This file attachment provides drawings related to a federal construction contract opportunity issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation seeks bids for Project 202-318-REHAB Building Construction at the TOGUS VA Medical Center in Augusta, Maine. The opportunity involves rehabilitation and repair of an existing building as depicted across 402 drawings totaling 20MB. Bids are due by the date listed in solicitation number 36C77624B0006 for awarding a fixed-price construction contract to renovate the medical facility. Veteran-owned small businesses and service-disabled veteran-owned small businesses will receive preference in the full and open competition.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartfort, CT 06103
(315) 484-5958 Mat Perkins
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP
MES GROUP
550 North Reo St. Suite 203 Tampa, FL 33609
(813) 289-4700 Nicholas Stephensen, P.E.
STRUCTURAL
C&S Companies 2575 E Camelback Rd, Suite 740 Phoenix, AZ 85016
(602) 997-7536 Bryan K. Salt, P.E. S.E.
B
IM
/4
-3
C o n s tr u c t S u b s ta n c e
U s e
R e s id e n ti a l R e h a b
B u ild in g /4
-3
.A u g u s ta
.A rc h .r v t
/2
/2
:4
:5
P
M
GI000
COVER SHEET 402-318
BLDG 258
07/26/2022 M.PERKINS K.MACAULAY
100% CONSTRUCTION
DOCUMENTS
ISSUED FOR BIDDING
Construct Substance Use Residential Rehab
1 VA Center, Augusta, Maine
100% CONSTRUCTION DOCUMENTS
ISSUED FOR BIDDING
07/26/2022
402-318 Construct Substance Use Residential Rehab -
BLDG 258
Togus VA Medical Center
THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
SIGNATURE 06/24/2022 DATE
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
CO: Connie Taylor Contracting Officer Department of Veterans Affairs Program Contracting Activity Central (PCAC) 6150 Oak Tree Blvd, STE 300 Independence, OH 44131 phone: (440) 334-7809
COR: Elizabeth Wytas Contracting Officer's Representative VA Maine Healthcare System, Togus 1 VA Center Augusta, Maine 04330 Cell: 207.250.3134 Desk: 207.623.8411 x6447
- DRAWING INDEX -
BB SHEET NAME
INCLUDED IN
60% DD
INCLUDED IN
90% CD
INCLUDED IN
100%
A-900 3D VIEWS Yes Yes Yes
A-901 3D EXTERIOR CONCEPT IMAGES Yes Yes Yes
ARCHITECTURAL SIGNAGE
AW001 INTERIOR SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL
NOTES AND SCHEDULE
Yes Yes Yes
AW002 EXTERIOR SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL
NOTES AND SCHEDULE
Yes Yes Yes
AW101 ARCHITECTURAL INTERIOR SIGNAGE PLANS Yes Yes Yes
INTERIORS
IN001 INTERIOR NOTES AND FINISH BOARDS Yes Yes Yes
IN101 INTERIOR FINISH PLAN - FIRST FLOOR OVERALL Yes Yes Yes
IN102 INTERIOR FINISH PLAN - SECOND FLOOR OVERALL Yes Yes Yes
IN501 DETAILS - INTERIOR FINISH Yes Yes Yes
IN601 INTERIOR FINISH LEGEND AND ROOM FINISH SCHEDULE Yes Yes Yes
IN901 INTERIOR 3D CONCEPT IMAGES Yes Yes Yes
FURNITURE
IF101 INTERIOR FURNITURE PLAN - FIRST FLOOR - OVERALL Yes Yes Yes
IF102 INTERIOR FURNITURE PLAN - SECOND FLOOR - OVERALL Yes Yes Yes
EQUIPMENT
Q-101 EQUIPMENT PLAN - FIRST FLOOR - OVERALL Yes Yes Yes
Q-102 EQUIPMENT PLAN - SECOND FLOOR - OVERALL Yes Yes Yes
Q-601 EQUIPMENT SCHEDULE Yes Yes Yes
FIRE PROTECTION
FX001 FIRE PROTECTION NOTES & DETAILS Yes Yes Yes
FX101 FIRE PROTECTION PLAN - FIRST FLOOR Yes Yes Yes
FX102 FIRE PROTECTION PLAN - SECOND FLOOR Yes Yes Yes
FX103 FIRE PROTECTION PLAN - PENTHOUSE Yes Yes Yes
FX201 FIRE PROTECTION HAZARD CLASSIFICATION PLANS Yes Yes Yes
PLUMBING
PL001 PLUMBING LEGEND, NOTES, & ABBREVIATIONS Yes Yes Yes
PL101 PLUMBING PLANS - FIRST FLOOR Yes Yes Yes
PL102 PLUMBING PLANS - SECOND FLOOR Yes Yes Yes
PL102.1 PLUMBING PLAN - SECOND FLOOR STORM DRAINAGE No Yes Yes
PL103 PLUMBING PLAN - PENTHOUSE Yes Yes Yes
PL104 PLUMBING PLAN - PENTHOUSE ROOF No Yes Yes
PL501 PLUMBING DETAILS Yes Yes Yes
PW301 WASTE & VENT RISER DIAGRAMS Yes Yes Yes
PW302 DOMESTIC RISER DIAGRAM Yes Yes Yes
PW303 STORM RISER DIAGRAM Yes Yes Yes
MECHANICAL
MH001 MECHANICAL NOTES, LEGEND, & ABBREVIATIONS Yes Yes Yes
MH002 MECHANICAL SCHEDULES Yes Yes Yes
MH003 MECHANICAL SCHEDULES No Yes Yes
MS101 MECHANICAL SITE PLAN Yes Yes Yes
MH101 MECHANICAL PLAN - FIRST FLOOR Yes Yes Yes
MH102 MECHANICAL PLAN - SECOND FLOOR Yes Yes Yes
MH103 MECHANICAL PLAN - PENTHOUSE Yes Yes Yes
MH201 MECHANICAL AIRFLOW PLAN - FIRST FLOOR Yes Yes Yes
MH202 MECHANICAL AIRFLOW PLAN - SECOND FLOOR Yes Yes Yes
MH401 MECHANICAL SECTIONS Yes Yes Yes
MP101 MECHANICAL PIPING PLANS Yes Yes Yes
MH501 HVAC DETAILS Yes Yes Yes
MH502 HVAC DETAILS Yes Yes Yes
MH503 HVAC DETAILS Yes Yes Yes
MH504 HVAC DETAILS No No Yes
MH601 HVAC CONTROLS Yes Yes Yes
MH602 HVAC CONTROLS Yes Yes Yes
MH603 HVAC CONTROLS No Yes Yes
ELECTRICAL
E-001 ELECTRICAL NOTES & LEGENDS Yes Yes Yes
ES101 ELECTRICAL SITE PLAN Yes Yes Yes
ES102 ELECTRICAL SITE PHOTOMETRIC PLAN Yes
EL101A ELECTRICAL LIGHTING PLAN - FIRST FLOOR PART A Yes Yes Yes
EL101B ELECTRICAL LIGHTING PLAN - FIRST FLOOR PART B Yes Yes Yes
EL102 ELECTRICAL LIGHTING PLAN - SECOND FLOOR Yes Yes Yes
EL103 ELECTRICAL LIGHTING PLAN - ROOF Yes Yes Yes
EM-101 ELECTRICAL MECHANICAL POWER PLAN - FIRST FLOOR Yes Yes Yes
EM-102 ELECTRICAL MECHANICAL POWER PLAN - SECOND FLOOR Yes Yes Yes
EP101A ELECTRICAL POWER PLAN - FIRST FLOOR PART A Yes Yes Yes
