Attachment 3 LCIC Lighting Specifications.pdf
PDF 1 MB Posted
- Attached to
- GAOA LCIC Lighting Upgrades Federal contract opportunity
- Solicitation number
- 1240LU25R0026
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a detailed specification for an electrical lighting upgrade project for the Lewis and Clark National Forest. The project involves comprehensive electrical and lighting system modifications, specifically focusing on the LCIC (Location) Lighting Electrical Project, with a project number of 1240LU21F0066 located in Great Falls, Montana. The specification covers multiple technical divisions including electrical requirements, lighting controls, wiring devices, panelboards, and LED lighting, with a strong emphasis on wireless lighting control solutions using Crestron electronics.
The project scope includes installing new lighting fixtures, lighting control systems, electrical infrastructure components, and associated hardware. Key technical specifications mandate use of LED lighting with 50,000-hour fixture life, wireless control devices with 128-bit encryption, and compatibility with BACnet/IP systems. The lighting control system features include scene creation, time clock functionality, occupancy sensing, and integration capabilities with audio/visual systems. The specification also emphasizes seismic performance requirements, energy efficiency standards, and comprehensive warranty provisions, with most components carrying a five-year warranty. The total project magnitude is estimated between $500,000 to $1,000,000, with all questions due by September 11, 2025, at 4:00 PM MDT.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1240LU25R0026 LCIC Lighting Upgrade.pdf | ||
| Attachment 2 Statement of Work.pdf | ||
| Attachment 4 LCIC Lighting Drawings.pdf | ||
| Attachment 1 Schedule of Items.docx | DOCX document | |
| Attacment 5 Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL FOR:
LCIC LIGHTING
ELECTRICAL
PROJECT NO. - 1240LU21F0066
Great falls ,MT
Volume 1
Date: November 30, 2021
100% CONSTRUCTION DOCUMENTS
ARCHITECT
MOSAIC ARCHITECTURE, P.C.
428 N Last Chance Gulch Helena, Montana 59601
Phone: 406-449-2013 www.mosaicarch.com
1240LU21F0066 / LCIC Lighting Electrical TABLE OF CONTENTS
TABLE OF CONTENTS
The following listed documents comprise the Table of Contents for the USDA LCIC Lighting, Great Falls, Montana.
Where the numerical sequence of Sections or Divisions is interrupted, such interruptions are intentional
PROJECT MANUAL
TABLE OF CONTENTS
PROJECT REPRENSTATIVES
TECHNICAL SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 1000- Summary 01 2105- -Substitution Procedure 01 3000- Administrative Requirements 01 4000- Quality Requirements 01 5000 -Temporary Facilities and Controls 01 5813 -Temporary Project Signage 01 6000 -Product Requirements 01 7000 -Execution and Closeout Requirements 01 7419 -Construction Waste Management and Disposal 01 7800 -Closeout Submittals 01 7900 -Demonstration and Training
DIVISION 02 - EXISTING CONDITIONS
DIVISION 03 - CONCRETE
DIVISION 04 - MASONRY
DIVISION 05 - METALS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
DIVISION 08 - OPENINGS
DIVISION 09 - FINISHES
DIVISION 10 - SPECIALTIES
DIVISION 11 - EQUIPMENT
DIVISION 12 - FURNISHINGS
1240LU21F0066 / LCIC Lighting Electrical TABLE OF CONTENTS
DIVISION 14 - CONVEYING EQUIPMENT
DIVISION 26 – ELECTRICAL AND LIGHTING
260010 - General Electrical Requirements
260513 SF - MEDIUM-VOLTAGE CABLES
260519 - Low-Voltage Electrical Power Conductors and Cables 260526 - Grounding and Bonding for Electrical Systems 260529 - Hangers and Supports for Electrical Systems 260533 - Raceways and Boxes for Electrical Systems
260548.16 - Seismic Controls for Electrical Systems 260553 - Identification for Electrical Systems 260923 - Lighting Controls 262416 - Panelboards 262726 - Wiring Devices 264313 - Surge Protection for Low-Voltage Electrical Power Circuits 265100 - LED Lighting
DIVISION 31 - EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
DIVISION 33 - UTILITIES
1240LU21F0066 / LCIC Lighting Electrical 01 1000 - 1 SUMMARY
SECTION 01 1000 SUMMARY
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Phased construction.
