ATTACHMENT 3 - Drawings.pdf
PDF 18 MB Posted
- Attached to
- Y1AZ--EHRM Training and Administrative Support Space Construction - Tomah Federal contract opportunity
- Solicitation number
- 36C77622B0010
About this file
This document provides details for a federal contract solicitation to renovate training and administrative space at the Tomah VA Medical Center. The solicitation seeks a general contractor to furnish all labor, materials, equipment and supervision required to renovate the EHRM Training Room and Administrative Support Space on the third floor of Building 407. The work includes general construction, alterations, removal of existing structures, millwork, permanently mounted equipment, interior finishes and other items. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEER, MECHANICAL
ARCHITECT
NAGEL Architects + Engineers 13100 watertown plank rd, #200 Elm Grove, WI 53122 Phone: 262.641.0746
FAX: 888.600.6207
Contact: Kenneth Shane E-mail: ken.shane@nagel.us
DESIGNER LIST AND STAMPS________________
OTIE
1033 N Mayfair Rd Suite 200 Milwaukee, WI 53226 Contact: Christopher Stipe, PE E-mail: cstipe@otie.com
CONSULTANT,
TECHNOLOGY
MES Group 550 North Reo Street Suite 203 Tampa, FL 33609 Contact: David Keith, PE E-mail: david.keith@MESGroupinc.com
OTIE
1033 N Mayfair Rd Suite 200 Milwaukee, WI 53226 Contact: Jeff Gawronski, PE E-mail: jgawronski@otie.com
ENGINEER, ELECTRICAL
CONSULTANT,
HAZARDOUS MATERIALS
The Reese Group 310 E Buffalo St Suite 106 Milwaukee, WI 53202 Contact: Tina Reese E-mail: treese@the-reese-group.com
ENGINEER, PLUMBING
OTIE
1033 N Mayfair Rd Suite 200 Milwaukee, WI 53226 Contact: Timothy Wendt, PE E-mail: twendt@otie.com
BLDG 407
5T H
S T
E ST
NORTHCOUNTY HWY E
TOMAH VA MEDICAL CENTER
500 E. Veterans St Tomah, WI 54660
CONTACT:
Robert Pidgeon, COR robert.pidgeon@va.gov 608-372-3971 Ext 64227
COUNTY HWY E
INTERSTATE 94TOMAH VAMC
CAMPUS
NORTH
NORTH ARROW
ELEVATION REFERENCE
SYMBOL
ELEVATION REFERENCE
SYMBOL
SECTION REFERENCE
SYMBOL
ENLARGED AREA
REFERENCE SYMBOL
DOOR TAG
REVISION TAG
WINDOW TAG
ROOM TAG
COLUMN REFERENCE
SYMBOL
Name Elevation
A101
A101
SIM
A101
SIM
NORTH
PARTITION TAG
A36C G11C
ARCHITECTURAL SYMBOLS___
ROOM NAME
111A
EQUIPMENT TAGX####
A101
SIM DETAIL REFERENCE
SYMBOL
AD101.1 MATCH LINE
AREA NOT IN CONTRACT
A ALIGN FINISH
SURFACES FLUSH
WALL TAG1iEX1
FINISH WOOD
CONCRETE MASONRY UNIT (CMU)
CONCRETE, CAST-IN-PLACE
CONCRETE, PRE-CAST
FILL - PER NOTE
INTERMITTENT BLOCKING
CONT. ROUGH FRAMING
STEEL
EARTH
RIGID INSULATION
BATT INSULATION
GYPSUM BOARD
MARBLE/GRANITE/STONE
TILE/TERRAZZO
GLASS
LARGE SCALE
SECTIONS
BRICK
PLYWOOD
MATERIAL
MATERIAL LEGEND__________
EARTH, COMPACT
ALUMINUM
FILL, POROUS
SHEET # SHEET NAME
11 - PLUMBING - P
P001 PLUMBING GENERAL INFORMATION
PD100 BASEMENT/CRAWLSPACE PLAN, PLUMBING DEMOLITION
PD101 FIRST FLOOR PLAN, PLUMBING DEMOLITION
PD102 SECOND FLOOR PLAN, PLUMBING DEMOLITION
PD103 THIRD FLOOR PLAN, PLUMBING DEMOLITION
PD104 ATTIC FLOOR PLAN, PLUMBING DEMOLITION
P100 BASEMENT/CRAWLSPACE PLAN, PLUMBING
P101 FIRST FLOOR PLAN, PLUMBING
P102 SECOND FLOOR PLAN, PLUMBING
P103 THIRD FLOOR PLAN, PLUMBING
P104 ATTIC FLOOR PLAN, PLUMBING
P401 ENLARGED FLOOR PLANS, PLUMBING
P402 ENLARGED FLOOR PLANS, PLUMBING
P501 ISOMETRICS, PLUMBING
P502 DETAILS, PLUMBING
13 - MECHANICAL - M
M001 MECHANICAL GENERAL INFORMATION
MD103 THIRD FLOOR PLAN, MECHANICAL DEMOLITION
MD104 ATTIC FLOOR PLAN, MECHANICAL DEMOLITION
M100 BASEMENT/CRAWLSPACE PLAN, MECHANICAL
MH103 THIRD FLOOR PLAN, MECHANICAL DUCTWORK
MH104 ATTIC FLOOR PLAN, MECHANICAL DUCTWORK
MP103 THIRD FLOOR PLAN, MECHANICAL PIPING
MP104 ATTIC FLOOR PLAN, MECHANICAL PIPING
M401 ELEVATIONS AND ENLARGED PLANS, MECHANICAL
M501 DETAILS, MECHANICAL
M502 DETAILS, MECHANICAL
M511 DETAILS, MECHANICAL CONTROLS
M512 DETAILS, MECHANICAL CONTROLS
M601 SCHEDULES, MECHANICAL
14 - ELECTRICAL - E
E001 ELECTRICAL GENERAL INFORMATION
ED103 THIRD FLOOR PLAN, ELECTRICAL DEMOLTION
EL103 THIRD FLOOR PLAN, ELECTRICAL LIGHTING
EP100 BASEMENT/CRAWLSPACE PLAN, ELECTRICAL POWER
EP101 FIRST FLOOR PLAN, ELECTRICAL POWER
EP102 SECOND FLOOR PLAN, ELECTRICAL POWER
EP103 THIRD FLOOR PLAN, ELECTRICAL POWER
EP104 ATTIC FLOOR PLAN, ELECTRICAL
E601 ELECTRICAL PANEL SCHEDULES
E602 ELECTRICAL PANEL SCHEDULES
E603 ELECTRICAL DIAGRAMS
E604 ELECTRICAL DIAGRAMS
E605 ELECTRICAL SCHEDULES
E606 ELECTRICAL PARTIAL PLAN
FA001 FIRE ALARM GENERAL INFORMATION
FA103 THIRD FLOOR PLAN, FIRE ALARM
15 - TECHNOLOGY - T
TG001 SYMBOLS LEGEND AND NOTES
TG002 DETAILS
TD103 SPECIAL SYSTEMS THIRD FLOOR DEMOLITION PLAN
TS101 SPECIAL SYSTEMS PARTIAL SITE PLAN
TK103 SPECIAL SYSTEMS THIRD FLOOR NEW PLAN
TK104 SPECIAL SYSTEMS ATTIC FLOOR NEW PLAN
SHEET # SHEET NAME
00 - GENERAL - G
G001 COVER SHEET
G003 BUILDING CODE REVIEW & INFECTION CONTROL
G103 THIRD FLOOR PLAN, LIFE SAFETY
01 - ABATEMENT - H
H103 THIRD FLOOR PLAN, HAZARDOUS MATERIALS
07 - ARCHITECTURAL - A
AS101 SITE PLAN, ARCHITECTURAL
AD101 FIRST FLOOR PLAN, ARCHITECTURAL DEMOLITION
AD102 SECOND FLOOR PLAN, ARCHITECTURAL DEMOLITION
AD103 THIRD FLOOR PLAN, ARCHITECTURAL DEMOLITION
AD104 ATTIC FLOOR PLAN, ARCHITECTURAL DEMOLITION
A100 BASEMENT/CRAWLSPACE PLAN, ARCHITECTURAL
A101 FIRST FLOOR PLAN, ARCHITECTURAL
A102 SECOND FLOOR PLAN, ARCHITECTURAL
A103 THIRD FLOOR PLAN, ARCHITECTURAL
A104 ATTIC FLOOR PLAN, ARCHITECTURAL
A105 ROOF PLAN, ARCHITECTURAL
A106 ENLARGED FLOOR PLANS, ARCHITECTURAL
A113 THIRD FLOOR PLAN, REFLECTED CEILING
A133 THIRD FLOOR PLAN, WAYFINDING
A501 PARTITION TYPES & INTERIOR DETAILS
A601 DOOR AND FRAME SCHEDULE & DETAILS
A602 WINDOW & GLAZING PLAN, SCHEDULE, AND DETAILS
A701 TYPICAL DETAILS
08 - INTERIORS - I
I103 THIRD FLOOR PLAN, FINISH
I201 INTERIOR ELEVATIONS
09 - EQUIPMENT - Q
Q103 THIRD FLOOR PLAN, FF&E
Q401 ENLARGED FF&E PLANS
10 - FIRE PROTECTION - F
FP001 FIRE PROTECTION GENERAL INFORMATION
FD103 THIRD FLOOR PLAN, FIRE PROTECTION DEMOLITION
FP103 THIRD FLOOR PLAN, FIRE PROTECTION
FP104 ATTIC FLOOR PLAN, FIRE PROTECTION
FP501 DETAILS, FIRE PROTECTION
13100 watertown plank road suite 200 elm grove, wi 53122
DEPARTMENT OF VETERANS AFFAIRS
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
NAGEL A+E PROJECT NUMBER:VA PROJECT NUMBER:
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Consultant:
Nagel Architects + Engineers project number:
Project NumberProject TitleDrawing Title Phase
C :\U se rs
\to m o\ D oc um en ts
\2
_T om ah
E H
R M
_T om
.o st er ga ar d@ na ge l.u s.
