This is a Solicitation, Offer, and Award form (SF 1442) for construction services issued by the Department of Veterans Affairs Network Contracting Office 9 (NCO 9). The solicitation (36C24926R0077) requests replacement of high-efficiency, fully condensing, fire-tube hot-water boilers in nine buildings (1, 2, 3, 4, 16, 25, 28, 201, and 202) at the Franklin R Sousley Campus in Lexington, Kentucky. Buildings 201 and 202 must have propane dual-fuel capability. The work includes demolition of existing boilers, installation of new equipment with ancillary systems, integration with the Building Automation System (BAS), installation of life-safety and gas-safety systems, and commissioning. The contract period is 365 calendar days from Notice to Proceed, with a base performance period from September 25, 2026, through October 5, 2027. The magnitude of construction is between $2 million and $5 million.
This is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside acquisition using a Lowest Price Technically Acceptable (LPTA) source selection process. Offerors must be certified in the SBA's Dynamic Small Business Search (DSBS) registry and registered in the System for Award Management (SAM). Sealed offers are due September 21, 2026, by 10:00 AM CDT via email to Brian.Bentley@va.gov. A mandatory site visit is scheduled for August 27, 2026, at 9:00 AM EST. The Government will evaluate the three lowest-priced proposals for technical acceptability across five evaluation factors: relevant construction experience with high-efficiency boiler replacements, dual-fuel systems, multi-building healthcare campus upgrades, BAS integration, and life-safety/gas-safety system installation; key personnel experience in VA facility projects, BAS management, crane/rigging operations, and commissioning; and past performance with satisfactory ratings on boiler projects. A bid bond of 20% of the bid price (not to exceed $3 million) is required, and performance and payment bonds must be submitted within 10 days of award. The NAICS code is 238220 (Plumbing, Heating, and Air-Conditioning Contractors), and the PSC is J045.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Questions and Answers_FINAL.pdf | ||
| 36C24926R0077 0003.docx | DOCX document | |
| 36C24926R0077 0002.docx | DOCX document | |
| S06_Amendment 0001_36C24926R0077 FMS Boiler Replacement.docx | DOCX document | |
| ATTACHMENT 4 Price Breakout Schedule.xlsx | XLSX spreadsheet | |
| ATTACHMENT 3 General Conditions Breakout.xlsx | XLSX spreadsheet | |
| ATTACHMENT 1 Calculation of Self Performed Work.xlsx | XLSX spreadsheet | |
| ATTACHMENT 6 WD KY20260090.docx | DOCX document | |
| ATTACHMENT 5 Past Performance Questionnaire.pdf | ||
| ATTACHMENT 2 Contractor EMR Certification Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24926R0044
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C24926R0077 X 08-21-2026 596-26-4-5079-0034 596-26-4 Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 204 Murfreesboro
TN
37129 Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 204 Murfreesboro
TN
37129 Brian Bentley
(615) 225-6896 The contractor shall furnish all labor, material, equipment and supervision necessary to accomplish the work for Project 596-26-4 "FMS Boiler Replacement" at the Franklin R Sousley Campus, 2250 Leestown Rd, Lexington, KY 40511 in accordance with the statement of work. Work includes demolition and new construction, including, but not limited to, general construction, civil, architectural, electrical, low voltage, industrial hygiene, and certain other items.
NAICS code: 238220 - Plumbing, Heating, and Air-Conditioning Size Standard: $19 Million PSC: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating and Waste Disposal Equipment Set-Aside: 100% Service-Disabled Veteran Owned Small Business (SDVOSB) Reference VAAR 852.219-73 Magnitude of Construction: Between $2,000,000 and $5,000,000.
Site Visit: 08/27/2026 at 9AM EST Building 2, Second Floor,Room 216. There will only be one (1) site visit.
Please make sure you bring any necessary items to properly inspect the site.