EP101B ELECTRICAL POWER PLAN - FIRST FLOOR PART B Yes Yes Yes
EP102 ELECTRICAL POWER PLAN - SECOND FLOOR Yes Yes Yes
EP103 ELECTRICAL POWER PLAN - ROOF Yes Yes Yes
ET101 ELECTRICAL TELECOMMUNICATIONS PLAN - FIRST AND
SECOND FLOOR
Yes Yes Yes
EY101 ELECTRICAL AUXILIARY SYSTEMS PLAN - FIRST AND SECOND
FLOOR
Yes Yes Yes
EF101 ELECTRICAL FIRE ALARM PLAN - FIRST AND SECOND FLOOR Yes Yes Yes
EJ101 ELECTRICAL LIGHTNING PROTECTION PLAN Yes Yes Yes
E-500 ELECTRICAL DETAILS Yes Yes Yes
E-501 ELECTRICAL DETAILS Yes Yes Yes
E-601 ELECTRICAL SCHEDULES Yes Yes Yes
E-602 ELECTRICAL SCHEDULES Yes Yes Yes
E-701 ELECTRICAL ONE LINE DIAGRAM Yes Yes Yes
- DRAWING INDEX -
BB SHEET NAME
INCLUDED IN
60% DD
INCLUDED IN
90% CD
INCLUDED IN
100%
GENERAL
GI000 COVER SHEET Yes Yes Yes
GI050 GENERAL NOTES Yes Yes Yes
GI100 GENERAL SITE PLAN Yes Yes Yes
GI101 GENERAL LIFE SAFETY PLAN - FIRST AND SECOND FLOOR Yes Yes Yes
CIVIL
VF101 CIVIL SITE SURVEY PLAN Yes Yes Yes
VF102 CIVIL - SITE SURVEY REFERENCE VIEWS Yes Yes Yes
CD101 CIVIL - SITE DEMOLITION PLAN Yes Yes Yes
CS101 CIVIL - GRADING PLAN Yes Yes Yes
CG101 CIVIL SITE SURVEY PLAN Yes Yes Yes
CG102 CIVIL - EROSION CONTROL PLAN Yes Yes Yes
CG501 CIVIL - GRADING DETAIL SHEET Yes Yes Yes
CG502 CIVIL - GRADING DETAIL SHEET Yes Yes Yes
CU101 CIVIL UTILITY PLAN Yes Yes Yes
CU102 CIVIL – FOUNDATION DRAIN PLAN Yes
CU501 CIVIL - UTILITY DETAIL SHEET 1 Yes Yes Yes
CU502 CIVIL - UTILITY DETAIL SHEET 2 Yes Yes
LANDSCAPE
LS101 LANDSCAPE - PLANTING PLAN Yes Yes Yes
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES Yes Yes Yes
S-002 GENERAL STRUCTURAL NOTES CONTINUED Yes Yes Yes
S-003 SPECIAL INSPECTIONS Yes Yes Yes
S-010 LIVE LOAD DIAGRAMS Yes Yes Yes
S-011 LIVE LOAD DIAGRAMS Yes Yes Yes
S-012 SNOW LOAD DIAGRAMS Yes Yes Yes
S-101 STRUCTURAL FOUNDATION PLAN - OVERALL Yes Yes Yes
S-101A STRUCTURAL FOUNDATION PLAN - PART A Yes Yes Yes
S-101B STRUCTURAL FOUNDATION PLAN - PART B Yes Yes Yes
S-102 STRUCTURAL FRAMING PLAN - SECOND FLOOR - OVERALL Yes Yes Yes
S-102A STRUCTURAL FRAMING PLAN - SECOND FLOOR - PART A Yes Yes Yes
S-102B STRUCTURAL FRAMING PLAN - SECOND FLOOR - PART B Yes Yes Yes
S-103 STRUCTURAL FRAMING PLAN - ROOF - OVERALL Yes Yes Yes
S-103A STRUCTURAL FRAMING PLAN - ROOF - PART A Yes Yes Yes
S-103B STRUCTURAL FRAMING PLAN - ROOF - PART B Yes Yes Yes
S-104A STRUCTURAL FRAMING PLAN - HIGH ROOF Yes Yes Yes
S-301 MOMENT FRAME ELEVATIONS Yes Yes Yes
S-302 MOMENT FRAME ELEVATIONS Yes Yes Yes
S-310 FRAMING DETAILS No Yes Yes
S-401 ENLARGED PARTIAL FRAMING PLANS Yes Yes Yes
S-501 TYPICAL DETAILS Yes Yes Yes
S-502 TYPICAL DETAILS Yes Yes Yes
S-503 TYPICAL DETAILS Yes Yes Yes
S-504 TYPICAL DETAILS Yes Yes Yes
S-505 TYPICAL DETAILS Yes Yes Yes
S-510 FOUNDATION DETAILS Yes Yes Yes
S-511 FOUNDATION DETAILS Yes Yes Yes
S-520 FRAMING DETAILS Yes Yes Yes
S-521 FRAMING DETAILS Yes Yes Yes
S-522 FRAMING DETAILS Yes Yes Yes
S-523 FRAMING DETAILS No No Yes
S-530 ELEVATOR - SECTIONS AND DETAILS Yes Yes Yes
S-601 SCHEDULES Yes Yes Yes
S-602 GRAPHICAL COLUMN SCHEDULES Yes Yes Yes
S-603 GRAPHICAL COLUMN SCHEDULES Yes Yes Yes
S-540 COLD-FORMED STEEL FRAMING DETAILS No No Yes
ARCHITECTURAL
A-001 SYMBOLS, & GENERAL NOTES Yes Yes Yes
A-002 PROGRAM FLOOR PLANS Yes Yes Yes
A-101 ARCHITECTURAL FLOOR PLAN - FIRST FLOOR Yes Yes Yes
A-101A ARCHITECTURAL ENLARGED PLAN - FIRST FLOOR PART A Yes Yes Yes
A-101B ARCHITECTURAL ENLARGED PLAN - FIRST FLOOR PART B Yes Yes Yes
A-102 ARCHITECTURAL FLOOR PLAN - SECOND FLOOR Yes Yes Yes
A-102A ARCHITECTURAL ENLARGED PLAN - SECOND FLOOR PART A Yes Yes Yes
A-102B ARCHITECTURAL ENLARGED PLAN - SECOND FLOOR PART B Yes Yes Yes
A-103 ARCHITECTURAL FLOOR PLAN - PENTHOUSE Yes Yes Yes
AC101 ARCHITECTURAL REFLECTED CEILING PLAN - FIRST FLOOR
OVERALL
Yes Yes Yes
AC102 ARCHITECTURAL REFLECTED CEILING PLAN - SECOND FLOOR
OVERALL
Yes Yes Yes
A-201 ARCHITECTURAL EXTERIOR ELEVATIONS Yes Yes Yes
A-301 ARCHITECTURAL BUILDING SECTIONS Yes Yes Yes
A-351 WALL SECTIONS Yes Yes Yes
A-352 WALL SECTIONS Yes Yes Yes
A-401 ARCHITECTURAL ENLARGED PLANS AND INTERIOR
ELEVATIONS
Yes Yes Yes
A-402 ARCHITECTURAL ENLARGED PLANS AND INTERIOR
ELEVATIONS
Yes Yes Yes
A-403 ARCHITECTURAL ENLARGED PLANS AND INTERIOR
ELEVATIONS
Yes Yes Yes
A-450 ARCHITECTURAL STAIR DRAWINGS Yes Yes Yes
A-451 ARCHITECTURAL STAIR DRAWINGS Yes Yes Yes
A-501 DETAILS - EXTERIOR Yes Yes Yes
A-510 SECTION DETAILS Yes Yes Yes
A-552 ARCHITECTURAL CASEWORK DETAILS Yes Yes Yes
A-553 ARCHITECTURAL CASEWORK DETAILS Yes Yes
A-571 ARCHITECTURAL CEILING DETAILS Yes Yes
A-601 DOOR AND WINDOW SCHEDULES Yes Yes Yes
A-701 DOOR AND WINDOW DETAILS Yes Yes Yes
A-730 TYPICAL MOUNTING HEIGHTS Yes Yes Yes
ARCHITECTURE:
Mat Perkins Email: Mat.Perkins@triplecaeg.com Disclipine / Role: Architect, PM
Heather Gardiner Email: Heather.Gardiner@triplecaeg.com Discipline / Role: Interiors, PM
Kate Macaulay Email: Kate.Macaulay@triplecaeg.com Discipline / Role: Interiors
Caleb Lowery Email: Caleb.Lowery@triplecaeg.com Discipline / Role: Architect
Keefer Bickel Email: Keefer.Bickel@triplecaeg.com Discipline / Role: Architect
Kelly Struble Email: Kelly.Struble@triplecaeg.com Discipline / Role: Civil Designer
MEPF:
