Attachment 3.7 - Phase II - Live Demonstration of eDelivery Requirements.xlsx

XLSX spreadsheet 126 KB Posted

Attached to
Federal Highway Administration, Office of Federal Lands Highway’s eDelivery Construction Management System
Solicitation number
693JJ321R000013
Issued by

About this file

This request for proposal seeks to acquire a comprehensive web-based and mobile eDelivery construction management system for the Federal Highway Administration's Office of Federal Lands Highway. The system must fully integrate all aspects of FLH's program construction activities including engineering cost estimating, procurement and electronic bidding, construction management, and construction documentation management. It must provide design, acquisitions, construction, and document management modules that allow each module to communicate without manual data import/export. The system should support projects in both U.S. customary and metric units and allow multiple active specification books and cost accounts to be tracked throughout a project's lifecycle. It must also include a mobile application that enables offline access to documents, daily reports, pay notes, and estimates as well as photo capture and GIS data collection.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

High-Level Requirements Request for Proposal No. 693JJ321R000013 Attachment 3.7 - Live Demonstration of eDelivery Requirements Evaluation Factor 2 - eDelivery System Requirements

Attachment 3.1 Requirements Reference System Requirements

1. Overall System Requirements
1.0.aAbility for each module to communicate with each other without a manual import/export of data
1.0.bAbility to do a project in either US Customary units or metric units
1.0.cAbility to have multiple, active Specification Books within the system.
1.0.dProvide the ability throughout the life of a project (in Design, Acquisitions, and Construction modules) to track the required cost account information by multiple unique accounts
2. Design Module
2.0.aDevelop Independent Government Estimates (Engineer’s Estimates) for Construction Projects
2.0.bAbility to use Bid History Data to develop Unit Prices
2.0.cAbility to Create, Edit and Delete Multiple Schedules, Options, and Pay Item Alternates in a Project.
2.0.dProvide the ability to add a Supplemental Description to the project pay items.
2.0.eAbility to track engineer’s estimate cost by accounts. (Pay Items are split into separate accounts by quantity or percent)
2.0.fAbility to develop required design reports (including report data exports)
3. Acquisition Module
3.0.aAbility to create bid schedules
3.0.bAbility to create bid Amendments
3.0.cProvide a usable, secure eBidding submodule
3.0.dAbility to transfer a project from the Acquisition Module to the Construction Module
3.5.eNo cost for a company to submit a bid for a FHWA project
4. Construction Module
4.0.aAbility for the Construction Contractors to access projects
4.0.bAbility to track progress payment through the construction project
4.0.cAbility to track and manage accounting information
4.0.dAbility to create construction reports
4.0.eAbility access the project on a mobile device
4.0.fAbility to work offline
5. System Administration & Reporting
6.aProvide User and Role Management including the abilities for the administrative users to create and customize the roles
6.bThe system must support a master pay item list of items from the Federal Specification book
6.cThe system must be able to support pay item list from multiple Specification books (i.e. FP14, FP22, etc.)
6.dProvide the ability for the users to create and save standard and ad-hoc queries
6. System IT Requirements
7.aProvide details on two-factor authentication that will be used on the web-based part of the system for non-Government users
7.bThe system work with at least the web browsers from Google, Microsoft, Apple, and Firefox
7.cThe system provides a mobile offline option that works on at least Apple iOS
7.dProvide both a Production and Test/Sandbox instance of the system (two separate instances with two separate databases)
7.eThe system is hosted in a FedRAMP approved cloud
7.fAbility to import legacy data

&G

&"Calibri,Regular"&K0079C1Your Preferred Source for IT Acquisition Across the DoD | &K003A63www.esi.mil 1 ESICOMPASS081811