4. Access to site.
5. Coordination with occupants.
6. Work restrictions.
7. Specification and drawing conventions.
8. Miscellaneous provisions.
B. Related Requirements:
1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
1.02 PROJECT INFORMATION
A. Project Identification: LCIC Lighting Electrical
1. Project Location: Great Falls, MT
B. Owner: U. S. Forest Service
1. Owner's Representative: Contracting Officer
C. Architect: Mosaic Architecture, 428 Last Chance Gulch, Helena, MT 59601.
1.03 CONSTRUCTION TIME, SEQUENCING, & SCHEDULE
A. The total contract time for all phases of work shall be xxx calendar days from issuance of the Notice to Proceed to Substantial Completion.
B. The Owner will continue to occupy the site during construction. The Contractor is responsible for all coordination with the Owner's representative in scheduling all disruptions of access and utilities. The following is the anticipated construction sequence for the project and some of the Owner's occupancy requirements. Bid pricing must take into account the required project sequencing.
1.04 OWNER REQUIREMENTS
A. The Owner will the Building for the entirety of the project. Access to this building must be maintained throughout the project. Specific requirements:
1. Parking must remain usable by the Owner except where noted otherwise.
1.05 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following:
1. MATERIALS AND PRODUCTS FOR THE PROJECT SHALL BE COMPLIANT WITH
FEDERAL GOVERNMENT "BUY AMERICAN ACT."
B. Type of Contract:
1. Project will be constructed under a single prime contract.
1.06 ACCESS TO SITE
A. Use of Site: Limit use of Project Site to areas within the Contract limits indicated. Do not disturb portions of Project Site beyond areas in which the Work is indicated.
1. Limits: Confine construction operations to areas indicated.
a. Schedule deliveries to minimize use of driveways and entrances by construction operations.
b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
c.
1240LU21F0066 / LCIC Lighting Electrical 01 1000 - 2 SUMMARY
1.07 CONSTRUCTION RELATED DAMAGE
A. Construction Related Damage: Contractor agrees to pay the Owner all damages and costs incurred by the Owner or caused by the Owner by reason of the Contractor’s construction activity related damage including but not limited to damage to any of the Owner’s operating electrical equipment and/or computer technology and equipment.
1.08 COORDINATION WITH OCCUPANTS
A. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work.
1. Contracting Officer will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied prior to Owner acceptance of the completed Work.
2. Before limited government occupancy, mechanical and electrical systems shall be fully government will operate and maintain mechanical and electrical systems serving occupied portions of work.
3. On occupancy, government will assume responsibility for maintenance and custodial service for occupied portions of work.
4. Notify Owner not less than 72-hours in advance of any activities that will affect Owner's unrestricted access and/or operations and/or the Owner’s operations.
1.09 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7:00 a.m. to 6:00 p.m., Monday through Friday, unless otherwise indicated or arranged with Contracting Officer.
1. Contractor shall coordinate extended, weekend, and/or holiday hours with the Owner;
other work restrictions apply as enforced by the authority of jurisdiction.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by the government or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
1. Notify Contracting Officer not less than 1 calendar week in advance of proposed utility interruptions.
2. Obtain Contracting Officers written permission before proceeding with utility interruptions.
D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.
1. Notify Contracting Officer not less than two days in advance of proposed disruptive operations.
2. Obtain Contracting Officer written permission before proceeding with disruptive operations.
E. Controlled Substances: Use of tobacco products and other controlled substances on Project Site is not permitted.
1.10 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
1240LU21F0066 / LCIC Lighting Electrical 01 1000 - 3 SUMMARY
C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations scheduled on
Drawings.
3. Keynoting: Materials and products are identified by reference drawing note referencing
Specification Section numbers found in this Project Manual.
1.11 LAW AND REGULATIONS
A. Laws and Regulations: All applicable federal and state laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over the project shall apply to the contract throughout and will be deemed to be included in this contract the same as though herein written in full.
1.12 WARRANTY
A. Warranty & Service: The Contractor shall warranty all materials, equipment, and labor for one
(1) year following the date of Substantial Completion.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
1240LU21F0066 / LCIC Lighting Electrical
01 2105 - 1 Substitution Procedure
SECTION 01 2105
SUBSTITUTION PROCEDURE
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Section includes administrative and procedural requirements for substitutions.