Nick Stephenson - PE Email: nick.stephenson@mesgroupinc.com Discipline: Mechanical Phone: 813.331.5093
Dion Motl Email dion.motl@mesgroupinc.com Discipline Mechanical/Plumbing/Fire Phone 813.560.5111
David Keith Email david.keith@MESGroupinc.com Discipline Electrical Phone 813.331.5089
Sary Chhoeung Email Sary.Chhoeung@MESGroupInc.com Discipline Electrical Phone 813.331.5099
Tim Hunter Email tim.hunter@mesgroupinc.com Discipline Mechanical Phone 813.560.5111
Tyler Haltek Email tyler.haltek@mesgroupinc.com Discipline Mechanical Phone 813.331.5095
Susan Yongue Email susan.yongue@mesgroupinc.com Discipline Electrical Phone
STRUCTURAL:
Bryan Salt Email: bsalt@cscos.com Discipline/Role: Designer of Record
(602) 997 7536
Juan Lozoya Email: jlozoya@cscos.com Discipline/Role: Structural Engineer
(602) 422-8634
Charles Vonnahme Email: CVonnahme@cscos.com Discipline/role: BIM Telephone: (602) 422-8630 Ext: 3902
Margarita Oreshkova Email: MOreshkova@cscos.com Discipline/Role: BIM Telephone: (602) 422-8630 Ext: 6246
N
TRUE
NORTH
N
PLAN
NORTH
CONTRACTOR'S SCOPE OF WORK:
Contractor shall completely prepare project site for operations, including demolition and removal of existing site elements, and furnish labor and materials and perform work for the Togus VA Medical Center Substance Abuse Residential Rehabilitation Program as required by the drawings and specifications.
Period of performance is projected to be 540 calendar days.
The work will require construction of a two story addition connecting to the Maine Street Corridor at the ground level. Two enclosed stairs and one elevator will connect the upper and lower levels to provide circulation addition as required for exiting and convenience. Mechanical and electrical equipment will be housed in a rooftop penthouse accessed via one of the enclosed stair towers. The addition building is comprised of 12 resident bedrooms with attached bathrooms, resident amenity spaces, administrative offices, support spaces and a waiting and reception area.
Work includes general construction, alterations, and certain other items. Contractor shall provide services including but not limited to: furnish all supervision, labor, equipment, materials, and transportation necessary to accomplish work for the demolition and replacement as required by specifications and drawings.
Contractor is responsible for Asbestos Containing Materials (ACM) and Lead Based Paint (LBP) removal and mitigation, including Floor tile, Mastic and Lead Paint removal, where it occurs inside the project area of work. Please see Specifications in Division 2 for estimated quantities and locations. There will be no cost to the Government for any removal, testing, oversight or clearance of ACM.
Civil and Sitework: Work includes all labor, material, equipment, and supervision to perform new civil and site work by the construction drawings and specifications. Civil and Sitework includes all site preparation as well as providing new and relocating existing utilities and equipment, providing new site construction, landscaping, and physical security elements.
Electrical, Telecommunications, and Security Work: Work includes all labor, material, equipment and supervision to perform new electrical, communications and security systems to the spaces renovated and the new additions detailed by the construction drawings and specifications. Provide access control for all the required doors, coordinate with the door hardware schedule for additional requirements. Provide new cameras, associated devices, and equipment.
Mechanical, Plumbing and Fire Protection Work: Work includes all labor, material, equipment, and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project including provide materials and construction equipment as detailed by the construction drawings and specifications.
All new mechanical systems shall be addressable and controllable via the existing Engineering Control Center (ECC) and HVAC Shop. The ECC system shall monitor space conditions and unit status and shall alarm the Facility Operations staff as detailed by the mechanical control drawings and specifications.
New mechanical systems shall be designed to serve the new addition. Contractor is required to Test and Balance (TAB) new HVAC systems per 23 05 93. This work requires preconstruction TAB readings to establish baseline performance for all existing HVAC systems to remain serving the adjacent corridor.
Existing systems shall be rebalanced to preconstruction readings.
Contractor shall provide fire protection piping and sprinkler heads for the new building automatic sprinkler system as designed. New Fire Protection systems shall be provided per the construction drawings and specifications.
Contractor shall provide new piping, fixtures, valves, fittings, and devices as required by the construction drawings and specifications.
All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) for per Specification 01 91 00.
Inspections: Comprehensive 3rd party inspections, testing and written reports for all Divisions are required and paid by the General Contractor. Contractor shall employ third party inspection consultants to perform all inspections required by this contract.
