Attachment 3 - MAHG231034 Repair Well 9 Drawings.pdf

PDF 2 MB Posted

Attached to
MAHG23-1034 Repair Well 9
Solicitation number
FA301026R0012
Issued by

About this file

This document is a set of design drawings and specifications for the repair of Well #9 casing, drop pipe, pump, instrumentation, and controls at Keesler Air Force Base in Biloxi, Mississippi. The project number is MAHG231034 with contract number FA301026R0012, issued in March 2025.

The project encompasses both civil and electrical work. Civil scope includes construction of new concrete pads (8 inches and 6 inches of 3500 PSI fiber-reinforced polymer concrete) for generator and fuel tank installation, with specifications for rebar reinforcement, grounding rods, and expansion joints. Electrical scope involves demolition of existing equipment including the existing well pump, chlorine pump, pull box, safety switch, and meter, followed by installation of new equipment including a 150KW standby generator, 1000-gallon diesel fuel tank, automatic transfer switch (ATS), new smart meter, and replacement well and chlorine pumps. The new electrical system requires a new handhole with cable splice point, conduit installation at minimum 18 inches below grade, and new fiber-to-CAT6 media converter connectivity. All work must comply with AFI 32-1062 and UFC 3-540-01 standards. The drawings provide detailed site plans, elevation views, equipment layouts, one-line electrical diagrams, panel schedules, and conduit routing specifications to guide construction execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L ST

GEN CHAPPIE JAMES AV

3908 3909

INTERSTATE 10

U .S

. H W

Y

U.S. HWY 90

I-1

PROJECT LOCATION

PROJECT

LOCATION

C O

VE

R

S H

EE

T

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SO

LI

C

IT

AT

IO

N N

O

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

ST

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

L

ST

R

EE

T, B

U

IL

D

IN

G

BI

LO

XI

, M

S

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

R

EP

AI

R W

EL

L

#9 C

AS

IN

G , D

R O

P

PI

PE

, P

U M

P, IN

ST

R

U M

EN

TA

TI

O

N , A

N D

C O

N

TR

O

LS

PR

O

JE

C

T N

O . M

AH

G

M

AR

C H

K.

PA

H

LA

VA

N

Z.

C

O O

M

ES

AR

C

H D

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

0%

D

ES

IG

N

G-001

KEESLER AIR FORCE BASE BILOXI, MS

REPAIR WELL #9 CASING, DROP PIPE, PUMP,

INSTRUMENTATION, AND CONTROLS

MAHG231034 FA301026R0012 Attachment 3

ISSUE DATE: MARCH 2025

INDEX OF DRAWINGS

SHEET NO. DESCRIPTION OF SHEET

COVER SHEETG-001

CONCRETE PAD SECTIONS AND EXPANSION JOINT DETAILC-301

GENERAL SHEETS

CIVIL

NEW CONSTRUCTION SITE PLANC-101

ELECTRICAL

ELECTRICAL DEMOLITION SITE POWER PLANE-101

ELECTRICAL NEW SITE POWER PLANE-102

CONCRETE PAD SITE PLANC-102

ELECTRICAL DEMOLITION EQUIPMENT LAYOUTE-401

ELECTRICAL NEW EQUIPMENT LAYOUTE-402

NORTH

ELECTRICAL DEMOLITION ONE-LINE DIAGRAM E-601

ELECTRICAL NEW ONE-LINE DIAGRAM AND PANEL SCHEDULEE-602

ELECTRICAL DETAILSE-301

ELECTRICAL NEW SITE - DIMENSIONSE-103

CONDUIT INSTALLATION CROSS-SECTIONC-302

u

C.

Deer Is

AutoCAD SHX Text Big Lake

AutoCAD SHX Text Back Bay of Biloxi

AutoCAD SHX Text Bernard Bayou

AutoCAD SHX Text Biloxi River

AutoCAD SHX Text Little Biloxi River

AutoCAD SHX Text Tchoutacabouffa River

AutoCAD SHX Text Tuxachanie

AutoCAD SHX Text Creek

AutoCAD SHX Text Tchoutacabouffa

AutoCAD SHX Text River

AutoCAD SHX Text Cedar

AutoCAD SHX Text Lake

AutoCAD SHX Text Deer Island

AutoCAD SHX Text Mississippi Sound

EXISTING FENCE

EX

IS

TI

N

G C

H

LO

R

IN

E

TA

N K

BLDG 3967

1 CONCRETE PAD PLAN VIEW

SCALE: 1:40

'-5

7'-8"

EXISTING GATES

4'

5'

1'

PLAN

NORTH

N

EW

C O

N

ST

R U

C

TI

O N

S

IT

E

PL

AN

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SO

LI

C

IT

AT

IO

N N

O

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

ST

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

L

ST

R

EE

T, B

U

IL

D

IN

G

BI

LO

XI

, M

S

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

R

EP

AI

R W

EL

L

#9 C

AS

IN

G , D

R O

P

PI

PE

, P

U M

P, IN

ST

R

U M

EN

TA

TI

O

N , A

N D

C O

N

TR

O

LS

PR

O

JE

C

T N

O . M

AH

G

M

AR

C H

K.

PA

H

LA

VA

N

Z.

C

O O

M

ES

AR

C

H D

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

0%

D

ES

IG

N

C-101

7' -1

1"

7' -8

NEW 8", 3500 PSI

CONCRETE PAD

SEE DETAIL 1/C-102

NEW 6", 3500 PSI

CONCRETE PAD

SEE DETAIL 1/C-102

EXISTING CONCRETE

PAD

NEW ATS

SEE ELECTRICAL

FOR DETAILS

NEW GENERATOR

SEE ELECTRICAL

FOR DETAILS

NEW FUEL TANK

SEE ELECTRICAL

FOR DETAILS

6'-4"

5'

I I I I I I I I I I I I I I I I I I I r

J

_l

_l

___, r r •

I ---,L _ _r ___ _j ,u~--- rOi-----_J

- 0---- ffi J

J

C O

N C

R

ET

E

PA

D S

IT

E

PL

AN

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SO

LI

C

IT

AT

IO

N N

O

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

ST

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

L

ST

R

EE

T, B

U

IL

D

IN

G

BI

LO

XI

, M

S

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

R

EP

AI

R W

EL

L

#9 C

AS

IN

G , D

R O

P

PI

PE

, P

U M

P, IN

ST

R

U M

EN

TA

TI

O

N , A

N D

C O

N

TR

O

LS

PR

O

JE

C

T N

O . M

AH

G

M

AR

C H

K.