1.02 DEFINITIONS
A. Substitutions: Changes proposed by contractor in products, materials, equipment and methods of construction from those required by the contract documents.
1.03 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Substitution Requests: Submit electronic copy of request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and drawing numbers and titles.
1. Documentation: Show compliance with requirements for substitution and the following, as applicable:
a. Statement indicating why specified product or fabrication or installation cannot be provided, if applicable.
b. Coordination information, including a list of changes or modifications needed to other parts of the work and to construction performed by Owner and separate contractors that will be necessary to accommodate proposed substitution.
c. Detailed comparison of significant qualities or proposed substitution with those of the work specified. Include annotated copy of applicable specification section. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, substantial design characteristics, warranties and specific features and requirements indicated. Indicate deviations, if any, from work specified.
d. Product data, including drawings and descriptions of products and fabrication and installation procedures.
e. Samples, where applicable or requested.
f. Certificates and qualification data, where applicable and requested.
g. List of similar installations for completed project names and addresses and names and addresses of Architects and Owners.
h. Material test reports from qualified testing agency indicating and interpreting test results for compliance with requirements indicated.
i. Research reports evidencing compliance with building code in effect for project, from
ICC-ES.
j. Detailed comparison of Contractor's construction schedule using proposed substitution from products specified in work, including effect of overall contract time.
If specified product or methods of construction cannot be provided within the contract time, include letter from manufacturer, or manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delay in delivery.
k. Cost information, including a proposal change, if any, in contract sum.
l. Contractors certification that proposed substitution complies with requirements in the contract documents except as indicated in substitution request, is compatible with related materials, and is appropriate for applications indicated.
m. Contractors waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.
2. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within 7 days of receipt of a request substitution. Architect will notify Contractor of acceptance or rejection of proposed substitution within 15 days of
01 2105 - 2 Substitution Procedure receipt of request, or seven days of receipt of additional information or documentation, whichever is later.
a. Forms of Acceptance: Addendum, Change Order, Construction Change Directive, or
Architect's Supplemental Instructions for minor changes in the work.
b. Use product specified if Architect does not issue a decision on use of a proposed substitution within time indicated.
1.04 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage qualified testing agency to perform compatibility tests of recommended by manufacturer.
PART 2 PRODUCTS
2.01 PRODUCTS
A. Substitutions for Cause: Submit requests for substitution immediately upon discovery of need for change, but not later than 15 days prior to time required for preparation and review of related Submittal.
1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied.
a. Requested substitution is consistent with the Contract Documents and will produce indicated results.
b. Requested substitution will not adversely affect Contractor's construction schedule.
c. Requested substitution has received necessary approvals of authorities having jurisdiction.
d. Requested substitution is compatible with other portions of the work.
e. Requested substitution has been coordinated with other portions of the work.
f. Requested substitution provides specified warranty.
g. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.
h. Requested substitution will provide identical visual effect to specified products in every regard.
2. Substitution for Convenience: Not allowed.
PART 3 - NOT USED
END OF SECTION
01 3000 - 1 Administrative Requirements
SECTION 01 3000
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Electronic document submittals.
B. Preconstruction meeting.
C. Progress meetings.
D. Construction progress schedule.
E. Submittals for review, information, and project closeout.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 ELECTRONIC DOCUMENT SUBMITTAL
A. All documents transmitted for purposes of administration of the contract are to be in electronic (PDF) format.
1. Besides submittals for review, information, and closeout, this procedure applies to requests for information (RFI's) progress documentation, contract modification documents (e.g. supplementary instructions, change proposals, change orders), applications for payment, field reports and meeting minutes, and any other document any participant wishes to make part of the project record.
3.02 PRECONSTRUCTION MEETING
A. Attendance Required:
1. Forest Service.
2. Mosaic Architecture.
3. Electrical Engineer
4. Contractor.
5. All major sub-contractors.
B. Agenda:
1. Execution of Forest Service-Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.
5. Designation of personnel representing the parties to Contract and <1|A/E|>.
6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
7. Scheduling.
C. Contractor will record minutes and distribute copies within seven days after meeting to participates, with one copy to Owner, participants, and those affected by decisions made.
3.03 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the work at maximum bi-monthly intervals.