Commissioning: The VA has arranged with a third-party individual, company, or firm to act as the Commissioning Agent. The Commissioning Agent is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process. The Contractor shall employ or appoint staff to act as a Commissioning Manager (see 01 91 00) to carry out all commissioning tasks including managing submittal requirements and resolution of the issues log, and coordination with the third party Commissioning Agent.
The expected construction period duration for each building includes all pre-construction activity and post-construction testing, third-party inspections and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS DESIGN/BID/BUILD). Contractor to perform Commissioning of all new systems and existing systems impacted by the project according to requirements in sections: 01 91 00 – GENERAL COMMISSIONING
REQUIREMENTS; 21 08 00 – COMMISSIONING OF FIRE SUPPRESSION SYSTEMS, 22 08 00 –
COMMISSIONING OF PLUMBING SYSTEMS, 23 08 00 – COMMISSIONING OF HVAC SYSTEMS; 26
08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS; 27 08 00 – COMMISSIONING OF
COMMUNICATIONS SYSTEMS, 28 08 00 – COMMISSIONING OF ELECTRONIC SAFETY AND
SECURITY SYSTEMS and 33 08 00 – COMMISSIONING OF SITE UTILITY SYSTEMS. A detailed commissioning plan is required to ensure that all devices are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.
Accessibility: The design shall be constructed to ensure access to the handicapped and disabled. All facilities which are open to the public, to limited segments of the public, visited by the public in the conduct of normal business, or those which hire or have the capacity to hire civilian personnel, shall be designed and constructed to be accessible to the handicapped. Design and construction must comply with HYPERLINK "https://www.access-board.gov/guidelines-and-standards/buildings-and-sites/about-the-aba-standards" Architectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities and HYPERLINK "http://www.cfm.va.gov/til/etc/dsBarrFree.pdf" PG-18-13 VA Barrier Free Design Standard, whichever is most stringent.
Infection Control: The construction shall clearly define and meet “Infection Control Barrier” criteria. The construction shall be in accordance with the AIA Guidelines for Design and Construction of Hospital and Health Care Facilities and address; the impact of demolition, renovation including walls and ceiling, electrical, mechanical, equipment and equipment support installation, and new construction.
HIPAA: The design shall accommodate compliance with current HIPAA requirements.
Complete and Functional: The Additions and Renovation shall be phased and address coordination between all phases to provide a complete, watertight, and functional project for the intended use. Free and unobstructed egress shall be maintained during all phases.
RENDERING OF PROPOSED BUILDING ENTRY
PHOTO OF EXISTING COURT
VETERANS AFFAIRS
CAMPUS MAP
SCALE: NTS
LOCATION MAP
SCALE: NTS
1. Coordinate finishes at existing to new at Maine Street
2. Locate AED equipment.
OPEN ITEMS - DESIGN:
DEDUCTIVE ALTERNATES
D1
DEDUCTIVE ALTERNATE #1: REMOVE ALL SCOPE OF WORK ASSOCIATED
WITH ENCLOSING THE CONNECTING CORRIDOR A-131, INCLUDING THE
WALLS, WINDOW, CEILING, AND ROOF. THE RAISED CONCRETE SLAB AND
SUPPORTING WALLS SHALL REMAIN AND PROVIDE AN OUTSIDE
CONNECTION TO MAINE STREET. (~889 SF)
D2
DEDUCTIVE ALTERNATE #2: REMOVE ALL SCOPE OF WORK ASSOCIATED
WITH FINISHING OUT MEN'S LOUNGE ROOM A-115, WOMEN'S LOUNGE A-116,
AND FAMILY VISITATION A-117. PROVIDE STORAGE SPACE ONLY. (~813 SF)
NOTE: DEDUCTIVE ALTERNATES ARE CASCADING. EACH DEDUCT WILL BE TAKEN IN
SUCCESSION AND SHALL BE PRICED UNDER SEQUENTIAL, SEPARATE CLINs
(CONTRACT LINE ITEM NUMBER) SO DETERMINATIONS CAN BE MADE AND
PRIORITIES ESTABLISHED BASED ON BIDS RECEIVED.
Revisions: Date:
COMMISSIONING:
Phil Moody Email: Philip.Moody@MESGroupinc.com Discipline: Commissioning Agent (CxA)
(813) 331-5085
Taylor Rinaldi Email:Taylor.Rinaldi@MESGroupinc.com Disclipine: Commissioning Agent (CxA)
(813) 331-5097
07/26/2022
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartfort, CT 06103
(315) 484-5958 Mat Perkins
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP
MES GROUP
550 North Reo St. Suite 203 Tampa, FL 33609
(813) 289-4700 Nicholas Stephensen, P.E.
STRUCTURAL
C&S Companies 2575 E Camelback Rd, Suite 740 Phoenix, AZ 85016
(602) 997-7536 Bryan K. Salt, P.E. S.E.
B
IM
/4
-3
C o n s tr u c t S u b s ta n c e
U s e
R e s id e n ti a l R e h a b
B u ild in g /4
-3
.A u g u s ta
.A rc h .r v t
/2
/2
:2
:1
A
M
GI050
GENERAL NOTES 402-318
BLDG 258
07/26/2022 MRP CJL
100% CONSTRUCTION
DOCUMENTS
ISSUED FOR BIDDING
Construct Substance Use Residential Rehab
1 VA Center, Augusta, Maine
1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR
THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL
AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING
SPECIFICATION MANUAL FOR NEW WORK AND THE MPI
MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR
REPAINTING WORK.
2. PAINTING WORK: INCLUDES TAPING, SURFACE
PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD
PAINTING AND FINISHING AS REQUIRED BY STANDARD
PRACTICE, MANUFACTURER OR SPECIFICATION. REQUIRED
COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP
PRIMING, SURFACE TREATMENT AND FINISHING. THE WORK
ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF
OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS
MAY REQUIRE OTHER TYPES OF PAINTING, INCLUDING, BUT
NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND
FACTORY PRIMING.
3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED
OTHERWISE, CONTRACTOR IS TO FIELD PAINT INTERIOR
AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES,
WHETHER OR NOT PREVIOUSLY PAINTED, AND ALL NEW
ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED
TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL
AND EXPOSED PIPING AND FITTINGS (INCLUDING IRON AND
PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE
SHALL BE SEALED, UNLESS NOTED OTHERWISE OR NOT
RECOMMENDED BY MANUFACTURER. PAINTING SCOPE
ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS,
SPECIFICATIONS AND PAINTING GENERAL NOTES. THESE
SOURCES ARE COMPLEMENTARY, NOT MUTUALLY
EXCLUSIVE.
4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD
PAINTING OF INTERIOR AND EXTERIOR EXPOSED PIPES,
DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND
PRIMED METAL SURFACES OF EQUIPMENT IN EXPOSED
AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL
WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF
ELECTRICAL AND MECHANICAL WORK IN ELECTRICAL AND
MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED
OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF
PIPING FOR MECHANICAL AND PLUMBING WORK IS
COVERED IN THE MECHANICAL OR PLUMBING
SPECIFICATIONS.