rv t
7/
/2
1:
:0
P
M
EHRM TRAINING AND ADMIN SUPPORT SPACE
500 E. VETERANS STREET, BLDG #407
TOMAH, WI 54660
21007676-21-703
G001
COVER SHEET EHRM TRAINING AND ADMIN
SUPPORT SPACE
500 E. VETERANS STREET, TOMAH, WI 54660
676-21-703
21 JULY 2021 KS TMO
FULLY SPRINKLERED
21007
BID DOCUMENTS
REVISION 01
SHEET INDEX ____________________
PROJECT SITE MAP___________________PROJECT LOCATION MAP______________STATION INFORMATIONPERSPECTIVE_______________________________________
T
T&G TONGUE & GROOVE
T/O(T.O.) TOP OF
TB TOWEL BAR
TC TERRA COTTA
TEL TELEPHONE
TEMP TEMPORARY
THK THICKNESS
THR THRESHOLD
THRU THROUGH
TOL TOLERANCE
TOT TOTAL
TOW(T.O.W.) TOP OF WALL
TPD TOILET PAPER DISPENSER
TR TREAD
TRM TRANSOM
TV TELEVISION
TYP TYPICAL
TZ TERRAZZO
U
UC UNDERCUT
UNFIN UNFINISHED
UNO(U.N.O) UNLESS NOTED OTHERWISE
UR URINAL
UTIL UTILITY
V
VAR VARNISH
VCT VINYL COMPOSITION TILE
VEH VEHICLE
VERT VERTICAL
VF VINYL FABRIC
VG VERTICAL GRAIN
VIN VINYL
VJ V-JOINT(ED)
VNR VENEER
VT VINYL TILE
W
W WEST
W WIDTH, WIDE
W/ WITH
W/D WASHER & DRYER
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WDW WINDOW
WG WIRED GLASS
WH WALL HUNG
WHS WHEEL STOP
WI WROUGHT IRON
WM WIRE MESH
WP WATER PROOFING
WPT WORKING POINT
WR WATER REPELLANT
WSCT WAINSCOT
WT WEIGHT
WTW WALL-TO-WALL
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
Q
QRT QUARRY TILE
QT QUARTZ TILE
QTY QUANTITY
R
RA RETURN AIR
RAD RADIUS
RB RUBBER BASE
RBT RABBET, REBATE
RBT RUBBER TILE
RC RESILIENT CHANNEL
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE REINFORCE(D)(ING)
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCED
REM REMOVE
REQ'D REQUIRED
RESIL RESILIENT
REV REVISION
RFG ROOFING
RFH ROOF HATCH
RFL REFLECT(ED)(IVE)(OR)
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RS RISER
RT RETURN
RWC RAINWATER CONDUCTOR
S
S SOUTH
SC SOLID CORE
SCHED SCHEDULE
SCN SCREEN
SD STORM DRAIN
SEC SECTION
SF SQUARE FEET
SFG SAFETY GLASS
SH SHELF, SHELVING
SHR SHEER
SHT SHEET
SHTG SHEATHING
SHV SHELVES
SI SQUARE INCHES
SIM SIMILAR
SL SLEEVE
SNT SEALANT
SP STANDPIPE
SP SOUNDPROOF
SPEC SPECIFICATION
SPK SPEAKER
SPKLR SPRINKLER
SPL SPECIAL
SQ SQUARE
SS STAINLESS STEEL
SSEW SANITARY SEWER
STA STATION
STC SOUND TRANSMISSION CLAS
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUS SUSPENDED
SUSP SUSPENSION
SYM SYMMETRICAL, SYMMETRY
SYN SYNTHETIC
SYS SYSTEM
M
M.O. MASONRY OPENING
M.R. MOISTURE RESISTANT
MAS MASONRY
MAX MAXIMUM
MBR MEMBER
MC MEDICINE CABINET
MECH MECHANIC(AL)
MED MEDIUM
MEMB MEMBRANE
MET METAL
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINUTE, MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MLD MO(U)LDING
MOD MODULAR
MOV MOVABLE
MT MOUNT(ED)(ING)
MTL MATERIAL
MULL MULLION
MWK MILLWORK
N
N NORTH
N/A NOT APPLICABLE
NAT NATURAL
NI NICKEL
NIC NOT IN CONTRACT
NO. NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NTS NOT TO SCALE
O
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED CONTRACTOR
INSTALLED
OPNG OPENING
OPP OPPOSITE
OPPHD OPPOSITE HAND
OVHD OVERHEAD
OWJ OPEN-WEB JOIST
P
PAR PARALLEL
PB PANIC BAR
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PED PEDESTAL
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PFN PREFINISHED
PG PLATE GLASS
PKG PARKING
PL PROPERTY LINE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLF POUNDS PER LINEAR FOOT
PNL PANEL
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PRF PREFORMED
PROJ PROJECT
PRT PROPERTY
PSC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT
PTC POST-TENSIONED CONCRETE
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PWD PLYWOOD
G
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACT(OR)
GCMU GLAZED CONC. MASONRY UNITS
GEN GENERAL
GF GROUND FACE
GKT GASKET(ED)
GL GLASS
GLU LAM GLUE LAMINATED
GOVT GOVERNMENT
GP GALVANIZED PIPE
GPL GYPSUM LATH
GPPL GYPSUM PLASTER
GPT GYPSUM TILE
GRN GRANITE
GS(S) GALVANIZED STEEL (SHEET)
GST GLAZED STRUCTURAL TILE
GT GROUT
GWB GYPSUM WALL BOARD
GYP GYPSUM
H
HB HOSE BIBB
HBD HARDBOARD
HC HANDICAPPED
HCT HOLLOW CLAY TILE
HDR HEADER
HDWD HARDWOOD
HDWR HARDWARE
HGT HEIGHT
HJT HEAD JOINT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HTG HEATING
HTR HEATER
HVAC HEAT, VENTILATION, & AIR CONDITIONING
HWH HOT WATER HEATER
I
ID INSIDE DIAMETER
IN INCH
INC INCLUDING
INSUL INSULATE(D)(ION)
INT INTERIOR
INV INVERT
J
JC JANITOR'S CLOSET
JOINT JT
K
KIT KITCHEN
KO KNOCKOUT
KP KICK PLATE
L
LAB LABORATORY
LAD LADDER
LAV LAVATORY
LB POUND
LB LAG BOLT
LBL LABEL
LH LEFT HAND
LL LIVE LOAD
LMS LIMESTONE
LP LIGHT PROOF
LPT LOW POINT
LT LIGHT
LTG LIGHTING
LTL LINTEL
LVR LOUVER
LW LIGHTWEIGHT
D
D DRAIN
DA DOUBLE ACTING
DEG DEGREE
DEMO DEMOLISH, DEMOLITION
DEP DEPRESSED
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIA DIAMETER
DIM DIMENSION
DL DEAD LOAD
DMT DEMOUNTABLE
DN DOWN
DP DAMP PROOFING
DPR DAMPER
DR DOOR
DRW DRYWALL
DS DOWNSPOUT
DT DRAIN TILE
DTL DETAIL
DW DUMBWAITER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRAWER
E
E EAST
EA. EACH
EF EXHAUST FAN
EIFS EXTERIOR INSULATION & FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSE
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
ESC ESCALATOR
ESMT EASEMENT
EST ESTIMATE
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
F
F/O FACE OF
FAS FASTEN(ER)
FBD FIBERBOARD
FBO FURNISHED BY OTHERS
FD FLOOR DRAIN
FDN FIRE DEPARTMENT
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FACTORY FINISH
FG FIBERGLASS
FIN FINISH(ED)
FLR FLOOR
FN FENCE
FOB FACE OF BRICK
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FPL FIREPLACE
FR FRAME(D)(ING)
FRA FRESH AIR
FRC FIRE-RESISTANT COATING
FRT FIRE-RETARDANT
FS FULL SIZE
FT FOOT
FTG FOOTING
FUR FURRED(ING)
FURN FURNITURE
FUT FUTURE
A
A/C AIR CONDITIONING
AB ANCHOR BOLT
ABV ABOVE
AC ACOUSTICAL
ACC ACCESS
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADDL ADDITIONAL
ADH ADHESIVE
ADJ ADJUSTABLE, ADJACENT
AFF(A.F.F.) ABOVE FINISH FLOOR
AGG AGGREGATE
ALT ALTERNATE
ANC ANCHOR, ANCHORAGE
ANOD ANODIZED
AP ACCESS PANEL
APX APPROXIMATE
ARCH ARCHITECT(URAL)
ASB ASBESTOS
ASC ABOVE SUSPENDED CEILING
AUTO AUTOMATIC
B
B/O(B.O.) BOTTOM OF
BD BOARD
BELOW BEL
BET BETWEEN
BITUM BITUMINOUS
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
BRK BRICK
BS BOTH SIDES
BSMT BASEMENT
BUR BUILT-UP ROOFING
BVL BEVELED
BW BOTH WAYS
C
C-C CENTER TO CENTER
CAB CABINET
CALC CALCULATION
CB CATCH BASIN
CEM CEMENT
CFL COUNTER FLASH(ING)
CFT CUBIC FOOT
CHAM CHAMFER
CI CAST IRON
CIP CAST-IN-PLACE CONCRETE
CIR CIRCLE
CIRC CIRCUMFERENCE
CJ CONTROL JOINT
CK CAULK(ING)
CL CENTER LINE
CLG CEILING
CLR CLEAR
CLS CLOSURE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMB COMBINATION
COMPO COMPOSITION
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACT
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
CPT CARPET
CRS COURSE(S)
CS COUNTERSINK
CSMT CASEMENT
CST CAST STONE
CT CERAMIC TILE
CYD CUBIC YARD
ARCHITECTURAL ABBREVIATIONS______________________________________________________________________________________________________________________
Revisions: Date:
SCHEMATIC DESIGN 35% 21 MAY 2021
DESIGN DEVELOPMENT 65% 4 JUNE 2021
CONSTRUCTION DOCUMENTS 95% 21 JUNE 2021
BID DOCUMENTS 5 JULY 2021
BID DOCUMENTS REVISION 01 21 JULY 2021
DN
UPUP
2738A
2737 2739 2771 2773 2785 2784
2742 2744 2768 2770 2788
2774A7C26
7C25
2786 2784A
7C29
7C27
7C28 2782A2783
2709A
2709 2782
7C23
2738A
DN
7C
UP
UP UP
1701 1700
1701A
7C13
S5
1742C
1742B
0B
1742A
1737 1739 1741 1743 1767 1769 1799
S6 1742 1750A 1766 1768 1770 1772 S4 17887C19
7C17
7C15
7C14
7C11
1773 1775
4A
A
NOTES - INFECTION CONTROL
1. THE INTENT OF INFECTION CONTROL ISOLATION IS TO PROTECT PATIENTS IN THE
HOSPITAL WHICH HAVE LOW IMMUNE LEVELS. THEREFORE, CONSTRUCTION
OPERATIONS NEED TO BE DIRECTED TO CONTAIN DUST AND PARTICULATE MATTER
TO THE CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER SHALL BE SEALED
COMPLETELY WITH MIN 4 MIL POLY AND DUCT TAPE DURING CLASS II, III, OR IV
OPERATIONS.