B. Attendance Required:
1. Contractor.
2. Forest Service.
3. Mosaic Architecture.
4. Electrical Engineer
5. Contractor's superintendent.
01 3000 - 2 Administrative Requirements
C. Agenda:
1. Review minutes of previous meetings.
2. Review of work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Maintenance of progress schedule.
7. Corrective measures to regain projected schedules.
8. Planned progress during succeeding work period.
9. Maintenance of quality and work standards.
10. Effect of proposed changes on progress schedule and coordination.
11. Other business relating to work.
D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Mosaic Architecture, Forest Service, participants, and those affected by decisions made.
3.04 CONSTRUCTION PROGRESS SCHEDULE - SEE SECTION 01 3216
A. If preliminary schedule requires revision after review, submit revised schedule within 10 days.
B. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.
C. Within 10 days after joint review, submit complete schedule.
D. Submit updated schedule with each Application for Payment.
3.05 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
B. Submit to Mosaic Architecture for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.
C. Samples will be reviewed for aesthetic, color, or finish selection.
D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01 7800 - Closeout Submittals.
3.06 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's field reports.
6. Other types indicated.
B. Submit for Mosaic Architecture's knowledge as contract administrator or for Forest Service.
3.07 SUBMITTALS FOR PROJECT CLOSEOUT
A. Submit Correction Punch List for Substantial Completion.
B. Submit Final Correction Punch List for Substantial Completion.
C. When the following are specified in individual sections, submit them at project closeout in compliance with requirements of Section 01 7800 - Closeout Submittals:
01 3000 - 3 Administrative Requirements
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Bonds.
5. Other types as indicated.
D. Submit for Forest Service's benefit during and after project completion.
3.08 SUBMITTAL PROCEDURES
A. Shop Drawing Procedures:
1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting the
Contract Documents and coordinating related work.
2. Generic, non-project-specific information submitted as shop drawings do not meet the requirements for shop drawings.
B. Transmit each submittal with a copy of approved submittal form.
C. Transmit each submittal with approved form.
D. Sequentially number the transmittal form. Revise submittals with original number and a sequential alphabetic suffix.
E. Identify Project, Contractor, Subcontractor or supplier, pertinent drawings and detail number, and specification section number, as appropriate on each copy.
F. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and contract documents.
G. Schedule submittals to expedite the project, and coordinate submission of related items.
H. For each submittal for review, allow 15 days excluding delivery time to and from the contractor.
I. Identify variations from contract documents and product or system limitations that may be detrimental to successful performance of the complete work.
J. Provide space for Contractor and Mosaic Architecture review stamps.
K. When revised for resubmission, identify all changes made since previous submission.
L. Distribute reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with requirements.
M. Submittals not requested will not be recognized or processed.
01 4000 - 1 Quality Requirements
SECTION 01 4000
QUALITY REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. References and standards.
B. Testing and inspection agencies and services.
C. Control of installation.
D. Mock-ups.
E. Tolerances.
1.02 REFERENCE STANDARDS
A. ASTM C1021 - Standard Practice for Laboratories Engaged in Testing of Building Sealants
2008 (Reapproved 2014).
B. ASTM C1077 - Standard Practice for Agencies Testing Concrete and Concrete Aggregates for
Use in Construction and Criteria for Testing Agency Evaluation 2017.
C. ASTM C1093 - Standard Practice for Accreditation of Testing Agencies for Masonry 2015a, with Editorial Revision (2016).
D. ASTM D3740 - Standard Practice for Minimum Requirements for Agencies Engaged in the
Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction 2012a.
E. ASTM E329 - Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection 2018.
F. ASTM E543 - Standard Specification for Agencies Performing Nondestructive Testing 2015.
G. IAS AC89 - Accreditation Criteria for Testing Laboratories 2017.
1.03 REFERENCES AND STANDARDS
A. For products and workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. Comply with reference standard of date of issue current on date of Contract Documents, except where a specific date is established by applicable code.
C. Obtain copies of standards where required by product specification sections.
D. Maintain copy at project site during submittals, planning, and progress of the specific work, until
Substantial Completion.
E. Should specified reference standards conflict with Contract Documents, request clarification from Mosaic Architecture before proceeding.
F. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of Mosaic Architecture shall be altered from Contract Documents by mention or inference otherwise in any reference document.
1.04 TESTING AND INSPECTION AGENCIES AND SERVICES
A. Forest Service will employ and pay for services of an independent testing agency to perform other specified testing.
B. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents.
01 4000 - 2 Quality Requirements
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from
Mosaic Architecture before proceeding.
D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Have work performed by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.
3.02 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate.
B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Mosaic Architecture before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
3.03 TESTING AND INSPECTION
A. Testing Agency Duties:
1. Provide qualified personnel at site. Cooperate with Mosaic Architecture and Contractor in performance of services.
2. Perform specified sampling and testing of products in accordance with specified standards.
3. Ascertain compliance of materials and mixes with requirements of Contract Documents.
4. Promptly notify Mosaic Architecture and Contractor of observed irregularities or non-compliance of Work or products.
5. Perform additional tests and inspections required by Mosaic Architecture.
6. Submit reports of all tests/inspections specified.
B. Limits on Testing/Inspection Agency Authority:
1. Agency may not release, revoke, alter, or enlarge on requirements of Contract
Documents.
2. Agency may not approve or accept any portion of the Work.
3. Agency may not assume any duties of Contractor.
4. Agency has no authority to stop the Work.
C. Contractor Responsibilities:
1. Deliver to agency at designated location, adequate samples of materials proposed to be used that require testing, along with proposed mix designs.
2. Cooperate with laboratory personnel, and provide access to the Work and to manufacturers' facilities.
3. Provide incidental labor and facilities:
a. To provide access to Work to be tested/inspected.
b. To obtain and handle samples at the site or at source of Products to be tested/inspected.
01 4000 - 3 Quality Requirements
c. To facilitate tests/inspections.
d. To provide storage and curing of test samples.
4. Notify Mosaic Architecture and laboratory 24 hours prior to expected time for operations requiring testing/inspection services.
5. Employ services of an independent qualified testing laboratory and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
6. Arrange with Forest Service's agency and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
D. Re-testing required because of non-compliance with specified requirements shall be performed by the same agency on instructions by Mosaic Architecture.
E. Re-testing required because of non-compliance with specified requirements shall be paid for by Contractor.
3.04 DEFECT ASSESSMENT
A. Replace Work or portions of the Work not complying with specified requirements.
B. If, in the opinion of Mosaic Architecture, it is not practical to remove and replace the work, Mosaic Architecture will direct an appropriate remedy or adjust payment.
01 5000 - 1 Temporary Facilities and Controls
SECTION 01 5000
TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Temporary utilities.
B. Temporary telecommunications services.
C. Temporary sanitary facilities.
D. Temporary Controls: Barriers, enclosures, and fencing.
E. Waste removal facilities and services.
F. Project identification sign.
G. Field offices.
1.02 TEMPORARY UTILITIES
A. Provide and pay for all electrical power, lighting, and water required for construction purposes.
B. Use trigger-operated nozzles for water hoses, to avoid waste of water.
C. Provide barriers to prevent unauthorized entry to construction areas, to prevent access to areas that could be hazardous to workers or the public, to allow for owner's use of site and to protect existing facilities and adjacent properties from damage from construction operations and demolition.
D. Provide barricades and covered walkways required by governing authorities for public rights-of-way and for public access to existing building.
E. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.
1.03 VEHICULAR ACCESS AND PARKING
A. Coordinate access and haul routes with governing authorities and Forest Service.
B. Provide and maintain access to fire hydrants, free of obstructions.
C. Provide means of removing mud from vehicle wheels before entering streets.
D. Provide temporary parking areas to accommodate construction personnel. When site space is not adequate, provide additional off-site parking.
1.04 WASTE REMOVAL
A. Provide waste removal facilities and services as required to maintain the site in clean and orderly condition.
B. Provide containers with lids. Remove trash from site periodically.
C. If materials to be recycled or re-used on the project must be stored on-site, provide suitable non-combustible containers; locate containers holding flammable material outside the structure unless otherwise approved by the authorities having jurisdiction.
D. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids.
1.05 PROJECT IDENTIFICATION
A. Provide project identification sign of design and construction indicated on drawings.
B. Erect on site at location indicated.
C. No other signs are allowed without Forest Service permission except those required by law.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
01 5813 - 1 Temporary Project Signage
SECTION 01 5813
TEMPORARY PROJECT SIGNAGE
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Project identification sign.
