PRST Template V. 1.1 – JUNE2018

Performance Requirements Summary Table Template v2.0_MAY 2018

Performance Requirements Summary Table

Requirement (Task number and title from

SOW/PWS)

CDRL

(if applicable)

Performance Objective Performance

Standard

Acceptable

Quality

Level

(AQL)

Monitoring Method

4.1 Support Material:

Material procurement report

A001

Material procurement is conducted in accordance with Applicable

Documentation 3.3, 3.4, 3.5, and

3.6.

Report is technically accurate and customer acceptable.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.2 Support Material

Repair: Repair feasibility assessment report

A002

Repair assessments are conducted in accordance with Applicable

Documentation 3.1.

Report is technically accurate and customer acceptable.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.2 Support Material

Repair: Repair Status

Report

A003

Repairs are completed in accordance with Applicable

Documentation 3.1 for non-commercial items and commercial repair standards for commercial items and foreign owned items are returned in accordance with

Applicable Documentation 3.9.

Repairs are completed delivered on schedule, meet test and performance requirements, and are customer acceptable.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.3 Obsolescence

Management: GIDEP

Alerts and Safe-Alert

Reports

A004

Alerts are identified in accordance with Applicable Documentation

3.10.

Alerts are reviewed and in a timely manner and clearly identified.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.3 Obsolescence

Management:

Forecasting

Diminishing

Manufacturing Sources and Material Shortages

(DMSMS) Metrics

Data

A005

Obsolescence issues are identified in accordance with Applicable

Documentation 3.10..

All system parts are reviewed for obsolescence issues in a timely manner and clearly identified.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.3 Obsolescence

Management:

Obsolescence Analysis

Report

A006 Design modifications are accurate and resolve identified issues.

Recommend design changes resolve all identified obsolescence issues.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.4 Prototype

Hardware/Software

Fabrication:

System/Subsystem

Specification

A007

Documentation is accurate and reflects all applicable requirements in accordance with Applicable

Documentation 3.9.

Deliverable products are technically accurate and customer acceptable.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.4 Prototype

Hardware/Software

Fabrication:

Developmental Design

Drawings and

Associated Lists

A008

Documentation is accurate and reflects all applicable requirements in accordance with Applicable

Documentation 3.9.

Deliverable products are technically accurate and customer acceptable.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.4 Prototype

Hardware/Software

Fabrication: Product

A009

Documentation is accurate and reflects all applicable requirements

Deliverable products are technically

Standard is met 95% of the time.

Government review of deliverable documents.

PRST Template V. 1.1 – JUNE2018

Performance Requirements Summary Table Template v2.0_MAY 2018

Drawings and

Associated Lists in accordance with Applicable

Documentation 3.9.

accurate and customer acceptable.

Feedback from NUWC customer.

4.4 Prototype

Hardware/Software

Fabrication: Software and Firmware Images

A010

Documentation is accurate and reflects all applicable design documentation.

Deliverable products are technically accurate and customer acceptable.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.4 Prototype

Hardware/Software

Fabrication: Associated

Source Code

A011

Documentation is accurate and reflects all applicable design documentation.

Deliverable products are technically accurate and customer acceptable.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.4 Prototype

Hardware/Software

Fabrication: Software

Documentation -

Detailed Design

Description

A012

Documentation is accurate and reflects all applicable design documentation.

Deliverable products are technically accurate and customer acceptable.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.4 Prototype

Hardware/Software

Fabrication: Software

Build Procedures and

Build Environment

A013

Documentation is accurate and reflects all applicable design documentation.

Deliverable products are technically accurate and customer acceptable.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.4 Prototype

Hardware/Software

Fabrication:

Engineering Change

Proposal (ECP)

A014

Documentation is accurate and reflects all applicable design documentation.

Deliverable products are technically accurate and customer acceptable.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.4 Prototype

Hardware/Software

Fabrication:

Specification Change

Notices

A015

Documentation is accurate and reflects all design documentation.

Deliverable products are technically accurate and customer acceptable.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.4 Prototype

Hardware/Software

Fabrication: Notice of

Revision (NOR)

A016

Documentation is accurate and reflects all design documentation.

Deliverable products are technically accurate and customer acceptable.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.5 On-Site Technical

Assistance: Technical

Assistance Report

A017

On-site tech assists are conducted per in accordance with TI, and

Applicable Documentation 3.1 and

3.2.

Report is technically accurate, clear, concise, and provided in accordance with agree upon schedules.

Standard is met 95% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.