2. PROVIDE TRIATEK ISOLATION MONITORS OR VA APPROVED EQUAL DURING CLASS III
OR CLASS IV CONSTRUCTION OPERATIONS. EACH AREA TO BE UNDER NEGATIVE
PRESSURE (0.02"WC) DURING THESE OPERATIONS. MONITOR TO MEASURE
PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND ADJACENT CORRIDOR
OR ROOM AS DIRECTED BY VA.
3. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON, PROVIDE
A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION
CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF
CONSTRUCTION. PROVIDE AT LEAST 10 DAYS NOTICE FOR EACH PERMIT.
4. WHERE BARRIER SEPARATES CONSTRUCTION FROM OCCUPIED SPACE, CONSTRUCT
IC (INFECTION CONTROL) CONSTRUCTION BARRIER FROM FLOOR THRU SUSPENDED
CEILINGS TO DECK/FLOOR ABOVE. ALL IC BARRIERS TO BE CONSTRUCTED AS 1 HOUR
FIRE AND SMOKE RATED BARRIERS. EXCEPTION - AT EXISTING 1 HOUR RATED LATH
AND PLASTER CEILINGS CONSTRUCT IC BARRIER FROM FLOOR TO CEILING ABOVE.
SEE BARRIER DETAILS THIS SHEET.
5. CONTRACTOR SHALL PROVIDE NEW ACCESS DOORS AND PROXIMITY CARD READERS
AT ALL IC BARRIERS. IC BARRIERS SHALL BE INSTALLED AND REMOVED ONLY OUTSIDE
OF NORMAL HOURS OF OPERATION FOR ADJACENT AREAS.
6. WHEN REQUIRED BY IC CONSTRUCTION CLASS, PROVIDE BALANCING DAMPERS IN THE
MAIN SUPPLY AND EXHAUST DUCT WORK SERVING CONSTRUCTION ZONE.
TEMPORARILY BALANCE AIR FLOW TO PROVIDE NEGATIVE AIR FLOW IN
CONSTRUCTION ZONE AT ALL TIMES AS INDICATED BELOW. DAMPERS TO REMAIN IN
DUCT AFTER CONSTRUCTION IS COMPLETE AND IS TO BE SECURED IN FINAL
BALANCING POSITION PRIOR TO TURNING SYSTEM OVER FOR OCCUPANCY.
7. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO
COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES
PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS
NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE
REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL
CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS
NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN
THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA.
8. ALL CONSTRUCTION DEBRIS, WASTE, AND TRANSPORTATION OF DEMOLITION ITEMS
SHALL BE CONVEYED IN A COVERED DUMPSTER CONTAINER SUCH THAT NO
DEBRIS/ITEMS ARE VISIBLE.
PATIENT RISK
GROUP
LOW RISK
GROUP
CONSTRUCTION TYPE
MEDIUM RISK
GROUP
HIGH RISK
GROUP
HIGHEST RISK
GROUP
TYPE A TYPE B TYPE C TYPE D
I
I
I
II III/IV
II
II
II II
III/IV
III/IV
III
III/IV
IV
IV
IV
INFECTION CONTROL CONSTRUCTION RISK CLASS CHART
SEE INFECTION CONTROL SPECIFICATION FOR DETAILED INFORMATION REGARDING
CONSTRUCTION TYPE DEFINITIONS AND INFECTION CONTROL PRECAUTIONS REQUIRED BY
EACH CONSTRUCTION RISK CLASS.
LEGEND - INFECTION CONTROL
CONSTRUCTION BARRIER; TYPE AS REQUIRED
BY INFECTION CONTROL RISK CLASS.
CAUTION
CONSTRUCTION
ZONE
T/FLOOR
0'-0"
B/CEILING
EXISTING
B/STRUCTURE
EXISTING
TAPE ALL EDGES
W/ DUCT TAPE
H.M. DOOR ON
H.M. FRAME, 1 HR
RATED W/SEALS
(PAINTED YELLOW)
HAND SANITIZER
TRIATEK MONITOR
ELECTRONIC
LOCK W/ CARD
READER
DOOR CLOSER
EXTEND PARTITION
TO B/O STRUCTURE
AND TAPE ALL
EDGES W/ DUCT
TAPE
RECORDS
STORAGE
STAIR
S6
STAIR
S4
MECH
G003
G003
STAIR
S6
CORRIDOR
7C33
STAIR
S4
G003 6 G003
W.C.
STORAGE
STAIR
S5
G003
G003
G003
G003
RM
RM
IT/DATA
OFFICE
W.C.
RM
STORAGE
C O
R R
ID
O
R 7C
C
O R
R
ID
O R
7C
IT/DATA
ROOM
OFFICE
SOILED
HOLD.
COPIER
S T
O R
TLT
2747A STAIR
S5
RM
RM
2762A
RM
G003
G003
ELEC
ELEC
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Nagel Architects + Engineers project number:
C :\U se rs
\to m o\ D oc um en ts
\2
_T om ah
E H
R M
_T om
.o st er ga ar d@ na ge l.u s.
rv t
7/
/2
1:
:1
P
M
G003
BUILDING CODE REVIEW &
INFECTION CONTROL
EHRM TRAINING AND ADMIN
SUPPORT SPACE
500 E. VETERANS STREET, TOMAH, WI 54660
676-21-703
21 JULY 2021 KS TMO
BID DOCUMENTS
REVISION 01
FULLY SPRINKLERED
21007
BUILDING CODE REVIEW
IBC CODE SECTION REQUIRED PROVIDED NFPA 101 SECTION REQUIRED PROVIDED
OCCUPANCY OR USE CLASSIFICATION
Single BUSINESS CHAPTER 6.1 NEW BUSINESS Accessory Occupancy [508.4] N/A N/A CHAPTER 6.1.14 N/A N/A Incidental Uses [Table 509] N/A N/A CHAPTER 6.2 N/A N/A
SPECIAL DETAIL REQUIREMENTS PER OCCUPANCY
Special Applications [Ch 4] N/A PER CHAPTER 38 N/A N/A Occupancy Separations Needed? [Table 508.4] N/A N/A N/A High Hazard Class [Section 414] N/A N/A N/A
TYPE OF CONSTRUCTION & LIMITS [TABLE 503]
Construction Class Type IIIB NFPA 220 Type 3 (200) Allowable Area 57,000 SF PER FLOOR EXISTING N/A Area Increase: Sprinkler N/A N/A N/A Area Increase; Frontage N/A N/A N/A Total Area w/ increases N/A N/A N/A Allowable Height N/A N/A N/A Height Modifications N/A N/A N/A Allowable # of Stories N/A N/A N/A
POSITIONING ON PROPERTY [TABLE 602]
Distance to property lines (N, E, S, W) N/A N/A N/A Distance to other buildings N/A N/A N/A Distance to same building N/A N/A N/A Allowable Exterior Wall Openings [705] EXISTING EXISTING N/A
FIRE SUPPRESSION SYSTEMS
Sprinkler Requirement NFPA 13 NFPA 13 N/A Alarm & Detection System Requirement NFPA 72 NFPA 72 N/A Monitoring Services AS REQ'D AS REQ'D Standpipe systems EXISTING EXISTING Portable fire extinguishers NFPA 10 SEE G103 NFPA 10 Smoke control systems N/A N/A
MEANS OF EGRESS PARAMETERS
Occupant Load [Table 1004.1.2] - BUSINESS USE 9706 GSF@150 GSF/PERSON =
65 PERSONS
[Table 7.3.1.2] 9706 GSF@150 GSF/PERSON =
65 PERSONS
Required Exit Capacities 33 PERSONS EACH 33 PERSONS EACH # of exits required [1006.2.2.1] 2 CHAPTER 7.4.1.1 2 Exit width 65 PERSONS@0.2"/PERSON =
13"; 44" MIN CORRIDOR WIDTH
SEE PROVIDED EGRESS
CHART G103
CHAPTER 7.3.4 65 PERSONS@0.2"/PERSON =
13"; 44" MIN CORRIDOR WIDTH
SEE PROVIDED EGRESS
CHART G103
Exit discharge SEE PROVIDED EGRESS
CHART G103
CHAPTER 7.7 SEE PROVIDED EGRESS
CHART G103
Door Hardware Requirements AS REQ'D CHAPTER 7.2 AS REQ'D Misc & Special Requirements PER CHAPTER 38 Stair Width 98 PERSONS@0.3"/PERSON =
29.4"
44" EXISTING CHAPTER 7.2.2 98 PERSONS@0.3"/PERSON =
29.4"
44" EXISTING
Common path of travel 100' SEE COMMON PATH CHART
SHEET G103