PA

H

LA

VA

N

Z.

C

O O

M

ES

AR

C

H D

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

0%

D

ES

IG

N

C-102

1. THE TOP 12" OF SUBGRADE BENEATH THE SLAB SHALL BE THOROUGHLY

COMPACTED TO 95% OF MAXIMUM DENSITY PER ASTM D698.

2. SLAB TO BE MADE OF FIBER REINFORCED POLYMER (FRP) CONCRETE WITH

MINIMUM 28 DAY STRENGTH OF 3500 PSI WITH 2 INCH LENGTH OF MONOFILAMENT

MACROSYNTHETIC FIBERS AT APPROXIMATELY 4 LB/YD^3 DOSAGE.ADD

AIR-ENTRAINING ADMIXTURE CONFORMING TO ASTM C260/C260M.

3. TOP OF PAD TO BE SMOOTH, SLOPED, AND CLEARED OF ALL FRAMING MATERIAL

AFTER CONCRETE SETS. SEE DETAIL 1/C-301.

4. NO WALLS SHALL BE BUILT AROUND GENERATOR, NOR CANOPIES ABOVE

GENERATOR.

5. COORDINATE WITH CLP UTILITIES TO ALLOW ANY AND ALL INSPECTIONS BEFORE,

DURING, AND AFTER CONSTRUCTION OF PAD.

6. REBAR SUPPORTS SHOULD BE USED TO KEEP THE REBAR IN PLACE. USE OF

CONCRETE BRICKS AS SUBSTITUTE OF SUPPORTS IS NOT PERMITTED.

7. ALL REBAR SHOULD AT LEAST HAVE 3" COVER ON ALL SIDES UNLESS OTHERWISE

NOTED.

8. REVIEW GENERATOR INSTALLATION INSTRUCTIONS BEFORE FORMING THE

CONDUIT STUB UP AREA. PROVIDE AREA PER MANUFACTURER REQUIREMENTS.

9. BOND GROUNDING ROD TO REBAR IN SLAB AND TO GENERATOR FRAME. STUB

ROD UP 6" ABOVE TOP OF CONCRETE PAD. SIZE BOND PER NEC 2550-66

REQUIREMENTS BASED ON PHASE CONDUCTOR SIZE. PROVIDE BRAIDED, BARE

CU BOND CABLE FROM GROUND BAR TO PAD REINFORCING AND TO FRAME.

LEAVE SUFFICIENT SLACK ABOVE PAD TO TIE TO GENSET FRAME, MINIMUM OF 24"

COIL. THERE WILL BE TWO GROUNDING RODS. ONE FOR THE GENERATOR AND

ONE FOR THE FUEL TANK.

10. CONTRACTOR TRADES TO COORDINATE INSTALLATION OF CONDUIT

PENETRATIONS.

GENERAL SHEET NOTES

EXPANSION JOINT 0'-1" DEPTH

AT CENTER OF PAD

GROUNDING ROD, SEE NOTE 9

GROUNDING ROD, SEE NOTE 9

EXISTING GATE

1 CONCRETE PAD PLAN VIEW

SCALE: 1/2" = 1'-0"

#6 REBAR, EQUALLY

SPACED @ 7" O.C.

#6 REBAR, EQUALLY

SPACED @ 15" O.C

C

-3

C

-3

PLAN

NORTH

5' -0

25'-5"

7' -8

3"

3"

3"

3"

C

-3

C

-3

C-301

C-301

4'

5'

6' -4

3" 3"

3" 3"

0---c5

4 • f-------'----0-- ft·~.--.\.

O

N C

R

ET

E

PA

D S

EC

TI

O N

S

AN

D

EX

PA

N

SI

O

N J

O

IN

T D

ET

AI

L

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SO

LI

C

IT

AT

IO

N N

O

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

ST

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

L

ST

R

EE

T, B

U

IL

D

IN

G

BI

LO

XI

, M

S

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

R

EP

AI

R W

EL

L

#9 C

AS

IN

G , D

R O

P

PI

PE

, P

U M

P, IN

ST

R

U M

EN

TA

TI

O

N , A

N D

C O

N

TR

O

LS

PR

O

JE

C

T N

O . M

AH

G

M

AR

C H

K.

PA

H

LA

VA

N

Z.

C

O O

M

ES

AR

C

H D

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

0%

D

ES

IG

N

C-301

1. THE TOP 12" OF SUBGRADE BENEATH THE SLAB SHALL BE THOROUGHLY

COMPACTED TO 95% OF MAXIMUM DENSITY PER ASTM D698.

2. SLAB TO BE MADE OF FIBER REINFORCED POLYMER (FRP) CONCRETE WITH

MINIMUM 28 DAY STRENGTH OF 3500 PSI WITH 2 INCH LENGTH OF MONOFILAMENT

MACROSYNTHETIC FIBERS AT APPROXIMATELY 4 LB/YD^3 DOSAGE.ADD

AIR-ENTRAINING ADMIXTURE CONFORMING TO ASTM C260/C260M.

3. TOP OF PAD TO BE SMOOTH, SLOPED, AND CLEARED OF ALL FRAMING MATERIAL

AFTER CONCRETE SETS. SEE DETAIL 1.

4. NO WALLS SHALL BE BUILT AROUND GENERATOR, NOR CANOPIES ABOVE

GENERATOR.

5. COORDINATE WITH CLP UTILITIES TO ALLOW ANY AND ALL INSPECTIONS BEFORE,

DURING, AND AFTER CONSTRUCTION OF PAD.

6. REBAR SUPPORTS SHOULD BE USED TO KEEP THE REBAR AT PLACE. USE OF

CONCRETE BRICKS AS SUBSTITUTE OF SUPPORTS IS NOT PERMITTED.

7. ALL REBAR SHOULD AT LEAST HAVE 3" COVER FROM THE SIDES UNLESS

OTHERWISE NOTED.

8. REVIEW GENERATOR INSTALLATION INSTRUCTIONS BEFORE FORMING THE

CONDUIT STUB UP AREA. PROVIDE AREA PER MANUFACTURER REQUIREMENTS.