1.02 QUALITY ASSURANCE
A. Sign Painter: Experienced as a professional sign painter for minimum three years.
B. Finishes, Painting: Adequate to withstand weathering, fading, and chipping for duration of construction.
1.03 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements for submittal procedures.
B. Shop Drawing: Show content, layout, lettering, color, foundation, structure, sizes and grades of members.
PART 2 PRODUCTS
2.01 SIGN MATERIALS
A. Structure and Framing: New, metal, structurally adequate.
B. Sign Backer: Exterior grade plywood with medium density overlay, minimum 3/4 inch thick, standard large sizes to minimize joints.
C. Rough Hardware: Galvanized.
D. Lettering: Exterior quality paint, contrasting colors.
2.02 PROJECT IDENTIFICATION SIGN
A. One painted sign, 48 sq ft area, bottom 6 feet above ground.
B. Content:
1. Project title, logo and name of Forest Service as indicated on Contract Documents.
2. Names and titles of Mosaic Architecture and Consultants.
3. Name of Prime Contractor and major Subcontractors.
C. Graphic Design, Colors, Style of Lettering: Designated by Mosaic Architecture.
PART 3 EXECUTION
3.01 INSTALLATION
A. Install project identification sign within 14 days after date fixed by Notice to Proceed.
B. Install sign surface plumb and level, with butt joints. Anchor securely.
01 6000 - 1 Product Requirements
SECTION 01 6000
PRODUCT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General product requirements.
B. Transportation, handling, storage and protection.
C. Product option requirements.
D. Substitution limitations.
E. Maintenance materials, including extra materials, spare parts, tools, and software.
1.02 SUBMITTALS
A. Proposed Products List: Submit list of major products proposed for use, with name of manufacturer, trade name, and model number of each product.
1. Submit within 15 days after date of Agreement.
2. For products specified only by reference standards, list applicable reference standards.
B. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.
C. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
D. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.
1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.
1.03 QUALITY ASSURANCE
A. Source Limitations: To the fullest extent possible, provide products of the same kind and from a single source.
B. Compatibility of Options: When the contractor is given the option of selecting between two or more products for use on the project, the product selected shall be compatible with products previously selected, even if previously selected products were also options.
C. Nameplates: Except for the required labels and operating data, do not attach or imprint manufacturer's or producers nameplates or trademarks on exposed surfaces of products which will be exposed to view in occupied spaces or on the exterior.
1. Labels: Locate required product labels and stamps on concealed surface or where required for observation after installation, on an acceptable surface that is not conspicuous.
2. Equipment Nameplates: Provide a permanent nameplate on each item of service connected or power operated equipment. Locate on an easily accessible surface which is inconspicuous in occupied space. The nameplates shall contain, as applicable, the following information and other essential operating data:
a. Name of product and manufacturer.
b. Model and serial number.
c. Capacity.
d. Speed.
e. Rating.
01 6000 - 2 Product Requirements
1.04 PRODUCT, DELIVERY, STORAGE AND HANDLING
A. Should space on site be inadequate for storage of equipment and materials to be incorporated in the work, the contractor and all sub-contractor will be required to provide off-site storage for such materials and equipment.
1. Locations and facilities for off-site storage shall be identified for the Owner and Architect.
2. Off-Site storage shall be governed by the requirements of Article 9.3.2 of the General
Conditions.
B. Deliver, store and handle products in accordance with the manufacturer's recommendations, using means and methods that will prevent damage, deterioration and loss, including theft.
1. Schedule delivery to minimize long-term storage at the site and to prevent overcrowding of construction spaces.
2. Coordinate delivery and installation time to ensure minimum holding time of items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft and other losses.
3. Deliver products to the site in the manufacturer's original sealed container and other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting and installing.
4. Inspect products upon delivery to ensure compliance with the construction documents and to ensure that products are undamaged and properly protected.
5. Store products in a manner that will facilitate inspection and measurement of quantity or counting of units.
6. Store heavy materials away from the project structure in a manner that will not endanger the supporting construction.
7. Store products subject to damage by the elements above ground, under cover in a weather tight enclosure with ventilation adequate to prevent condensation.