PER CHAPTER 38 100'
Travel distance to Exits 300' SEE TRAVEL DISTANCE
CHART SHEET G103
PER CHAPTER 38 300'
Stair enclosure <3 STORIES: 1 HR FIRE
RESISTANCE
AS REQ'D & EXISTING CHAPTER 7.2.2.5 <3 STORIES: 1 HR FIRE
RESISTANCE
AS REQ'D AND EXISTING
Vertical openings <3 STORIES: 1 HR FIRE
RESISTANCE
AS REQ'D & EXISTING <3 STORIES: 1 HR FIRE
RESISTANCE
AS REQ'D AND EXISTING
Accessible means of egress 1 PER ACCESSIBLE AREA AS REQ'D & EXISTING CHAPTER 7.5.4 1 PER ACCESSIBLE AREA AS REQ'D AND EXISTING Emergency lightning SEE LIGHTING PLAN SEE LIGHTING PLAN CHAPTER 7.8-9 Dead End Corridor 50' MAX SEE LIFE SAFETY PLAN 50' MAX SEE LIFE SAFETY PLAN Mezzanine w/o sprinkler N/A N/A CHAPTER 8.6.10 N/A N/A
OTHER ARCHITECTURAL ELEMENTS
Roof requirements -Access EXISTING EXISTING CHAPTER 7.2.1.5.9 -Rails N/A N/A
FIRE PERFORMANCE REQUIREMENTS [TABLE 601] NFPA 220 [Table 4.1.1] Columns 0 EXISTING 0 EXISTING Floor 0 EXISTING 0 EXISTING Roof 0 EXISTING 0 EXISTING Roof Covering CLASS C EXISTING CLASS C EXISTING Exterior Walls 2 HR EXISTING 2 HR EXISTING Interior Bearing Walls 0 N/A 0 N/A Fire Walls N/A N/A N/A N/A Opening Protectives N/A N/A [Table 8.3.3.2.2] N/A N/A Other partitions 0 AS REQ'D 0 AS REQ'D Corridors [1020.1] 0 0 PER CHAPTER 38 0 0 Exit passageways N/A N/A N/A N/A Vertical exit enclosures <3 STORIES: 1 HR FIRE
RESISTANCE
EXISTING <3 STORIES; 1 HR FIRE
RESISTANCE
EXISTING
Vertical shafts <3 STORIES: 1 HR FIRE
RESISTANCE
EXISTING <3 STORIES; 1 HR FIRE
RESISTANCE
EXISTING
Penthouse Walls EXISTING EXISTING EXISTING EXISTING Penthouse Roof EXISTING (CLASS C) MATCH EXISTING EXISTING MATCH EXISTING Storage Rooms N/A N/A N/A N/A Occupancy separations N/A N/A [Table 6.1.14.4.1] N/A N/A Hazardous areas N/A N/A CHAPTER 6.2 N/A N/A Accessible means of egress [1009.1.2] 1 PER ACCESSIBLE AREA AS REQ'D other N/A N/A
SMOKE COMPARTMENT N/A N/A
ATTIC REQUIREMENTS
-Access EXISTING EXISTING -Smoke separations EXISTING EXISTING
CONSTRUCTION MATERIALS - FINISHES
Exit Enclosures & Passageways [Table 803.11] CLASS B CLASS B Corridors CLASS C CLASS C Rooms & Enclosed spaces CLASS C CLASS C
ENERGY EFFICIENCY REQUIREMENTS
Energy Conservation:
Insulation Above Deck N/A N/A N/A Walls Above Grade, Wood Framed N/A N/A N/A Walls Below Grade N/A N/A N/A Floors, Mass N/A N/A N/A Slab-on-grade Floors, Heated N/A N/A N/A Opaque Doors N/A N/A N/A Vertical Fenestration, Fixed U-FACTOR 0.36 MIN; SHGC
0.40 MIN
AS REQ'D N/A
Vertical Fenestration, Operable U-FACTOR 0.43 MIN; SHGC
0.40 MIN
AS REQ'D N/A
Vertical Fenestration, Entrance Doors N/A N/A N/A Skylights N/A N/A N/A
MEP REQUIREMENTS
Lighting NATURAL: 8% OF FLOOR
SERVED -OR- ARTIFICIAL: 10
FOOT CANDLES OVER AREA
AT 30" AFF
EXISTING N/A
Water Closets (2) PER GENDER (3) PER GENDER N/A Lavatories (2) PER GENDER (3) PER GENDER N/A Bathtubs/Showers N/A N/A N/A Drinking Fountains 1 BOTTLE FILLING STATION
PROVIDED
N/A
Other (mop basin) 1 ELSEWHERE IN EXISTING
BLDG
N/A
3/8" = 1'-0"
INFECTION CONTROL BARRIER DETAIL
1/32" = 1'-0"
THIRD FLOOR PLAN, INFECTION CONTROL
3/32" = 1'-0"
ENLARGED INFECTION CONTROL PLAN
3/32" = 1'-0"
ENLARGED INFECTION CONTROL PLAN
1/32" = 1'-0"
SECOND FLOOR PLAN, INFECTION CONTROL
3/32" = 1'-0"
ENLARGED INFECTION CONTROL PLAN
3/32" = 1'-0"
ENLARGED INFECTION CONTROL PLAN
3/32" = 1'-0"
ENLARGED INFECTION CONTROL PLAN
3/32" = 1'-0"
ENLARGED INFECTION CONTROL PLAN
3/32" = 1'-0"
ENLARGED INFECTION CONTROL PLAN
3/32" = 1'-0"
ENLARGED INFECTION CONTROL PLAN
1/32" = 1'-0"
FIRST FLOOR PLAN, INFECTION CONTROL
3/32" = 1'-0"
ENLARGED INFECTION CONTROL PLAN
3/32" = 1'-0"
ENLARGED INFECTION CONTROL PLAN
Revisions: Date:
SCHEMATIC DESIGN 35% 21 MAY 2021
DESIGN DEVELOPMENT 65% 4 JUNE 2021
CONSTRUCTION DOCUMENTS 95% 21 JUNE 2021
FIRE BARRIER, 1 HR
FIRE BARRIER, 2 HR
BUILDING EXIT
COMMON PATH OF EGRESS TRAVEL
EGRESS WIDTH TAG
EXIT ACCESS CORRIDOR
LEGEND - LIFE SAFETY PLAN
EXIT ACCESS TRAVEL DISTANCE
ROOM TAG WITH OCCUPANT LOAD
GROSS AREA BOUNDARY
ROOM NAME
AREA
OCCU TYPE - LOAD
42"
SUITE, SIZE AS NOTED
AREA ABOVE OCCUPANCY HAZARD
FE SEMI-RECESSED FIRE EXTINGUISHER CABINET
522 SF
CLASSROOM
690 SF
COMMAND
256 SF
PLAN/PREP
356 SF
CERNER
ARCHITECTS
228 SF
HELP DESK
206 SF
IT/DATA
930 SF
CLASSROOM
579 SF
CLASSROOM
198 SF
LOUNGE/NOURISH
198 SF
W.C., MEN'S
237 SF
W.C., WOMEN'S
CORRIDOR
7C32
CORRIDOR
7C31
CORRIDOR
7C33
357 SF
CLASSROOM
221 SF
CONFERENCE
142 SF
WAITING
435 SF
CLASSROOM
63 SF
ELEC
29 SF
FP
3709A
1133 SF
CERNER
ADMIN
190 SF
MECH
STAIR
S6
STAIR
S4
ELEC
DATA
3721A
RECORDS
STORAGE
ELEVATOR
87 SF
ELEV LOBBY
P A
T H
P A
T H
P A
T H
A
SUITE
1810 SF
P A
T H
BP
A
T H
PATH 2
S6 S4 34" 34"
C O
R R
ID
O
R 7C
FE FE
FE
FE
62 1/2"
9706 SF
NEW BUSINESS
OCCUPANCY
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Nagel Architects + Engineers project number:
C :\U se rs
\to m o\ D oc um en ts
\2
_T om ah
E H
R M
_T om
.o st er ga ar d@ na ge l.u s.
rv t
7/
/2
1:
:1
P
M
G103
THIRD FLOOR PLAN, LIFE SAFETY EHRM TRAINING AND ADMIN
SUPPORT SPACE
500 E. VETERANS STREET, TOMAH, WI 54660
676-21-703
21 JULY 2021 KS TMO
BID DOCUMENTS
REVISION 01
FULLY SPRINKLERED
21007
OCCUPANCY BY AREA PER IBC TABLE 1014.1.2 / NFPA 101 TABLE 7.3.1.2
AREA OCCUPANCY
PERSONS
NAME SF TYPE FUNCTION LOAD FACTOR
BUSINESS AREA
NEW BUSINESS OCCUPANCY 9706 SF B - BUSINESS BUSINESS AREA 150 65
9706 SF 65
COMMON PATH OF
EGRESS TRAVEL
PATH A
63'-5"
PATH B
69'-8"
EXIT ACCESS TRAVEL
DISTANCE
PATH 1
154'-6"
PATH 2
134'-2"
PROVIDED EGRESS WIDTH
DOOR NO. EGRESS WIDTH
S4 34" S6 34" Total Provided Egress Width 68"
1/8" = 1'-0"
THIRD FLOOR PLAN, LIFE SAFETY 0' 4' 8' 16'
NORTH
1/32" = 1'-0"
THIRD FLOOR OCCUPANCY PLAN
Revisions: Date:
SCHEMATIC DESIGN 35% 21 MAY 2021
DESIGN DEVELOPMENT 65% 4 JUNE 2021
CONSTRUCTION DOCUMENTS 95% 21 JUNE 2021
1 1
1 1 1
1 1 1
1 1 1
1 1
2 2
2 2 2
2 2 2
2 2 2 2
2 2 2222
4 4
4 4
6 6 6 6
6 6 6
6 6 6 6
666666
6 6
EXERCISE
DAYROOM
MECH
BEDROOM
SHOWER
3715 BEDROOM
LAUNDRY
MEN'S W.C.
H.A.C.
