The file's text, extracted by GovTribe without its formatting.
Section B
| PRICING SCHEDULE | | | | | | | | | | |
| FORT BUCHANAN COMMISSARY | | | | | FOR DECA USE ONLY | | | | | |
| Attachment 3 – Pricing Schedule and Cost Breakout | | | | | | | | | | |
| BASE YEAR: July 1, 2026 - June 31, 2027 | QUANTITY | UNIT OF ISSUE | UNIT PRICE | AMOUNT | REVISED UNIT PRICE | CORRECT AMOUNT | SS | RSHA | C | I |
| 0001 | Custodial Operations | 12 | Months | $0.00 | $0.00 | | | | | | |
| Subtotal - Base Year | | | | $0.00 | | $0.00 | | | | |
| OPTION YEAR 1: July 1, 2027 - June 31, 2028 | QUANTITY | UNIT OF ISSUE | UNIT PRICE | AMOUNT | | | | | | |
| 1001 | Custodial Operations | 12 | Months | $0.00 | $0.00 | | | ERROR:#REF! | | | |
| Subtotal - Option Year 1 | | | | $0.00 | | | | | | |
| OPTION YEAR 2: July 1, 2028 - June 31, 2029 | QUANTITY | UNIT OF ISSUE | UNIT PRICE | AMOUNT | | | | | | |
| Custodial Operations | 12 | Months | $0.00 | $0.00 | | | | | | |
| 2001 | Subtotal - Option Year 2 | | | | $0.00 | | | | | | |
| OPTION YEAR 3: July 1, 2029 - June 31, 2030 | QUANTITY | UNIT OF ISSUE | UNIT PRICE | AMOUNT | | | | | | |
| 3001 | Custodial Operations | 12 | Months | $0.00 | $0.00 | | | | | | |
| Subtotal - Option Year 3 | | | | $0.00 | | | | | | |
| OPTION YEAR 4: July 1, 2030 - June 31, 2031 | QUANTITY | UNIT OF ISSUE | UNIT PRICE | AMOUNT | | | | | | |
| 4001 | Custodial Operations | 12 | Months | $0.00 | $0.00 | | | | | | |
| Subtotal - Option Year 4 | | | | $0.00 | | | | | | |
| GRAND TOTAL | | | | $0.00 | | | | | | |
&"Arial,Bold"Attachment 3
Cost Breakout Attachment 3
| Qoters are required to submit their cost breakout in accordance with |
| "Quote Submission (Format and Content)," located in the solicitation |
| The tabs below contain worksheets for Custodial, Yearly Totals, |
| 5 Year totals, and Loaded Wages for Janitors and Project Mangers. |
| The Custodial worksheet contains "sample" occupational |
| titles and the applicable minimum wage rates. |
Custodial
| SOLICITATION NUMBER: | HQC00826QE005 | SOLICITATION NUMBER: | HQC00826QE005 | SOLICITATION NUMBER: | HQC00826QE005 |
| COMMISSARY: | Fort Buchanan | COMMISSARY: | Fort Buchanan | COMMISSARY: | Fort Buchanan |
| CONTRACTOR NAME: | | CONTRACTOR NAME: | 0 | CONTRACTOR NAME: | 0 |
| Custodial Operations Work Sheet | | Custodial Operations Work Sheet | | Custodial Operations Work Sheet | |
| Direct Labor | | | | | | Contractor Proposed | | | | | | DOLLAR TOTALS | | | | |
| | | | | | RSHA Supplies & Equipment | | | | | | ================ | | | | |
| | | WDR | | | | | | | | | | | | | |
| COST ELEMENT | | Hours X | Rates = | Labor Cost | | (The elements listed below are SAMPLES and are not to be considered | | | | | | | | | | |
| = | = | = | = | = | | a requirement of the solicitation.) | | | | | | | | | | |
| Janitor | | 0 | 17.75 | $0.00 | | | | | | | | COST ELEMENT | | | | DOLLARS |