PART 2 PRODUCTS
2.01 NEW PRODUCTS
A. Provide new products unless specifically required or permitted by Contract Documents.
B. Use of products having any of the following characteristics is not permitted:
1. Made using or containing CFC's or HCFC's.
2. Made of wood from newly cut old growth timber.
3. Containing lead, cadmium, or asbestos.
C. Where other criteria are met, Contractor shall give preference to products that:
1. If used on interior, have lower emissions, as defined in Section 01 6116.
2. If wet-applied, have lower VOC content, as defined in Section 01 6116.
3. Have longer documented life span under normal use.
4. Result in less construction waste.
5. Are made of recycled materials.
2.02 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.
B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed.
C. Products Specified by Naming One or More Manufacturers with a Provision for
Substitutions: Submit a request for substitution for any manufacturer not named.
2.03 MAINTENANCE MATERIALS
A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in individual specification sections.
B. Deliver to Project site; obtain receipt prior to final payment.
01 6000 - 3 Product Requirements
PART 3 EXECUTION
3.01 SUBSTITUTION LIMITATIONS
A. Substitutions may be considered when a product becomes unavailable through no fault of the Contractor.
B. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents.
C. A request for substitution constitutes a representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product.
2. Agrees to provide the same warranty for the substitution as for the specified product.
3. Agrees to coordinate installation and make changes to other work that may be required for the work to be complete with no additional cost to Owner.
4. Waives claims for additional costs to time extension that may subsequently become apparent.
D. Substitutions will not be considered when they are indicated or implied on shop drawings or product data submittals, without separate written request, or when acceptance will require revision to the Contract Documents.
3.02 TRANSPORTATION AND HANDLING
A. Package products for shipment in manner to prevent damage; for equipment, package to avoid loss of factory calibration.
B. If special precautions are required, attach instructions prominently and legibly on outside of packaging.
C. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.
D. Transport and handle products in accordance with manufacturer's instructions.
E. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.
F. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.
G. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage, and to minimize handling.
H. Arrange for the return of packing materials, such as wood pallets, where economically feasible.
3.03 STORAGE AND PROTECTION
A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication. See Section 01 7419.
B. Store and protect products in accordance with manufacturers' instructions.
C. Store with seals and labels intact and legible.
D. Store sensitive products in weathertight, climate-controlled enclosures in an environment favorable to product.
E. For exterior storage of fabricated products, place on sloped supports above ground.
F. Protect products from damage or deterioration due to construction operations, weather, precipitation, humidity, temperature, sunlight and ultraviolet light, dirt, dust, and other contaminants.
G. Comply with manufacturer's warranty conditions, if any.
H. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.
01 6000 - 4 Product Requirements
I. Prevent contact with material that may cause corrosion, discoloration, or staining.
J. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.
K. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.
01 7000 - 1 Execution and Closeout Requirements
SECTION 01 7000
EXECUTION AND CLOSEOUT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Examination, preparation, and general installation procedures.
B. Pre-installation meetings.
C. Cutting and patching.
D. Surveying for laying out the work.
E. Cleaning and protection.
F. Starting of systems and equipment.
G. Demonstration and instruction of Forest Service personnel.
H. Closeout procedures, including Contractor's Correction Punch List, except payment procedures.
I. General requirements for maintenance service.
1.02 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Survey work: Submit name, address, and telephone number of Surveyor before starting survey work.
1. On request, submit documentation verifying accuracy of survey work.
2. Submit a copy of site drawing signed by the Land Surveyor, that the elevations and locations of the work are in compliance with Contract Documents.
3. Submit surveys and survey logs for the project record.
C. Cutting and Patching: Submit written request in advance of cutting or alteration that affects:
1. Structural integrity of any element of Project.
2. Integrity of weather exposed or moisture resistant element.
3. Efficiency, maintenance, or safety of any operational element.
4. Visual qualities of sight exposed elements.
5. Work of Forest Service or separate Contractor.
1.03 QUALIFICATIONS
A. For surveying work, employ a land surveyor registered in the State in which the Project is located and acceptable to Mosaic Architecture. Submit evidence of surveyor's Errors and Omissions insurance coverage in the form of an Insurance Certificate. Employ only individual(s) trained and experienced in collecting and recording accurate data relevant to ongoing construction activities,
1.04 PROJECT CONDITIONS
A. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases.