FP
3736A
BEDROOM
LOUNGE
BEDROOM
BEDROOM
BEDROOM
BEDROOM
STOR
BEDROOM
TLT
STOR
STOR
37493749A
STORAGE
TLT
BEDROOM
TLT
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
SOCIAL WORK
ELEC
SOCIAL WORK
IT
3772A
TLT
3744ASTAIR
S6
STAIR
S4
CORR
7C31
CORR
7C32
CORR
7C33
CORR
7C36
CORR
7C37
RECORDS
STORAGE
OFFICE
3752A
CORR
7C38
A. ACCORDING TO THE LEAD IN PAINT RESULTS OF THE COADED
SURFACES EVALUATED, LEAD IN PAINT WAS PREVALENT ON 3RD
FLOOR. CURRENTLY THE WISCONSIN DEPARTMENT OF NATURAL
RESOURCES (WDNR) ALLOWS THE DISPOSAL OF BUILDING
MATERIALS BEARING LEAD BASED PAINT ("LBP") IN C & D LANDFILLS
PROVIDED THE LBP IS INTACT AND SECURELY AFFIXED TO THE
SUBSTRATE TO WHICH IT WAS APPLIED. DETERIORATED LBP
SHOULD BE REMOVED AND/OR STABILIZED (ENCAPSULATED PRIOR
TO BEING IMPACTED BY DEMOLITION ACTIVITIES. REMOVED PAINT
WASTES SHOULD BE PROFILED (FOR POTENTIALLY HAZARDOUS
WASTE DISPOSAL REQUIREMENTS) AND PROPERLY DISPOSED OF
IF THEY ARE TO BE IMPACTED BY DEMOLITION ACTIVITIES. IF
BUILDING MATERIALS BEARING LBP ARE GOING TO BE RECYCLED
OR USED AS "CLEAN" FILL (SUCH AS THE CINDER BLOCK AND THE
CERAMIC TILES IN THE BATHROOMS) THE LEAD COATINGS MUST BE
REMOVED PRIOR TO RECYCLING OR THEIR USE AS "CLEAN" FILL.
B. IT SHOULD BE NOTED THAT UNDAMAGED LBP MAY BE PRESENT ON
UNTESTED BUILDING MATERIALS AND THAT FURTHER TESTING OF
THESE SURFACES MAY BE NECESSARY BASED ON RENOVATION
TECHNIQUES AND POTENTIAL LEAD EXPOSURES. IN ACCORDANCE
WITH OSHA REGULATIONS, SAMPLING RESULTS WILL BE PROVIDED
TO THE CONTRACTOR COMPLETING ACTIVITIES THAT WILL
DISTURB ANY PAINT OR OTHER COATED SURFACES POTENTIALLY
CONTAINING LEAD SO POTENTIAL LEAD EXPOSURE ASSESSMENT
CAN BE COMPLETED. WHERE LEAD IS PRESENT, IT SHOULD BE
ASSUMED THAT WORKERS WILL BE EXPOSED TO LEAD ABOVE THE
ACTION LEVEL AND PERSONAL PROTECTIVE MEASURES SHOULD
BE IMPLEMENTED UNTIL AN EXPOSURE ASSESSMENT IS
COMPLETED IN ACCORDANCE WITH OSHA REGULATION 29 CFR
1926.62.
C. THE FOLLOWING HAZARDOUS/SPECIAL WASTES DURING THE
ASSESSMENT THAT SHOULD BE REMOVED FROM THE 3RD FLOOR
OF THE BUILDING PRIOR TO RENOVATION AND BE DISPOSED OF
PROPERLY IF THEY ARE IMPACTED BY RENOVATION:
D. SAMPLES OF THE FOLLOWING MATERIALS CONTAINED LESS THAN
(<) 1% ASBESTOS WERE VERIFIED IN ACCORDANCE WITH
WISCONSIN DEPARTMENT OF NATURAL RESOURCES ("WDNR") BY
POLARIZED LIGHT MICROSCOPY ("PLM") POINT COUNT
METHODOLOGIES: DRYWALL SYSTEMS, DRYWALL JOINT
COMPOUND, AND MARBLE PANEL GROUT.
E. AN ASBESTOS CONTAINING MATERIAL ("ACM") IS DEFINED AS A
MATERIAL THAT CONTAINS GREATER THAN (>) 1 PERCENT (%)
ASBESTOS BY LABORATORY PLM ANALYSIS. ACCORDING TO THE
WDNR, WISCONSIN DEPARTMENT OF HEALTH SERVICE (" WDHS")
AND THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
("USEPA") MATERIALS CONTAINING 1% ASBESTOS OR LESS BY
STANDARD PLM MUST BE VERIFIED BY PLM POINT COUNT
ANALYSIS. THE COMPOSTED SAMPLES OF THE DRYWALL SYSTEM
AND MARBLE PANEL GROUT WERE FOUND TO CONTAIN LESS THAN
(<) 1% ASBESTOS BY POINT COUNT ANALYSIS.
F. MATERIALS CONTAINING LESS THAN (<) 1% ASBESTOS, SUCH AS
THE DRYWALL JOINT COMPOUND, DRYWALL SYSTEM AND MARBLE
PANEL GROUT, MAY NOT BE REGULATED (EITHER THE REMOVAL
OR WASTE DISPOSAL) BY THE WDNR OR WDHS. HOWEVER, AT
LEAST PORTIONS OF THE OSHA ASBESTOS IN CONSTRUCTION
STANDARD (1926.1101) STILL APPLY WHEN THESE MATERIALS ARE
DISTURBED.
G. ALL WORK UNDER THIS CONTRACT SHALL BE DONE IN STRICT
ACCORDANCE WITH ALL APPLICABLE GENERAL STATE AND LOCAL
REGULATIONS, STANDARDS AND CODES GOVERNING ASBESTOS
ABATEMENT, LEAD BASED PAINT WORK PRACTICES, AND ANY
OTHER TRADE WORK DONE IN CONJUNCTION WITH THE ASBESTOS
ABATEMENT.
H. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO
AVOID CREATION OF LEAD FUMES, INCLUDING THE USE OF LOW-
TEMPERATURE DEMOLITION METHODS FOR EXISTING DOORS AND
WINDOWS.
I. CONTRACTOR SHALL ISOLATE HVAC SYSTEMS IN AREA OF
ABATEMENT FROM ALL OTHER AREAS OF BUILDING.
GENERAL NOTES - HAZARDOUS MATERIALS PLAN
• APPROXIMATELY EIGHTY-ONE (81) LIGHT FIXTURES
CONTAINING ONE HUNDRED FIFTY-NINE (159) BALLASTS.
UNLESS LABELED AS "NON-PCB" THE BALLASTS SHOULD
BE ASSUMED TO CONTAIN PCBS AND BE DISPOSED OF AS
HAZARDOUS WASTE.
• APPROXIMATELY THREE HUNDRED-TWENTY-FIVE (325)
FLUORESCENT LIGHT BULBS OF VARIOUS SIZES.
FLUORESCENT LIGHT BULBS CONTAIN MERCURY.
• APPROXIMATELY TWELVE (12) EMERGENCY LIGHTS/EXIT
LIGHTS THAT MAY CONTAIN HEAVY METALS.
• APPROXIMATELY FOURTEEN (14) DOOR CLOSERS THAT
MAY CONTAIN OILS. THESE OILS MAY CONTAIN PCBS AND
SHOULD BE TESTED FOR PCB CONTENT AND PROPERLY
DISPOSED.
• APPROXIMATELY FIVE (5) SMOKE ALARMS. THESE ITEMS
MAY CONTAIN RADIOACTIVE MATERIALS.
LEGEND - HAZARDOUS MATERIALS PLAN
KEYNOTES - HAZARDOUS MATERIALS PLAN
1 ASBESTOS CONTAINING VINYL ASBESTOS TILE & MASTIC PRESENT
2 ASBESTOS CONTAINING CAULK PRESENT
3 ASBESTOS CONTAINING PIPE FITTING MATERIALS AND/OR NON-
FIBERGLASS ASBESTOS CONTAINING THERMAL SYSTEMS
INSULATION MATERIAL PRESENT
4 INACCESSIBLE CEILING OR CHASE. ASBESTOS CONTAINING PIPE
FITTING MATERIALS AND/OR NON-FIBERGLASS ASBESTOS
CONTAINING THERMAL SYSTEMS MATERIAL MAY BE PRESENT.
5 ASSUMED ASBESTOS CONTAINING FIRE RATED DOOR
6 'TRANSITE' ASBESTOS CONTAINING CEMENT PANEL PRESENT
BEHIND EXISTING BELOW-WINDOW METAL RADIATOR ENCLOSURE
AND RADIATOR.
ASBESTOS CONTAINING GRAY EXTERIOR WINDOW CAULK -
APPROX. FIFTY-TWO (52) SQFT.
ASBESTOS CONTAINING 12"X12" FLOOR TILE WITH MASTIC -
APPROXIMATELY SEVEN THOUSAND ONE HUNDRED
NINETY NINE (7,199) SQFT.
ASBESTOS CONTAINING PIPE INSULATION (NON-
FIBERGLASS) & HARD PIPE FITTINGS - APPROXIMATELY
FIFTY-FOUR (54) LINEAR FEET VISIBLE. PLEASE NOTE THAT
ADDITIONAL QUANTITIES OF NON-FIBERGLASS PIPE
INSULATION AND FITTINGS ARE LIKELY PRESENT IN
SEALED WALL AND CEILING CAVITIES AS WELL AS SEALED
PIPE CHASES.
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Nagel Architects + Engineers project number:
C :\U se rs
\to m o\ D oc um en ts
\2
_T om ah
E H
R M
_T om
.o st er ga ar d@ na ge l.u s.
rv t
7/
/2
1:
:2
P
M
H103
THIRD FLOOR PLAN, HAZARDOUS
MATERIALS
EHRM TRAINING AND ADMIN
SUPPORT SPACE
500 E. VETERANS STREET, TOMAH, WI 54660
676-21-703
21 JULY 2021 KS TMO
BID DOCUMENTS
REVISION 01
FULLY SPRINKLERED
21007
1/8" = 1'-0"
THIRD FLOOR PLAN, HAZARDOUS MATERIALS 0' 4' 8' 16'
NORTH
Revisions: Date:
CONSTRUCTION DOCUMENTS 95% 21 JUNE 2021
NOT USED
LEGEND - SITE PLAN
1. BUILDING TO REMAIN IN OPERATION DURING CONSTRUCTION.
CONTRACTOR TO MAINTAIN ACCESS TO ENTRIES UNLESS
OTHERWISE COORDINATED WITH THE VA.