9. BOND GROUNDING ROD TO REBAR IN SLAB AND TO GENERATOR FRAME. STUB

ROD UP 6" ABOVE TOP OF CONCRETE PAD. SIZE BOND PER NEC 2550-66

REQUIREMENTS BASED ON PHASE CONDUCTOR SIZE. PROVIDE BRAIDED, BARE

CU BOND CABLE FROM GROUND BAR TO PAD REINFORCING AND TO FRAME.

LEAVE SUFFICIENT LACK ABOVE PAD TO TIE TO GENSET FRAME, MINIMUM OF 24"

COIL. HERE WILL BE TWO GROUNDING RODS. ONE FOR THE GENERATOR AND ONE

FOR THE FUEL TANK.

GENERAL SHEET NOTES

1 NEW GENERATOR AND FUEL TANK CONCRETE PAD

SCALE: NTS

3/8"

CLEAN TOP 1" OF JOINT BEFORE

SEALING

2" 3/ 4"

1/ 4"

1/ 4"

È

/1 6"

1/2" DIA. BACKER ROD

1/8"

3 EXPANSION JOINT DETAIL

SCALE: NTS

BOND GROUND ROD TO

REBAR IN SLAB AND TO

GENERATOR FRAME

(1) 5/8" DIA. X 10'-0" LONG

CU GROUND ROD. BOND TO PAD REBAR

WITH EXOTHERMIC WELDING

3/4" CHAMFER

(TYP-ALL SIDES)SEE DETAIL A

BOND GROUND ROD TO

REBAR IN SLAB AND TO

GENERATOR FRAME

#6 REBAR LOCATED

AT CENTER OF THICKNESS

OF PAD

(1) 5/8" DIA. X 10'-0" LONG

CU GROUND ROD. BOND TO PAD REBAR

WITH EXOTHERMIC WELDING

3"

3/4" CHAMFER

(TYP-ALL SIDES)

8" 4"

EXISTING MATERIAL COMPACTED

TO 95% STD. PROCTOR PRIOR

CONSTRUCTION 6" OF 610 CRUSHED LIMESTONE

COMPACTED TO 98% STD. PROCTOR

PRIOR TO CONSTRUCTION

8" 3500 PSI CONCRETE

SLAB WITH STEEL REINFORCEMENT

GEOTEXTILE

FABRIC

4 ATS CONCRETE PAD SECTION

SCALE: NTS

6" 3500 PSI CONCRETE INSTALL 6"X6" (W1.4 10 GAUGE) WWF

3" MIN. SPACING

1. SEE E-301 FOR CONDUIT INSTALLATION DETAILS. CONTRACTOR TRADES TO

COORDINATE INSTALLATION OF CONDUIT PENETRATIONS.

2. JOINTS SHALL BE SAWED

3. GENERATOR/FUEL TANK AND ATS SLABS TO HAVE A 2% SLOPE AWAY FROM THE

FENCELINE.

KEYNOTES

EXISTING MATERIAL

COMPACTED TO 95% STD.

PROCTOR PRIOR TO

CONSTRUCTION

GEOTEXTILE

FABRIC

6" OF 610 CRUSHED

LIMESTONE COMPACTED

TO 95% STD. PROCTOR

PRIOR TO CONSTRUCTION

2 NEW GENERATOR AND FUEL TANK CONCRETE PAD

SCALE: NTS

(1) 5/8" DIA. X 10'-0" LONG

CU GROUND ROD. BOND TO PAD REBAR

WITH EXOTHERMIC WELDING

BOND GROUND ROD TO

REBAR IN SLAB AND TO

GENERATOR FRAME

#6 REBAR LOCATED

AT CENTER OF THICKNESS

OF PAD

EXISTING MATERIAL COMPACTED

TO 95% STD. PROCTOR PRIOR

CONSTRUCTION

GEOTEXTILE

FABRIC

8" 3500 PSI CONCRETE

SLAB WITH STEEL REINFORCEMENT

3"

6" OF 610 CRUSHED LIMESTONE

COMPACTED TO 98% STD. PROCTOR

PRIOR TO CONSTRUCTION

2"

6"

3"

4"

8"

3/4" CHAMFER

(TYP-ALL SIDES)

EXISTING MATERIAL

COMPACTED TO 95% STD.

PROCTOR PRIOR TO

CONSTRUCTION

EXISTING MATERIAL

COMPACTED TO 95% STD.

PROCTOR PRIOR TO

CONSTRUCTION

EXISTING MATERIAL

COMPACTED TO 95% STD.

PROCTOR PRIOR TO

CONSTRUCTION

. 4 ..• ·. • • • • • ..... ·-. • ... . flJ . . .., . . •.. • • ·., • . _.·..__, ...... · . ~ .... ' :- · .. · ..... - ••

• .. • flJ -. :. ,., • .-. : • . .:. •

·A.,,. •. • • . ', • •

4 • • .• a. •

- "v ' - "v

- /I ~ - / ~ -t:,. ' ' ' t:,. ' ', ' t:,. 0 s;z ' I - "v

4 .

• . 4 . .. • 4 .. :1, .

. .,, •• ,d • -

.d . • .d

.: ~ - / ~ /I ~ . 4 .. • .11 · .,, 4 .. .

t:,. ' ' t:,. ' '

' L:,,. I ' L:,,.

L:,,.

s;z' _"y - "v "v

I "v

_j L

/I ~ of-------

O

N D

U

IT

IN

ST

AL

LA

TI

O

N C

R O

SS

-S

EC

TI

O N

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SO

LI

C

IT

AT

IO

N N

O

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

ST

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

L

ST

R

EE

T, B

U

IL

D

IN

G

BI

LO

XI

, M

S

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

R

EP

AI

R W

EL

L

#9 C

AS

IN

G , D

R O

P

PI

PE

, P

U M

P, IN

ST

R

U M

EN

TA

TI

O

N , A

N D

C O

N

TR

O

LS

PR

O

JE

C

T N

O . M

AH

G

M

AR

C H

K.

PA

H

LA

VA

N

Z.

C

O O

M

ES

AR

C

H D

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

0%

D

ES

IG

N

C-302

1. CONTRACTOR TRADES TO COORDINATE INSTALLATION OF CONDUIT PENETRATIONS.

GENERAL SHEET NOTES

1 TYP. CONDUIT INSTALLATION CROSS-SECTION

SCALE: 1:20

CONDUIT TO BE A MIN.