| Project Manager | | 0 | 0.00 | $0.00 | | | | | | | | = | | | | = |
| | 0 | 0.00 | $0.00 | | | | | Qty. | Unit/ | Extended | DIRECT LABOR | | | | 0.00 |
| | 0 | 0.00 | $0.00 | | Elements | | | Yearly | Price | Price | HEALTH & WELFARE | | | | 0.00 |
| | 0 | 0.00 | $0.00 | | = | = | = | = | = | = | = | | | | = |
| | 0 | 0.00 | $0.00 | | Bowl, Cleaner | | | 0 | 0.00 | $0.00 | SUB-TOTAL | | | | 0.00 |
| - | - | - | | - | | Cartridges | | | 0 | 0.00 | $0.00 | | | | | |
| TOTALS | | 0 | | $0.00 | | Cleaner, Carpet | | | 0 | 0.00 | 0.00 | HOLIDAYS, SICK & VACATIONS | | | | 0.00 |
| = | = | = | | = | | Cleaner, Compound | | | 0 | 0.00 | 0.00 | HOL, SICK & VAC. HEALTH & WELFARE | | | | 0.00 |
| Indirect Labor Hours (Non-Working) | | 0 | | | | Cleaner, Glass | | | 0 | 0.00 | 0.00 | = | | | | = |
| | = | | | | Cleaner, Neutral | | | 0 | 0.00 | 0.00 | SUB-TOTAL | | | | 0.00 |
| Direct Labor Hours (Productive/Working) | | 0 | | | | Disinfectant | | | 0 | 0.00 | 0.00 | | | | | |
| | = | | | | Dust Cloths | | | 0 | 0.00 | 0.00 | FRINGES | | | | 0.00 |
| | | | | | Dust Mop Heads | | | 0 | 0.00 | 0.00 | | | | | |
| Direct Labor Health & Welfare | | | | | | Floor Finish | | | 0 | 0.00 | 0.00 | EQUIPMENT & SUPPLIES | | | | 0.00 |
| NOTE: Insert the appropriate H&W/Annual Benefit Fund/Pension Rate for all employees not covered by the CBA. | | | | | | Floor Sealer | | | 0 | 0.00 | 0.00 | | | | | - |
| | | H&W/Pension | H&W/Pension | | Floor Stripper | | | 0 | 0.00 | 0.00 | SUB-TOTAL | | | | 0.00 |
| COST ELEMENT | | Hours X | Rates = | Cost | | Gloves | | | 0 | 0.00 | 0.00 | | | | | = |
| = | = | = | = | = | | Gloves, Latex | | | 0 | 0.00 | 0.00 | G&A | 0.00% | | | 0.00 |
| Janitor | | 0 | 4.93 | $0.00 | | Kintowel Wiper | | | 0 | 0.00 | 0.00 | | | | | |
| Project Manager | | 0 | 4.93 | $0.00 | | LiquidLive | | | 0 | 0.00 | 0.00 | PROFIT | 0.00% | | | 0.00 |
| | 0 | 0.00 | $0.00 | | Masks | | | 0 | 0.00 | 0.00 | | | | | |
| | 0 | 0.00 | $0.00 | | Mop Head, Wet | | | 0 | 0.00 | 0.00 | = | | | | = |
| | 0 | 0.00 | $0.00 | | Neutralizer | | | 0 | 0.00 | 0.00 | GRAND TOTAL | | | | 0.00 |
| | 0 | 0.00 | $0.00 | | Pads, Aqua 27" | | | 0 | 0.00 | 0.00 | = | | = | = | = |
| - | - | - | | - | | Pads, Buffing | | | 0 | 0.00 | 0.00 | | | MONTHLY PRICE | | 0.00 |
| TOTALS | | 0 | | $0.00 | | Pads, Doodle Bug | | | 0 | 0.00 | 0.00 | | | = | = | = |
| = | = | = | | = | | Polish, Furniture | | | 0 | 0.00 | 0.00 | | | | | |
| Holidays, Sick, and Vacations | | | | | | Polish, Metal | | | 0 | 0.00 | 0.00 | | | | | |
| | | | | | Propane | | | 0 | 0.00 | 0.00 | | | | | |
| Insert HOLIDAYS for employees not covered by the CBA | | | | Holidays/ | | Rain Suit | | | 0 | 0.00 | 0.00 | | | | | |
| | | Sick/ | Sick/Vacations | | Respirators | | | 0 | 0.00 | 0.00 | | | | | |
| COST ELEMENT | | Holidays | Vacations | Dollars | | Retainer | | | 0 | 0.00 | 0.00 | | | | | |
| = | = | = | = | = | | Safety Shoes | | | 0 | 0.00 | 0.00 | | | | | |
