Attachment_3_-_Price_Schedule_0001.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- ADMIN XERI INTERPRETIVE, FAB, & INSTALL
- Solicitation number
- 140R3026Q0083
About this file
This is a Price Schedule template for the Administration Xeriscape Interpretive, Fabrication, and Installation project in Boulder City, Nevada, issued under Request for Quote (RFQ) Solicitation Number 140R3026Q0083 by the Department of the Interior Bureau of Reclamation. The pricing structure is organized into eight Contract Line Item Numbers (CLINs) with a lump sum pricing model where offerors must price individual components and roll them into CLIN totals. CLIN 0001 covers two Welcome Kiosks, each including sign graphics, metal patterns/engraving, post and frame, and concrete footings. CLIN 0002 encompasses five story-themed interpretive signs (BOR Overview/Reclamation, Indigenous Life Before the Dam, Local Water Use, Boulder City Story 1 and 2, and BOR Admin Building), each with similar component requirements. CLIN 0003 includes three special story installations: Hoover Dam (with three sign graphics, metal work, and props/castings), The Lawn's Evolution (with sculptural elements), and a Boulder City Inset Map. CLIN 0004 covers eight teaser signs and five Snake/Scorpion warning signs. CLIN 0005 includes 14 Plant ID miscellaneous signs. CLIN 0006 allows for rock coring and drilling as needed. CLIN 0007 covers imagery including three artworks/illustrations, two map arts, and 45 photographs. CLIN 0008 accounts for material shipping and installation. The template requires offerors to enter unit prices only in highlighted green cells, with automatic calculation of total amounts. This is a 100% small business set-aside with NAICS code 339950 (Sign Manufacturing) and a 500-employee size standard.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Interpretive Panels Price Sched
ADMINISTRATION XERISCAPE INTERPRETIVE FABRICATION AND INSTALLATION
BOULDER CITY - NEVADA
| CLIN | Supplies or Services | Estimated Quantity | Qty | Unit | Unit Price | Amount |
| 0001 | Welcome-Orientation (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN) | |||||
| 1 | LS | $ - 0 | ||||
| A-1 Welcome Kiosk | ||||||
| Sign Graphic | 1 | EA | $ - 0 | $ - 0 | ||
| Metal patterns/engraving | 1 | EA | $ - 0 | $ - 0 | ||
| Post and Frame | 1 | EA | $ - 0 | $ - 0 | ||
| Footing (round, cast-in-place concrete) | 1 | EA | $ - 0 | $ - 0 | ||
| A-2 Welcome Kiosk | ||||||
| Sign Graphic | 1 | EA | $ - 0 | $ - 0 | ||
| Metal patterns/engraving | 1 | EA | $ - 0 | $ - 0 | ||
| Post and Frame | 1 | EA | $ - 0 | $ - 0 | ||
| Footing (round, cast-in-place concrete) | 1 | EA | $ - 0 | $ - 0 | ||
| 0002 | Story (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN) | 1 | LS | $ - 0 | ||
| B1 BOR Overview/Reclamation | ||||||
| Sign Graphic | 1 | EA | $ - 0 | $ - 0 | ||
| Metal patterns/engraving | 1 | EA | $ - 0 | $ - 0 | ||
| Post and Frame | 1 | EA | $ - 0 | $ - 0 | ||
| Footing (round, cast-in-place concrete) | 1 | EA | $ - 0 | $ - 0 | ||
| B2 Indigenous Life Before the Dam | ||||||
| Sign Graphic | 1 | EA | $ - 0 | $ - 0 | ||
| Metal patterns/engraving | 1 | EA | $ - 0 | $ - 0 | ||
| Post and Frame | 1 | EA | $ - 0 | $ - 0 | ||
| Footing (round, cast-in-place concrete) | 1 | EA | $ - 0 | $ - 0 | ||
| B3 Local Water Use | ||||||
| Sign Graphic | 1 | EA | $ - 0 | $ - 0 | ||
| Metal patterns/engraving | 1 | EA | $ - 0 | $ - 0 | ||
| Post and Frame | 1 | EA | $ - 0 | $ - 0 | ||
| Footing (round, cast-in-place concrete) | 1 | EA | $ - 0 | $ - 0 | ||
