Attachment_3_-_Price_Schedule.pdf
PDF 172 KB Posted
- Attached to
- ADMIN XERI INTERPRETIVE, FAB, & INSTALL
- Solicitation number
- 140R3026Q0083
About this file
This is a Price Schedule for the Administration Xeriscape Interpretive Fabrication and Installation contract in Boulder City, Nevada (Document No. 140R3026Q0083).
The contract covers the fabrication and installation of interpretive signage and related installations organized into eight Contract Line Item Numbers (CLINs). CLIN 0001 (Welcome-Orientation) includes two welcome kiosks, each comprising sign graphics, metal patterns/engraving, post and frame, and cast-in-place concrete footing. CLIN 0002 (Story) encompasses five narrative displays: BOR Overview/Reclamation, Indigenous Life Before the Dam, Local Water Use, Boulder City Story 1 and 2, and BOR Admin Building, each with identical component requirements. CLIN 0003 (Special Stories) includes three complex installations: Hoover Dam (three sign graphics, metal patterns, post/frame with concrete block aprons, three props/castings, and slab footing), The Lawn's Evolution (two sign graphics, sculptural pillar with frame, and slab footing), and Boulder City Map (slate/concrete inset with curb footing). CLIN 0004 (Teasers) provides three teaser signs and five snake/scorpion warning signs with graphics, metal patterns, posts, and footings. CLIN 0005 (Plant ID) includes 14 miscellaneous plant identification signs with graphics and posts. CLIN 0006 (Miscellaneous) contains a rock coring/drilling allowance for material removal and disposal. CLIN 0007 (Imagery) requires three artworks/illustrations, two map artworks, and 45 photographs. CLIN 0008 (Material Shipping/Installation) covers transportation and installation services. All CLINs require offerors to price component line items separately and roll totals into the respective CLIN lump sum amounts. The price schedule requires completion of unit prices and amounts for all items, with a final total price calculation for all CLINs combined.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3 – Price Schedule
Document No.
140R3026Q0083
Document Title Administration Xeriscape Interpretive Fabrication and Installation
ADMINISTRATION XERISCAPE INTERPRETIVE
FABRICATION AND INSTALLATION
BOULDER CITY - NEVADA
CLIN Supplies or Services Estimated Quantity
Unit Unit Price
Amount
0001 Welcome-Orientation (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN)
LS
A-1 Welcome Kiosk
Sign Graphic 1 EA $ $
Metal patterns/engraving 1 EA $ $
Post and Frame 1
EA $ $
Footing (round, cast-in-place concrete)
1 EA $ $
A-2 Welcome Kiosk
Sign Graphic 1
Post and Frame 1 concrete)
1 EA $ $
0002 Story (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN)
1 LS $ $ ____________
B1 BOR Overview/Reclamation
Sign Graphic 1 EA $ $
Post and Frame 1 EA $ $
Footing (round, cast-in-place concrete)
1 EA $ $
B2 Indigenous Life Before the Dam
Post and Frame 1 EA $ $ Footing (round, cast-in-place concrete)
Document No.
140R3026Q0083
Document Title Administration Xeriscape Interpretive
Unit Unit Price
Amount
B3 Local Water Use
Post and Frame 1 EA $ $
Footing (round, cast-in-place concrete)
B4a Boulder City Story 1
Post and Frame 1 EA $ $
Footing (round, cast-in-place concrete)
B4b Boulder City Story 2
Post and Frame 1 EA $ $ Footing (round, cast-in-place concrete)
B5 BOR Admin Building
Post and Frame 1 EA $ $ Footing (round, cast-in-place concrete)
1 EA $ $
0003 Special Stories (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN)
C1 Special Story – Hoover Dam
C1-1 Hoover Dam 1 Sign Graphic 1 EA $ $
C1-2 Hoover Dam 2 Sign Graphics 1 EA $ $
Document No.
140R3026Q0083
Document Title Administration Xeriscape Interpretive
Unit Unit Price
Amount
C1-3 Hoover Dam 3 Sign Graphics 1 EA $ $ Metal patterns/engraving 1 EA $ $
Post, Frame, Aprons, Concrete Block
1 EA $ $
Props/castings
3 EA $ $
Footing (slab or strip, cast-in-place
C-2 Special Story - The Lawn’s
C2-1 The Lawn’s Evolution 1 1 EA $ $
C2-2 The Lawn’s Evolution 2
Metal patterns/engraving
Sculptural Pillar and Frame 1 EA $ $ Footing (round or slab, cast-in-place concrete)
C-3 Map - Boulder City
Inset Map (slate, concrete) 1 EA $ $ Footing (slab & curb, cast-in-place
0004 Teasers (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN)
D1-3 Teasers
Sign Graphic 3 EA $ $
Post and Frame 3 EA $ $
3 EA $ $
D-4 Snake/Scorpion Warning
Sign Graphic 5 EA $ $
Post and Frame 5 EA $ $
Document No.
140R3026Q0083
Document Title Administration Xeriscape Interpretive
Unit Unit Price
Amount
Footing (round, cast-in-place concrete)
5 EA $ $
0005 Plant ID (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN)
1 LS $ $ ____________
E1-14 Miscellaneous
Sign Graphic 14 EA $ $ Post and Frame 14 EA $ $
0006 Miscellaneous (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN)
1 LS $ $ ____________
Rock Coring/Drilling allowance (i.e., rock material removal, disposal, etc.)
1 LS $ $
0007 Imagery (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN)
1 LS $ $ ____________
Artworks/Illustrations 3 EA $ $ Map Art 2 EA $ $ Photos 45 EA $ $
0008 Material Shipping/Installation 1 LS $ $ ____________
TOTAL FOR CLINS 0001 - 0008 PRICE SCHEDULE $
File details come from the government source that posted it. Updated .