Functional Requirements_Sec. 1 Request for Proposal No. 693JJ321R000013

Attachment 3.1 Requirements Reference System Requirements

1. Module Interoperability
1.1.aProvide Design, Acquisitions, Construction, and Document Management Modules
1.1.bAbility for each module to communicate with each other without a manual import/export of data
1.1.cAbility to manage module access based on status (e.g., if a project is in Acquisitions, then Design is inactive)
2. Add/Create New Projects and Search for Existing Project
1.2.aIn all phases of the system (Design, Acquisition, and Construction), provide the ability to search for and select an existing project within the system using numerous filters and keyword search for Project Number and Project Name.
1.2.bAbility to add new projects and enter Project information noted below.
1.2.cAbility to copy an existing Project, including Project information, and user-selected Milestone Engineer’s Estimate. Copy all Project Information, Account information and the Milestone Engineers Estimate (including all Schedules and Options). [Do NOT copy any data entered in the Acquisitions or Construction modules, i.e. do NOT copy bid prices, award information, construction payment information, Daily Reports, etc.]
3. Track General Project Information
1.3.aAll General Project Information shall be viewable to Design, Acquisition, and Construction
1.3.bTrack all General Project information
4. Units (US or Metric)
1.4Ability to do a project in either US Customary units or metric units. See also Master Pay Item list (Section 6.3)
5. Select Specification Book
1.5.aAbility to have multiple, active Specification Books within the system
1.5.bAbility to assign a specific Specification book to a project (i.e. FP03, FP14, FP20 to a project). See also Master Pay Item list Section 6.3.
6. General Account Requirements
1.6.1.aAbility to add multiple unique construction accounts to the Project during any project phase. [user input]
1.6.1.bAbility to Split Pay Items into Separate Accounts by exact quantity (throughout the life of the project, i.e. in Design, Acquisition, and Construction)
1.6.1.cAbility to Split Pay Items into Separate Accounts by percentage (throughout the life of the project, i.e. in Design, Acquisition, and Construction)
1.6.1.dAbility to Chain Account Numbers during any project phase (i.e. prioritize accounts)
1.6.1.eAbility to have multiple, separate account chains in a project
1.6.1.fAbility to Override the calculated Current Approved (payment) Amount with a user entered payment amount for each Construction account
1.6.1.gAbility to add multiple unique construction engineering accounts to the project during the construction phase [user input]
7. Design & Acquisition modules – Account Data Tracked for Each CONSTRUCTION ACCOUNT
1.6.2In Design and Acquisition Modules track the following data for each Construction Account - see Attachment 3.1, Section 1.6.2
8. Construction module – ADDITIONAL Account Data Tracked for Each CONSTRUCTION ACCOUNT
1.6.3.aOriginal Obligated Amount: [User input, prior to contract award]. Includes both Bid Items and Incentives at award.
1.6.3.bCurrent Obligated Amount: [Calculated]. Includes Original Obligated Amount + any obligations/deobligations from signed Contract Modifications.
1.6.3.cPrevious Paid Expenditures: [Calculated].
1.6.3.dCurrent Approved Amount: [Calculated].
1.6.3.eCurrent Payment: [Calculated OR User input if Account Override marked as Yes] *
1.6.3.fAbility to Override the calculated Current Approved Amount: [User Input: Yes or No]*
1.6.3.g* If Override is designated as Yes, allow the user to enter a payment amount (that overrides the calculated amount)
1.6.3.hTo-Date Expenditures: [Calculated]
1.6.3.iProbable Amount: [Calculated]
1.6.3.jConstruction Account Totals [Calculated) for: Original Obligated Amount, Current Obligated Amount, Previous Paid Expenditures, Current Approved Amount, Current Payment, To-Date Expenditures, and Probable Amount
9. Construction module – Account Data Tracked for Each CONSTRUCTION ENGINEERING ACCOUNT
1.6.4In the Construction Module, track the following account data for Each CONSTRUCTION ENGINEERING ACCOUNT (see Attachment 3.1, Section 1.6.4)

&G

&"Calibri,Regular"&K0079C1Your Preferred Source for IT Acquisition Across the DoD | &K003A63www.esi.mil 1 ESICOMPASS081811

Functional Requirements_Sec. 2 Request for Proposal No. 693JJ321R000013

Attachment 3.1 Requirements Reference System Requirements

1. Managing Design Estimates
2.1.aCreate, Edit and Delete Multiple Milestone Estimates (e.g., 30%, 70%, 95%, etc.) in a Project.
2.1.bAbility to Create, Edit and Delete Multiple Schedules, Options, and Pay Item Alternates within each Milestone Estimate in a Project.
2.1.cCopy existing Milestone Estimates from one project into another project. The copy should include all schedules and options, including pay items, unit prices, quantities, account splits associated with the existing milestone estimate, as well as schedule and option information
2.1.dCopy existing Milestone Estimates to create a new Milestone Estimate within a project. The copy should include all schedules and options, including pay items, unit prices, quantities, account splits associated with the existing milestone estimate, as well as schedule and option information.
2.1.eProvide ability to prevent editing Milestone Estimates after the milestone estimate has been completed to preserve previous versions as needed.
2.1.fTransfer the final, completed Engineer’s Estimate data to the Acquisitions module.
2. Schedule, Option, and Pay Item Alternate Information/Data
2.2.aAbility to differentiate between Schedule Options, and Pay Item Alternate
2.2.bAbility to designate each Schedule, Option, and Pay Item Alternate with single letter
2.2.cAbility to select, show and change standard Construction Types for each Schedule and Option (predefined, selectable)
2.2.dProvide Description for each Schedule, Option, and Pay Item Alternate (user input)
2.2.eProvide ability to enter Miles, Lane-miles, Trail miles for each Schedule and Option (user input)
2.2.fProvide the ability to enter and track GIS Data for each Schedule and Option (user input). At least one GIS data point is needed for each Schedule and Option (one field to enter Latitude and one field to enter Longitude) in addition to providing a remarks field.
2.2.gProvide the ability to enter Bridge tracking data for multiple Bridges: Bridge name or Bridge No, Bridge Length, Bridge sqft. Also, ability to select Bridge Construction type (predefined, selectable)
3. Pay Items
2.3.aAbility to show, add and delete pay items to multiple Schedules, Options, and Pay item Alternates from a Master List based the Specification Book (FP) that has been assigned to the project.
2.3.bAbility to show that a pay item is eligible for a material incentive (as designated in the Master Pay Item List)
2.3.cProvide the ability to add a Supplemental Description to the project pay items. This supplemental description would not be added to the standard description for the pay items in the Master List. Supplemental Descriptions should be included in the Bid History.
2.3.dAbility to add, edit and delete quantities to each standard and temporary pay item within each Schedule, Option, and Pay Item Alternate.
2.3.eAbility to add/create Temporary pay items. Temporary pay items will be clearly marked as temporary. (Temporary pay item should not be added to the Master Pay Item List)
2.3.fEnsure that a Milestone Estimate containing temporary pay items cannot be transferred to the Acquisitions module.
2.3.gAbility to designate specific pay items as a "Contract Quantity".
2.3.hWithin a project, provide the ability to modify the default Bid Decimal for the quantities for each pay item within affecting the Master Pay Item list. (Default Bid Decimals are assigned in the Master Pay Item list. See Section 6.3)
2.3.iAbility to split Pay Items into multiple unique funding accounts by percentage of cost for LPSM and CTSM pay units, and by quantity for other pay units. See Section 1.6 for more information.
2.3.jAbility to split the quantities into Columns (I.e. categories) for the Summary of Quantities Report. See Sections 2.6.2
2.3.kAbility to add Column Headings (I.e. categories) for the Summary of Quantities Report. See Sections 2.6.2
2.3.lProvide the ability to add Summary of Quantity Remarks for each pay item (user defined).
2.3.mProvide unique line items numbers for each pay item in each Schedule/Option.
2.2.nProvide for the unique line item number to begin with the Schedule/Option Letter