2. DUE TO LIMITED AREA WITHIN FENCE CONSTRUCTION SITE, ALL
ON-SITE STORAGE OF NEW MATERIALS AND CONSTRUCTION
EQUIPMENT SHALL BE SHORT-TERM AND COORDINATED BY THE
CONTRACTOR AND THE VA.
3. ALL DAILY ON-SITE CONSTRUCTION TRAFFIC AND PARKING
SHALL BE COORDINATED WITH VA. HOSPITAL PERSONNEL SHALL
MAINTAIN CONTROL OF PRIME PARKING AREAS.
4. AREA OUTSIDE OF THE CONSTRUCTION FENCE IS TO BE KEPT
CLEAR OF ALL CONSTRUCTION MATERIALS AND EQUIPMENT AND
REMAIN SAFE FOR VA USE (TYPICAL).
5. COORDINATE LIFT AND/OR CRANE OPERATING SCHEDULE WITH
VA FOR AFTER HOURS WEEKEND WORK, AS FACILITY
PROTOCOLS REQUIRE EVACUATION OF FIRST AND SECOND
FLOOR AREAS DURING USE. REFER TO SPECIFICATION SECTION
01 35 26.
6. CONTRACTOR TO PROVIDE STEEL ROAD PLATES OVER EXISTING
UNDERGROUND PASSAGES AND UTILITY TUNNELS FOR ALL
EQUIPMENT EXCEEDING 50,000# LOAD. PLATES SHALL EXTEND A
MINIMUM OF 1 FOOT PAST THE EDGE OF TUNNELS AND BE
SECURED AGAINST UPLIFT. PROVIDE STAMPED STRUCTURAL
CALCULATIONS VERIFYING PLATE STRENGTH AS RELATED TO
THE PROPOSED EQUIPMENT LOAD.
7. PROVIDE TEMPORARY CONSTRUCTION FENCE AROUND
DUMPSTER AND STAGING AREA. COORDINATE EXACT
LOCATION, SIZE AND DURATIONS WITH THE VA. AT PROJECT
COMPLETION, ALL TEMPORARY FENCING AND ALL RELATED
ITEMS ARE TO BE REMOVED FROM THE SITE, ALONG WITH ALL
CONSTRUCTION DEBRIS AND DUMPSTERS. ASPHALT PAVING,
CONCRETE CURBS, CONCRETE SIDEWALKS, AND ANY OTHER
SITE SURFACES OR AMENITIES DAMAGED DURING
DEMOLITION/CONSTRUCTION ARE TO BE REPLACED TO THE VA’S
SATISFACTION AT THE CONTRACTOR’S OWN EXPENSE.
8. TEMPORARY CONSTRUCTION FENCE SHALL BE CHAIN LINK. SEE
DETAIL THIS SHEET. PROVIDE PERSONNEL AND EQUIPMENT
GATES WITH LOCKING STRONG ARM AS NEEDED.
9. PROVIDE CONSTRUCTION SIGNAGE AS REQ'D BY SPECS.
10. CONTRACTOR SHALL CONFIRM THAT SOIL BEARING CAPACITY AT
LOCATION OF EQUIPMENT PAD IS SUFFICIENT TO SUPPORT PAD
AND CHILLER UNIT PRIOR TO ANY SITE WORK RELATED TO PAD
OR CHILLER IS PERFORMED.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION AND
PRESERVATION OF ANY EXISTING BURIED UTILITIES IN THE AREA
OF WORK, AND FOR COMPLIANCE WITH WISCONSIN STATUTE
182.0175.
GENERAL NOTES - SITE PLAN
BLDG 407
EXISTING
PARKING
EXISTING
PARKING
EXISTING BLDG
CONNECTOR
EXISTING BLDG
CONNECTOR
EXISTING TRANSFORMER
R A
M P
EXISTING UNDERGROUND
FUEL STORAGE
PROPOSED
CONTRACTOR
ACCESS TO BLDG
AS101
3 4
12" CONC PAD ON 24"
COMPACTED FREE-DRAINING FILL.
SEE GENERAL NOTE 10.
CHILLER UNIT FOR NEW AHU
IN ATTIC. SEE MECH DWGS.
4' -6
/4
6'
-0
'-3
7"
3/
4" 4'
-4
4' -2
3'
-1
/2
3' -2
4'
-5
4X EXT TREATED CEDAR WD
POST, TYP
EXISTING BUILDING WALL
1'-3" 3'-4"
1' -8
2'
-9
16'-11 1/2"
4'-1 1/2" 4'-1 1/2" 4'-1 1/2" 4'-1 1/2" 2 3/4"+/- 7'-6" 2 3/4"
DOUBLE DOOR ACCESS GATE; 1X6
EXT TREATED CEDAR FENCING
BOARDS ON 2X FRAME. PROVIDE
HARDWARE SET HW-G7 AS SPEC.
AS1013
AS101
AS101
AS101 4
SIM
2' -7
2'
-7
4" CONC WALK ON 4" GRANULAR FILL.
T/O SLAB 2" ABOVE EXISTING GRADE.
PROVIDE CONT COMPRESSIBLE FILLER
STRIP BETWEEN WALK AND PAD.
CORE CONC AND INSTALL/GROUT IN
PLACE STL PIPE AS REQ'D TO RECEIVE
DOOR CANE BOLTS. INSTALL T/O PIPE
FLUSH WITH T/O CONC. COORD EXACT
LOCATIONS W/ DOOR HARDWARE MFR.
GRAVEL MOW STRIP
CONC EMBED AS REQ'D FOR GATE
STOP STL PIPE, TYP. COORD EXACT
LOCATIONS AND HEIGHTS ABOVE
GRADE W/ DOOR HARDWARE MFR
NOTE: CONTRACTOR SHALL COORDINATE EXACT SIZE OF ENCLOSURE
WITH SIZE AND REQUIRED CLEARANCES OF APPROVED CHILLER UNIT.
SIZE AND CLEARANCES SHOWN ARE BASIS OF DESIGN ONLY.
3'-4" 1'-6"
2" 7'
-0
6"
1X6 EXT TREATED
CEDAR FENCING
BOARDS, TYP
EXISTING BLDG WALL
EXISTING GRADE
1X6 EXT TREATED
CEDAR FENCING
BOARDS, TYP
6" 7'
-0
2"
3' -6
M
IN
6"
4X4 EXT TREATED
CEDAR WD POST, TYP
1X6 EXT TREATED CEDAR
FENCING BOARDS @ 6" O.C.
CENTER AND BURY
POST IN 12" DIA CONC
12" CIP PAD
#6 @ 12" OC EACH
WAY AT MID-DEPTH
4" 8"
24" COMPACTED FREE DRAINING
FILL; EXTEND 24" OUT FROM SLAB
EDGE ALL SIDES. FILL AROUND
POST EMBEDS AS NEEDED.
GRAVEL MOW STRIP
W/ CONT BLACK RIGID
PVC EDGE SYSTEM
LAWN - RESEED TO MATCH
EXISTING AS REQ'D
+/- 6"
CHAIN LINK
FENCE POST CAP
CHAIN LINK FENCE FRAME
AND FEET, 1.25" OD, HOT
DIPPED GALV STL TUBE,
FULLY WELDED
10 GA. MIN STL WIRE
MESH, 2" MIN OPENING
CONNECT WIRE MESH
TO TENSION BAR AND
CLAMP BAR TO FRAME
BY TENSION BANDS
PROVIDE (4) SANDBAGS
PER POST MIN
10'-0" O.C MAX
7' -0
M
IN
LOCKING STRONG ARM
GATE LATCH; PROVIDE
AT ALL GATES IN
CONSTRUCTION FENCE
GATE HINGES AS
REQUIRED
FENCEGATE
3' -0
3'
-0
4' -0
M
IN
4'-0"
4X4 EXT TREATED WD
POSTS IN POST HOLES
EXT GRADE FACE PANEL, ALUM SKIN
LAMINATED TO WOOD CORE. CORE
EDGES PHYSICALLY SEALED
NOTES:
1. BASIS OF DESIGN FOR THIS SIGN IS VA
SPECIALITY SIGN SP-24.04. REFER TO VA
SIGNAGE DESIGN GUIDE.
2. SIGN TO BE ATTACHED TO POSTS USING
WOOD SCREWS AND LAG BOLTS AS REQ'D.
3. ALL VISIBLE SURFACES SHALL BE PRIMED
AND PAINTED U.N.O.
4. CONTRACTOR SHALL LOCATE SIGN AS
REQ'D BY COR. SIGN SHALL BE REMOVED
AND/OR RELOCATED AS REQ'D BY COR.
2" 9"
1/
2"
1/ 2"
CHANGEABLE NUMBERS. CONTRACTOR
TO UPDATE NUMBERS ON A DAILY BASIS
2"
KEYNOTES - SITE PLAN
1 APPROXIMATE PROPOSED CONTRACTOR LAY-DOWN AREA. SEE
GENERAL NOTES THIS SHEET FOR FENCING REQUIREMENTS
2 PROPOSED CRANE LOCATION 1
3 PROPOSED CRANE LOCATION 2
4 PROPOSED CONTRACTOR DUMPSTER AREA. PROVIDE CHUTE
FROM AREA OF WORK TO DUMPSTER; COORDINATE EXACT
CHUTE LOCATION FROM WORK AREA TO DUMPSTER WITH COR.