To obtain clarifications and/or additional information concerning the contract requirement, specifications and/or identifying section, paragraph, and page number and must bein question format. All RFIs submitted shall include the project number and title, contractor name, city, state, phone number, date submitted and RFI questions. Questions received after 10:00 AM EST September 02, 2026, will not be answered unless determined to be in the best interest of the government. Telephone requests will NOT be accepted. Technical questions will not be answered at the site visit as questions MUST BE in writing and submitted as an RFI.
In accordance with P.L. 109-461, this acquisition is 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns. In order to be eligible to receive an award under this solicitation, the SDVOSB & Joint Venture (JV) contractors must provide proof/documentation of SBA Certification-DSBS Registry at the time of offers due and at award.
In accordance with RFO 52.204-7 System for Award Management(SAM), all prospective offerors must proof/documentation of the proposal as non-responsive and not eligible for award. Additionally, failure to complete and sign all required RFO certifications will render the offeror as technically unacceptable and ineligible for award. Additionally, failure to complete and sign all required RFO certifications will render the offeror as technically unacceptable and ineligible for award. Joint Ventures (JVs) submitting an offer shall also submit printed proof of their SBA DSBS and / or SBA SDVOSB certification with their offer. JV offerors failing to submit this proof shall be rendered technically unacceptable outright and shall not be eligible for award.
Project will be procured under RFO 15.103-2 Lowest Price Technically Acceptable.
Offerors are to submit one (1) electronic copy of entire proposal (in the order as solicited) along with, an electronic copy of bid bond to Brian.Bentley@va.gov, on or before the due date/time stated in Block 13.
Proposals are to be submitted via email only. Proposals sent in any form other than email will be rendered unacceptable and shall not be eligible for award.
X 52.211-10 X
10AM
CDT
09-21-2026 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Line Item 001: Offer Item 596-3660162-5079-855100-2670 0100555X9 90C Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 204 Murfreesboro
TN
37129 90C FSC e-Invoicing Payment http://www.fsc.va.gov/fsc/einvoice.asp Invoice Setup Information 1-877-489-6135 Invoice must be submitted electronically
Setup 1-877-489-6135 X Matthew Whisman Contracting Officer
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 PRICE/COST SCHEDULE | 5 |
| ITEM INFORMATION | 5 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 21 |
| 2.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION) | 21 |
| 2.2 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION) | 31 |
| 2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION) | 31 |
| 2.4 52.228-1 BID GUARANTEE (SEP 1996) | 31 |
| 2.5 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021) | 32 |
| 2.6 52.233-2 SERVICE OF PROTEST (SEP 2006) | 32 |
| 2.7 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION) | 33 |
| 2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 37 |
| 2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 37 |
| 2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 38 |
| REPRESENTATIONS AND CERTIFICATIONS | 39 |
| 3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 39 |
| 3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 40 |
| GENERAL CONDITIONS | 43 |
| 4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021) | 43 |
| 4.2 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 44 |
| 4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2025) (DEVIATION) | 44 |
| 4.4 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (NOV 2025) (DEVIATION) | 46 |
| 4.5 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV 2025) | 46 |
| 4.6 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 51 |
| 4.7 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOV 2025) (DEVIATION) | 52 |
| 4.8 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) | 58 |
| 4.9 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION) | 59 |
| 4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 69 |
| 4.11 52.236-8 OTHER CONTRACTS (AUG 2025) (DEVIATION) | 70 |
| 4.12 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 72 |
| 4.13 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 75 |
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
The Contractor shall furnish all labor, supervision, equipment and material for replacement of high efficiency stainless steel condensing hot water boilers in buildings 1, 2, 3, 4, 16 ,25, 28, 201 and 202 (201 and 202 must be propane dual fuel capable) along with necessary ancillary equipment, contractor is to dispose of or recycle all waste, spoils, or excess. At no time between September 1 and May 1 can any building’s hot water heating loop remain out of service for more than 4 consecutive hours.
Contract Period: Base POP Begin: 09-25-2026 POP End: 10-05-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment LOCAL STOCK NUMBER: Fees
| GRAND TOTAL |
| __________________ |
STATEMENT OF WORK
596-26-4 FMS Boiler Replacement for Franklin R Sousley Campus, Lexington VAMC.