18" UNDER GROUND CONDUIT GOING TO

B3967 ti •. 4 • ,d . . ;. .•

: ... . • .- • • . . 4 •. ·

• .. ·•. • • -d • ... ·,

• .. • ... :•4••· • .... . . :· ..... • .. '·.; :_ ..... . . • . . . . . ..... ,4 ••

ELECTRICAL

UG UG UG

BLDG 3967

EX

IS

TI

N

G C

H

LO

R

IN

E

TA

N K

EXISTING

UNDERGROUND

FEED FROM

T35-3902

EXISTING FENCE

EL

EC

TR

IC

AL

D

EM

O

LI

TI

O N

S

IT

E

PO

W

ER

P

LA

N

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

E-101

1. INTERCEPT EXISTING UTILITY FEED. REMOVE CONDUIT AND CABLE FROM PULL BOX

AND SAFETY SWITCH BACK TO NEW HAND HOLE AS SEEN ON DRAWING E-102.

2. REMOVE AND DISPOSE PULL BOX AND SAFETY SWITCH OUTSIDE OF BLDG 3967.

3. REMOVE AND DISPOSE OUT OF EXISTING METER.

KEYNOTES

1. CALL 811 AND APPLY FOR DIG PERMIT WITH THE GOVERNMENT PRIOR TO ANY DIG

WORK AND SHOULD ACCOUNT FOR PROCESSING TIME.

2. VERIFY ALL DIMENSIONS, CONNECTIONS, EXISTING EQUIPMENT, AND EXISTING

CONDITIONS PRIOR TO ORDERING EQUIPMENT AND COMMENCING WORK.

3. SEE DRAWING E-601 FOR EXISTING ONE-LINE DIAGRAM.

GENERAL SHEET NOTES

1 ELECTRICAL DEMOLITION SITE POWER PLAN

SCALE: 1" = 5'-4"

PLAN

NORTH

SO

LI

C

IT

AT

IO

N N

O

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

ST

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

L

ST

R

EE

T, B

U

IL

D

IN

G

BI

LO

XI

, M

S

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

R

EP

AI

R W

EL

L

#9 C

AS

IN

G , D

R O

P

PI

PE

, P

U M

P, IN

ST

R

U M

EN

TA

TI

O

N , A

N D

C O

N

TR

O

LS

PR

O

JE

C

T N

O . M

AH

G

M

AR

C H

H

. S

AN

TI

AG

O

R . L

AN

D

G R

AV

E

AR

C

H D

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

0%

D

ES

IG

N

E.

C

LE

VE

LA

N

D

K.

P

AH

LA

VA

N

PULL BOX

SAFETY SWITCH

METER 3

EXISTING

SAFETY SWITCH

EXISTING LOAD

CENTER

LEGEND

UG UNDERGROUND CONDUIT TO REMAIN

CONDUIT, CABLES AND EQUIPMENT TO

REMOVE AND DISPOSE

CONDUIT CHANGE FROM BELOW TO

ABOVE GRADE

I I I I I I I I I I I I I I I I I I

"" I.~ ~ . ~ ~0

I

- i

- 0 0

I

I _J

- - - - - - - - --r--~ rl.:l===__J J::-=:___J :\ ~j , r

J~-========~~'~11_i_1r----

"1 r------- 7J------oe-- 1·ri

~ t-----'------,,

- \ I

I

UG UG UG

UG

UG

UG

UG

UGU

G

UG

UG

UG

UG

UG

UG UG UG

UG

EL

EC

TR

IC

AL

N

EW

S

IT

E

PO

W

ER

P

LA

N

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

E-102

1. INTERCEPT EXISTING UTILITY FEED. PROVIDE NEW HAND HOLE (24"X30"X24") AND

SPLICE CABLE TO EXTEND FEED TO NEW ATS.

2. PROVIDE NEW AUTOMATIC TRANSFER SWITCH (ATS).

3. PROVIDE NEW PERMANENT STANDBY GENERATOR.

4. PROVIDE 1000 GALLON NEW DIESEL TANK CAPABLE OF PROVIDING GENERATOR

WITH A RUNTIME OF 72 HOURS. TANK SHALL MATCH EXISTING BASE DIESEL TANKS

(CORE ENGINEERED SOLUTIONS CONVAULT) OR APPROVED EQUAL.

5. PROVIDE NEW SMART METER. ROUTE NEW CONDUIT FROM ATS TO SMART METER.

6. REFER TO CIVIL DRAWINGS C-101 AND C-102 FOR CONCRETE PAD INFORMATION.

7. PROVIDE A NEW GFCI PROTECTED, HEAVY DUTY QUADPLEX RECEPTACLE IN

WEATHERPOOF ENCLOSURES (HUBBLE RW58750 OR APPROVED EQUAL) FOR

GENERATOR ACCESSORIES AND MAINTENANCE. COORDINATE LOCATION OF

QUADPLEX WITH THE GOVERNMENT. RECEPTACLE TO BE MOUNTED ON UNISTRUT

OUTSIDE OF THE NEW CONCRETE PAD.

KEYNOTES

1. CALL 811 AND APPLY FOR DIG PERMIT WITH THE GOVERNMENT PRIOR TO ANY DIG

WORK AND ACCOUNT FOR PROCESSING TIME.

2. VERIFY ALL DIMENSIONS, CONNECTIONS, EXISTING EQUIPMENT, AND EXISTING

CONDITIONS PRIOR TO ORDERING EQUIPMENT AND COMMENCING WORK.

3. SEE DRAWING E-602 FOR MORE DETAILED INFORMATION REGARDING NEW

ELECTRICAL EQUIPMENT.

4. CONDUIT ROUTING FOR SCHEMATIC PURPOSES ONLY. VERIFY EXISTING CONDUIT

ROUTING AND ROUTE NEW CONDUIT AS NEEDED.

5. UNDERGROUND CONDUITS SHALL BE MINIMUM 18" BELOW GRADE.

6. DRILL, BORE, PATCH AND WEATHER SEAL ANY NEW OR MODIFIED WALL

PENETRATIONS.

