Attachment 3 Prime Cost Proposal Spreadsheet_.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
REQUEST FOR PROPOSALS – Test, Evaluation, Repair, Modification & Upgrade of Electronic Warfare Systems
Solicitation number
N0016426RWS78
Issued by

About this file

This is a Prime Cost Proposal Spreadsheet template for Solicitation N0016426RWS78, issued by the Naval Sea Systems Command for test, evaluation, repair, modification, and upgrade of electronic warfare systems. The spreadsheet is designed to capture comprehensive labor and other direct cost (ODC) pricing information across a five-year performance period.

The template requires contractors to provide detailed labor cost breakdowns including direct labor costs by employee, labor category, and year with associated hours and rates; uncompensated overtime (UCOT) percentages; base year escalation rates; indirect costs across multiple categories; subcontractor costs and fees; prime contractor pass-through costs; and surge and special studies labor costs. Additional sections address other direct costs such as travel and materials for both prime contractors and subcontractors, with provisions for G&A adders. The spreadsheet includes analytical sections for fee calculation, pass-through analysis (capped at 8% per SeaPort-NxG IDIQ Contract terms), and fixed fee analysis for labor performed by the prime contractor. A labor rates summary table captures employee names, labor categories, total burdened rates, annual hours, and full-time equivalent (FTE) calculations, with separate tracking for overtime and overtime premiums across base years and option periods. This template appears to be a standard cost proposal requirement for SeaPort-NxG IDIQ contracts under the Department of the Navy.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Labor Cost Summary Solicitation No. N0016426RWS78 Escalation Rate Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Enter escalation percentage noted in RFP Prime Offeror Name: Year 1 Year 2 Year 3 Year 4 Year 5

Total for All YearsDirect Labor AdjustmentsYear 1Year 2Year 3Year 4Year 5
Cost ElementsCorresponding eCraft Labor CodeDirect Labor: Employee NamePlace of Performance

Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Contractor Site Government Site Other

Exempt/Non-Exempt Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Indicate if proposed employees are exempt/non-exempt from FLSA

HoursAmountCurrent Rate
Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Enter direct labor payroll rateUncompensated Overtime % (UCOT)

Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Enter UCOT percentage Adjusted Rate with UCOT Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Calculate direct labor rate adjusted for UCOT

Base Year Escalation Rate (%) Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Enter BY escalation percentage Base Year Labor Rate Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Calculate Base Year Direct Labor rate Hours Amount Labor Rate Hours Amount Labor Rate Hours Amount Labor Rate Hours Amount Labor Rate Hours Amount

Prime Contractor Labor Cost
Prime Contractor Direct Labor
Company Labor Category

Total CORE Direct Labor Cost

Prime Contractor Indirect Labor Cost
Indirect Cost 1 ( %)
Indirect Cost 2 ( %)
Indirect Cost 3 ( %)
Etc.
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1 Cost
Subcontractor 1 Fee
Subcontractor 2 Cost
Subcontractor 2 Fee
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through
Handling ( %)
G&A ( %)
Other (if any)
Total pass through (not including fee)

Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fee on Labor
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Surge CLINs (use Weighted Average Loaded Labor Rate - before fee) Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): If Applicable

Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Contractor Site Government Site Other

Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Indicate if proposed employees are exempt/non-exempt from FLSA

Fee on Surge Labor
Prime Contractor Fixed Fee on Surge Labor

Total Surge Costs

Special Studies CLINs (use Weighted Average Loaded Labor Rate - before fee) Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): If applicable

Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Enter escalation percentage noted in RFP Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Enter direct labor payroll rate Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Enter UCOT percentage

Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Calculate direct labor rate adjusted for UCOT

Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Enter BY escalation percentage

Langell, Tisha N CIV USN NSWC CD CRANE IN (USA): Calculate Base Year Direct Labor rate

Fee on Special Studies Labor
Prime Contractor Fixed Fee on Special Studies Labor
Total Special Studies Costs
Total Labor Cost (including Surge, Special Studies and Fee)
Other Direct Costs - Prime
Prime Travel
Prime Material
Any adders to ODCs such as G&A (cost only - no fee)
Other Direct Costs - Sub-Contractor
Sub-Contractor Travel
Subcontractor 1
Subcontractor 2
Etc.
Sub-Contractor Material
Subcontractor 1
Subcontractor 2
Etc.
Any adders to ODCs such as G&A (cost only - no fee) to Subcontractor ODC
Total ODCs

Total CPFF all CLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor *
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Maximum Pass Through Allowed by SeaPort-NxG IDIQ Contract8%
Fee Analysis - Total for All YearsPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Maximum Fixed Fee Allowed by SeaPort-NxG IDIQ Contract
* When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B.

Labor Rates

Employee Name (if applicable)Labor CategoryTotal Burdened RateTotal WY Hours (e.g., 1880, 1920, 2080)FTE $
John Doe - SAMPLESr. Engineer$85.001920$163,200.00

Add rows as needed.

Overtime

Year 1Year 2Year 3Year 4Year 5
Prime Proposed Burdened OT
Sub-contractor 1 Proposed Burdened OT
Sub-contractor 2 Proposed Burdened OT
Sub-contractor 3 Proposed Burdened OT
Etc.

Total Proposed Burdened OT

Overtime Premium Breakdown

Base Yr 1Base Yr 2Option 1Option 2Option 3
Prime Proposed Burdened OT Premium
Sub-contractor 1 Proposed Burdened OT Premium
Sub-contractor 2 Proposed Burdened OT Premium
Sub-contractor 3 Proposed Burdened OT Premium
Etc.
Total Proposed Burdened OT Premium

File details come from the government source that posted it. Updated .