| Janitor | | 12 | 0 | $0.00 | ( (Holidays + Vacations) * 8) | Sanitizer, Compound D2 | | | 0 | 0.00 | 0.00 | | | | | |
| Project Manager | | 12 | 0 | $0.00 | times Work Hours | Soap, Hand, Liquid | | | 0 | 0.00 | 0.00 | | | | | |
| | 0 | 0 | $0.00 | divided by ( 2080 hours - | Sponges | | | 0 | 0.00 | 0.00 | | | | | |
| | 0 | 0 | $0.00 | ( (Holidays + Vacations) * 8) ) | Spray Bottle | | | 0 | 0.00 | 0.00 | | | | | |
| | 0 | 0 | $0.00 | times the hourly rate | Spray Bottle Trigger | | | 0 | 0.00 | 0.00 | | | | | |
| | 0 | 0 | $0.00 | in each category | Spray Buff | | | 0 | 0.00 | 0.00 | | | | | |
| - | - | - | | - | | Toilet Tissue, 96rl | | | 0 | 0.00 | 0.00 | | | | | |
| TOTALS | | 24 | | $0 | | Towels, Pop-Up | | | 0 | 0.00 | 0.00 | | | | | |
| = | = | = | | = | | Trash Liners, Lg | | | 0 | 0.00 | 0.00 | | | | | |
| | | | | | Trash Liners, Sm | | | 0 | 0.00 | 0.00 | | | | | |
| Holidays, Sick, and Vacations Health & Welfare | | | | | | Vaccuum Belts | | | 0 | 0.00 | 0.00 | | | | | |
| NOTE: Insert the appropriate H&W/Annual Benefit Fund/Pension Rate for all employees not covered by the CBA. | | | | | | Visors | | | 0 | 0.00 | 0.00 | | | | | |
| | Holidays/Sick/ | | | | Battery Charger | | | 0 | 0.00 | 0.00 | | | | | |
| | Vacations | H&W/Benefit Fund/ | H&W/Benefit Fund/ | | Buffer, High Speed | | | 0 | 0.00 | 0.00 | | | | | |
| COST ELEMENT | | Hours X | Pension Rates = | Pension Cost | | Burnisher High Speed | | | 0 | 0.00 | 0.00 | | | | | |
| = | = | = | = | = | | Burnisher, 21" Propane | | | 0 | 0.00 | 0.00 | | | | | |
| Janitor | | 0 | 5.09 | $0.00 | | Caddy, Maid | | | 0 | 0.00 | 0.00 | | | | | |
| Project Manager | | 0 | 5.09 | $0.00 | | Carpet Extractor | | | 0 | 0.00 | 0.00 | | | | | |
| | 0 | 0.00 | $0.00 | | Floor Scrubber, Low Speed | | | 0 | 0.00 | 0.00 | | | | | |
| | 0 | 0.00 | $0.00 | | Scrubber, 20" | | | 0 | 0.00 | 0.00 | | | | | |
| | 0 | 0.00 | $0.00 | | Scrubber, Auto | | | 0 | 0.00 | 0.00 | | | | | |
| | 0 | 0.00 | $0.00 | | Vacuum, Wet/Dry | | | 0 | 0.00 | 0.00 | | | | | |
| - | - | - | | - | | Washer, Pressure | | | 0 | 0.00 | 0.00 | | | | | |
| TOTALS | | 0 | | $0.00 | | | | | 0 | 0.00 | 0.00 | | | | | |
| = | = | = | | = | | | | | 0 | 0.00 | 0.00 | | | | | |
| | | | | | = | = | = | = | = | = | | | | | |
| | | | | | TOTALS | | | | | $0.00 | | | | | |
| FRINGE CALCULATIONS | | | | | | = | = | = | = | = | = | | | | | |
| COST ELEMENT | | | | | DOLLARS |
| = | = | = | = | = | = |
| DIRECT LABOR | | | | | $0.00 |
| DIRECT LABOR HEALTH & WELFARE | | | | | $0.00 |
| HOLIDAYS, SICK, AND VACATIONS | | | | | $0.00 |
| HOLIDAYS, SICK, AND VACATIONS HEALTH & WELFARE | | | | | $0.00 |
| - | - | - | - | - | - |
| SUBTOTAL | | | | | $0.00 |
| = | = | = | = | = | = |
| FICA | X | 7.65% | | = | $0.00 |
| FUTA | X | 0.60% | | = | $0.00 |
| SUTA | X | 2.51% | | = | $0.00 |
| Workman's Compensation | X | 4.00% | | = | $0.00 |
| Employer's Liability | X | 0.00% | | = | $0.00 |
| Comprehensive General Liability | X | 0.00% | | = | $0.00 |
| Other | X | 0.00% | | = | $0.00 |
| Other | X | 0.00% | | = | $0.00 |
| - | - | - | - | - | - |
| TOTAL FRINGES | | | | | $0.00 |
| = | = | = | = | = | = |
Year Totals
| SOLICITATION NUMBER: | HQC00826QE005 |
| COMMISSARY: | Fort Buchanan |
| CONTRACTOR NAME: | 0 |
| BASE YEAR GRAND TOTALS | |
| DOLLAR TOTALS |
| ================ |
| COST ELEMENT | DOLLARS |
| = | = |
| DIRECT LABOR | 0.00 |
| DIRECT LABOR HEALTH & WELFARE | 0.00 |
| = | = |
| TOTAL | 0.00 |
| HOLIDAYS, SICK & VACATIONS | 0.00 |
| HOL, SICK & VAC. HEALTH & WELFARE | 0.00 |
| = | = |
| TOTAL | 0.00 |
FRINGE CALCULATIONS 0.00
SUPPLIES & EQUIPMENT 0.00
SUB-TOTAL 0.00
G&A 0.00
PROFIT 0.00
5 Yr. Totals
| SOLICITATION NUMBER: | HQC00826QE005 |
| COMMISSARY: | Fort Buchanan |
| CONTRACTOR NAME: | 0 |
| GRAND TOTALS |
| BASE YEAR | OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | GRAND |
| COST ELEMENT | DOLLARS | DOLLARS | DOLLARS | DOLLARS | DOLLARS | TOTALS |
| = | = | = | = | = | = | = |
| DIRECT LABOR | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| DIRECT LABOR HEALTH & WELFARE | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| = | = | = | = | = | = | = |
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| HOLIDAYS, SICK & VACATIONS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| HOL, SICK & VAC. HEALTH & WELFARE | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| = | = | = | = | = | = | = |
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
FRINGE CALCULATIONS 0.00 0.00 0.00 0.00 0.00 0.00
SUPPLIES & EQUIPMENT 0.00 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL 0.00 0.00 0.00 0.00 0.00 0.00
G&A 0.00 0.00 0.00 0.00 0.00 0.00
PROFIT 0.00 0.00 0.00 0.00 0.00 0.00
| = | = | = | = | = | = | = |
| GRAND TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| = | = | = | = | = | = | = |
| SOLICITATION NUMBER: | HQC00826QE005 | | | | |
| COMMISSARY: | Fort Buchanan | | | | |
| CONTRACTOR NAME: | 0 | | | | |
| ESCALATION FACTORS | | | | |
| | OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 |
| COST ELEMENT | | DOLLARS | DOLLARS | DOLLARS | DOLLARS |
| = | = | = | = | = | = |
| DIRECT LABOR | | 0.00% | 0.00% | 0.00% | 0.00% |
| DIRECT LABOR HEALTH & WELFARE | | 0.00% | 0.00% | 0.00% | 0.00% |
| = | = | = | = | = | = |
| TOTAL | | | | | |
| HOLIDAYS AND VACATIONS | | 0.00% | 0.00% | 0.00% | 0.00% |
| HOLIDAYS AND VACATIONS. HEALTH & WELFARE | | 0.00% | 0.00% | 0.00% | 0.00% |
| = | = | = | = | = | = |
| TOTAL | | | | | |
| FRINGE CALCULATIONS | | 0.00% | 0.00% | 0.00% | 0.00% |
| SUPPLIES & EQUIPMENT | | 0.00% | 0.00% | 0.00% | 0.00% |
| SUB-TOTAL | | | | | |
| G&A | | 0.00% | 0.00% | 0.00% | 0.00% |
| PROFIT | | 0.00% | 0.00% | 0.00% | 0.00% |
| = | = | = | = | = | = |
| GRAND TOTAL | | | | | |
| = | = | = | = | = | = |
Janitor