STATEMENT OF WORK PART A – GENERAL INFORMATION
A.1 INTRODUCTION – This requirement is for replacement of high efficiency condensing hot water boilers in buildings 1, 2, 3, 4, 16, 25, 28, 201 and 202 and necessary ancillary equipment.
A.2 BACKGROUND –
Franklin R Sousley Campus, 2250 Leestown Rd, Lexington, KY 40511:
Replacement of high efficiency condensing hot water boilers in buildings 1, 2, 3, 4, 16 ,25, 28, 201 and 202 and necessary ancillary equipment due to current BSE aging out of service.
The requirements do not apply for the 6500.6 Appendix A and a Security accreditation package is not required. There is no physical connection to a VA network.
A.3 OFFER ITEM
OFFER ITEM - The Contractor shall furnish all labor, supervision, equipment and material for replacement of high efficiency stainless steel condensing hot water boilers in buildings 1, 2, 3, 4, 16 ,25, 28, 201 and 202 (201 and 202 must be propane dual fuel capable) along with necessary ancillary equipment, contractor is to dispose of or recycle all waste, spoils, or excess. At no time between September 1 and May 1 can any building’s hot water heating loop remain out of service for more than 4 consecutive hours. Period of performance is 365 calendar days after receipt of Notice to Proceed (NTP).
STATEMENT OF WORK PART B – WORK REQUIREMENTS
B.1 Tasks to be accomplished:
· All tasks, boilers, ancillary equipment and required additional safety must be completed in accordance with the most current versions of VA Directive 1810, Boiler Efficiency Institute Safety Device Testing Manual, and all local, state, and federal regulations and codes.
All submittals must include:
· Product Data: Include performance data, operating characteristics, furnished specialties, and accessories.
· Shop Drawings: For boilers, boiler trim, and accessories.
· Include plans, elevations, sections, details, and attachments to other work.
· Wiring Diagrams: Power, signal, and control wiring.
· Retain subparagraph and associated subparagraphs below if boilers are required to withstand specific design loads and Architect either has delegated design responsibility to Contractor or wants to review structural data as another way to verify equipment's compliance with performance requirements. Professional engineer qualifications are specified in Division 01 Section "Quality Requirements."
· Retain subparagraph below if equipment includes wiring.
· Retain first paragraph and subparagraphs below if required by seismic criteria applicable to Project. Coordinate with Division 23 Section "Vibration and Seismic Controls for HVAC Piping and Equipment."
· Source quality-control test reports: Indicate and interpret test results for compliance with performance requirements before shipping.
· Field quality-control test reports: Indicate and interpret test results for compliance with performance requirements.
· Efficiency Data Points: Data shall be submitted per ASHRAE 155 Method of Testing for Rating Commercial Space Heating Boiler Systems. This data shall cover steady state thermal efficiency, part load efficiency, and idling energy input rate. Efficiency data not supported by a third party published test standard shall not be permitted.
· Standard Warranty: Boilers shall include manufacturer's standard form in which manufacturer agrees to repair or replace components of boilers that fail in materials or workmanship within specified warranty period
· Boilers must match or slightly exceed output MBH of current boilers in service
· Description: Boilers shall be natural gas fired, with the exception of buildings 201 and 202 being dual fuel with propane back up fully condensing, and fire tube design. The boiler shall be factory-fabricated, factory-assembled, and factory-tested, fire-tube condensing boiler with heat exchanger sealed pressure tight, built on a steel base; including insulated jacket; flue-gas vent; combustion-air intake connections; water supply, return, and condensate drain connections; and controls
· Heat Exchanger: The heater exchanger shall bear the ASME “H” stamp for 160 psi working pressure and shall be National Board listed. The heat exchanger shall be constructed of a fully welded 316L stainless steel interior with a carbon steel shell and of fire tube design.
· Condensate Collection Basin: Fully welded 316L stainless steel.