B. Dust Control: Execute work by methods to minimize raising dust from construction operations. Provide positive means to prevent air-borne dust from dispersing into atmosphere and over adjacent property.
C. Noise Control: Provide methods, means, and facilities to minimize noise produced by construction operations.
D. Pollution Control: Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations. Comply with federal, state, and local regulations.
01 7000 - 2 Execution and Closeout Requirements
1.05 COORDINATION
A. Coordinate scheduling, submittals, and work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later.
B. Notify affected utility companies and comply with their requirements.
C. Verify that utility requirements and characteristics of new operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.
D. Coordinate space requirements, supports, and installation of mechanical and electrical work that are indicated diagrammatically on drawings. Follow routing indicated for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.
E. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.
F. Coordinate completion and clean-up of work of separate sections.
G. After Forest Service occupancy of premises, coordinate access to site for correction of defective work and work not in accordance with Contract Documents, to minimize disruption of Forest Service's activities.
PART 2 PRODUCTS
2.01 PATCHING MATERIALS
A. New Materials: As specified in product sections; match existing products and work for patching and extending work.
B. Type and Quality of Existing Products: Determine by inspecting and testing products where necessary, referring to existing work as a standard.
C. Product Substitution: For any proposed change in materials, submit request for substitution described in Section 01 6000 - Product Requirements.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work. Start of work means acceptance of existing conditions.
B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.
C. Examine and verify specific conditions described in individual specification sections.
D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.
E. Verify that utility services are available, of the correct characteristics, and in the correct locations.
F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. After uncovering existing work, assess conditions affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions.
3.02 PREPARATION
A. Clean substrate surfaces prior to applying next material or substance.
B. Seal cracks or openings of substrate prior to applying next material or substance.
C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.
01 7000 - 3 Execution and Closeout Requirements
3.03 LAYING OUT THE WORK
A. Verify locations of survey control points prior to starting work.
B. Promptly notify Mosaic Architecture of any discrepancies discovered.
C. Establish elevations, lines and levels. Locate and lay out by instrumentation and similar appropriate means:
1. Site improvements including pavements; stakes for grading, fill and topsoil placement;
utility locations, slopes, and invert elevations.
2. Grid or axis for structures.
3. Building foundation, column locations, ground floor elevations.
D. Periodically verify layouts by same means.
E. Maintain a complete and accurate log of control and survey work as it progresses.
3.04 GENERAL INSTALLATION REQUIREMENTS
A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.
B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.
C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.
D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.
E. Make neat transitions between different surfaces, maintaining texture and appearance.
3.05 CUTTING AND PATCHING
A. Whenever possible, execute the work by methods that avoid cutting or patching.
B. Perform whatever cutting and patching is necessary to:
1. Complete the work.
2. Fit products together to integrate with other work.
3. Provide openings for penetration of mechanical, electrical, and other services.
4. Match work that has been cut to adjacent work.
5. Repair areas adjacent to cuts to required condition.
6. Repair new work damaged by subsequent work.
7. Remove samples of installed work for testing when requested.
8. Remove and replace defective and non-complying work.
C. Execute work by methods that avoid damage to other work and that will provide appropriate surfaces to receive patching and finishing. In existing work, minimize damage and restore to original condition.
D. Employ original installer to perform cutting for weather exposed and moisture resistant elements, and sight exposed surfaces.
E. Cut rigid materials using masonry saw or core drill. Pneumatic tools not allowed without prior approval.
F. Restore work with new products in accordance with requirements of Contract Documents.
G. Fit work air tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.
H. Patching:
1. Finish patched surfaces to match finish that existed prior to patching. On continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit.
2. Match color, texture, and appearance.
3. Repair patched surfaces that are damaged, lifted, discolored, or showing other imperfections due to patching work. If defects are due to condition of substrate, repair substrate prior to repairing finish.
01 7000 - 4 Execution and Closeout Requirements
3.06 PROGRESS CLEANING
A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.
B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space.
C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.
D. Collect and remove waste materials, debris, and trash/rubbish from site periodically and dispose off-site; do not burn or bury.
3.07 PROTECTION OF INSTALLED WORK
A. Protect installed work from damage by construction operations.
B. Provide special protection where specified in individual specification sections.
C. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.
D. Provide…
This is the start of the file's text. The full file is on GovTribe.