| SOLICITATION NUMBER: | HQC00826QE005 | SOLICITATION NUMBER: | HQC00826QE005 | SOLICITATION NUMBER: | HQC00826QE005 |
| COMMISSARY: | Fort Buchanan | COMMISSARY: | Fort Buchanan | COMMISSARY: | Fort Buchanan |
| CONTRACTOR NAME: | 0 | CONTRACTOR NAME: | | CONTRACTOR NAME: | |
Janitor Loaded Wage Rate Work Sheet Janitor Loaded Wage Rate Work Sheet Janitor Loaded Wage Rate Work Sheet
| Direct Labor | | | | | Contractor Proposed | | | | | | | DOLLAR TOTALS | | | |
| | | | | Custodial Supplies & Equipment | | | | | | | ================ | | | |
| | | WD | | | | | | | | | | | | |
| COST ELEMENT | | Hours X | Rates = | Labor Cost | | | | | | | | | | | |
| = | = | = | = | = | | | | | | | | | | | |
| Janitor | | 1 | 17.75 | $17.75 | | | | | | | COST ELEMENT | | | | DOLLARS |
| | | | | | | | | | | = | | | | = |
| NOTE: A QUANTITY OF 1 HAS BEEN ENTERED TO | | | | | | | | | | | DIRECT LABOR | | | | $17.75 |
| CALCULATE THE LOADED HOURLY RATE. PROCEED | | | | | | | | | | | DIRECT LABOR HEALTH & WELFARE | | | | $5.09 |
| TO ENTER FRINGE, G&A, AND PROFIT PERCENTAGES | | | | | | | | | | | = | | | | = |
| | | | | | | | | | | SUB-TOTAL | | | | $22.84 |
| - | - | - | | - | | | | Qty. | Unit/ | Extended | | | | | |
| TOTALS | | 1 | | $17.75 | Elements | | | Yearly | Price | Price | HOLIDAYS, SICK & VACATIONS | | | | $0.97 |
| = | = | = | | = | = | = | = | = | = | = | HOL, SICK & VAC. HEALTH & WELFARE | | | | $0.25 |
| Indirect Labor Hours (Non-Working) | | | | | Supplies and Equipment Costs | | | 0 | 0.00 | $0.00 | = | | | | = |
| | = | | | are not included in the loaded | | | 0 | 0.00 | $0.00 | SUB-TOTAL | | | | $1.22 |
| Direct Labor Hours (Productive/Working) | | 1 | | | rate for Janitor | | | 0 | 0.00 | 0.00 | | | | | |
| | = | | | | | | 0 | 0.00 | 0.00 | FRINGES | | | | $3.54 |
| | | | | | | | 0 | 0.00 | 0.00 | | | | | |
| | | | | | | | 0 | 0.00 | 0.00 | EQUIPMENT & SUPPLIES | | | | $0.00 |
| Direct Labor Health and Welfare | | | | | | | | 0 | 0.00 | 0.00 | | | | | - |
| | | | | | | | 0 | 0.00 | 0.00 | SUB-TOTAL | | | | $27.60 |
| | | H&W | H&W | | | | 0 | 0.00 | 0.00 | | | | | = |
| COST ELEMENT | | Hours | Rates | Cost | | | | 0 | 0.00 | 0.00 | G&A | 0.00% | | | $0.00 |
| = | = | = | = | = | | | | 0 | 0.00 | 0.00 | | | | | |
| Janitor | | 1 | 5.09 | $5.09 | | | | 0 | 0.00 | 0.00 | PROFIT | 0.00% | | | $0.00 |
| | | | | | | | 0 | 0.00 | 0.00 | | | | | |
| | | | | | | | 0 | 0.00 | 0.00 | = | | | | = |
| | | | | | | | 0 | 0.00 | 0.00 | GRAND TOTAL | | | | $27.60 |
| | | | | | | | 0 | 0.00 | 0.00 | = | | = | = | = |
| | | | | | | | 0 | 0.00 | 0.00 | | | | | |
| - | - | - | | - | = | = | = | = | = | = | | | | | |
| TOTALS | | 1 | | $5.09 | TOTALS | | | | | $0.00 | | | | | |
| = | = | = | | = | = | = | = | = | = | | | | | | |
| Holidays, Sick, and Vacations | | | | | |
| | | | Holidays/ | |
| | | Sick/ | Sick/Vacations | |
| COST ELEMENT | | Holidays | Vacations | Dollars | |
| = | = | = | = | = | |
