Sol_140FF027Q0053_Amd_0003.pdf
PDF 243 KB Posted
- Attached to
- Mold remediation, Merritt Island NWR
- Solicitation number
- 140FF027Q0053
- Issued by
- Not on record
About this file
This document is Amendment 0003 to a federal solicitation for mold remediation services at Merritt Island National Wildlife Refuge (NWR), issued by the U.S. Fish and Wildlife Service (FWS), SAT Team 3, located in Falls Church, Virginia. The amendment addresses industry concerns raised during the solicitation process and maintains the closing deadline of Monday, November 16, 2026, at 2:00 p.m. The solicitation number is 140FF027Q0053, with an effective date of October 29, 2026. All other terms and conditions from the original solicitation remain unchanged.
The amendment is accompanied by a Questions and Answers document that clarifies key requirements for offerors. Regarding insurance, contractors must maintain Workers' Compensation at statutory limits, Employer's Liability of at least $100,000, Commercial General Liability of at least $500,000 per occurrence, Automobile Liability of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage, and Contractor's Pollution Liability including mold-related operations of $1,000,000 per occurrence and $2,000,000 aggregate. Evidence of insurance must be provided before work commences, and subcontractors performing mold-related work must carry their own pollution liability coverage at the same limits. Regarding scope, offerors must price only the work expressly defined in the Performance Work Statement (PWS), which includes cleaning and remediation of attic roof decking and removal and disposal of contaminated conference-room flex-duct; roof decking removal/replacement and flex-duct replacement are excluded. The Government will provide a February 2012 Comprehensive Asbestos Survey and obtain a supplemental affected-area asbestos inspection before intrusive work begins; offerors shall not include asbestos-related work in their pricing. The Government will secure and seal affected north-side window assemblies and provide temporary exterior weatherproofing before remediation activities; the contractor remains responsible for protecting openings it creates and maintaining containment and humidity control. Contact information includes Technical POC Keith Ramos at (321) 861-2278 and Contract POC Fred Riley at Fred_riley@ios.doi.gov.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Fred Riley
See continuation page
FWS, SAT Team 3 5275 Leesburg Pike Falls Church VA 22041
FSE
140FF027Q0053
10/29/2026
10/29/2026
1 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140FF027Q0053/0003
Amendment 0003 is necessary to address concerns posed from industry.
Closing remains Monday, November 16, 2026, at
2:00pm.
All other terms and conditions remain unchanged.
Mold remediation, Merritt Island NWR
Tech POC Name/#: Keith Ramos (321) 861-2278
Contract POC: Fred Riley, Fred_riley@ios.doi.gov
Questions and Answers
Question 1: PWS Section 4.3 says an asbestos inspection report would be provided before the solicitation. It is not among the posted attachments. Can you provide it, or confirm none exists?
Answer 1: The Government has located a February 2012 Comprehensive Asbestos Survey that includes the project facility, identified as the Fire Cache/Administrative Building. The survey will be provided as an attachment to the solicitation amendment.
Because the 2012 survey does not address every material anticipated to be disturbed under the current mold-remediation scope, the Government will also obtain a supplemental, affected-area asbestos inspection. The supplemental report will be provided to the Contractor before intrusive work begins.
Offerors shall not include asbestos inspection, testing, or abatement in their proposed prices. If the supplemental inspection identifies asbestos-containing material that affects the scope, schedule, or performance requirements, the Government will address it through an appropriate solicitation amendment or contract modification before the affected material is disturbed.
Question 2: Insurance: PWS Section 10 states that insurance requirements will be established in the solicitation. Please provide the required coverages and minimum limits.
Answer 2: The Contractor shall maintain the following insurance throughout contract performance:
1. Workers’ Compensation: Statutory limits required by applicable Federal and Florida law.
2. Employer’s Liability: Not less than $100,000.
3. Commercial General Liability: Not less than $500,000 per occurrence for bodily injury.
4. Automobile Liability for vehicles used in contract performance: Not less than $200,000 per person and $500,000 per occurrence for bodily injury, and $20,000 per occurrence for property damage.
5. Contractor’s Pollution Liability, including mold-related operations: $1,000,000 per occurrence or claim and $2,000,000 aggregate.
The Contractor shall provide evidence of the required insurance before commencing work. Required coverage shall apply to subcontractors performing work on the Government installation, consistent with FAR 52.228-5.
Question 3: The Bio Pro assessment report recommends removal of affected attic roof decking and replacement of the conference-room flex duct. The PWS excludes both (cleaning of decking only; flex duct removal only). Please confirm that offerors should price strictly to the PWS.
Answer 3: Confirmed. Offerors shall price the work expressly defined by the PWS. The base scope includes cleaning and remediation of retained attic roof decking and removal and disposal of the identified contaminated conference-room flex-duct branch.
Roof-deck removal or replacement and flex-duct replacement are excluded.
The assessment report documents existing conditions and informs the remediation protocol, but it does not add reconstruction or replacement work expressly excluded by the PWS. If roof decking cannot be successfully remediated, or additional replacement work is determined necessary, the condition shall be documented and referred to the Government for separate action. No excluded work may be performed without written authorization from the Contracting Officer.
Question 4: Have the identified water-intrusion sources at the north-side walls and window assemblies already been corrected?
Answer 4: No. The source of water intrusion at the north-side window assemblies has not yet been permanently corrected. The Government will have the affected window assemblies secured and sealed before mold-remediation work begins.
Question 5: If not, does the Government have a separate repair plan, and are those corrections anticipated before mold-remediation work begins?
Answer 5: Yes. Before mold-remediation work commences, the Government will have the affected north-side window assemblies secured and sealed. This work is separate from the mold-remediation contract and shall not be included in the Contractor’s proposed price. The mold-remediation Contractor will not be held responsible for subsequent water intrusion through the Government-repaired or sealed window assemblies, or for water damage or mold growth resulting from such intrusion. This allocation does not relieve the Contractor of responsibility for intrusion or damage directly caused by its own actions, damage to the completed repair or weatherproofing, or failure to protect an opening created during its work.
Question 6: If permanent repairs will occur later, will temporary weatherproofing or other moisture-control measures be provided to prevent additional intrusion during remediation and clearance?
Answer 6: Yes. The Government will provide temporary exterior covering or weatherproofing at the affected north-side window assemblies before intrusive remediation activities. The temporary protection will be maintained as necessary to prevent additional water intrusion until the permanent window repairs are completed.
The mold-remediation Contractor remains responsible for protecting any openings it creates, maintaining containment and temporary humidity control, and promptly reporting any evidence of additional moisture intrusion.
Question 7: If additional water intrusion occurs during the remediation or drying period, how will the resulting interruption, restoration of acceptable conditions, and any necessary schedule or scope adjustments be addressed?
Answer 7: If additional water intrusion occurs, the Contractor shall immediately notify the COR, document the condition with photographs and moisture readings, and suspend work in the affected area when necessary to protect personnel, containment, completed work, and materials to remain. The Contractor shall take reasonable temporary protective measures within its control but shall not perform permanent building-envelope repairs or expand the remediation scope without written authorization from the Contracting Officer. The Government will evaluate and address the source of the new intrusion and will authorize resumption of affected work after the area is adequately protected. Before post-remediation verification, the affected area must again meet the SOW requirements for drying, cleanliness, moisture content, and relative humidity. If the additional intrusion or resulting deficiency is attributable to the Contractor’s failure to maintain required protection, containment, temporary closures, or humidity control, corrective work and repeat testing will be performed at no additional cost to the Government. If the intrusion is outside the Contractor’s control, any demonstrated effect on contract time, cost, or scope will be evaluated under the applicable contract terms and must be authorized through a written contract modification. No adjustment is automatic.
Question 8: The contractor’s pollution liability requirement calls for coverage that includes mold-related operations, but the minimum limit is blank. Could you confirm the required per-occurrence and aggregate limits, and whether the air-handler cleaning subcontractor must carry its own pollution liability policy or can be covered under the prime contractor’s policy?
Answer 8: Contractor’s Pollution Liability limits of $1,000,000 per occurrence or claim and $2,000,000 aggregate. Coverage should specifically include mold, fungi, microbial contamination, HVAC and air-handler cleaning, containment failure, cleanup, transportation, and disposal. The prime contractor should maintain this coverage, and any subcontractor performing air-handler, duct-cleaning, or other mold-related work should carry its own pollution-liability coverage at the same limits, even if the prime contractor’s policy also provides coverage. Certificates of Insurance should be required before the applicable work begins.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .