ATTACHMENT 1 Calculation of Self Performed Work.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Y1DA--Project # 596-26-4 – Construction for FMS Boiler Replacement
Solicitation number
36C24926R0077
Issued by

About this file

This is a cost breakdown template for calculating self-performed versus subcontracted work requirements for federal construction contractors. The document applies specifically to offerors classified under NAICS code 238220 (All Other Specialty Trade Contractors) and requires that prime contractors perform at least 25 percent of total contract performance costs using their own employees. The template instructs offerors to provide a detailed breakdown of personnel and material/equipment costs organized by specification division, clearly identifying which work will be performed by the prime contractor versus subcontractors, and noting the small business (SB) vendor status of each subcontractor.

The calculation methodology requires offerors to subtract total subcontractor personnel costs from combined prime and subcontractor personnel costs, then divide the remainder by total personnel costs and multiply by 100 to determine the self-performed work percentage. Personnel costs are defined to include laborers, mechanics, tradesmen, and directly charged office personnel such as project managers, superintendents, and administrative staff. Home office overhead, profit/fee, and bond costs are to be added to the subtotal of personnel and material costs. The template includes a certification statement requiring an authorized representative's signature, confirming the accuracy of the representations provided.

View the file

Other files

File Type Posted
Solicitation Questions and Answers_FINAL.pdf PDF
36C24926R0077 0003.docx DOCX document
36C24926R0077 0002.docx DOCX document
S06_Amendment 0001_36C24926R0077 FMS Boiler Replacement.docx DOCX document
ATTACHMENT 3 General Conditions Breakout.xlsx XLSX spreadsheet
ATTACHMENT 6 WD KY20260090.docx DOCX document
ATTACHMENT 5 Past Performance Questionnaire.pdf PDF
ATTACHMENT 4 Price Breakout Schedule.xlsx XLSX spreadsheet
36C24926R0077_1.docx DOCX document
ATTACHMENT 2 Contractor EMR Certification Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for All Other Specialty Trade Contractors (NAICS code 238220) must provide
at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format.
Specification DivisionSB Vendor (Y or N)Personnel CostMaterial/Equipment Costs
PrimeY$0.00$0.00Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only.
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
(Add additional lines as necessary for each Division applicable to this project)$$
$ - 0$0.00
$$
Sub Total (Personnel Costs, Material/Equipment Costs)$0.00Add percentage to gray areas only.
Percentage0Profit$0.00
Percentage0Home Office Overhead$0.00
Percentage0Bond$0.00
Grand Total$0.00
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors:$0.00
2. Subtract all subcontractor personnel costs* companies that will perform work
on this contract:$0.00
3. Remainder is ‘Total amount of work to be self-performed under the
Contract’:$0.00
4. Self-performed work = Line 3/Line 1 x 100 =ERROR:#DIV/0!
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to
the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.

(Signature and Typed Name of Authorized Representative) Date

(Title of Authorized Representative)