2.3.oAllow the use of multiple, duplicate pay items if necessary within any schedule or option.
2.3.pProvide user friendly interface to enter the above data, similar to a spreadsheet
4. Bid History/Unit Price Analysis
2.4.aProvide an explanation of the bid history statistical analysis that your system can provide. Explain what statistical information will be available to the designer based on the bid history data available on FLH projects and explain any flexibility provided to develop the unit price. Provide a workflow describing the unit price analysis process that will be utilized by the designer to evaluate historical bid prices in accordance with the requirements below. Identify the information that will be available to the designer and the steps the designer will take to identify the projects for analysis, select appropriate data, and identify the estimated unit price.
2.4.bProvide explanation for how bid history is handled between different Specification Books.
2.4.cProvide a method of bid history analysis that includes the use of filters to select a group of projects to analyze historical unit prices. Required filters include: State, Pay Item Number, Pay Item Description, Pay Item Supplemental Description, Partner Agency, Schedule/Option/Pay Item Alternate Letter, Project Number, Award Date, Pay Unit, Quantity, Specification Book, Construction Type, Density, and Terrain.
2.4.dProvide the ability to save the filter settings for use on the entire project.
2.4.eProvide a method to use different filters for an individual pay item. This may be need if the project filters do not find enough bid history to develop an acceptable price for the pay item.
2.4.fUse selected filters to calculate unit price analysis.
2.4.gProvide the ability to exclude outlier unit prices from the analysis
2.4.hProvide a method to select the individual bid history prices to use to develop the unit price based on the results of the filters in the analysis above.
2.4.iProvide a method to Inflate Unit Prices for each pay item based on multiple Construction Cost Indices. See Section 6.4 for additional information/requirements for unit price analysis.
2.4.jProvide the ability to generate formatted reports for Bid History Unit Price Analysis (BHUPA) or propose for consideration another way to show the specific selected or used bid data that the unit price is derived from and store this data. See SOW Exhibit No. 1 for example reports.
2.4.kAbility to upload electronic files (spreadsheets, word processing documents, etc.) associated with unit price calculation for each pay item if the bid history method was not used to calculate the estimated unit price.
5. Incentives
2.5.aAbility to add, edit and show multiple specific pay item material incentives for each milestone estimate’s schedules, options, and pay item alternates. (Pre-defined material incentive type, user defined dollar amount, such as potential total dollar amount of 401 Asphalt Material Quality Incentive).
2.5.bAutomatically generate the appropriate material incentive-based on the pay item material incentive designation.
2.5.cAbility to add, edit and show multiple individual project non-material incentives for each milestone estimate’s schedules, options, and pay item alternate (user defined dollar amount such as pavement roughness, partnering, etc.).
2.5.dAbility to include the costs of all incentives in the overall project total cost for each milestone estimate schedule, option, and pay item alternate.
2.5.eAbility to split the cost of each individual incentives into separate, multiple unique funding accounts by dollar amount for each milestone estimate.
6. Design Engineer's Estimate Reports
2.6.1Provide Engineer’s Estimate Report for all Schedules, Options, and Pay Item Alternates, including the following information - See Attachment 3.1, Section 2.6.1)
7. Design Summary of Quantity Reports
2.6.2Provide a Summary of Quantities Report for all Schedules, Options, and Pay Item Alternates, including the following - See Attachment 3.1, Section 2.6.2)
8. Design Unit Price Analysis Reports
2.6.3Provide a Design Unit Price Analysis Report, including the following information - See Attachment 3.1, Section 2.6.3)