· Intake Filter and Dirty Filter Switch: Boiler shall include an intake air filter with a factory installed air pressure switch. The pressure switch will alert the end user on the screen of the boiler that the intake filter is dirty and needs to be changed.
· Burner: Natural gas, forced draft single burner premix design. Operation of the burner shall not exceed that of 5.7% oxygen level or 40% excess air. The burner shall be high temperature stainless steel with a woven Fecralloy outer covering to provide modulating firing rates. The burner shall be capable of the stated gas train turndown without loss of combustion efficiency. The burner shall be removable from the boiler without removing the gas/air manifold.
· Exhaust flue for the FCB/OCB 1000 – 4000 must be Category IV approved PVC, CPVC, PP or stainless steel sealed vent material from one of the approved manufacturers listed in the Installation and Operation manual. Boilers exhaust vent length must be able to extend up to 150 equivalent feet.
· Exhaust flue for the FCB/OCB 5000 – 6000 must be UL listed, Category IV approved stainless steel sealed vent material from one of the approved manufacturers listed in the Installation and Operation manual. Boilers exhaust vent length must be able to extend up to 150 equivalent feet.
· Intake piping for all models must be of approved material as listed in the Installation and Operations manual. Boilers intake pipe length must be able to extend up to 150 equivalent feet.
· Boiler venting and intake piping configuration shall be installed per one of the approved venting methods shown in the Installation and Operation manual.
· Boiler shall come standard with a flue sensor to monitor and display flue gas temperature on factory provided LCD display.
· Boilers using common venting must contact the factory for sizing
· Burner and Hydrostatic Test: Factory adjust burner to eliminate excess oxygen, carbon dioxide, oxides of nitrogen emissions, and carbon monoxide in flue gas and to achieve combustion efficiency; perform hydrostatic test
· Connect hot-water piping to supply and return boiler tappings with shutoff valve and union or flange at each connection.
· Install piping from safety relief valves to nearest floor drain.
· Boiler Venting:
· Install flue venting kit and combustion-air intake. Connect full size to boiler connections. Comply with requirements in manufacturer literature.
· Perform tests and inspections and prepare test reports.
· Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing.
· Tests and Inspections:
· Perform installation and startup checks according to manufacturer's written instructions. Complete startup form included with Boiler and return to Manufacturer as described in the instructions.
· Leak Test: Hydrostatic test. Repair leaks and retest until no leaks exist.
· Operational Test: Start units to confirm proper motor rotation and unit operation. Adjust air-fuel ratio and combustion.
· Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
· Check and adjust initial operating set points and high- and low-limit safety set points of fuel supply, water level and water temperature.
· Set field-adjustable switches and circuit-breaker trip ranges as indicated.
· Occupancy Adjustments: When requested within 12 months of date of Substantial Completion, provide on-site assistance in adjusting system to suit actual occupied conditions. Provide up to two visits to Project during other than normal occupancy hours for this purpose.
· Performance Tests:
· Engage a factory-authorized service representative to inspect component assemblies and equipment installations, including connections, and to conduct performance testing.
· Boilers shall comply with performance requirements indicated, as determined by field performance tests. Adjust, modify, or replace equipment to comply.
· Perform field performance tests to determine capacity and efficiency of boilers.
· Repeat tests until results comply with requirements indicated.
· Provide analysis equipment required to determine performance.
· Provide temporary equipment and system modifications necessary to dissipate the heat produced during tests if building systems are not adequate.
· Notify COR in advance of test dates.
· Perform a combustion analysis after installation and adjust gas valve per the Installation and Operations manual and note in startup report.
· Document test results in a report and submit to COR.
· Install CO and combustible gas detectors with audible alarm and BAS reporting on emergency power circuit.
· Install Maxon automatic safety gas shutoff with manual reset on natural gas main entering building with capability to alarm to BAS.
· Replace boiler isolation valves with new Victaulic valves buildings 1, 2, 3, 4, 16 ,25, 28, 201 and 202
· Decommission and remove existing boilers buildings 1, 2, 3, 4, 16 ,25, 28, 201 and 202.