GENERAL SHEET NOTES

1 ELECTRICAL NEW SITE POWER PLAN

SCALE: 1" = 5'-4"

EX

IS

TI

N

G C

H

LO

R

IN

E

TA

N K

BLDG 3967

EXISTING

UNDERGROUND

FEED FROM

T35-3902

EXISTING FENCE

EXISTING

SAFETY SWITCH

PLAN

NORTH

N

EW

D

IE

SE

L

TA

N

K N

EW

G

EN

ER

AT

O

R

NEW ATS

FUEL TANK

FILL PORT

NEW SMART

METER

NEW HANDHOLE

SO

LI

C

IT

AT

IO

N N

O

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

ST

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

L

ST

R

EE

T, B

U

IL

D

IN

G

BI

LO

XI

, M

S

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

R

EP

AI

R W

EL

L

#9 C

AS

IN

G , D

R O

P

PI

PE

, P

U M

P, IN

ST

R

U M

EN

TA

TI

O

N , A

N D

C O

N

TR

O

LS

PR

O

JE

C

T N

O . M

AH

G

M

AR

C H

H

. S

AN

TI

AG

O

R . L

AN

D

G R

AV

E

AR

C

H D

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

0%

D

ES

IG

N

E.

C

LE

VE

LA

N

D

K.

P

AH

LA

VA

N

6 NEW CONCRETE

PAD

6 NEW CONCRETE

PAD

EXISTING LOAD

CENTER

NEW QUADPLEX RECEPTACLE

BOX ON UNISTRUT

E-301

LEGEND

UG UNDERGROUND CONDUIT

ABOVE GROUND CONDUIT

QUADPLEX RECEPTACLE

DETAIL CALLOUT

DETAIL NUMBER

SHEET NUMBER

BREAK LINE

E-301

CONDUIT CHANGE FROM BELOW TO

ABOVE GRADE

l I

1--- 0 1------------i

I

I I I

0 ~ ----- ---i---- -----

~o---+-----i· ~&~ - - _J (

• , ,,; .- ---i----f------+--0 --------1( vv

'i------t

0----- ( 'T''j \,j /

I l I I I I I I I I

V \ L

----) TL_ _____ I

----- ----)r ----- -----

: JI J J

r, T

L/

EL

EC

TR

IC

AL

N

EW

S

IT

E

D

IM

EN

SI

O N

S

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

E-103

1. CALL 811 AND APPLY FOR DIG PERMIT WITH THE GOVERNMENT PRIOR TO ANY DIG

WORK AND ACCOUNT FOR PROCESSING TIME.

2. VERIFY ALL DIMENSIONS, CONNECTIONS, EXISTING EQUIPMENT, AND EXISTING

CONDITIONS PRIOR TO ORDERING EQUIPMENT AND COMMENCING WORK.

3. SEE DRAWING E-602 FOR MORE DETAILED INFORMATION REGARDING NEW

ELECTRICAL EQUIPMENT.

GENERAL SHEET NOTES

1 ELECTRICAL NEW SITE DIMENSIONS

SCALE: 1" = 5'-4"

EX

IS

TI

N

G C

H

LO

R

IN

E

TA

N K

BLDG 3967

EXISTING FENCE

EXISTING

SAFETY SWITCH

PLAN

NORTH

N

EW

D

IE

SE

L

TA

N

K N

EW

G

EN

ER

AT

O

R

NEW ATS

FUEL TANK

FILL PORT

NEW SMART

METER

37'-8"±

8' -8

8' -1

1"

21'±

NEW HANDHOLE

SO

LI

C

IT

AT

IO

N N

O

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

ST

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

L

ST

R

EE

T, B

U

IL

D

IN

G

BI

LO

XI

, M

S

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

R

EP

AI

R W

EL

L

#9 C

AS

IN

G , D

R O

P

PI

PE

, P

U M

P, IN

ST

R

U M

EN

TA

TI

O

N , A

N D

C O

N

TR

O

LS

PR

O

JE

C

T N

O . M

AH

G

M

AR

C H

H

. S

AN

TI

AG

O

R . L

AN

D

G R

AV

E

AR

C

H D

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

0%

D

ES

IG

N

E.

C

LE

VE

LA

N

D

K.

P

AH

LA

VA

N

NEW CONCRETE

PAD

NEW CONCRETE

PAD

EXISTING LOAD

CENTER

1'

1'

1'

1'

'-5

J J J J J J J J J J J J J J J J J J J

\ \ Iii.

L l J J I • j I f - I

- r-

~ r-l -, I f

-1-U

L/ L/ '

' \ L J "·-- _,,.. 0

EL

EC

TR

IC

AL

D

ET

AI

LS

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

E-301

1. CONDUITS SHALL HAVE MINIMUM 3" SPACING BETWEEN EACH CONDUIT AND

INTERIOR OF NEW EQUIPMENT.

2. ELECTRICAL CONTRACTOR SHALL COORDINATE CONDUIT STUB UP LOCATIONS

WITH THE CIVIL CONTRACTOR PRIOR TO POURING CONCRETE.

3. MODIFY ARRANGEMENT OF CONDUITS BASED ON THE PURCHASED EQUIPMENT

MANUFACTURER'S CABLE ENTRY RECOMMENDATIONS.

GENERAL SHEET NOTES

1 ATS CONCRETE PAD TOP ELEVATION

SCALE: 1" = 1'-0"

ATS CONDUITS

ID SIZE ROUTE

1 2-1/2" FROM TRANSFORMER T35-3902

2 2-1/2" SPARE

3 3/4" TO B3967 SMART METER

4 2-1/2" TO B3967 SAFETY SWITCH

5 2-1/2" SPARE

6 2-1/2" SPARE

7 2-1/2" FROM GENERATOR CIRCUIT BREAKER

8 3/4" FROM GENERATOR CONTROL PANEL

1 2

PLAN

NORTH

1'

ATS

CONCRETE PAD

1'

CAP END OF CONDUIT

CAP END OF CONDUIT

1' -6

3 SPARE CONDUIT DETAIL (TYP.)

SCALE: 1" = 1'-0"

CONCRETE PAD

CONDUIT SHALL FACE AWAY FROM CENTER OF CONCRETE PAD

SO

LI

C

IT

AT

IO

N N

O

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

ST

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

L

ST

R

EE

T, B

U

IL

D

IN

G

BI

LO

XI

, M

S

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

R

EP

AI

R W

EL

L

#9 C

AS

IN

G , D

R O

P

PI

PE

, P

U M

P, IN

ST

R

U M

EN

TA

TI

O

N , A

N D

C O

N

TR

O

LS

PR

O

JE

C

T N

O . M

AH

G

M

AR

C H

H

. S

AN

TI

AG

O

R . L

AN

D

G R

AV

E

AR

C

H D

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

0%

D

ES

IG

N

E.

