ATTACHMENT 3 General Conditions Breakout.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Y1DA--Project # 596-26-4 – Construction for FMS Boiler Replacement
Solicitation number
36C24926R0077
Issued by

About this file

This file is a General Conditions Breakout template for a construction contract related to the FMS Boiler Replacement project (Solicitation 36C24926R0077) at the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The document outlines the required cost categories that contractors must itemize when submitting General Conditions costs on their Schedule of Values, in accordance with VAAR 852.243-70 Construction Contract Changes-Supplement.

The template organizes General Conditions costs into three primary categories: Project Management (including superintendent, safety manager, CPM scheduler, quality assurance personnel, project managers, field office staff, and expeditor positions); Bonds and Insurance (covering builder's risk insurance, general liability insurance, and security/payment/performance bonds); and Site Conditions (encompassing temporary utilities, communications infrastructure, fire protection, fencing, environmental controls, traffic management, security, documentation, and protective measures). The document specifies that overhead and contractor fee percentages must include insurance, supervisory personnel, security, small tools, job burdens, and home office expenses with no separate allowances. All line items currently display zero values, indicating this is a template for contractors to complete with actual project costs. The file establishes contractual restrictions regarding what can and cannot be claimed as separate line items, with items such as contract change review, coordination, estimating, and expediting considered inherent to supervisor overhead and contractor fees.

View the file

Other files

File Type Posted
Solicitation Questions and Answers_FINAL.pdf PDF
36C24926R0077 0003.docx DOCX document
36C24926R0077 0002.docx DOCX document
S06_Amendment 0001_36C24926R0077 FMS Boiler Replacement.docx DOCX document
ATTACHMENT 1 Calculation of Self Performed Work.xlsx XLSX spreadsheet
ATTACHMENT 4 Price Breakout Schedule.xlsx XLSX spreadsheet
36C24926R0077_1.docx DOCX document
ATTACHMENT 6 WD KY20260090.docx DOCX document
ATTACHMENT 5 Past Performance Questionnaire.pdf PDF
ATTACHMENT 2 Contractor EMR Certification Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GC Breakout

GENERAL CONDITIONS BREAKOUT
When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.243-70 Construction Contract Changes-Supplement, paragraph (c)(1), the following contractual restrictions apply: Overhead and Contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor's overhead and/or fee percentage.
General Condition DescriptionValue
Project Management:$ - 0
Superintendent(s)$ - 0
Safety Manager$ - 0
CPM Scheduler$ - 0
Quality Assurance/Quality Control$ - 0
Project Manager (s)$ - 0
Project Executive$ - 0
Field Office Engineer$ - 0
Field Office Support Staff$ - 0
Project Expeditor$ - 0
Assistant Superintendent (s)$ - 0
Project Manager Subtotal:$ - 0
Bonds and Insurance (excluding any for Subcontractors):$ - 0
Builder’s Risk Insurance$ - 0
General Liability Insurance$ - 0
Security, Payment & Performance Bonds$ - 0
Bonds and Insurance Subtotal:$ - 0
Site Conditions:$ - 0
Temporary Power Consumption (Offices)$ - 0
Temporary Power Consumption (General Site Use)$ - 0
Temporary Water and Sewer Consumption$ - 0
Temporary Water Hookup, Distribution & Meters$ - 0
Temporary Electrical Hookup, Distribution & Meters$ - 0
Temporary Telephone & Network System Installation$ - 0
Temporary Telephone & Internet Consumption Fees$ - 0
Temporary Fire Protection$ - 0
Temporary Heating & Cooling$ - 0
Temporary Fencing$ - 0
Temporary Covered Walkways$ - 0
SWPPP Measures$ - 0
Temporary Entries and Truck Washes$ - 0
Street Cleaning (by G.C.)$ - 0
Traffic Control Measures$ - 0
Temporary Barricades & Signage$ - 0
Temporary Roads & Walkways (install & maintenance)$ - 0
Temporary Lighting$ - 0
Temporary Partitions & Covered Floor Openings$ - 0
Temporary Toilets/Sanitary Measures$ - 0
Temporary Laydown (prep and restoration)$ - 0
Security System/Watchman$ - 0
Pre-construction Photo Documentation$ - 0
Progress Photos$ - 0
Temporary Protection (in place work/adjacent structures)$ - 0
$ - 0
$ - 0
$ - 0
General Conditions Total$ - 0