5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT
AN EDGE, CORNER, CHANGE OF MATERIALS OR CHANGE
OF PAINT COLOR. COMPLETED PAINTING SHALL NOT
IMPEDE THE INTENDED OPERATION OF ANY ITEM, SUCH AS
WINDOWS, DRAWERS, HINGES, DOORS, ETC.
6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE
REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND
COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA
ON ONE SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF
TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE
ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING
EDGES OR CORNERS.
7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT
PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR
INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE
INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC
MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND
EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL
EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS,
LIGHTING FIXTURES, SWITCHGEAR, MOTORS,
DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR
SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO
PAINT AN ITEM OR SURFACE, FOLLOW PROCEDURES
LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION
(RFI).
8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE
INDICATED, DO NOT PAINT METAL SURFACES OF ANODIZED
ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE,
COPPER, BRASS, BRONZE AND SIMILAR FINISHED
MATERIALS.
9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED,
DO NOT PAINT SURFACES SUCH AS WALLS AND CEILINGS
IN CONCEALED AND GENERALLY INACCESSIBLE AREAS,
INCLUDING FURRED AREAS, UTILITY TUNNELS, PIPE
SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL
CONCRETE IN PIPE SPACE.
10. OPERATING PARTS AND SENSING DEVICES: UNLESS
OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF
OPERATING UNITS SUCH AS VALVES, DAMPER
OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT
SENSING OR EMITTING DEVICES THAT MIGHT NOT
FUNCTION PROPERLY IF PAINTED.
11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-
REQUIRED LABELS.
12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT
COMPLETION OF WORK. NO EPOXY PAINT.
13. ALL INTERIOR SURFACES, WALLS, FRAMES, ETC.,
REQUIRED TO HAVE NEW FINISHES APPLIED, SHALL HAVE
ALL EXISTING AND CONTRACTOR CAUSED HOLES, CRACKS,
AND OTHER IMPERFECTIONS FILLED WITH APPROVED
PATCHING MATERIAL. PATCH TO BE FINISHED FLUSH WITH
ADJACENT SURFACE, WITH TEXTURE TO MATCH TEXTURE
OF ADJACENT SURFACE. SEE SPECIFICATIONS FOR
PATCHING REQUIREMENTS.
14. PAINT EXPOSED TOP EDGE OF ALL TERRAZZO FLOOR BASE
TO MATCH WALL PAINT. CLEAN TERRAZZO FACE OF ANY
OLD PAINT.
15. PAINT EXISTING MECHANICAL HEATING UNIT COVER AND
ACCESSORIES, INCLUDING ALL SUPPORT BRACKETS.
PAINT THE HEATING WATER PIPING THAT IS EXPOSED TO
VIEW BELOW THE UNIT. PAINT ALL WALL SURFACES THAT
ARE VISIBLE BEHIND HEATING UNIT WHEN COVER IS IN
PLACE.
16. THE CONTRACTOR SHALL FIELD VERIFY EXISTING PAINT
MATERIALS AND FINISHES. APPLY THE APPROPRIATE
SEPARATION COAT (PRIMER/BONDING COAT) BETWEEN ALL
NON-COMPATIBLE COATINGS (I.E. WHERE NEW WATER-
BORNE ACRYLIC IS TO BE INSTALLED OVER EXISTING OIL
BASE PAINT).
GENERAL PAINTING NOTES:
1. THE PRIMARY OBJECTIVE OF APPLYING SEALANT IS TO
FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR
BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR
WET\DAMP LOCATIONS. PROPER PRIMING MUST BE USED
WITH SEALANTS.
2. THE PRIMARY OBJECTIVE OF APPLYING CAULKING IS TO
ENHANCE APPEARANCE AND FINISH AT INTERIOR
APPLICATIONS AND IN SOME SITUATIONS TO REDUCE
AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE
EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER
PENETRATIONS (FIRE CAULKING) AND TO DECREASE
SOUND TRANSMISSION THROUGH WALLS AND CEILINGS.
OTHER USES MAY BE NOTED IN THE SPECIFICATIONS
AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS
ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING
SHOULD BE USED, FOLLOW PROCEDURES LISTED IN
SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED)
SHALL BE USED AT HORIZONTAL AND VERTICAL CONCRETE
JOINTS AND AS NOTED.
4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION
JOINT MATERIAL, AS REQUIRED, SHALL BE USED AT
MASONRY AND CONCRETE CONTROL JOINTS.
5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF
SEALANT BETWEEN PERIMETER SOLE PLATES AND
FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR
THRESHOLDS IN SEALANT UNLESS NOTED OTHERWISE.
6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND BOTH SIDES OF DOOR FRAMES.
7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND INTERIOR WALL MOUNTED EQUIPMENT FRAMES
AND EXPOSED SUPPORTS.
8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS
BETWEEN DIFFERENT WALL MATERIALS (TILE TO BRICK,
CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL
TO P-LAM, ETC).
9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL
GAPS OR 1/16TH INCH OR MORE.
10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS
THROUGH, FLOORS AND WALLS.
11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND
CEILING PIPE PENETRATIONS. WHERE ESCUTCHEONS ARE
SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A
BED OF SEALANT.
12. USE SPECIFIED CAULK OR SEALANT AROUND
PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH
AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE
ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS,
LIGHTING, VENTS, ETC.
GENERAL SEALANT / CAULKING
NOTES:
PHASING NOTES:
AT ALL TIMES MAINTAIN VEHICLE ACCESS, ESPECIALLY FOR
AMBULANCE ACCESS TO AND FROM AMBULANCE ENTRANCES.
CONTRACTOR IS RESPONSIBLE FOR ELIMINATING
DISTURBANCES TO ADJACENT BUILDING ACCESS AND
FUNCTION - ANY REQUIRED DISTURBANCES SHALL BE
COORDINATED WITH THE COR WITH A MINIMUM OF 2 WEEKS
ADVANCE NOTICE.
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND
REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK
MUST BE INSPECTED AND APPROVED BY LOCAL
AUTHORITIES.
3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE
VERIFIED BY THE CONTRACTOR(S) PRIOR TO FABRICATION
AND CONSTRUCTION. IF INCONSISTENCIES,
CONTRADICTIONS OR OMISSIONS ARE DISCOVERED
FOLLOW PROCEDURES LISTED IN SECTION 01 26 13
REQUESTS FOR INFORMATION (RFI).
4. GENERAL CONTRACTOR SHALL COORDINATE ALL
MECHANICAL AND ELECTRICAL DUCT SIZES AND
LOCATIONS.
5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT
THE USE OF A KEY OR SPECIAL KNOWLEDGE.
6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE
INSTALLED LEVEL WITH EACH OTHER AND PLUMB.
7. THE WORK INDICATED IN THE NOTES DESCRIBES THE
GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED
TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE
FULL SCOPE OF WORK.