· Install hydraulic separator and complete necessary piping modifications needed buildings 1, 2, 3, 4, 16 ,25, 28, 201 and 202
· Demolition of old concrete equipment pads and construction of new concrete equipment pad based on dimensional requirements of new equipment.
· Place new boilers in mechanical rooms. Boilers must be installed in a location allowing for future serviceability in accordance with manufacturer listed minimum install distances or greater.
· Make all necessary water and fuel piping connections to each boiler. Install piping adjacent to boiler to allow service and maintenance. Connect gas piping to boiler gas-train inlet with union. Piping shall be at least full size of equipment connection. Provide a reducer and regulator if required. Gas regulator shall also be installed per IOM.
· Make all necessary electrical load connections to each boiler. Single-Point Field Power Connection: Factory-installed and factory-wired switches, motor controllers, transformers, and other electrical devices necessary shall provide a single-point field power connection to boiler.
· Make all necessary electrical controls connections to each boiler.
· Install additional safety devices required for hot water boilers in accordance with Boiler Efficiency Institute Safety Device Testing Manual.
· Make necessary changes and additions to existing JCI Metasys BAS to allow for control and monitoring of boilers and ancillary equipment.
· Complete manufacturer start-up and associated documentation.
· Complete boiler combustion analysis and tune to include documentation.
· Test and adjust all safeties in accordance with Boiler Efficiency Institute Safety Device Testing Manual and provide associated documentation.
· Work shall conform to all recognized standards of the HVAC, Plumbing/Pipefitting, and Electrical trades including but not limited to all EPA and OSHA rules and regulations.
· Waste will be disposed of in accordance with all federal, state, and local laws.
· Contractor to provide waste manifests and company certification/training documents.
· Contractor is responsible for all OSHA monitoring of their employees.
· Owner is responsible for moving items from the work area affected.
· Comply with all applicable specifications below.
Additional tasks:
· Contractor must apply for all applicable permits.
· Contractor will provide chemical inventory list and associated Safety Data Sheets for all chemicals used in project.
· All work must be completed in accordance with local, State and Federal regulations.
· Contractor shall provide daily cleanup of work area and trash removal from site.
· Provide all required documentation for mechanical abatement.
· Work shall take place during normal business hours, off tour hours may be authorized with prior request.
· Review and adhere to the Combined Specs
· Contractor shall submit all outage requests at minimum of one week before the requested outage date”
STATEMENT OF WORK PART C – SUPPORTING INFORMATION
· Work at the government site shall not take place on Federal holidays or weekends unless specifically directed by the Contracting Officer in the Contract. All work in areas involved shall be scheduled with the VA Engineering Service representative. Work shall be scheduled for proper execution to completion of contract.
· Type of Contract: One time service contract.
· Contract Award Meeting: The contractor and all on-site staff will attend construction safety orientation Monday or Tuesday morning in the Facilities Management Department and complete the photo identification badge process prior to start of project, if required.
· Security Requirements: Contractor shall identify which employees will be working under the awarded contract. Contractor personnel shall include employees, sub-contractors, subcontractor employees, suppliers and delivery personnel entering the Medical Center. This does not apply to suppliers and delivery personnel making deliveries to the VA warehouse dock only. Those employees shall bring photo ID to obtain a VA Contractor identification badge that shall be always worn above the belt while on Medical Center property. Contractor's employees shall return all I.D. badges to designated personnel at time designated in the task order.
· General Requirements: Prior to award of a contract, the contracting firm shall furnish to the Government a statement of facts, in detail, as to his previous experience, organization, and facilities available to perform work. A minimum of five years is required. The contracting firm to provide all necessary training/certification documentation.
· Supervision/Communications. At all times during the performance, the Contractor's Superintendent (if applicable) shall be available by cellular phone. Prior to beginning any work, the Contractor shall supply the COR with the telephone number for the Superintendent. The Contractor's "Competent Person" that meets OSHA training guidelines, is capable of making decisions and acting on behalf of the Contractor shall be physically located on site at all times during performance of the contract. If the Contractor's Competent Person is absent from the job site for an extended period of time, the COR may send all Contractor/sub-contractor employees off the job.