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Nagel Architects + Engineers project number:
C :\U se rs
\to m o\ D oc um en ts
\2
_T om ah
E H
R M
_T om
.o st er ga ar d@ na ge l.u s.
rv t
7/
/2
2:
:2
P
M
AS101
SITE PLAN, ARCHITECTURAL EHRM TRAINING AND ADMIN
SUPPORT SPACE
500 E. VETERANS STREET, TOMAH, WI 54660
676-21-703
21 JULY 2021 KS TMO
BID DOCUMENTS
REVISION 01
FULLY SPRINKLERED
21007
0' 4' 8' 16'
NORTH
1" = 20'-0"
SITE PLAN, ARCHITECTURAL
1/4" = 1'-0"
ENLARGED SITE PLAN, CHILLER UNIT
1/4" = 1'-0"
WOOD FENCE ELEVATION, EAST
1/4" = 1'-0"
WOOD FENCE ELEVATION, NORTH (WEST SIM)
3/4" = 1'-0"
WOOD FENCE SECTION, TYPICAL
1/2" = 1'-0"
CONSTRUCTION FENCE DETAIL
3/4" = 1'-0"
CONSTRUCTION SIGN DETAIL
Revisions: Date:
SCHEMATIC DESIGN 35% 21 MAY 2021
DESIGN DEVELOPMENT 65% 4 JUNE 2021
CONSTRUCTION DOCUMENTS 95% 21 JUNE 2021
UP
UP UP
1701 1700
1701A
7C13
S5
1742C
1742B
B
1742A
1737 1739 1741 1743 1767 1769 1799
S6 1742 1750A 1766 1768 1770 1772 S4 17887C19
7C17
7C15
7C14
7C11
1773 1775
A
AREA FOR REPLACEMENT OF PLUMBING RISERS FROM BASEMENT
TO THIRD FLOOR. ACT SYSTEM TO BE REMOVED AS NEEDED TO
PERFORM WORK. REMOVE AND PROTECT ALL EXISTING CEILING
MOUNTED ITEMS. SEE PLUMBING DEMO DWGS FOR DETAILS.
ELEC
NO ARCH.
DEMOLITION
THIS RM. SEE
NEW WORK.
OPEN TO
BASEMENT
BELOW
EXISTING ABANDONED
TELEPHONE CONDUIT TO
REMAIN
A. BEFORE BEGINNING ANY DEMOLITION WORK EACH CONTRACTOR
AND DISCIPLINE SHALL PERFORM A FULL EXAMINATION OF ALL
AREAS OF WORK AND FULLY VERIFY ALL EXISTING CONDITIONS
ALONG WITH ALL OF THE AREAS OF WORK FOR ANY UNFORESEEN
CONDITIONS OR DISCREPANCIES FROM THE DOCUMENTATION
THAT WOULD AFFECT THEIR WORK AND/OR THE WORK OF
OTHERS. ANY UNFORESEEN CONDITIONS OR DISCREPANCIES
DISCOVERED ARE TO BE IMMEDIATELY IDENTIFIED AND
COORDINATED WITH THE GENERAL/PRIME CONTRACTOR WHO
SHALL IN TURN DOCUMENT AND PROMPTLY REPORT ANY SUCH
CONDITIONS DIRECTLY TO THE VA/COR FOR DIRECTION ON HOW
TO PROCEED BEFORE ALLOWING ANY WORK TO BEGIN.
B. ALL EXISTING CONSTRUCTION OR ITEMS INDICATED TO REMAIN IN
PLACE AND OPERATION SHALL BE PROTECTED FROM DAMAGE
BOTH DURING THE DEMOLITION OPERATIONS AS WELL AS THE
NEW CONSTRUCTION EFFORTS. WHERE PRACTICABLE, AND WITH
THE VA/COR'S APPROVAL, THE CONTRACTOR MAY ELECT TO
REMOVE SUCH ITEMS TO A SUITABLE STORAGE LOCATION DURING
THE DEMOLITION PHASE AND THEN PROPERLY CLEAN AND
REINSTALL THE ITEMS WHEN APPLICABLE. IN NO CASE SHALL ANY
LIFE SAFETY DEVICES, SYSTEMS OR MEASURES BE COMPROMISED
BY THE TEMPORARY REMOVAL OF ANY NECESSARY ELEMENTS OF
WORK, FOR THE CONVENIENCE OF THE CONTRACTOR, THAT WERE
NOT PROPERLY REPLACED IN KIND WITH A SIMILAR PROPERLY
OPERATING TEMPORARY DEVICE.
C. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PATCH,
REPAIR, REFINISHING AND/OR REPLACEMENT OF ALL
CONSTRUCTION, MATERIALS, ASSEMBLIES, EQUIPMENT, SIGNAGE
AND FINISHES DAMAGED BY THE PROJECT DEMOLITION,
TEMPORARY CONSTRUCTION, NEW CONSTRUCTION OR THE
MOVEMENT OF PERSONNEL, TOOLS, EQUIPMENT, MATERIALS, ETC.
BOTH INSIDE AND OUTSIDE OF THE DESIGNATED AREAS OF WORK.
D. PROVIDE ALL PHYSICAL AND ENVIRONMENTAL PROTECTIVE
MEASURES AS REQUIRED BY THE PROJECT DOCUMENTS, VA
FEDERAL AND LOCAL REQUIREMENTS, APPLICABLE OSHA
REGULATIONS, THE STATION AND ALL LOCAL INFECTION CONTROL
AUTHORITIES, NFPA REQUIREMENTS, THE VA/COR AND ALL OTHER
REGULATORY AGENCIES AND VA AUTHORITIES HAVING
JURISDICTION OVER THIS PROJECT.
E. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK WITH
WORK OF HAZARDOUS MATERIALS ABATEMENT. REFERENCE
HAZARDOUS MATERIALS PLANS AND ABATEMENT SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
F. CONTRACTOR SHALL FILL LEVEL WITH ADJACENT ANY AND ALL
DEPRESSIONS, INDENTATIONS, OR HOLES EXPOSED IN EXISTING
CONCRETE FLOOR SLAB AS A RESULT OF DEMOLITION WORK.
G. CONTRACTOR SHALL VERIFY LOCATION AND EXTENT OF ALL
EXISTING HOLLOW CLAY TILE PARTITIONS WITHIN SCOPE OF WORK
PRIOR TO BEGINNING DEMOLITION.
H. SALVAGE EXISTING LIFE SAFETY EQUIPMENT AND SIGNAGE FOR
REUSE. RETURN EXCESS EQUIPMENT TO VA.
I. REMOVE AND PROTECT ALL EXISTING RADIATORS AND GRILLE
COVERS AT BUILDING PERIMETER. ABATEMENT CONTRACTOR TO
REMOVE ALL EXISTING METAL FLANGES AT EDGES OF RADIATOR
OPENINGS AND ALL 'TRANSITE' PANELS BEHIND EXISTING
RADIATORS. SALVAGE ALL METAL RADIATOR FLANGES AND
DISPOSE OF TRANSITE PANELS. MARK RADIATORS AND GRILLES
SUCH THAT EACH CAN BE REPLACED IN ITS ORIGINAL LOCATION.
SEE MECHANICAL AND ABATEMENT DRAWINGS FOR RADIATOR
LOCATIONS AND ADDITIONAL INFORMATION.
GENERAL NOTES - DEMOLITION PLAN
LEGEND - DEMOLITION PLAN
EXISTING ELEMENT TO BE REMOVED
EXISTING ELEMENT TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVED
EXISTING DOOR TO REMAIN
1/8" = 1'-0"
FIRST FLOOR PLAN, ARCHITECTURAL DEMOLITION
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Nagel Architects + Engineers project number:
C :\U se rs
\to m o\ D oc um en ts
\2
_T om ah
E H
R M
_T om
.o st er ga ar d@ na ge l.u s.
rv t
7/
/2
1:
:2
P
M
AD101
FIRST FLOOR PLAN,
ARCHITECTURAL DEMOLITION
EHRM TRAINING AND ADMIN
SUPPORT SPACE
500 E. VETERANS STREET, TOMAH, WI 54660
676-21-703
21 JULY 2021 KS TMO
BID DOCUMENTS
REVISION 01
FULLY SPRINKLERED
21007
0' 4' 8' 16'
NORTH
Revisions: Date:
SCHEMATIC DESIGN 35% 21 MAY 2021
DESIGN DEVELOPMENT 65% 4 JUNE 2021
CONSTRUCTION DOCUMENTS 95% 21 JUNE 2021
BID DOCUMENTS 5 JULY 2021
KEYNOTES - DEMOLITION PLAN
DN
UPUP
2738A
2737 2739 2771 2773 2785 2784
2742 2744 2768 2770 2788
2774A7C26
7C25
2786 2784A
7C29
7C27
7C28 2782A2783
2709A
2709 2782
7C23
STORAGE
RM
W.C.
CORRIDOR
7C22
CORRIDOR
7C21
IT/DATA
ROOM
SOILED
HOLD.
STOR
COPIER
OFFICE
RM
RM
2762A
STAIR
S5
TLT
2747A
RM
EXPOSED TO
STRUCTURE ABOVE
A. BEFORE BEGINNING ANY DEMOLITION WORK EACH CONTRACTOR
AND DISCIPLINE SHALL PERFORM A FULL EXAMINATION OF ALL
AREAS OF WORK AND FULLY VERIFY ALL EXISTING CONDITIONS
ALONG WITH ALL OF THE AREAS OF WORK FOR ANY UNFORESEEN
CONDITIONS OR DISCREPANCIES FROM THE DOCUMENTATION
THAT WOULD AFFECT THEIR WORK AND/OR THE WORK OF
OTHERS. ANY UNFORESEEN CONDITIONS OR DISCREPANCIES
DISCOVERED ARE TO BE IMMEDIATELY IDENTIFIED AND
COORDINATED WITH THE GENERAL/PRIME CONTRACTOR WHO
SHALL IN TURN DOCUMENT AND PROMPTLY REPORT ANY SUCH
CONDITIONS DIRECTLY TO THE VA/COR FOR DIRECTION ON HOW
TO PROCEED BEFORE ALLOWING ANY WORK TO BEGIN.
B. ALL EXISTING CONSTRUCTION OR ITEMS INDICATED TO REMAIN IN
PLACE AND OPERATION SHALL BE PROTECTED FROM DAMAGE
BOTH DURING THE DEMOLITION OPERATIONS AS WELL AS THE
NEW CONSTRUCTION EFFORTS. WHERE PRACTICABLE, AND WITH
THE VA/COR'S APPROVAL, THE CONTRACTOR MAY ELECT TO
REMOVE SUCH ITEMS TO A SUITABLE STORAGE LOCATION DURING
THE DEMOLITION PHASE AND THEN PROPERLY CLEAN AND
REINSTALL THE ITEMS WHEN APPLICABLE. IN NO CASE SHALL ANY
LIFE SAFETY DEVICES, SYSTEMS OR MEASURES BE COMPROMISED
BY THE TEMPORARY REMOVAL OF ANY NECESSARY ELEMENTS OF
WORK, FOR THE CONVENIENCE OF THE CONTRACTOR, THAT WERE
NOT PROPERLY REPLACED IN KIND WITH A SIMILAR PROPERLY
OPERATING TEMPORARY DEVICE.
C. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PATCH,
REPAIR, REFINISHING AND/OR REPLACEMENT OF ALL
CONSTRUCTION, MATERIALS, ASSEMBLIES, EQUIPMENT, SIGNAGE
AND FINISHES DAMAGED BY THE PROJECT DEMOLITION,
TEMPORARY CONSTRUCTION, NEW CONSTRUCTION OR THE
MOVEMENT OF PERSONNEL, TOOLS, EQUIPMENT, MATERIALS, ETC.
BOTH INSIDE AND OUTSIDE OF THE DESIGNATED AREAS OF WORK.
D. PROVIDE ALL PHYSICAL AND ENVIRONMENTAL PROTECTIVE
MEASURES AS REQUIRED BY THE PROJECT DOCUMENTS, VA
FEDERAL AND LOCAL REQUIREMENTS, APPLICABLE OSHA
REGULATIONS, THE STATION AND ALL LOCAL INFECTION CONTROL
AUTHORITIES, NFPA REQUIREMENTS, THE VA/COR AND ALL OTHER
REGULATORY AGENCIES AND VA AUTHORITIES HAVING
JURISDICTION OVER THIS PROJECT.
E. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK WITH
WORK OF HAZARDOUS MATERIALS ABATEMENT. REFERENCE
HAZARDOUS MATERIALS PLANS AND ABATEMENT SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
F. CONTRACTOR SHALL FILL LEVEL WITH ADJACENT ANY AND ALL
DEPRESSIONS, INDENTATIONS, OR HOLES EXPOSED IN EXISTING
CONCRETE FLOOR SLAB AS A RESULT OF DEMOLITION WORK.
G. CONTRACTOR SHALL VERIFY LOCATION AND EXTENT OF ALL
EXISTING HOLLOW CLAY TILE PARTITIONS WITHIN SCOPE OF WORK
PRIOR TO BEGINNING DEMOLITION.
H. SALVAGE EXISTING LIFE SAFETY EQUIPMENT AND SIGNAGE FOR
REUSE. RETURN EXCESS EQUIPMENT TO VA.
I. REMOVE AND PROTECT ALL EXISTING RADIATORS AND GRILLE
COVERS AT BUILDING PERIMETER. ABATEMENT CONTRACTOR TO
REMOVE ALL EXISTING METAL FLANGES AT EDGES OF RADIATOR
OPENINGS AND ALL 'TRANSITE' PANELS BEHIND EXISTING
RADIATORS. SALVAGE ALL METAL RADIATOR FLANGES AND
DISPOSE OF TRANSITE PANELS. MARK RADIATORS AND GRILLES
SUCH THAT EACH CAN BE REPLACED IN ITS ORIGINAL LOCATION.
SEE MECHANICAL AND ABATEMENT DRAWINGS FOR RADIATOR
LOCATIONS AND ADDITIONAL INFORMATION.
GENERAL NOTES - DEMOLITION PLAN
LEGEND - DEMOLITION PLAN
EXISTING ELEMENT TO BE REMOVED
EXISTING ELEMENT TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVED
EXISTING DOOR TO REMAIN
1/8" = 1'-0"
SECOND FLOOR PLAN, ARCHITECTURAL DEMOLITION 0' 4' 8' 16'
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Nagel Architects + Engineers project number:
C :\U se rs
\to m o\ D oc um en ts
\2
_T om ah
E H
R M
_T om
.o st er ga ar d@ na ge l.u s.
rv t
7/
/2
1:
:2
P
M
AD102
SECOND FLOOR PLAN,
ARCHITECTURAL DEMOLITION
EHRM TRAINING AND ADMIN
SUPPORT SPACE
500 E. VETERANS STREET, TOMAH, WI 54660
676-21-703
21 JULY 2021 KS TMO
BID DOCUMENTS
REVISION 01
FULLY SPRINKLERED
21007
NORTH
Revisions: Date:
SCHEMATIC DESIGN 35% 21 MAY 2021
DESIGN DEVELOPMENT 65% 4 JUNE 2021
CONSTRUCTION DOCUMENTS 95% 21 JUNE 2021
BID DOCUMENTS 5 JULY 2021
BID DOCUMENTS REVISION 01 21 JULY 2021
KEYNOTES - DEMOLITION PLAN
1 EXISTING GYPSUM BD CEILING THIS ROOM, TO BE DEMOLISHED AS
REQ'D TO PERFORM ABOVE-CEILING WORK FOR ROOMS ON THIRD
FLOOR ABOVE. SALVAGE ALL EXISTING CEILING MOUNTED ITEMS FOR
REINSTALLATION.
2 EXISTING ACT CEILING SYSTEM THIS ROOM, TO BE DEMOLISHED AS
REQ'D TO PERFORM ABOVE-CEILING WORK FOR ROOMS ON THIRD
FLOOR ABOVE. SALVAGE ALL EXISTING CEILING MOUNTED ITEMS FOR
REINSTALLATION.
3 DEMOLISH EXISTING SOFFIT AS REQUIRED TO PERFORM
ABOVE-CEILING WORK.
1111 1
33 3 3
4 4 4
2 22
17 7
1 11
11 11 111 1
58 88
10 10 10
12 12
10 10
10 12
10 10 12
101012
121012
13 10
13 13
1515 15 1515
15 15
15 15
1515 15 15
15 15
15 15
15 15
151515
161616 16
161616
1616 1616
161616
16161616
181818
181818
16 161616
181818
181818
181818
181818
18 18
16161616161616
1616 16
1616161616
16 16
16 16
1818 1818
1818 18181818
161616
1717171717
1818181818
1818 1818181818
181818
LEGEND - DEMOLITION PLAN
EXISTING ELEMENT TO BE REMOVED
EXISTING ELEMENT TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVED
EXISTING DOOR TO REMAIN
A. BEFORE BEGINNING ANY DEMOLITION WORK EACH CONTRACTOR
AND DISCIPLINE SHALL PERFORM A FULL EXAMINATION OF ALL
AREAS OF WORK AND FULLY VERIFY ALL EXISTING CONDITIONS
ALONG WITH ALL OF THE AREAS OF WORK FOR ANY UNFORESEEN
CONDITIONS OR DISCREPANCIES FROM THE DOCUMENTATION
THAT WOULD AFFECT THEIR WORK AND/OR THE WORK OF
OTHERS. ANY UNFORESEEN CONDITIONS OR DISCREPANCIES
DISCOVERED ARE TO BE IMMEDIATELY IDENTIFIED AND
COORDINATED WITH THE GENERAL/PRIME CONTRACTOR WHO
SHALL IN TURN DOCUMENT AND PROMPTLY REPORT ANY SUCH
CONDITIONS DIRECTLY TO THE VA/COR FOR DIRECTION ON HOW
TO PROCEED BEFORE ALLOWING ANY WORK TO BEGIN.
B. ALL EXISTING CONSTRUCTION OR ITEMS INDICATED TO REMAIN IN
PLACE AND OPERATION SHALL BE PROTECTED FROM DAMAGE
BOTH DURING THE DEMOLITION OPERATIONS AS WELL AS THE
NEW CONSTRUCTION EFFORTS. WHERE PRACTICABLE, AND WITH
THE VA/COR'S APPROVAL, THE CONTRACTOR MAY ELECT TO
REMOVE SUCH ITEMS TO A SUITABLE STORAGE LOCATION DURING
THE DEMOLITION PHASE AND THEN PROPERLY CLEAN AND
REINSTALL THE ITEMS WHEN APPLICABLE. IN NO CASE SHALL ANY
LIFE SAFETY DEVICES, SYSTEMS OR MEASURES BE COMPROMISED
BY THE TEMPORARY REMOVAL OF ANY NECESSARY ELEMENTS OF
WORK, FOR THE CONVENIENCE OF THE CONTRACTOR, THAT WERE
NOT PROPERLY REPLACED IN KIND WITH A SIMILAR PROPERLY
OPERATING TEMPORARY DEVICE.
C. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PATCH,
REPAIR, REFINISHING AND/OR REPLACEMENT OF ALL
CONSTRUCTION, MATERIALS, ASSEMBLIES, EQUIPMENT, SIGNAGE
AND FINISHES DAMAGED BY THE PROJECT DEMOLITION,
TEMPORARY CONSTRUCTION, NEW CONSTRUCTION OR THE
MOVEMENT OF PERSONNEL, TOOLS, EQUIPMENT, MATERIALS, ETC.
BOTH INSIDE AND OUTSIDE OF THE DESIGNATED AREAS OF WORK.
D. PROVIDE ALL PHYSICAL AND ENVIRONMENTAL PROTECTIVE
MEASURES AS REQUIRED BY THE PROJECT DOCUMENTS, VA
FEDERAL AND LOCAL REQUIREMENTS, APPLICABLE OSHA
REGULATIONS, THE STATION AND ALL LOCAL INFECTION CONTROL
AUTHORITIES, NFPA REQUIREMENTS, THE VA/COR AND ALL OTHER
REGULATORY AGENCIES AND VA AUTHORITIES HAVING
JURISDICTION OVER THIS PROJECT.
E. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK WITH
WORK OF HAZARDOUS MATERIALS ABATEMENT. REFERENCE
HAZARDOUS MATERIALS PLANS AND ABATEMENT SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
F. CONTRACTOR SHALL FILL LEVEL WITH ADJACENT ANY AND ALL
DEPRESSIONS, INDENTATIONS, OR HOLES EXPOSED IN EXISTING
CONCRETE FLOOR SLAB AS A RESULT OF DEMOLITION WORK.
G. CONTRACTOR SHALL VERIFY LOCATION AND EXTENT OF ALL
EXISTIN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .