The document is a draft Past Performance Information (PPI) sheet for a federal contract opportunity, specifically for the All Domain Common Platform (ADCP) Security Cloud Engineering Network Development (ASCEND) solicitation. The PPI sheet is designed for offerors to provide detailed information about their previous contract performance, including contract type, dollar value, period of performance, capabilities delivered, and data deliverables. Key instructions include completing a separate sheet for each relevant contract, with a focus on ordering type contractual vehicles, and providing frank, concise comments about past performance.

The form requires offerors to specify their role (prime contractor or subcontractor), contract types (such as Firm Fixed Price, Time and Materials, or Cost), and performance details. It includes sections for evaluating program complexity, technology levels, performance locations, and subcontractor involvement. The document emphasizes the government's independent assessment of relevancy and requires offerors to highlight their ability to resolve past performance issues, demonstrate corrective actions, and provide a comprehensive overview of their contract history. The draft is part of a voluntary feedback process for the ASCEND solicitation, with responses due by Wednesday, 30 April 2025 at 5 PM Eastern.

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT - FA873025RB007 - All Domain Common Platform (ADCP) Security Cloud Engineering Network Develpoment (ASCEND) RFI, newest first.
File Type Posted
DRAFT Solicitation - FA873025RB007.pdf PDF
Attachment 5 - Draft Transmittal Letter Draft.pdf PDF
Attachment 2 - DRAFT Task Order 0001 PWS.pdf PDF
Exhibit A - Draft CDRLs.pdf PDF
DRAFT SECTION M ASCEND.pdf PDF
Attachment 4 -Draft Client Authorization Letter.pdf PDF
Attachment 7 - Cross Reference Matrix Sample.pdf PDF
Attachment 1 - DRAFT ASCEND IDIQ PWS.pdf PDF
Attachment 6 - Draft Consent Letter.pdf PDF
Exhibit B - Draft ASCEND Past Performance Questionnaire.pdf PDF
DRAFT SECTION L ASCEND.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP FA873025RB007

ATTACHMENT 3

Past Performance Information

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

Present/Past Performance PPI Sheet

(TO BE COMPLETED BY OFFEROR,

JOINT VENTURE MEMBER, AND IF

APPLICABLE, CRITICAL

SUBCONTRACTOR)

Request the offeror/joint venture member/critical subcontractor, if applicable, complete a separate Past Performance Information Sheet for each relevant contract. See Clause L-900, Paragraph 6 of this RFP for detailed instructions and limits on number and recency of contracts.

Offeror/joint venture member/critical subcontractor is requested to provide frank, concise comments regarding present/past performance on the program identified in B. below.

If the contract being submitted is an ordering type contractual vehicle (for example, including but not limited to an Indefinite Delivery “D” type contract per FAR 16.5), only after issuance of a delivery/task order does performance occur. The Contract Number, Total Contract Dollar Value, Period of Performance, Capabilities Delivered, Type and Complexity of Data Deliverable submitted here should be for the order or series of orders, the offeror has performed under this ordering type contractual vehicle.

If a series of orders is being submitted, the offeror shall include a list that includes the order numbers, each order’s Total Contract Dollar Value, each order’s Period of Performance, each order’s Capabilities Delivered, and the Type and Complexity of Data Deliverables on each order.

If the series of orders contains more than 5 orders, include this information on a separate attachment. See Section L-900 Paragraph D 3.1 for more information on proposal submission and Section M-900 Paragraph D.3 for evaluation information.

A. OFFEROR:

(1) Name (Company/Division)

(2) Address

(3) CAGE Code

B. PROGRAM/PROJECT TITLE and CONTRACT NUMBER:

(If submitting ordering type contract: List the basic contract number and each order number or order number within the series of orders)

B. Role of the Offeror In Effort: __________ Prime Contractor __________ Subcontractor

Note that the information provided in the Past Performance Information Sheet shall reflect the role that the offeror/joint venture member/critical subcontractor performed in the effort, i.e., an offeror who performed as a subcontractor shall identify the contract type, dollar value, description, etc. of its subcontract with the prime contractor.

C. NAME OF CONTRACTING ACTIVITY OR CUSTOMER:

D. CONTRACT TYPE(S) – CHECK ALL THAT APPLY

a. Firm Fixed Price _____

b. Time and Materials _____

c. Cost _____

d. Other (Explain)

E. TOTAL CONTRACT DOLLAR VALUE: (If you performed work as a subcontractor, identify your total contract dollar value and the PRIME’s total contract dollar value, if known. Describe any changes in dollar value that may have occurred from time of contract award to the conclusion of the effort or the present, whichever is applicable.) If submitting an ordering type contract, list the original and current total contract dollar values for each order or order within the series of orders. If your series of orders consists of more than three

(3) individual orders include the information in a separate attachment.

1. Original Total Contract Dollar Value:

(If submitting ordering type contract: List the original total contract dollar value for each order or order within the series of orders)

2. Current Total Contact Dollar Value:

(If submitting ordering type contract: List the current total contract dollar value for each order or order within the series of orders)

3. Explain the differences in Total Contract Value, if applicable: Enter an explanation of the difference between the Original Total Contract Dollar Value and the Current Total Contract Dollar Value as of the time of proposal submission.

4. If Award Fee Contract, what percentages of the fee have been awarded in each of last 3 years?

F. PERIOD OF PERFORMANCE: (includes start and end dates, i.e. Jan 2004 – Dec 2007)

If submitting an ordering type contract, the “Period of Performance” submitted here should be for the order (or series of orders), the offeror has performed under this ordering type contractual vehicle. The offeror shall submit the “Start Date” for the individual order or the first order in the series. The offeror shall submit the “Original End Date” for the individual order or the last order in the series. If the “End Date” on the individual order or last order within the series of orders has changed, these changes would need to be reflected in the “Current End Date” Section below. Also, if submitting a series of orders, list the Start Date, Original End Date and Current End Date for each order. If your series of orders consists of more than 5 individual orders include the information in a separate attachment.

1. Start Date: Input start date of contract/order/series of orders.

2. Original End Date: Input original end date of contract/order/series of orders based on award.

3. Current End Date (if changed): Input end date, as the contract/order/series of orders stands at time of proposal submission.

G. Capabilities delivered in the effort:

If submitting an ordering type contract, the capabilities submitted here should be for the order (or series of orders), the offeror has delivered under this ordering type contractual vehicle. If a series of orders is being submitted, the offeror should list the capabilities delivered, for each order within the series of orders. Only list the capabilities that have been delivered, on the individual order or orders within the series of orders. If more than 5 orders are in the series of orders, include the information in a separate attachment.

I. Type and Complexity of Data Deliverables:

Include the type and complexities of data deliverables for each contract/order/series or orders.

If more than five (5) orders are in the series of orders, include the information in a separate attachment.

J. BRIEF DESCRIPTION OF EFFORT:

1. As a part of this narrative description, highlight portions considered most relevant to the current acquisition; addressing how and to what extent the proposed effort relates to the program identified in B. above. To supplement the data provided in response to this paragraph, complete the following regarding relevancy of the effort identified in paragraph B to the proposed effort. This is limited to two pages beyond the page limitation of the Past Performance Information sheet information.

2. This paragraph shall also include details to support the offeror’s record for on-time delivery, technical quantity and cost control for this effort identified in paragraph B.

above.

RELEVANCY TABLE

(Complete with each effort submitted for evaluation)

This table will assist the PCO in evaluating the relevancy of the proposed effort to the instant requirement. Offeror/joint venture member/critical subcontractor, if applicable, shall only complete column three. Offeror’s/joint venture member’s/critical subcontractor’s answers are applicable only to the effort identified in paragraph B. above, not the offeror’s/joint venture member’s/critical subcontractor’s proposed solutions to the instant effort. If additional space is needed, please attach a separate sheet to your response (limited to two pages). Please be as specific as possible with the fill-in information provided.