· The Contracting Officer's Representative (COR) is responsible for the inspection of the work called for in this job. The Contracting Officer's Representative will be identified in the task order by name, telephone number and location. Inspections made by the COR are for the sole benefit of the Government and do not relieve the Contractor of any quality control responsibilities.
· The Safety Manger is responsible for safety inspections of all contract operations. The Safety Manager will be identified in the task order by name, phone number and location.
· Drawings – General. Contract drawings (if applicable) will indicate the extent and location of work. If any departure from the contract drawings are deemed necessary by the Contractor, the details of such departure and the reasons therefore shall be submitted to the Contracting Officer for approval as soon as practical. No such departure shall be made without proper written permission of the Contracting Officer. The Contractor is responsible for all information and requirements in drawings and specifications that pertain to the task order.
· Verification of Dimensions – The Contractor shall visit the job site to thoroughly familiarize himself with all the details of the work and working conditions. The Contractor shall also verify all dimensions in the field and shall advise the Contracting Officer of any discrepancy before performing any work. The Contractor shall be specifically responsible for the coordination and proper relation of his work to the building, structure, phasing and ensure the safety of employees and workmen.
· Smoking Policy. The Contractor shall not allow smoking on VA property.
· Parking/Traffic Regulations. The Contractor shall not park on grassy areas unless approved by the COR and the Contractor agrees to restore areas back to VA standards. Drivers should be particularly concerned with pedestrian traffic. Yield to pedestrians in crosswalks. Posted speed limits and all other traffic controls are to be observed by operators at all times. Seat belt use is mandatory on the VA grounds.
CHANGES TO STATEMENT OF WORK
· Any changes to this SOW shall be authorized and approved only through written correspondence from the Contracting Officer. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the Contracting Officer shall be borne by the contractor.
CONFIDENTIALITY AND NONDISCLOSURE
It is agreed that:
1. The preliminary and final deliverables and all associated working papers, application source code, and other material deemed relevant by VA which has been generated by the contractor in the performance of this task order are the exclusive property of the U.S. Government and shall be submitted to the Contracting Officer at the conclusion of the task order.
2. The Contracting Officer will be the sole authorized official to release verbally or in writing, any data, the draft deliverables, the final deliverables, or any other written or printed materials pertaining to this task order. No information shall be released by the contractor. Any request for information relating to this task order presented to the contractor shall be submitted to the Contracting Officer for response.
3. Press releases, marketing material or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the Contracting Officer.
CONTRACTOR PERSONNEL SECURITY REQUIREMENTS[footnoteRef:0] [0:
Contractor will not have access to VA computer system.
RECORDS MANAGEMENT OBLIGATIONS
A. Applicability - This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.
B. Definitions - “Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.
The term Federal record:
· includes Lexington VA Health Care System (LVAHCS) records.
· does not include personal materials.
· applies to records created, received, or maintained by Contractors pursuant to their LVAHCS contract.
· may include deliverables and documentation associated with deliverables.
C. Requirements - Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
LVAHCS and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of LVAHCS or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to LVAHCS. The agency must report promptly to NARA in accordance with 36 CFR 1230.
The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to LVAHCS control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and LVAHCS guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with LVAHCS policy.
The Contractor shall not create or maintain any records containing any non-public LVAHCS information that are not specifically tied to or authorized by the contract.
The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
The LVAHCS owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which LVAHCS shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take LVAHCS-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
[Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]
D. Flowdown of requirements to subcontractors - The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.
Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
(End of clause)
Material and Workmanship (Apr 1984)
(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.
(b) The Contractor shall obtain the Contracting Officer’s approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer’s approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.
(c) All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.
(End of clause) Permits and Responsibilities (Nov 1991) The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occurs as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
(End of clause) Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984)
(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work sites, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site, and (2) on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(End of clause) Cleaning Up (Apr 1984) The Contractor shall, at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer or the Contracting Officer's Technical Representative (COTR).