&G

&"Calibri,Regular"&K0079C1Your Preferred Source for IT Acquisition Across the DoD | &K003A63www.esi.mil 1 ESICOMPASS081811

Functional Requirements_Sec. 3 Request for Proposal No. 693JJ321R000013

Attachment 3.1 Requirements Reference System Requirements

1. Acquisition Project Information
3.1.aAbility to enter solicitation number (user input)
3.1.bAbility to indicate public and private. If status marked as private, then “Source Selection Information – See FAR 2.101 and 3.104” shall be on all generated documents and access restricted from users in other modules until promoted to construction (predefined, selectable list).
231.cProvide ability to indicate solicitation procedure (predefined, selectable list).
3.1.dProvide ability to indicate competition information (predefined, selectable list).
3.1.eAbility to change project name and number limited by access/role (User Input).
2. Solicitation Preparation
3.2.aAbility to indicate Cost Plus Time (A+B) bidding and calendar day notes (predefined, selectable list/User Input)
3.2.bAbility to generate bid schedules that indicate schedule type (See SOW Exhibit No. 1 for example)
3.2.cAbility to change bid schedule type (predefined, selectable list)
3.2.dAbility to create multiple bid schedule groupings for each project (e.g., provide different combinations of schedules and options, each with or without Cost plus time bidding) (predefined, selectable list)
3.2.eAbility to manage Cost plus Time Bidding (automatically provided on bid schedule, calculate total cost based on bid) (User Input)
3.2.fAbility to manually enter calendar day cost to support the calculation of the total contract amount under Cost plus time bidding (User Input).
3.2.gAbility to generate BODEE (See SOW Exhibit No. 1 for example)
3. Amendments
3.3.aAbility to add multiple administrative and pay item Amendments for each project (User Input).
3.3.bAbility to track multiple Amendments
3.3.cAbility to change pay items due to Amendments (all functionality that Design has – entering/editing quantities, pay items addition, etc., with the exception of adding temporary pay items)
3.3.dAbility to track Amendment changes on all design reports and future documents at the individual pay item level (bid schedule, BODEE, Bid Tabulations, Obligation Tabulations, Awarded Bid Schedule, etc.)
4. eBidding
3.4.aAbility to collect Contractor Information including: Contractor name, Contractor address, Contractor phone, Contractor e-mail, Contractor DUNS number (User Input).
3.4.bAbility for contractor to enter bid information including: unit bid price for each pay item, calculate the bid for each pay item for electronic bids enter the, provide the ability for the contractor to provide a bid total for each item for paper bids, and calculate the total bid amount for each schedule & option, as well as totals for bid schedule grouping (User Input).
3.4.cFor Cost Plus Time bidding ability to enter bidder days for time and calculate total of days times administrative fee (User Input).
3.4.dAbility to ensure confidentially of the contractor’s bid.
3.4.eAbility to handle alternative and innovative contracting methods.
3.4.fAbility to post messages and notices to bidders.
3.4.gDenies bidder’s access to bids after bid opening time.
3.4.hAllow bidders to modify or withdraw bid before bid opening time.
3.4.iTime and date stamp all submissions.
3.4.jProvide secure electronic signatures.
3.4.kProvide verification that bidders have received an amendment.
3.4.lAbility to cancel or change bid opening time.
3.4.mAbility to control who can bid on a project.
3.4.nAbility to receive bid bonds.
5. Bid/Proposal Evaluation
3.6.aAbility to indicate responsiveness of bidder (predefined, selectable list).
3.6.bAbility to capture bid date, location and the name of the bid opening officer (User Input).
3.6.cAbility to indicate Bid Guarantee type (predefined, selectable list).
3.6.dAbility to provide Bid Price Analysis.
3.6.eAbility to generate Bid Tabulation Report (See SOW Exhibit No. 1 for example).
6. Pre-Award
3.7.aAbility to select Bidder/Offeror for award (selectable list)
3.7.bAbility to enter and show multiple specific pay item material incentives for each schedule/option. (Pre-defined material incentive type, user defined dollar amount, such as potential total dollar amount of 401 Asphalt Material Quality Incentive based on our SCR's) (User Input).
3.7.cAbility to enter total project incentive amount (User Input)
3.7.dAbility to create Obligation Tabulation with selected contractor total cost, incentives and account splits (See SOW Exhibit No. 1 for example)
3.7.eAbility to add new account numbers (User Input)
3.7.fAbility to indicate immediately awarded Schedules/Options and possible Options to be awarded later (selectable list)
3.7.gAbility to input obligated amounts for award for each account (User Input)
3.7.hAbility to input awarded project length (User Input)
3.7.iAbility to create Awarded Bid Schedule (See SOW Exhibit No. 1 for example)
7. Award
3.8.aAbility to enter contract and task order numbers (User Input)
3.8.bAbility to enter award date (User Input)
3.8.cAbility to send bid data to bid history
3.8.dAbility to transfer project to construction
3.8.eAbility to also transfer Options not initially awarded to Construction, so that Construction may easily add them to the Contract via a Modification
8. Bid Schedule Report
3.9.1Ability to create a Bid Schedule Report (see Attachment 3.1, Section 3.9.1, and SOW Exhibit No. 1 for an example)
9. BODEE
3.9.2Ability to create a BODEE Report (see SOW Exhibit No. 1)
10. Bid Tabulation Report
3.9.3Ability to create a Bid Tabulation Report (see SOW Exhibit No. 1 for example )
11. Obligation Tabulation Report
3.9.4Ability to create an Obligation Tabulation Report (see SOW Exhibit No. 1)
12. Awarded Bid Schedule
3.9.5Ability to create an Awarded Bid Schedule (see SOW Exhibit No. 1)
13. Innovative Contracting
3.1Provide system flexibility to accommodate the above innovative contracting methods. Describe how your system can accommodate these innovative contracting methods.

