Attachment 3 - Pricing Worksheet.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- HT941026Q2018
- Issued by
-
Defense Health Agency
About this file
This is a pricing worksheet for pest management services at Joint Base Elmendorf-Richardson, Alaska under solicitation HT941026Q2018. The contract covers a base year (April 15, 2026 – April 14, 2027) plus four one-year option periods and a FAR 52.217-8 extension period (April 15, 2031 – October 14, 2031).
The services required include monthly delivery of small rodent glue boards to 15 breakrooms on the 1st floor and 9 breakrooms on the 2nd floor of Building 5955, plus 2 locations on the 1st floor and 1 location on the 2nd floor of the Lynx building. Metal cans must be provided monthly to 10 outside locations and 7 inside locations on the lower level of Building 5955, and 6 inside locations of the Lynx building. As-needed pest control treatments are specified with annual caps: bed bug room spray treatment (not to exceed 3 times per year), bed bug temperature air heat treatment up to 900 square feet (not to exceed 2 times per year), bed bug elite 8 heat treatment up to 300 square feet (not to exceed 4 times per year), interior insect treatment for entire interiors excluding kitchen and dining areas (2 times per year), and exterior carpet ant spray treatment at 50 square feet per application (not to exceed 4 times per year). The pricing worksheet is a template with blank price fields for contractors to complete; all pricing columns currently display $0, indicating this is the blank form awaiting contractor submissions.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base & Option Periods
| HT941026Q2018 Pricing Worksheet | ||||||
| INSERT CONTRACTOR INFORMATION | ||||||
| TOTAL | $ - 0 | |||||
| TOTAL with FAR 52.217-8 | $ - 0 | |||||
| BASE YEAR | ||||||
| PoP | CLIN | DESCRIPTION | Unit of Issue | Quantity | Price | TOTAL |
| 15 April 2026 - 14 April 2027 | 0001 | The contractor shall provide small rodent glue boards for 15 breakrooms on the 1st floor and 9 breakrooms on the 2nd floor of building 5955 on a monthly basis. The contractor shall provide small rodent glue boards for 2 locations on the 1st floor and 1 location on the 2nd floor of the Lynx building on a monthly basis. | Month | 12 | $ - 0 | |
| 0002 | The contractor shall provide metal cans for 10 locations on the outside 1st floor exits of building 5955 and 7 metal cans for the inside of the lower level of building 5955 on a monthly basis. The contractor shall provide metal cans for 6 locations on the inside of the 1st floor of the Lynx building on a monthly basis. | Month | 12 | $ - 0 | ||
| NTE | 0003 | The contractor shall provide bed bug room spray treatment for building 5955 or the Lynx building as needed, not to exceed 3 times per year. | Each | 3 | $ - 0 | |
| NTE | 0004 | The contractor shall provide bed bug temperature air heat treatment up to 900 sq feet for building 5955 or the Lynx building as needed, not to exceed 2 times per year. | Each | 2 | $ - 0 | |
| NTE | 0005 | The contractor shall provide bed bug elite 8 heat treatment up to 300 sq feet for building 5955 or the Lynx building as needed, not to exceed 4 times per year. | Each | 4 | $ - 0 | |
| NTE | 0006 | The contractor shall provide interior insect treatment for the entire interior of building 5955 and the Lynx building 2 times per year excluding the Kitchen and Dining Hall | Each | 2 | $ - 0 | |
| NTE | 0007 | The contractor shall provide exterior carpet ant spray treatment (50 sq ft) for building 5955 and the Lynx building as needed, not to exceed 4 times a year. | Each | 4 | $ - 0 | |
| BASE TOTAL | $ - 0 |
| OPTION PERIOD 1 | ||||||
| PoP | CLIN | DESCRIPTION | Unit of Issue | Quantity | Price | TOTAL |
| 15 April 2027 - 14 April 2028 | 1001 | The contractor shall provide small rodent glue boards for 15 breakrooms on the 1st floor and 9 breakrooms on the 2nd floor of building 5955 on a monthly basis. The contractor shall provide small rodent glue boards for 2 locations on the 1st floor and 1 location on the 2nd floor of the Lynx building on a monthly basis. | Month | 12 | $ - 0 | |
| 1002 | The contractor shall provide metal cans for 10 locations on the outside 1st floor exits of building 5955 and 7 metal cans for the inside of the lower level of building 5955 on a monthly basis. The contractor shall provide metal cans for 6 locations on the inside of the 1st floor of the Lynx building on a monthly basis. | Month | 12 | $ - 0 | ||