C

LE

VE

LA

N

D

K.

P

AH

LA

VA

N

CONCRETE

LEGEND

SOIL

SCALE: 3/4" = 1'-0"

PLAN

NORTH

2'-2"

GENERATOR

CONCRETE PAD

2 GENERATOR CONCRETE PAD TOP ELEVATION

GENERATOR CONDUITS

ID SIZE ROUTE

1 2-1/2" TO ATS (EMERGENCY POWER)

2 2-1/2" SPARE

3 3/4" TO ATS (GENERATOR START/STOP)

3' 1'

2'

3'-4" 2'-2"

1'

CONTINUATION OF GENERATOR AND FUEL TANK CONCRETE PAD

1'

E-301

I I I I I I ffi

I I - [ ,· .. • .. _ .. -, I L--

. . '• • 4

.. • 4 "' . ' . ~ .. .. • 4

. . • ~ . . 1' •• 4 • ~

.. . : • . 4 . 4 • :., ·. !. 4 . •

I I

">• ". • . ·. . 1, '- ' 1, ' 1/ ; ' / • . • • • / 1// ,"- ' -;-

~ "< ~ "< ' " / ' ~ _J

0----

I

I I I I I I I I I I I I

.Jt( ~ . ~ .... 0 ' ~p~ f

J

...._ J

I f

J f

J

EXISTING PUMP

MOTOR STARTER

WINDOW

EXISTING DISCONNECT SWITCH

EXISTING TRANSFORMER

EXISTING MAIN DISCONNECT

EXISTING SUB-PANEL

EXISTING

CSI PANEL

WELL PUMP

CONCRETE PILLAR

5" ABOVE FINISHED FLOOR

AIR RELIEF

CHECK VALVE

FLUORIDATION

SYSTEM

CHLORINE PUMP

FLOW METER CHART

FLOW METER

CHLORINE ALARM

PANEL

CHLORINE TANKS

REGULATOR

CONCRETE PILLAR

2'-2" ABOVE FINISHED

FLOOR

8" CMU WALL

EL

EC

TR

IC

AL

D

EM

O

LI

TI

O N

EQ

UI

PM

EN

T

LA

YO

UT

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

E-401

1. REMOVE EXISTING WELL PUMP.

2. REMOVE EXISTING CHLORINE PUMP.

KEYNOTES

1. SEE DRAWING E-601 FOR EXISTING ONE-LINE DIAGRAM.

GENERAL SHEET NOTES

1 ELECTRICAL DEMOLITION EQUIPMENT LAYOUT

SCALE: NOT TO SCALE

PLAN

NORTH

EXISTING

FIBER PANEL

SO

LI

C

IT

AT

IO

N N

O

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

ST

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

L

ST

R

EE

T, B

U

IL

D

IN

G

BI

LO

XI

, M

S

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

R

EP

AI

R W

EL

L

#9 C

AS

IN

G , D

R O

P

PI

PE

, P

U M

P, IN

ST

R

U M

EN

TA

TI

O

N , A

N D

C O

N

TR

O

LS

PR

O

JE

C

T N

O . M

AH

G

M

AR

C H

H

. S

AN

TI

AG

O

R . L

AN

D

G R

AV

E

AR

C

H D

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

0%

D

ES

IG

N

E.

C

LE

VE

LA

N

D

K.

P

AH

LA

VA

N

DEMOLITION SCOPE

LEGEND

F_ -_ - Ll------l-'I

I '------' 11=t-=-=--~~

0....--------------

\"--..._j ___ //

EXISTING PUMP

MOTOR STARTER

WINDOW

EXISTING DISCONNECT SWITCH

EXISTING TRANSFORMER

EXISTING MAIN DISCONNECT

EXISTING SUB-PANEL

EXISTING

CSI PANEL

WELL PUMP

CONCRETE PILLAR

5" ABOVE FINISHED FLOOR

AIR RELIEF

CHECK VALVE

FLUORIDATION

SYSTEM

CHLORINE PUMP

FLOW METER CHART

FLOW METER

CHLORINE ALARM

PANEL

CHLORINE TANKS

REGULATOR

CONCRETE PILLAR

2'-2" ABOVE FINISHED

FLOOR

8" CMU WALL

EL

EC

TR

IC

AL

N

EW

E

Q

UI

PM

EN

T

LA

YO

UT

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

E-402

1. PROVIDE NEW REPLACEMENT WELL PUMP.

2. PROVIDE NEW REPLACEMENT CHLORINE PUMP.

3. PROVIDE NEW FIBER TO CAT6 MEDIA CONVERTER. CONNECT MEDIA CONVERTER

TO EXISTING FIBER STRAND INSIDE CSI PANEL. RUN NEW CAT6 CABLE IN 3/4" EMT

CONDUIT FROM MEDIA CONVERTER TO NEW SMART METER. COORDINATE WORK

WITH 81 COMMS.

KEYNOTES

1. VERIFY ALL DIMENSIONS, CONNECTIONS, EXISTING EQUIPMENT, AND EXISTING

CONDITIONS PRIOR TO ORDERING EQUIPMENT AND COMMENCING WORK.

2. SEE DRAWING E-602 NEW ONE-LINE DIAGRAM FOR MORE DETAILED INFORMATION

REGARDING NEW ELECTRICAL EQUIPMENT.

3. CONDUIT ROUTING FOR SCHEMATIC PURPOSES ONLY. ROUTE NEW CONDUIT AS

NEEDED.

GENERAL SHEET NOTES

1 ELECTRICAL NEW EQUIPMENT LAYOUT

SCALE: NOT TO SCALE

PLAN

NORTH

EXISTING

FIBER PANEL

NEW SMART METER

SO

LI

C

IT

AT

IO

N N

O

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

ST

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

L

ST

R

EE

T, B

U

IL

D

IN

G

BI

LO

XI

, M

S

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

R

EP

AI

R W

EL

L

#9 C

AS

IN

G , D

R O

P

PI

PE

, P

U M

P, IN

ST

R

U M

EN

TA

TI

O

N , A

N D

C O

N

TR

O

LS

PR

O

JE

C

T N

O . M

AH

G

M

AR

C H

H

.S

AN

TI

AG

O

R .L

AN

D

G R

AV

E

AR

C

H D

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

0%

D

ES

IG

N

E.