(End of clause) Accident Prevention (Nov 1991)
(a) The Contractor shall provide and maintain work environments and procedures which will—
(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities
(2) Avoid interruptions of Government operations and delays in project completion dates; and
(3) Control costs in the performance of this contract.
(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—
(1) Provide appropriate safety barricades, signs, and signal lights
(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910; and
(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.
(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.
(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.
(End of clause)
END OF STATEMENT OF WORK
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION)
(a) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. As a minimum, offers shall include—
(1) The solicitation number;
(2) The name, address, telephone number of the Offeror;
(3) The Offeror’s Unique Entity Identifier (UEI) and, if applicable, Electronic Funds Transfer (EFT) indicator;
(4) Information necessary to evaluate the factors contained in the provision at 52.212-2 or as described in the solicitation;
(5) Responses to provisions that require Offeror completion of information, representations, and certifications (other than those collected via the System for Award Management (SAM)); and
(6) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and any solicitation amendments.
(b) Period for acceptance of offers. The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(c) Late submissions, modifications, revisions, and withdrawals of offers.
(1) Offerors are responsible for submitting offers and any modifications or revisions to the Government office designated in the solicitation by the time specified in the solicitation.
(2) Any offer, modification, or revision received after the time specified for receipt of offers is “late” and will not be considered unless it is received before award is made and the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition. However, a late modification of an otherwise successful offer that makes its terms more favorable to the Government will be considered at any time it is received and may be accepted.
(3) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(4) Offerors may withdraw their offers by written notice to the Government received at any time before award.
(d) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with Offerors. Therefore, the Offeror’s initial offer should contain the Offeror’s best terms. However, the Government reserves the right to conduct discussions, if necessary. The Government may reject any or all offers if such action is in the public interest, accept other than the lowest offer, and waive informalities and minor irregularities in offers received.
(e) Debriefings. If a postaward debriefing is given to requesting Offerors, the Government will disclose the following information, if applicable:
(1) The agency’s evaluation of the significant weak or deficient factors in the debriefed Offeror’s offer.
(2) The overall evaluated cost or price and technical rating of the successful Offeror and the debriefed Offeror and past performance information on the debriefed Offeror.
(3) The overall ranking of all Offerors when any ranking was developed by the agency during source selection.
(4) A summary of the rationale for award.
(5) For acquisitions of commercial products, the make and model of the product to be delivered by the successful Offeror.
(6) Reasonable responses to relevant questions posed by the debriefed Offeror as to whether the agency followed source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities.
(End of Provision) ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES Provisions that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following provisions are incorporated into 52.212-1 as an addendum to this solicitation:
IMPORTANT OFFEROR INFORMATION
SOLICITATION MATERIALS
All solicitation materials (drawings, specifications, contract forms, Amendments, and other documents) will be posted to the Contract Opportunities Government website at https://sam.gov/. Enter “36C24926R0077” into the search box to access the materials. This is the only official location where documents and updates are posted. No hard-copy solicitation materials are available.
SOLICITATION SUBMISSION
The following documents must be included in the submission, in the formats stated:
SF1442 OFFER PAGE & REQUIRED CONTENTS
One (1) electronic copy of an original, fully completed, signed, and dated Standard Form SF1442 Offer page. Acknowledgment of all amendments (complete block 19 of the SF1442 or blocks 15a, 15b, 15c of each Amendment and include them with the SF1442 Offer). Prices on all line items listed on the Price/Cost Schedule. Completed Representations and Certifications (Revolutionary Federal Acquisition Regulation Overhaul (RFO) Clause 52.204-7). Fully completed Calculation of Contractor Self Performed Work, Contractor Experience Modification Rate (EMR) Certification, General Conditions Breakout, and Price Breakout Schedule.
Offerors are responsible for insuring and verifying that their offer and all required solicitation documents are received at the office and point of contact designated in block 8 of the SF1442 and by the date and time specified in block 13A of SF1442 (as amended).
BID BOND / BID…