

Final Contractor Remediation Report

Total

* The Contractor shall provide all labor, supervision, licenses, materials, equipment, containment, temporary controls, transportation, disposal, testing support, and incidentals necessary to complete the mold-remediation scope. The Contractor shall not include reconstruction, replacement finishes, permanent moisture-source correction, window work, ceiling repair, plumbing repair, roofing work, or permanent HVAC replacement.