| Janitor | | 12 | 0 | $0.97 | |
| | | | | (Work hours divided by ((2080 hours- |
| | | | | (Holidays/Sick+ Vacations)*8))) * |
| | | | | ((Closed Holidays*8*Hourly rate)+ |
| | | | | (Holidays worked*8*Hourly rate* time & half))+ |
| | | | | (Work Hours divided by(2080-((Holidays/Sick+ |
| - | - | - | | - | Vacations)*8)))*(Vacations *8*Hourly rate) |
| TOTALS | | 12 | | $0.97 | |
| = | = | = | | = | |
| Holidays, Sick, and Vacations Health & Welfare | | | | |
| | Holidays/Sick/ | | |
| | Vacations | H&W | H&W |
| COST ELEMENT | | Hours X | Rates | Cost |
| = | = | = | = | = |
| Janitor | | 0.05 | 5.09 | $0.25 |
FRINGE CALCULATIONS
| COST ELEMENT | | | | | DOLLARS |
| = | = | = | = | = | = |
| DIRECT LABOR COST | | | | | $17.75 |
| DIRECT HEALTH & WELFARE COSTS | | | | | $5.09 |
| HOLIDAYS/SICK/VACATION | | | | | $0.97 |
| HOLIDAYS AND VACATIONS HEALTH & WELFARE | | | | | $0.25 |
| - | - | - | - | - | - |
| SUBTOTAL | | | | | $24.06 |
| = | = | = | = | = | = |
| FICA | X | 7.65% | | = | $1.84 |
| FUTA | X | 0.60% | | = | $0.14 |
| SUTA | X | 2.51% | | = | $0.60 |
| Workman's Compensation | X | 4.00% | | = | $0.96 |
| Employer's Liability | X | 0.00% | | = | $0.00 |
| Comprehensive General Liability | X | 0.00% | | = | $0.00 |
| Other | X | 0.00% | | = | $0.00 |
| Other | X | 0.00% | | = | $0.00 |
| - | - | - | - | - | - |
| TOTAL FRINGES | | | | | $3.54 |
| = | = | = | = | = | = |
Project Manager
| SOLICITATION NUMBER: | HQC00826QE005 | SOLICITATION NUMBER: | HQC00826QE005 | SOLICITATION NUMBER: | HQC00826QE005 |
| COMMISSARY: | Fort Buchanan | COMMISSARY: | Fort Buchanan | COMMISSARY: | Fort Buchanan |
| CONTRACTOR NAME: | 0 | CONTRACTOR NAME: | | CONTRACTOR NAME: | |
| Lead Loaded Wage Rate Work Sheet | | Lead Loaded Wage Rate Work Sheet | | Lead Loaded Wage Rate Work Sheet | |
| Direct Labor | | | | | Contractor Proposed | | | | | | | DOLLAR TOTALS | | | |
| | | | | Shelf Stocking Supplies & Equipment | | | | | | | ================ | | | |
| | | WD | | | | | | | | | | | | |
| COST ELEMENT | | Hours X | Rates = | Labor Cost | | | | | | | | | | | |
| = | = | = | = | = | | | | | | | | | | | |
| Project Manager | | 1 | 0.00 | $0.00 | | | | | | | COST ELEMENT | | | | DOLLARS |
| | | | | | | | | | | = | | | | = |
| NOTE: A QUANTITY OF 1 HAS BEEN ENTERED TO | | | | | | | | | | | DIRECT LABOR | | | | $0.00 |
| CALCULATE THE LOADED HOURLY RATE. PROCEED | | | | | | | | | | | DIRECT LABOR HEALTH & WELFARE | | | | $5.09 |
| TO ENTER FRINGE, G&A, AND PROFIT PERCENTAGES | | | | | | | | | | | = | | | | = |
| | | | | | | | Qty. | Unit/ | Extended | SUB-TOTAL | | | | $5.09 |
| - | - | - | | - | Elements | | | Yearly | Price | Price | | | | | |
| TOTALS | | 1 | | $0.00 | = | = | = | = | = | = | HOLIDAYS, SICK & VACATIONS | | | | $0.00 |
| = | = | = | | = | Supplies and Equipment Costs | | | 0 | 0.00 | $0.00 | HOL, SICK & VAC. HEALTH & WELFARE | | | | $0.25 |