C

LE

VE

LA

N

D

K.

PA

H

LA

VA

N

3 NEW WORK SCOPE

LEGEND

I lo

I LJ

of----------

L

INCOMING UTILITY

FEED

#1/0

T35-3902

22.86/13.2KV Y-G

480/277V Y-G 750kVA

5.69%

LIGHTS

RECEPTACLES

SUB-PANEL

10 KVA

480V - 240/120V

1-PHASE

OUTSIDE INSIDE

TO B3902

DEMOLITION SCOPE

CIRCUIT BREAKER

MOTOR

SPD SURGE PROTECTOR DEVICE

TRANSFORMER

FUSED SAFETY SWITCH

XXXAF FRAME RATING

XXXAT FUSE TRIP RATING

30AF

10AT

EQUIPMENT

30AF

25AT

#1/0

EL

EC

TR

IC

AL

D

EM

O

LI

TI

O N

O N

E-

LI

N E

D

IA

G R

AM

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

E-601

75 HP

WELL PUMP #9

3 HP

CHLORINE PUMP

1. REMOVE AND DISPOSE OF EXISTING PULL BOX AND SAFETY SWITCH. REMOVE

CONDUITS AND CONDUCTORS FROM NEW SPLICE POINT TO EXISTING SAFETY

SWITCH INSIDE THE BUILDING.

2. REMOVE AND DISPOSE OF EXISTING WELL PUMP AND CHLORINE PUMP.

KEYNOTES

1. VERIFY CIRCUITS FOR ANY DISCREPANCIES AND MISSING DATA AND PROVIDE

REDLINES FOR A COMPLETE AND DETAILED RISER DIAGRAM.

GENERAL SHEET NOTES

EXISTING

175A

15A

M

M

SOFT

STARTER200A

WELL #9 PUMP CONTROL PANEL

1 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM

LEGEND

PULL BOX

NON-FUSED

DOUBLE THROW

SAFETY SWITCH

SO

LI

C

IT

AT

IO

N N

O

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

ST

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

L

ST

R

EE

T, B

U

IL

D

IN

G

BI

LO

XI

, M

S

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

R

EP

AI

R W

EL

L

#9 C

AS

IN

G , D

R O

P

PI

PE

, P

U M

P, IN

ST

R

U M

EN

TA

TI

O

N , A

N D

C O

N

TR

O

LS

PR

O

JE

C

T N

O . M

AH

G

M

AR

C H

H

. S

AN

TI

AG

O

R . L

AN

D

G R

AV

E

AR

C

H D

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

0%

D

ES

IG

N

E.

C

LE

VE

LA

N

D

K.

P

AH

LA

VA

N

200AF

150AT

F

F

F

F

_J J J _j J _j _J J _j J J _J J _J _J J _J J l ,-----' 0 r'

1 1 7 01 , I

___,,/ r· , I

I I

I LL --- 7

I ____ J L ___ _

_I I~ n __ 0 __ 7 r I -{

I I

D r-.

I

I

_J r-.

L ____ r-.

I v-..1.v rvy-v, ~o-J

I

NEW

WELL #9 PUMP CONTROL PANEL

200A

175A

15A

SOFT

STARTER

NEW

75 HP

WELL PUMP #9

NEW

2.5 HP

CHLORINE PUMP

INCOMING UTILITY

FEED

#1/0

T35-3902

22.86/13.2KV Y-G

480/277V Y-G 750kVA

5.69%

LIGHTS

RECEPTACLES

LOAD CENTER

10 KVA

480V - 240/120V

1-PHASE

OUTSIDE INSIDE

150KW STANDBY GENERATOR

225AS

200AT SPD

225A 4P

ATS

SPD

TO B3902

NEW WORK SCOPE

CIRCUIT BREAKER

MOTOR

SPD SURGE PROTECTOR DEVICE

TRANSFORMER

FUSED SAFETY SWITCH

AF FRAME RATING

AT FUSE TRIP RATING

EQUIPMENT

30AF

25AT

EL

EC

TR

IC

AL

N

EW

O

N E-

LI

N

E D

IA

G

R

AM

A N

D

PA

N

EL

S C

H

ED

U

LE

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

E-602

1. PROVIDE NEW 4#4/0 CU, #2 GND IN 2.5" CONDUIT AND A SPARE 2.5" CONDUIT FOR

POWER. PROVIDE A 3/4" CONDUIT FOR GENERATOR START SIGNAL CABLES FROM

THE ATS. PROVIDE GENERATOR START SIGNAL CABLES AS REQUIRED BY THE ATS

AND GENERATOR MANUFACTURER. PROVIDE PULL STRINGS AND CAP FOR EMPTY

CONDUITS.

2. PROVIDE NEW CUMMINS (OR APPROVED EQUAL) AUTOMATIC TRANSFER SWITCH

(ATS). ATS SHALL BE 480V 225A 3-PHASE WITH A SWITCHED NEUTRAL (4-POLE). ATS

SHALL BE DELAYED TRANSITION AND HAVE BYPASS ISOLATION FOR MAINTENANCE.

ATS SHALL BE SERVICE ENTRANCE RATED. ATS SHALL HAVE A 225AS/150AT

BREAKER WITH ADJUSTABLE LONG TIME PICKUP AND INSTANTANEOUS SETTINGS

ON THE INCOMING UTILITY SIDE. ATS SHALL BE MINIMUM NEMA 3R RATED FOR

OUTDOOR USE. ATS SHALL HAVE A SURGE PROTECTOR DEVICE CONNECTED TO

UTILITY SOURCE. SEE DRAWING E-301 FOR CONDUIT DETAIL.

3. PROVIDE NEW CUMMINS (OR APPROVED EQUAL) PERMANENT STANDBY

GENERATOR. GENERATOR SHALL BE 150KW 480V 3-PHASE WYE GROUNDED

CAPABLE OF HANDLING THE INRUSH CURRENT OF EXISTING AND NEW EQUIPMENT.

GENERATOR SHALL BE MINIMUM NEMA 3R RATED FOR OUTDOOR USE. GENERATOR

SHALL BE GROUNDED AS A SEPARATELY DERIVED SYSTEM. GENERATOR SHALL

HAVE A SURGE PROTECTOR DEVICE. GENERATOR BREAKER SHALL HAVE AN

ELECTRONIC LI TRIP UNIT WITH ADJUSTABLE LONG TIME AND INSTANTANEOUS

SETTINGS. CONTRACTOR TO PROVIDE ALL NECESSARY GROUNDING, BONDING AND

ACCESSORIES. GENERATOR SYSTEM SHALL COMPLY WITH AFI 32-1062 AND UFC

3-540-01.