&G

&"Calibri,Regular"&K0079C1Your Preferred Source for IT Acquisition Across the DoD | &K003A63www.esi.mil 1 ESICOMPASS081811

Functional Requirements_Sec. 4 Request for Proposal No. 693JJ321R000013

Attachment 3.1 Requirements Reference System Requirements

1. Project Information in Construction
4.1Track the following information in construction project information - See Attachment 3.1, Section 4.1
2. Subcontractor Information
4.1.2.aEnter, edit and show multiple subcontractor information (name, address, business type [SBA, WOB, VOB, from picklist], contact person, contact emails, contact phone numbers)
4.1.2.bSelect and show work items and project pay items associated (predefined, selectable) with subcontractor
4.1.2.cEnter, edit and show original and final subcontractor award amount (both user input) as well as award date
4.1.2.dAbility to indicate if required forms have been submitted (SF1413, SF1413s, and SF1775)
4.1.2.eAbility to attach documents (e.g., SF1413, SF1413s, and SF1775)
4.1.2.fShow overall subcontractors list
4.1.2.gShow total dollar amount of each subcontract and calculate the percent of the total contract that is subcontracted for each subcontract.
4.1.2.hInput expended dollar amount of each subcontract and calculate percent of total subcontract that has been expended
4.1.2.iInput retained amount (by prime contractor) for each subcontract
3. Labor and Equipment Information
4.2.1.aAbility to add/modify specific labor and equipment items or codes to a project picklist for selections on daily reports
4.2.1.bProvide Move-In/Move-Out dates for equipment
4.2.1.cAbility to confirm (via check box) whether equipment was clean upon Move-In
4.2.1.dAbility to add attachments and photos or documents to each piece of equipment or labor item
4.2.1.eAbility to assign labor/equipment to a specific contractor or subcontractors
4. Daily General Information
4.2.2.1Show and collect Daily information including the fields shown below - see Attachment 3.1, Section 4.2.2.1
5. Daily Record of Construction Activity for Both CDR and IDR
4.2.2.2.aAbility to enter multiple work activity codes. Each work activity code has the following information associated with it: work activity description, location, associated pay items, labor and equipment.
4.2.2.2.bAbility to select or assign contractor/subcontractor from previously entered data to each work activity code
4.2.2.2.cAbility to pick labor to assign to each work activity code
4.2.2.2.dAbility to pick equipment to assign to each work activity code
4.2.2.2.eAbility to input production time (hours worked by each labor classification for each work activity code)
4.2.2.2.fAbility to input equipment time (hours worked, hours idle, idle types (pick list))
4.2.2.2.gAbility to input narrative report of construction activities
6. Safety, Erosion, and Traffic Inspection Data for Both CDR and IDR
4.2.2.3.aProvide an indication for each of the following items (yes/no indication): Unsafe Operations, Traffic Control Problems, Erosion Control Problems, and Accidents.
4.2.2.3.bProvide a subsequent narrative text box for each of the following items when checked “yes”: Unsafe Operations, Traffic Control Problems, Erosion Control Problems, and Accidents.
4.2.2.3.cAbility to add attachments (documents or photos)
7. Additional Data for FHWA IDR Only
4.2.3.aAbility to input narrative report of daily Quality Assurance activities
4.2.3.bAbility to input inspector on site start and stop times
4.2.3.cApproval Workflow – creation by FHWA or inspection contractor, submission to FHWA, review and comment, approval/rejection to File
4.2.3.dApproval works flow should include automatic emails sent to the next reviewer/approver in the workflow process
4.2.3.eAbility to track IDR submittal and approval dates.
4.2.3.fProvide a mechanism to submit IDR to FHWA for review. IDR author and submittal date must be automatically shown to the reviewer and in the IDR report.
4.2.3.gProvide a view for the Project Engineer/designee to review the IDR and provide ability to approve the IDR with review comments
4.2.3.hThe IDR approver and approval date must be automatically shown to the reviewer and in the IDR report.
8. Additional Data for Contractor CDR Only
4.2.4.aAbility to input narrative report of daily Quality Control and Quality Assurance activities
4.2.4.bApproval Workflow – creation by construction contractor, submission to FHWA, review and comment to contractor, approval to File
4.2.4.cApproval works flow should include automatic emails sent to the next reviewer/approver in the workflow process
4.2.4.dProvide a view for the Contractor Superintendent/designee to review the CDR and provide ability to approve the CDR with review comments. The CDR Author, Author’s Project Title and submittal date must be automatically shown on the CDR.
4.2.4.eInclude the following certification signed by the Contractor on all reports: "I certify that the information contained in this record is accurate and that work documented herein complies with the contract. Exceptions to this certification are documented as a part of this Required record."
4.2.4.fAbility to track CDR submittal and approval date.
4.2.4.gInclude the Contractor’s Approver’s Name, Contractor Approver’s Project Title, and Approval date.
4.2.4.hProvide a mechanism to submit CDR to FHWA for review. CDR author and submittal date must be automatically shown to the reviewer and in the CDR report.
4.2.4.iProvide a view where FHWA can add comments to the CDR (i.e. disagree with certain aspects of the CDR).
4.2.4.jAllow for the CDR to be returned to the Contractor for editing and re-submittal if Required or requested by FHWA.
4.2.4.kThe CDR approver (FHWA) and approval date must be automatically shown to the reviewer and in the CDR report.
9. Daily Inspector Report
4.2.5Provide the daily inspector reports including the following information - see Attachment 3.1, Section 4.2.5
10. PE Daily Diary Information
4.3.aGenerate a PE Daily Dairy that allows input of the following information - see Attachment 3.1, Section 4.3.a
4.3.bAbility to record specific issues and automatically create a project specific pick list within the PE Daily Diary
4.3.cAbility to track specific issues by querying the project specific pick list for the PE Daily Diary
11. Project Engineer's Daily Diary
4.3.1The PE Daily Diary Report should include the following see Attachment 3.1, Section 4.3.1
12. Pay Notes Details for Contractor and FHWA
4.4.1.aShow Project Number, Project Name, Title (Contractor or FHWA Pay Note)
4.4.1.bAbility to select pay item number for multiple locations, dates, and quantities
4.4.1.cAbility to input location, Date, Pay Quantity, Quantity Remarks, and total production days
4.4.1.dAbility to pick measurement type - interim or final
4.4.1.eAbility to associate pay quantity with the account number(s) previously assigned to that pay item
4.4.1.fAbility to attach supporting documents (PDFs or photos)
4.4.1.gAbility to specify the individual’s name who performed the measurement
4.4.1.hAbility to submit contractor pay notes to FHWA, and FHWA pay notes to project engineer for review and approval process
4.4.1.iApproval Workflow – creation by construction contractor or FHWA, submission to FHWA, review and comment to contractor, approval to File and contractor
4.4.1.jApproval works flow should include automatic emails sent to the next reviewer/approver in the workflow process
4.4.1.kAbility to retent a quantity (or dollar amount for LPSM items) on an individual pay note.

