Attachment 3 - Pricing Worksheet.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Senior Engineering Services
- Solicitation number
- W911QY26RSETS
About this file
This is a Labor Pricing Worksheet template designed for JFET Engineering Services solicitation W911QY26RSETS, a small business set-aside for senior engineering services to develop military food service equipment systems and technologies. The worksheet is a blank template that contractors must complete to submit pricing proposals for the Department of the Army Materiel Command at Aberdeen Proving Ground.
The pricing worksheet structure requires vendors to enter labor categories with estimated hours and hourly rates across a base year and four option years, calculating subtotals for each period. Contractors must also itemize fringe benefits (percentage-based), overhead (percentage-based), materials (with detailed line-item support), travel costs, and other direct costs. The template applies G&A and profit/fee percentages to generate a grand total contract price. A separate materials tab is referenced for itemizing equipment and supplies needed to perform the contract. Contractors are instructed to include escalation factors for option years based on reputable sources such as Global Insights and to attach supporting documentation including historical data and assumptions. This is a fixed-price commercial services acquisition under FAR Part 12, with the NAICS code 541330 (Engineering Services) and PSC code R425 (Support-Professional: Engineering/Technical), restricted to firms with a small business size standard of $25,500,000.00.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor
Pricing Worksheet
| Company Name | |||||||||||||||
| Project Title: | JFET Engineering Services | ||||||||||||||
| Point of Contact | |||||||||||||||
| Date: | |||||||||||||||
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | |||||||||||
| Labor Category | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Labor Total | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 |
Fringe Benefits % $0.00 $0.00 $0.00 $0.00
Overhead % $0.00 $0.00 $0.00 $0.00 $0.00
Materials $0.00 $0.00 $0.00 $0.00 $0.00
Travel $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
G&A % $0.00 $0.00 $0.00 $0.00 $0.00
Profit/Fee % $0.00 $0.00 $0.00 $0.00 $0.00
| Grand Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor Categories. Enter all proposed labor categories for the project and the estimated hours for each related task. |
Materials. Itemize all items needed to perform the contract (See Materials tab)
Travel. Use an overall estimated cost for travel, combining such elements as air fare, per diem, and local travel multiplied by the number of trips.
| Other Direct Costs. Itemize any additional Direct Costs, if applicable. These items may include special test equipment, packaging and packing, telephone charges, etc. |
| Escalation factor. For option years, include escalation factor based on a reputable source, such as Global Insights, for each option year, if applicable. |
| Reference Material: Attach supportive documentation for support preparation, historical data, assumptions, etc. |
Prepared by:
| _____________________________________ |
| Preparer's Name, Position, Telephone number and Date |
Materials Materials Estimate - add lines as necessary.
Project Title:
Date:
| Item | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| Materials total | $0.00 |
File details come from the government source that posted it. Updated .