| Indirect Labor Hours (Non-Working) | | | | | are not included in the loaded | | | 0 | 0.00 | $0.00 | = | | | | = |
| | = | | | rate for Store Worker I | | | 0 | 0.00 | 0.00 | SUB-TOTAL | | | | $0.25 |
| Direct Labor Hours (Productive/Working) | | 1 | | | | | | 0 | 0.00 | 0.00 | | | | | |
| | = | | | | | | 0 | 0.00 | 0.00 | FRINGES | | | | $0.78 |
| | | | | | | | 0 | 0.00 | 0.00 | | | | | |
| | | | | | | | 0 | 0.00 | 0.00 | EQUIPMENT & SUPPLIES | | | | $0.00 |
| Direct Labor Health and Welfare | | | | | | | | 0 | 0.00 | 0.00 | | | | | - |
| | | | | | | | 0 | 0.00 | 0.00 | SUB-TOTAL | | | | $6.12 |
| | | H&W | H&W | | | | 0 | 0.00 | 0.00 | | | | | = |
| COST ELEMENT | | Hours | Rates | Cost | | | | 0 | 0.00 | 0.00 | G&A | 0.00% | | | $0.00 |
| = | = | = | = | = | | | | 0 | 0.00 | 0.00 | | | | | |
| Project Manager | | 1 | 5.09 | $5.09 | | | | 0 | 0.00 | 0.00 | PROFIT | 0.00% | | | $0.00 |
| | | | | | | | 0 | 0.00 | 0.00 | | | | | |
| | | | | | | | 0 | 0.00 | 0.00 | = | | | | = |
| | | | | | | | 0 | 0.00 | 0.00 | GRAND TOTAL | | | | $6.12 |
| | | | | | | | 0 | 0.00 | 0.00 | = | | = | = | = |
| | | | | = | = | = | = | = | = | | | | | |
| - | - | - | | - | TOTALS | | | | | $0.00 | | | | | |
| TOTALS | | 1 | | $5.09 | = | = | = | = | = | | | | | | |
| = | = | = | | = | | | | | | | | | | | |
| Holidays, Sick, and Vacations | | | | | |
| | | | Holidays/ | |
| | | Sick/ | Sick/Vacations | |
| COST ELEMENT | | Holidays | Vacations | Dollars | |
| = | = | = | = | = | |
| Project Manager | | 12 | 0 | $0.00 | |
| | | | | (Work hours divided by ((2080 hours- |
| | | | | (Holidays/Sick+ Vacations)*8))) * |
| | | | | ((Closed Holidays*8*Hourly rate)+ |
| | | | | (Holidays worked*8*Hourly rate* time & half))+ |
| | | | | (Work Hours divided by(2080-((Holidays/Sick+ |
| - | - | - | | - | Vacations)*8)))*(Vacations *8*Hourly rate) |
| TOTALS | | 12 | | $0.00 | |
| = | = | = | | = | |
| Holidays, Sick, and Vacations Health & Welfare | | | | |
| | Holidays/Sick/ | | |
| | Vacations | H&W | H&W |
| COST ELEMENT | | Hours X | Rates | Cost |
| = | = | = | = | = |
| Project Manager | | 0.05 | 5.09 | $0.25 |
FRINGE CALCULATIONS
| COST ELEMENT | | | | | DOLLARS |
| = | = | = | = | = | = |
| DIRECT LABOR COST | | | | | $0.00 |
| DIRECT HEALTH & WELFARE COSTS | | | | | $5.09 |
| HOLIDAYS, SICK, AND VACATIONS | | | | | $0.00 |
| HOLIDAYS, SICK, AND VACATIONS HEALTH & WELFARE | | | | | $0.25 |
| - | - | - | - | - | - |
| SUBTOTAL | | | | | $5.34 |
| = | = | = | = | = | = |
| FICA | X | 7.65% | | = | $0.41 |
| FUTA | X | 0.60% | | = | $0.03 |
| SUTA | X | 2.51% | | = | $0.13 |
| Workman's Compensation | X | 4.00% | | = | $0.21 |
| Employer's Liability | X | 0.00% | | = | $0.00 |
| Comprehensive General Liability | X | 0.00% | | = | $0.00 |
| Other | X | 0.00% | | = | $0.00 |
| Other | X | 0.00% | | = | $0.00 |
| - | - | - | - | - | - |
| TOTAL FRINGES | | | | | $0.78 |
| = | = | = | = | = | = |