| B4a Boulder City Story 1 | ||||||
| Sign Graphic | 1 | EA | $ - 0 | $ - 0 | ||
| Metal patterns/engraving | 1 | EA | $ - 0 | $ - 0 | ||
| Post and Frame | 1 | EA | $ - 0 | $ - 0 | ||
| Footing (round, cast-in-place concrete) | 1 | EA | $ - 0 | $ - 0 | ||
| B4b Boulder City Story 2 | ||||||
| Sign Graphic | 1 | EA | $ - 0 | $ - 0 | ||
| Metal patterns/engraving | 1 | EA | $ - 0 | $ - 0 | ||
| Post and Frame | 1 | EA | $ - 0 | $ - 0 | ||
| Footing (round, cast-in-place concrete) | 1 | EA | $ - 0 | $ - 0 | ||
| B5 BOR Admin Building | ||||||
| Sign Graphic | 1 | EA | $ - 0 | $ - 0 | ||
| Metal patterns/engraving | 1 | EA | $ - 0 | $ - 0 | ||
| Post and Frame | 1 | EA | $ - 0 | $ - 0 | ||
| Footing (round, cast-in-place concrete) | 1 | EA | $ - 0 | $ - 0 | ||
| 0003 | Special Stories (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN) | |||||
| 1 | LS | $ - 0 | ||||
| C1 Special Story – Hoover Dam | ||||||
| C1-1 Hoover Dam 1 Sign Graphic | 1 | EA | $ - 0 | $ - 0 | ||
| C1-2 Hoover Dam 2 Sign Graphics | 1 | EA | $ - 0 | $ - 0 | ||
| C1-3 Hoover Dam 3 Sign Graphics | 1 | EA | $ - 0 | $ - 0 | ||
| Metal patterns/engraving | 1 | EA | $ - 0 | $ - 0 | ||
| Post, Frame, Aprons, Concrete Block | 1 | EA | $ - 0 | $ - 0 | ||
| Props/castings | 3 | EA | $ - 0 | $ - 0 | ||
| Footing (slab or strip, cast-in-place concrete) | 1 | EA | $ - 0 | $ - 0 | ||
| C-2 Special Story - The Lawn’s Evolution | 1 | EA | $ - 0 | $ - 0 | ||
| C2-1 The Lawn’s Evolution 1 | 1 | EA | $ - 0 | $ - 0 | ||
| C2-2 The Lawn’s Evolution 2 | 1 | EA | $ - 0 | $ - 0 | ||
| Metal patterns/engraving | 1 | EA | $ - 0 | $ - 0 | ||
| Sculptural Pillar and Frame | 1 | EA | $ - 0 | $ - 0 | ||
| Footing (round or slab, cast-in-place concrete) | 1 | EA | $ - 0 | $ - 0 | ||
| C-3 Map - Boulder City | ||||||
| Inset Map (slate, concrete) | 1 | EA | $ - 0 | $ - 0 | ||
| Footing (slab & curb, cast-in-place concrete) | 1 | EA | $ - 0 | $ - 0 | ||
| 0004 | Teasers (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN) | |||||
| 1 | LS | $ - 0 | ||||
| D1-3 Teasers | ||||||
| Sign Graphic | 3 | EA | $ - 0 | $ - 0 | ||
| Metal patterns/engraving | 1 | EA | $ - 0 | $ - 0 | ||
| Post and Frame | 3 | EA | $ - 0 | $ - 0 | ||
| Footing (round, cast-in-place concrete) | 3 | EA | $ - 0 | $ - 0 | ||
| D-4 Snake/Scorpion Warning | ||||||
| Sign Graphic | 5 | EA | $ - 0 | $ - 0 | ||
| Metal patterns/engraving | 1 | EA | $ - 0 | $ - 0 | ||
| Post and Frame | 5 | EA | $ - 0 | $ - 0 | ||
| Footing (round, cast-in-place concrete) | 5 | EA | $ - 0 | $ - 0 | ||
| 0005 | Plant ID (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN) | 1 | LS | $ - 0 | ||
| E1-14 Miscellaneous | ||||||
| Sign Graphic | 14 | EA | $ - 0 | $ - 0 | ||
| Post and Frame | 14 | EA | $ - 0 | $ - 0 | ||
| 0006 | Miscellaneous (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN) | 1 | LS | $ - 0 | ||
| Rock Coring/Drilling allowance (i.e., rock material removal, disposal, etc.) | 1 | LS | $ - 0 | $ - 0 |
| 0007 | Imagery (the following items are rolled into this CLIN total price, offeror to price out separately and roll into total for this CLIN) | 1 | LS | $ - 0 | |
| Artworks/Illustrations | 3 | EA | $ - 0 | $ - 0 | |
| Map Art | 2 | EA | $ - 0 | $ - 0 | |
| Photos | 45 | EA | $ - 0 | $ - 0 | |
| 0008 | Material Shipping/Installation | 1 | LS | $ - 0 | $ - 0 |
| TOTAL FOR CLINS 0001 - 0008 PRICE SCHEDULE | $ - 0 | ||||
| Please only enter the Unit Price (highlighted in green). There are formulas to autmatically calculate thetotal amounts. |
File details come from the government source that posted it. Updated .