Category Example Fill in for the

Proposed Effort (GOVT has completed this column)

(DO NOT CHANGE)

Fill in for the Effort Identified in Paragraph B Above

1. Nature of Business Area(s) Involved

Platform development and maintenance supported at all Impact Levels (IL) to include IL6

Highly resilient cloud platform supported at all IL to include IL6

2. Required Levels of Technology

State of the Art, COTS, industry best practices, Modified component

Development, COTS, modified COTS

3. Performance Location

Facility 1:

address/prototype Facility 2: production

SIPR location

4. Contract Type(s) FFP, T&M, CPFF FFP, T&M, CPFF??CPIF?

5. Program Similarity

6. Program Complexity

High Complexity

7. Program Phase Design, development, production, sustainment

Design, Development, Production, Sustainment

8. Extent of subcontractor involvement

Prototype, production, specific assembly/role

9. Other 24/7/365 platform support and maintenance at all IL levels to include IL6

Prior experience supporting and maintaining a weapons system

24/7/365 platform support and maintenance at all IL levels to include IL6

Prior experience supporting and maintaining a weapons system operating within a cloud native environment operating within a cloud native environment

3. If you are small business, or, if you are a large business and a Small Business Subcontracting Plan per FAR 52.219-9 was NOT required by this effort, indicate your compliance with FAR 52.219-8, Utilization of Small Business Concerns, by completing the following. That is, when subcontracting possibilities existed on this effort, did you award subcontracts to small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns to the fullest extent consistent with efficient contract performance? If FAR 52.219-8 was NOT included in this effort, whenever subcontracting possibilities existed in the performance of this effort, address whether or not it was your policy to utilize small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns to the fullest extent consistent with efficient contract performance

Utilization of Small Business Concerns

Small Business Large Business

No subcontracting possibilities

In compliance

Not in compliance (address why)

4. If you are a large business, identify whether a subcontracting plan in accordance with FAR 52.219-9, Small Business Subcontracting Plan, was required by this effort. If one was required, complete the following regarding subcontracting goals and status-to-date. If goals were not met, please explain. This is applicable to large businesses only.

_____ Required

_____ Not Required

Category Goals Achieved-to-Date

Small Business

Small Disadvantaged Business

Women-Owned Small Business

HUBZone Small Business

Veteran-Owned Small Business

Service-Disabled Veteran Owned Small Business

HBCU/MI

K. PRIMARY POINTS OF CONTACT: (The offeror/joint venture member/critical subcontractor is responsible for exerting its best efforts to ensure that current information is provided for all individuals.)

Name and Office Symbol Phone Number FAX Number

1. Procuring Contracting Officer DSN & Comm DSN & Comm

2. Program Manager DSN & Comm DSN & Comm

3. Administrative Contracting Officer DSN & Comm DSN & Comm

4. Other (Please Specify) DSN & Comm DSN & Comm

L. Use this space to address any aspect about this program considered unique. Describe quality awards or certifications that indicate the offeror possesses a high-quality process for developing and producing the product/service required.

M. Summarize contract issues relative to the number and severity of quality deficiencies recorded/contract discrepancy reports issued, cure notices, show cause letters, termination for default or cause, disputes, claims, latent defects; and, corrective actions taken for the contract listed in Paragraph B above.

N. Additionally, for those efforts where you are cognizant of unfavorable and/or marginal past performance ratings/reports previously assessed by customers or clients, but feel that significant progress has been made but not yet credited or formally documented, provide the program name, contract number, customer location and a narrative explaining "fixes" made to date, or any other information regarding the unfavorable/marginal assessment. This narrative portion is limited to one (1) additional page beyond the Past Performance Information sheet required page limitation.

It is not presumed that performance has been perfect. Rather, the proposal should contain evidence of the offeror's/joint venture member’s/critical subcontractor’s ability to isolate the root causes of problems and should describe programs or actions taken to resolve those causes.

Demonstrated corrective actions (not just planned or promised), and the overall work record will be considered. Problems not addressed, but found by the Government during the evaluation of the information in this volume, will be assumed to still exist. Note: In the case of Contractor Performance Assessment Report System (CPARS), if your input has already been provided and the rationale/ circumstances have not changed, DO NOT repeat them here.

O. Was this contract effort (as identified in paragraph B. above) submitted as a past performance source of data for a previous WR-ALC procurement. Yes No . If yes, identify the buyer and/or contracting officer, their phone number and office symbol and solicitation number of the procurement for which this effort was submitted.

PLEASE NOTE: The Government is not bound by the offeror's opinion of relevancy. The Government will perform an independent assessment of relevancy of the data provided or obtained.

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104