| NTE | 1003 | The contractor shall provide bed bug room spray treatment for building 5955 or the Lynx building as needed, not to exceed 3 times per year. | Each | 3 | $ - 0 | |
| NTE | 1004 | The contractor shall provide bed bug temperature air heat treatment up to 900 sq feet for building 5955 or the Lynx building as needed, not to exceed 2 times per year. | Each | 2 | $ - 0 | |
| NTE | 1005 | The contractor shall provide bed bug elite 8 heat treatment up to 300 sq feet for building 5955 or the Lynx building as needed, not to exceed 4 times per year. | Each | 4 | $ - 0 | |
| NTE | 1006 | The contractor shall provide interior insect treatment for the entire interior of building 5955 and the Lynx building 2 times per year excluding the Kitchen and Dining Hall | Each | 2 | $ - 0 | |
| NTE | 1007 | The contractor shall provide exterior carpet ant spray treatment (50 sq ft) for building 5955 and the Lynx building as needed, not to exceed 4 times a year. | Each | 4 | $ - 0 | |
| OPTION PERIOD 1 TOTAL | $ - 0 |
| OPTION PERIOD 2 | ||||||
| PoP | CLIN | DESCRIPTION | Unit of Issue | Quantity | Price | TOTAL |
| 15 April 2028 - 14 April 2029 | 2001 | The contractor shall provide small rodent glue boards for 15 breakrooms on the 1st floor and 9 breakrooms on the 2nd floor of building 5955 on a monthly basis. The contractor shall provide small rodent glue boards for 2 locations on the 1st floor and 1 location on the 2nd floor of the Lynx building on a monthly basis. | Month | 12 | $ - 0 | |
| 2002 | The contractor shall provide metal cans for 10 locations on the outside 1st floor exits of building 5955 and 7 metal cans for the inside of the lower level of building 5955 on a monthly basis. The contractor shall provide metal cans for 6 locations on the inside of the 1st floor of the Lynx building on a monthly basis. | Month | 12 | $ - 0 | ||
| NTE | 2003 | The contractor shall provide bed bug room spray treatment for building 5955 or the Lynx building as needed, not to exceed 3 times per year. | Each | 3 | $ - 0 | |
| NTE | 2004 | The contractor shall provide bed bug temperature air heat treatment up to 900 sq feet for building 5955 or the Lynx building as needed, not to exceed 2 times per year. | Each | 2 | $ - 0 | |
| NTE | 2005 | The contractor shall provide bed bug elite 8 heat treatment up to 300 sq feet for building 5955 or the Lynx building as needed, not to exceed 4 times per year. | Each | 4 | $ - 0 | |
| NTE | 2006 | The contractor shall provide interior insect treatment for the entire interior of building 5955 and the Lynx building 2 times per year excluding the Kitchen and Dining Hall | Each | 2 | $ - 0 | |
| NTE | 2007 | The contractor shall provide exterior carpet ant spray treatment (50 sq ft) for building 5955 and the Lynx building as needed, not to exceed 4 times a year. | Each | 4 | $ - 0 | |
| OPTION PERIOD 2 TOTAL | $ - 0 |
| OPTION PERIOD 3 | ||||||
| PoP | CLIN | DESCRIPTION | Unit of Issue | Quantity | Price | TOTAL |
| 15 April 2029 - 14 April 2030 | 3001 | The contractor shall provide small rodent glue boards for 15 breakrooms on the 1st floor and 9 breakrooms on the 2nd floor of building 5955 on a monthly basis. The contractor shall provide small rodent glue boards for 2 locations on the 1st floor and 1 location on the 2nd floor of the Lynx building on a monthly basis. | Month | 12 | $ - 0 | |
| 3002 | The contractor shall provide metal cans for 10 locations on the outside 1st floor exits of building 5955 and 7 metal cans for the inside of the lower level of building 5955 on a monthly basis. The contractor shall provide metal cans for 6 locations on the inside of the 1st floor of the Lynx building on a monthly basis. | Month | 12 | $ - 0 | ||
| NTE | 3003 | The contractor shall provide bed bug room spray treatment for building 5955 or the Lynx building as needed, not to exceed 3 times per year. | Each | 3 | $ - 0 | |
| NTE | 3004 | The contractor shall provide bed bug temperature air heat treatment up to 900 sq feet for building 5955 or the Lynx building as needed, not to exceed 2 times per year. | Each | 2 | $ - 0 | |
| NTE | 3005 | The contractor shall provide bed bug elite 8 heat treatment up to 300 sq feet for building 5955 or the Lynx building as needed, not to exceed 4 times per year. | Each | 4 | $ - 0 | |
| NTE | 3006 | The contractor shall provide interior insect treatment for the entire interior of building 5955 and the Lynx building 2 times per year excluding the Kitchen and Dining Hall | Each | 2 | $ - 0 | |
| NTE | 3007 | The contractor shall provide exterior carpet ant spray treatment (50 sq ft) for building 5955 and the Lynx building as needed, not to exceed 4 times a year. | Each | 4 | $ - 0 | |
| OPTION PERIOD 3 TOTAL | $ - 0 |
| OPTION PERIOD 4 | ||||||
| PoP | CLIN | DESCRIPTION | Unit of Issue | Quantity | Price | TOTAL |
| 15 April 2030 - 14 April 2031 | 4001 | The contractor shall provide small rodent glue boards for 15 breakrooms on the 1st floor and 9 breakrooms on the 2nd floor of building 5955 on a monthly basis. The contractor shall provide small rodent glue boards for 2 locations on the 1st floor and 1 location on the 2nd floor of the Lynx building on a monthly basis. | Month | 12 | $ - 0 | |
| 4002 | The contractor shall provide metal cans for 10 locations on the outside 1st floor exits of building 5955 and 7 metal cans for the inside of the lower level of building 5955 on a monthly basis. The contractor shall provide metal cans for 6 locations on the inside of the 1st floor of the Lynx building on a monthly basis. | Month | 12 | $ - 0 | ||
| NTE | 4003 | The contractor shall provide bed bug room spray treatment for building 5955 or the Lynx building as needed, not to exceed 3 times per year. | Each | 3 | $ - 0 | |
| NTE | 4004 | The contractor shall provide bed bug temperature air heat treatment up to 900 sq feet for building 5955 or the Lynx building as needed, not to exceed 2 times per year. | Each | 2 | $ - 0 | |
| NTE | 4005 | The contractor shall provide bed bug elite 8 heat treatment up to 300 sq feet for building 5955 or the Lynx building as needed, not to exceed 4 times per year. | Each | 4 | $ - 0 | |
| NTE | 4006 | The contractor shall provide interior insect treatment for the entire interior of building 5955 and the Lynx building 2 times per year excluding the Kitchen and Dining Hall | Each | 2 | $ - 0 | |
| NTE | 4007 | The contractor shall provide exterior carpet ant spray treatment (50 sq ft) for building 5955 and the Lynx building as needed, not to exceed 4 times a year. | Each | 4 | $ - 0 | |
| OPTION PERIOD 4 TOTAL | $ - 0 |
| FAR 52.217-8: For purposes of evaluating the Option to Extend Services only | ||||||
| PoP | CLIN | DESCRIPTION | Unit of Issue | Quantity | Price | TOTAL |
| 15 April 2031 - 14 October 2031 | 5001 | The contractor shall provide small rodent glue boards for 15 breakrooms on the 1st floor and 9 breakrooms on the 2nd floor of building 5955 on a monthly basis. The contractor shall provide small rodent glue boards for 2 locations on the 1st floor and 1 location on the 2nd floor of the Lynx building on a monthly basis. | Month | 6 | $ - 0 | |
| 5002 | The contractor shall provide metal cans for 10 locations on the outside 1st floor exits of building 5955 and 7 metal cans for the inside of the lower level of building 5955 on a monthly basis. The contractor shall provide metal cans for 6 locations on the inside of the 1st floor of the Lynx building on a monthly basis. | Month | 6 | $ - 0 | ||
| NTE | 5003 | The contractor shall provide bed bug room spray treatment for building 5955 or the Lynx building as needed, not to exceed 3 times per year. | Each | 2 | $ - 0 | |
| NTE | 5004 | The contractor shall provide bed bug temperature air heat treatment up to 900 sq feet for building 5955 or the Lynx building as needed, not to exceed 2 times per year. | Each | 1 | $ - 0 | |
| NTE | 5005 | The contractor shall provide bed bug elite 8 heat treatment up to 300 sq feet for building 5955 or the Lynx building as needed, not to exceed 4 times per year. | Each | 2 | $ - 0 | |
| NTE | 5006 | The contractor shall provide interior insect treatment for the entire interior of building 5955 and the Lynx building 2 times per year excluding the Kitchen and Dining Hall | Each | 1 | $ - 0 | |
| NTE | 5007 | The contractor shall provide exterior carpet ant spray treatment (50 sq ft) for building 5955 and the Lynx building as needed, not to exceed 4 times a year. | Each | 2 | $ - 0 | |
| FAR 52.217-8 TOTAL | $ - 0 |
File details come from the government source that posted it. Updated .