8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE
FIELD VERIFIED. IF DIMENSIONAL INFORMATION IS
REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN
SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
9. FIELD VERIFICATION: BEFORE BIDDING AND DURING
CONSTRUCTION, CONTRACTOR SHALL VERIFY THAT
ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE
CONTRACT DOCUMENTS. REPORT DISCREPANCIES TO
ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING
WORK RELATED TO ANY DISCREPANCIES. SEE
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES,
SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT
BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION
PRIOR TO BIDDING, THE CONTRACTOR WILL BE DEEMED TO
HAVE ELECTED THE MORE COSTLY TIME, METHOD,
SYSTEM, PRODUCT, SUBCONTRACT AND/OR MATERIAL.
11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS
AS "NIC" IS NOT IN THE CONTRACT. HOWEVER, THE
CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK
INDICATED AS NIC.
12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS
WITH COR, INCLUDING STAGING AREAS, MATERIAL
STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY
OPERATIONS, INTERRUPTION OF UTILITIES. SEE
SPECIFICATIONS.
13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE
THE PLACEMENT OF EACH TRADE'S WORK SO THAT THERE
ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR
FUNCTION IMPAIRED. IT IS ESPECIALLY IMPORTANT TO
COORDINATE PENETRATIONS THROUGH FOUNDATIONS,
FLOORS, WALLS AND CEILING SPACES. SEE
SPECIFICATIONS.
14. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN
DISSIMILAR METALS. SEE SPECIFICATIONS.
15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY
SHALL BE FIRE TREATED. SEE SPECIFICATIONS. ALL
SURFACE ATTACHED METAL SHALL BE SEPARATED FROM
CONCRETE OR MASONRY BY NON-METALLIC MATERIAL
SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL
AS APPROVED BY ARCHITECT AND COR.
16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL
EQUIPMENT, FIXTURES, DEVICES, MECHANICAL, PLUMBING
OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR,
MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL
ELEVATION COORDINATION.
17. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK
PERMITS TO BE COORDINATED WITH COR. SUBMIT
CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.
GENERAL NOTES: GENERAL FIRE & LIFE SAFETY
NOTES:
FIRE ALARM
1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN
ACCORDANCE WITH CLASS "B" PATHWAY DESIGNATION OF
THE NFPA 72.
2. SUBMIT PER SECTION 01 33 23 SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES; AND SECTION 28 31 00 FIRE
DETECTION AND ALARM FOR APPROVAL PRIOR TO THE
INSTALLATION.
3. THE FIRE ALARM MAINTENANCE CONTRACTOR MUST
CERTIFY ALL PROGRAMMING DONE TO THE FIRE ALARM
SYSTEM. THE CONSTRUCTION CONTRACTOR MUST
EITHER HIRE THE CURRENT FIRE ALARM MAINTENANCE
CONTRACTOR TO PERFORM ALL FIRE ALARM
PROGRAMMING WORK OR IF THE PROGRAMMING IS
COMPLETED BY ANOTHER FIRE ALARM CONTRACTOR, THE
CONSTRUCTION CONTRACTOR MUST HIRE THE CURRENT
FIRE ALARM MAINTENANCE CONTRACTOR TO FULLY
INSPECT, TEST, AND CERTIFY THE PROGRAMMING WORK
DONE BY ANOTHER CONTRACTOR.
FIRE EXTINGUISHERS
1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE
WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND
SHALL MAINTAIN THEM DURING THE COURSE OF
CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb.
CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C
FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED AND
SHALL BE DRY CHEMICAL TYPE.
EXIT & EMERGENCY LIGHTING
1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING
TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT
REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR
INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY;
CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A
SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE
WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY
LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE
POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE
DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2"
BELOW THE THRESHOLD.
2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH
THE LOCAL AND CURRENT NEC GUIDELINES.
FIRE SPRINKLER SYSTEM
1. ALL NEW SPRINKLER HEADS, HANGERS AND RESTRAINTS
TO BE INSTALLED IN ACCORDANCE WITH 2019 NFPA 13.
A. NEW HEADS SHALL BE FM-APPROVED, QUICK
RESPONSE SPRINKLERS.
2. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE AS
FOLOWS:
A. 2" AND SMALLER - BLACK STEEL SCHEDULE 40
B. 2 1/2" AND LARGER - BLACK STEEL SCHEDULE 10
C. FLEXIBLE SPRINKLER HOSE SHALL BE FM-APPROVED
AND LIMITED TO HOSE WITH THREADED END FITTINGS
WITH A MINIMUM INSIDE DIAMETER OF 1 INCH AND A
MAXIMUM LENGTH OF 6 FEET.
FIRE STOPPING
1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE
STOPPING.
GENERAL
1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE
OR FLAME-PROOFED IN AN APPROVED MANNER.
2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS
LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF
NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF
NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE
INSTALLATION, INCLUDING INSULATION, FACING
MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.
3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-
CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS
SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25
AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED
IN ACCORDANCE WITH ASTM E 84.
4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE
CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR.
LATCHING AND LOCKING DOORS THAT ARE HAND-
ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL
BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE
HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT
REQUIRING THE ABILITY TO GRASP THE OPENING
HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS
ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT
FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM
AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE
AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE
LATCH, MEASURED FROM THE LEADING EDGE OF THE
DOOR.
5. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT
EXCEED:
A. INTERIOR DOORS - 5 lbs.
B. EXTERIOR DOORS - 8.5 lbs.
C. FIRE DOORS - 15 lbs.
6. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR
PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A
UL APPROVED METHOD AND MATERIAL.
FIRE & SMOKE DAMPERS
1. NEW FIRE & SMOKE DAMPERS ARE TO BE PROVIDED.
2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM.
THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER AND
FIRE ALARM SYSTEM.
1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO
COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES
AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE
ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF
DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND,
FOLLOW PROCEDURES LISTED IN SECTION 01 26 13
REQUESTS FOR INFORMATION (RFI). IF DISCREPANCIES
ARE DISCOVERED AFTER THE BIDFOLLOW PROCEDURES
LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION
(RFI) PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.
2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL
AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED
BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND
SHOP DRAWINGS CONTRACTOR SHALL VERIFY
DIMENSIONS AND RECOMMEND DIMENSIONAL
MODIFICATIONS AS REQUIRED.
3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR
PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS,
SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR
ELEVATIONS AND EXTERIOR ELEVATIONS.
4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON
STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.
MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES
MAY ALSO CONTAIN DIMENSIONAL INFORMATION RELATED
TO EQUIPMENT SIZES AND CLEARANCES.
5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X
4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT
NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT
ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT
BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE.
(FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE
SHOWN IN THE 16THS OF AN INCH, BUT STANDARD
MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").
6. FLOOR PLAN DIMENSIONS
A. THE LOWEST FLOOR OVERALL BUILDING
DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE
FOUNDATION WALL TO THE OPPOSITE OUTSIDE
FACE OF THE FOUNDATION WALL (OR, FROM
OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS
SHOWN.
B. DIMENSIONS ARE TO FINISH FACE OF WALL,
TYPICAL UNLESS NOTED OTHERWISE.
C. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL
(UNLESS NOTED AS "NOM").
D. DOOR OPENING DIMENSIONS IN FRAME
CONSTRUCTION (WOOD OR STEEL STUDS) ARE
TYPICALLY SHOWN AT THEIR CENTERLINES.
HOWEVER, WHEN THE EDGE OF THE DOOR IS
IMPORTANT, OR MAKES THE PLACEMENT CLEARER,
THE DIMENSION MAY BE TO THE ACTUAL FRAME
EDGE.
E. DOOR DIMENSIONS IN LOAD-BEARING MASONRY
AND CONCRETE WALLS ARE TO "ROUGH"
OPENINGS (FACES OF MASONRY OR CONCRETE).
TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE
THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE
EACH SIDE) AND PLUS 1/2" TOTAL FOR THE
HEAD/SILL DIMENSIONS.
F. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS
TO ADJACENT WALLS: BETWEEN FRAME FACES
AND FACES OF STUDS, OR FACES OF MASONRY OR
CONCRETE, AT NEARBY PERPENDICULAR WALLS
ARE TYPICALLY 4", DEPENDING ON HARDWARE
CLEARANCES AND FRAME REQUIREMENTS (2.5"-
DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=
4.0")
G. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH
AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR
PREFABRICATED STAIR ENCLOSURES, ARE NOTED
"CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES
OF FINISHES.
H. DIMENSIONS DESIGNATED WITH "MIN" INDICATE
THE MINIMUM CLEARANCE OR SEPARATION
REQUIRED.
7. ROOF PLAN DIMENSIONS
A. UN-DIMENSIONED LOCATIONS OF ROOFTOP
EQUIPMENT AND CONSTRUCTION OFTEN MAY BE
DETERMINED BY THE FLOOR PLAN BELOW, SUCH
AS ROOF HATCH DETERMINED BY REFERENCE TO A
FIXED WALL AND LADDER, OR MECHANICAL
EQUIPMENT DETERMINED BY DUCT PENETRATIONS
BETWEEN JOISTS.
B. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT
RAILS, HVAC EQUIPMENT, SCREEN WALLS,
ANTENNAS, WALK PADS, LADDERS, SCUPPER
LOCATIONS, ETC., MAY BE LOCATED FROM
MECHANICAL AND ELECTRICAL DRAWINGS OR
LOCATED BY SCALING. CONFIRM ALL ROOF ITEM
DIMENSIONS WITH THE ARCHITECT AND COR PRIOR
TO CONSTRUCTION.
8. VERTICAL DIMENSIONS
A. UNLESS NOTED OTHERWISE, THE FIRST FLOOR
REFERENCE ELEVATION IS 100'-0". THIS IS
REFERENCED TO A GROUND ELEVATION ABOVE
MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR
STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0"
ARE "-" (PREFIXED WITH A MINUS SIGN).
B. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON
ARCHITECTURAL DRAWINGS ARE TO TOP OF
DECKING OR SHEATING, BUT DO NOT INCLUDE
FINISHES OR ROOFING MATERIAL.
C. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE
TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD-
BEARING MASONRY OR CONCRETE WALLS, WHERE
THEY ARE TO ROUGH OPENINGS). HEIGHT
REFERENCES SHOULD BE TO THE NEXT LOWER
FINISH FLOOR ELEVATION
D. LIGHTING HEIGHTS ON WALLS ARE TO
CENTERLINES OF THE ELECTRICAL BOXES, UNO.
EQUIPMENT, VENT, PLUMBING AND FIXTURE
ELEVATIONS ARE TO CENTERLINES OF THE WALL
PENETRATIONS, UNO.
E. SOME VERTICAL DIMENSIONS ARE SHOWN ON
PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND
ELEVATION CHANGES. A PLAN ELEVATION CHANGE
SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND
INDICATES THE + OR - ELEVATION CHANGE IN
INCHES FROM THE FINISHED FLOOR ELEVATION
(FFE) NEXT TO IT.
GENERAL DIMENSIONING
NOTES:
1. HALF-TONED OR LIGHT LINES INDICATE EXISTING
CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE
EXTENT OF DEMOLITION.
2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY,
AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES
TO MEET APPROVAL OF CODE AGENCIES. COORDINATE
DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR
SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE
COR RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS
FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING
THE PRE-CONSTRUCTION WALK THROUGH.
4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS,
VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR
CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO
MAINTAIN THE INTEGRITY OF THE WALL, FLOOR, AND/OR
ROOF ASSEMBLY.
5. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-
WAY OF THE PROJECT SITE WILL BE IMPACTED BY
CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES
PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE
INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND
DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE
WITH THE LATEST OSHA REQUIREMENTS. COORDINATE
CONTRACTOR STAGING AREA AND PUBLIC ACCESS WITH
COR PRIOR TO CONSTRUCTION. PROTECT SIGNAGE WITHIN
PROJECT AREA.
6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND
DEMOLITION FOR RELATED DEMOLITION WORK.
7. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED
UTILITY & DEMOLITION WORK AND PROJECT PHASING
NOTES. COORDINATE UTILITY SYSTEM SHUTDOWNS WITH
COR.
GENERAL DEMOLITION AND
PHASING NOTES:
Revisions: Date:
This project complies with VA Directive 0056 "VA Sustainable Buildings Program" and the 2016 Guiding Principles for New Construction and Modernization, as noted below.
1.0 – Employ Integrated Design Principles
1. NC&M Criteria 1.1 – Integrated Design and Management (Core Criteria) - Met
2. We established sustainability goals as part of the project and incorporated into relevant design documents. Option 1 was followed; We used a collaborative, integrated process and team to plan, program, design, construct, commission, and transition to operation the New Construction.
3. NC&M Criteria 1.2 – Sustainable Siting (Core Criteria) - Met
4. We followed Federal Management Regulation requirements to make a positive contribution to the surrounding landscape, and specifically addressed the
National Historic Preservation Act of 1966 in collaboration with the state Society of Historic Preservation Office (SHPO), to maintain the contributing factors of the existing historically significant buildings with the new construction. Site sustainability was established through a series of detention areas and catch basins to manage stormwater collection and release to not add additional strain or load on the existing site systems. The existing corridor system utilized on campus to provide conditioned, sheltered access to the full campus will be extended, so that residents maintain easy access to the site facilities and amenities.
5. NC&M Criteria 1.3 – Stormwater Management (Core Criteria) - Met
6. The new construction disturbs a surface area greater than 5,000 Square Feet, therefore we developed a site strategy to maintain / improve property hydrology, in accordance with Statutory Requirements.
7. NC&M Criteria 1.4 – Infrastructure Utilization and Optimization (Non-Core Criteria) – Met
8. We prioritized on-site transportation to promote resident travel through the protected and conditioned corridors. The project staff and residents are currently accounted for in the campus parking plan, therefore no additional parking is planned / needed for this project. The vehicular loop that currently exists in the courtyard is being removed, and replaced with a smaller, parallel drop-off lane.
9. NC&M Criteria 1.5 – Commissioning (Core Criteria) – Met
10. Commissioning will be employed through a commissioning process to verify that the building and its commissioned components, assemblies, and systems
(including district heating and cooling system, and cooling towers) comply with the VA’s project requirements. A certified Commissioning Agent will be performing and completing the project commissioning.