4. PROVIDE AND INSTALL CURRENT TRANSFORMERS ON THE UTILITY SIDE INSIDE THE

ATS.

5. PROVIDE NEW SCHNEIDER ELECTRIC ION 8650 SMART METER IN ENCLOSURE OR

APPROVED EQUAL WITH CAT6 COMMUNICATION IN MINIMUM NEMA 1 ENCLOSURE.

CONTRACTOR TO PROVIDE CURRENT TRANSFORMERS, I/O PORTS AND ALL NEEDED

ACCESSORIES. COORDINATE WORK WITH 81 COMMS.

6. PROVIDE NEW 4#4/0 CU, #2 GND IN 2.5" CONDUIT FROM ATS TO EXISTING SAFETY

SWITCH INSIDE THE BUILDING. PROVIDE A NEW 3/4" CONDUIT FROM THE ATS TO THE

SMART METER. RE-USE EXISTING PENTRATIONS AND BORE OUT AS NEEDED.

7. PROVIDE NEW 3#12, #12 GND IN 3/4" CONDUIT FROM EXISTING LOAD CENTER TO

GENERATOR RECEPTACLES FOR GENERATOR ACCESSORIES. SEE DRAWING E-603

FOR PANEL SCHEDULE.

8. PROVIDE NEW 4#1/0, #6 GND IN 2.5" CONDUIT FROM NEW SPLICE POINT IN NEW

HANDHOLE TO NEW ATS.

9. REPLACE EXISTING BREAKER WITH NEW TANDEM MINI CIRCUIT BREAKER (SQUARE

D QOT1520 OR APPROVED EQUAL).

KEYNOTES

1. VERIFY CIRCUITS FOR ANY DISCREPANCIES AND MISSING DATA AND PROVIDE

REDLINES FOR A COMPLETE AND DETAILED ONE-LINE DIAGRAM.

2. PROVIDE ALL CONDUIT, FITTINGS, WEATHER SEALING, CONDUCTORS, SEALANTS

AND ACCESSORIES FOR A CODE COMPLIANT INSTALL.

3. ALL EQUIPMENT PROVIDED SHALL INCLUDE ALL ACCESSORIES AND PARTS NEEDED

FOR A COMPLETE AND FUNCTIONAL SYSTEM

4. ALL BELOW GRADE CONDUIT SHALL BE PVC SCHEDULE 40 AND TRANSITION TO

RIGID METAL CONDUIT (RMC) ABOVE GRADE.

GENERAL SHEET NOTES

1 ELECTRICAL NEW ONE-LINE DIAGRAM

LEGEND

200AF

150AT F

GEN START SIGNAL

F

F

---AF

---AT F

NEW SMART METER

SO

LI

C

IT

AT

IO

N N

O

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

ST

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

L

ST

R

EE

T, B

U

IL

D

IN

G

BI

LO

XI

, M

S

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

R

EP

AI

R W

EL

L

#9 C

AS

IN

G , D

R O

P

PI

PE

, P

U M

P, IN

ST

R

U M

EN

TA

TI

O

N , A

N D

C O

N

TR

O

LS

PR

O

JE

C

T N

O . M

AH

G

M

AR

C H

H

.S

AN

TI

AG

O

R .L

AN

D

G R

AV

E

AR

C

H D

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

0%

D

ES

IG

N

E.

C

LE

VE

LA

N

D

K.

PA

H

LA

VA

N

NEW HANDHOLE

AND SPLICE

LIGHTS

GENERATOR ACCESSORIES

2 ELECTRICAL PANEL SCHEDULE

rr= ,---------_J

I .---------.---~ 10 ©-:~----+--=-=------l

I 1

L _________ 7

--7 I

8 _J i I I I I I L _ i I

__ J I L_:--i

I I I L ____ _

©L __ 7 '-----------+-----++---------lM

_ _______ _J

0----

LOCATION: WELL 9 BUILDING VOLTAGE: 240/120V-1PH, 3W

FED FROM: 10 kVA TRANSFORMER MAIN BREAKER: MLO

MOUNTING: SURFACE LOAD CENTER BUS AMPACITY: 100 A

ACCESSORIES: LUGS:

AIC:

LOAD DESCRIPTION NOTE CB CKT, PH CKT, CB NOTE LOAD DESCRIPTION

INCOMING LUG 1 A 2

15/1 CHLORINE ALARM AND RECEPTACLE

2011 GENERATOR QUAD RECEPTACLE

RTUPOWER 2011 3 B 1511 - CiGR'i'SANEi Fi'iN - - - -4

LIGHT IN STORAGE ROOM 2011 5 A 6 3512 FLOW METER/RECORDER #6

FLOW METER/RECORDER #6 3512 7 B 8 INCOMING LUG

r-lJtes: Square D QO Load Center QO6-12L 100RB

0----i~- 0 ,------] 1---~_J

L_::::J

D

MAHG231034 Repair Well #9 Casing, Drop Pipe, Pump, Instrumentation, and Controls-Drawings.pdf
MAHG231034 Repair Well #9 Casing, Drop Pipe, Pump, Instrumentation, and Controls-Drawings.pdf
MAHG231034 B3967 Well 9.pdf
Sheets and Views
MAHG231034 B3967 Well 9-G-001
MAHG231034 B3967 Well 9-C-101
MAHG231034 B3967 Well 9-C-302
MAHG231034 B3967 Well 9 - Electrical.pdf
Sheets and Views
MAHG231034 B3967 Well 9-E-101
MAHG231034 B3967 Well 9-E-102
MAHG231034 B3967 Well 9-E-103 Dim
MAHG231034 B3967 Well 9-E-301
MAHG231034 B3967 Well 9-E-401
MAHG231034 B3967 Well 9-E-402
MAHG231034 B3967 Well 9-E-601 EXIST SLD
MAHG231034 B3967 Well 9-E-602 SLD
MAHG231034 B3967 Well 9-C-301.pdf
Sheets and Views
C-301
MAHG231034 B3967 Well 9-C-102.pdf
Sheets and Views
C-102

File details come from the government source that posted it. Updated .