2.0 – Optimize Energy Performance 1.NC&M Criteria 2.1 – Energy Efficiency (Core Criteria) – Met a.Compliance has been implemented with Federal Energy Efficiency Performance, in accordance with the Energy Policy Act of 2005. Previous project baselines were reviewed to ensure energy use reductions. LED lighting is used throughout the project, occupancy sensors, daylight harvesting, etc.
2.NC&M Criteria 2.2 – Energy Metering (Core Criteria) – Met a.Building-level meters for electricity and steam will be installed to confirm with the Department of Energy Federal Building Metering Guidance.
3.NC&M Criteria 2.3 – Renewable Energy (Non-Core Criteria) – Not Met / Not Applicable a.Renewable Energy criteria not applicable for this project scope
4.NC&M Criteria 2.4 – Benchmarking (Core Criteria) - Met a.Building performance benchmarking established in the commissioning project and monitored by the Station.
3.0 – Protect and Conserve Water 1.NC&M Criteria 3.1 – Indoor Water Use (Core Criteria) - Met a.Water conservation measures and technologies will be applied – such as WaterSense where applicable – to maximise water conservation.
2.NC&M Criteria 3.2 – Water Metering (Core Criteria) - Met a.Building level water meters will be installed and monitored to ensure optimized management of water use during occupancy, including leak detection in accordance with the Department of Energy’s Federal Building Metering Guidance.
3.NC&M Criteria 3.3 – Outdoor Water Use (Non-Core Criteria) - Met a.Water efficient landscaping best practices will be implemented, including minimizing irrigation beyond establishment of planting areas.
4.NC&M Criteria 3.4 – Alternative Water (Non-Core Criteria) – Not Met / Not Applicable a.Not applicable for this project scope.
4.0 – Enhance the Indoor Environment
1.NC&M Criteria 4.1 – Ventilation and Thermal Comfort (Core Criteria) - Met
a. In accordance with the Federal Management Regulations, we will comply with all ventilation and thermal comfort requirements to provide ample comfort to staff and residents.
2.NC&M Criteria 4.2 – Daylighting and Lighting Controls (Non-Core Criteria) - Met a.Daylighting and lighting controls have been established to meet required illumination levels. Ample windows have been added to all occupied spaces to ensure regular access to daylight.
3.NC&M Criteria 4.3 – Low-Emitting Materials and Products (Non-Core Criteria) - Met a.Low or no volatile organic compound (VOC) materials have been required for this project and documented in the specifications and drawings.
4.NC&M Criteria 4.4 – Radon Mitigation (Core Criteria) - Met
a. In accordance with the Federal Management Regulations, Radon levels will be managed and mitigated through the project construction, including sub-grade mitigation efforts.
5.NC&M Criteria 4.5 – Moisture and Mold Control (Non-Core Criteria) - Met a.Project moisture control has been developed in the project envelope and building design to minimize mold contamination, prevent building damage, and reduce health risks related to moisture.
6.NC&M Criteria 4.6 – Indoor Air Quality during Construction (Non-Core Criteria) - Met
a. Indoor air quality during construction is required to be monitored and managed. Any occupied spaces that will be disturbed by construction are required to isolate those areas to minimize infection risk.
7.NC&M Criteria 4.7 – Environmental Smoking Control (Core Criteria) - Met
a. In accordance with the Federal Management Regulations, any and all smoking on VA Campus is prohibited. This includes during construction.
8.NC&M Criteria 4.8 – Integrated Pest Management (Core Criteria) - Met a.Pest Management services provided through VA Staff to comply with Federal Management Regulation.
9.NC&M Criteria 4.9 – Occupant Health and Wellness (Core Criteria) - Met a.Occupancy health and wellness has been incorporated into the design to promote resident and staff health, including providing views to outdoors, large-print walls with natural elements, natural-looking interior finishes that are connected to the local area. Water Bottle Refilling stations are also provided on both floors for staffs and residents.
5.0 Reduce the Environmental Impact of Materials
1.NC&M Criteria 5.1 – Materials – Recycled Content (Core Criteria) - Met a.Project recycled content recommendations for building construction, modifications, operations, and maintenance, are specified in project sections 01 74 19 – “Construction Waste Management” and 01 81 13 – “Sustainability Requirements”
2.NC&M Criteria 5.2 – Materials - Biobased Content (Core Criteria) - Met a.Bio-based content and hazardous job requirements are specified in project section 01 35 26 – Safety Requirements.
3.NC&M Criteria 5.3 – Products (Non-Core Criteria) - Met a.Construction products and building supplies will be reviewed and selected following EPA’s recommendations of Specifications, Standards, and Ecolabels for Federal Purchasing.
4.NC&M Criteria 5.4 – Ozone Depleting Substances (Core Criteria) - Met a.Compliance with project materials with the EPA’s Significant New Alternative Policy Program, to ensure Refrigeration and Air Conditioning, Blown-Foam Agents, cleaning solvents, fire suppression and protection, and adhesives, coatings and inks do not negatively contribute to Ozone Depletion.
5.NC&M Criteria 5.5 – Hazardous Waste (Core Criteria) - Met a.Compliance with relevant hazardous waste construction activities is specified in project section 01 74 19 – “Construction Waste Management”, which includes requirements to delineate required material separations, recycling, and verification of material destinations and proposed travel measures.
6.NC&M Criteria 5.6 – Solid Waste Management (Non-Core Criteria) - Met a.Construction and Demolition waste management plan requirements, including diverting a minimum of 50 percent from landfills and incineration, is specified in project section 01 74 19 – “Construction Waste Management.”
6.0 Assess and Consider Building Resilience
1.NC&M Criteria 6.1 – Risk Assessment (Non-Core Criteria) - Met a.Risk assessment for the project was established at the on-set according to the VA’s Physical Security and Resiliency Design Manual (PSRDM). The building set-back was established to maintain vehicular distances. The front entry contains a concrete enclosed screening vestibule. The Front and sides of the building that are subject to potential blasts have been designed to withstand the PSRDM Requirements for the project program.
2.NC&M Criteria 6.2 – Building Resilience and Adaptation (Non-Core Criteria) - Met a.Risk assessment was reviewed and established according to the Va’s Physical Security and Resiliency Design Manual (PSRDM) for Life-Safety Facilities. Blast-Design was incorporated into the project to ensure staff and resident safety and facility operations continue during emergencies.
VA SUSTAINABLE BUILDINGS COMPLIANCE
DN
GATE
166.59
GATE
166.59
9.2
RIM
=1 .4 1'
W V
W V
S
S
PIV
90010
176.05
90009
176.21
D
YHs s s s s s
S
S
S
S
S
D
EE
P B
P B
P B
S
C
S
D Y
H
D
D Y
H
DN
DN
DN
DN
DN
DN
DN
DN
BLDG #206
BLDG #205
BLDG #204
BLDG #248
#244
B#232
B#208
BLDG #207
L S
P
M C
BLDG
#258
SITE SYMBOL LEGEND
SITE CODE NOTES
APPLICABLE BUILDING CODES
• 2021…