Martin, Jeffrey (FHWA): Martin, Jeffrey (FHWA):

What is meant by retent? Is that meant to be retain? This is contained within these cells and at least one more below.

4.4.1.lAbility for approver with appropriate rights to apply retent on specific pay items or pay notes and associated accounts in quantity, dollar amount, or percentage
4.4.1.mAutomatically assigns pay note number in sequential order
13. Approval of Contractor Pay Notes
4.4.2.aProvide the ability for Contractor to submit pay notes
4.4.2.bProvide the ability for the FHWA or Consultant to approve or reject pay notes.
4.4.2.cProvide the ability to track submittal and approval dates
4.4.2.dProvide the ability to track the staff that submits the pay note and the staff that approves the pay note
4.4.2.eProvide the ability to send rejected contractor’s Pay Notes back to the contractor for corrections
4.4.2.fProvide the ability to send a Pay Note report with its approval status for the current estimate to the contractor for informational purposes
4.4.2.gAbility for approvers to provide notes on approved/rejected pay notes
14. Approval of FHWA Pay Notes
4.4.3.aProvide the ability for project inspectors (either FHWA staff or consultant staff) to submit pay notes
4.4.3.bProvide the ability for the FHWA or Consultant to approve, reject, or edit pay notes.
4.4.3.cProvide the ability to track submittal and approval dates
4.4.3.dProvide the ability to track the staff that submits the pay note and the staff that approves the pay note
4.4.3.eProvide the ability to send rejected FHWA Pay Notes back to the FHWA inspector for corrections
4.4.3.fProvide the ability to send a Pay Note report with its approval status for the current/assigned estimate to the FHWA inspector for information purposes
4.4.3.gAbility for approvers to provide notes on approved/rejected pay notes
15. Pay Note Report
4.4.4The Pay Note Report (Government & Contractor Versions) should provide the following information - see Attachment 3.1, Section 4.4.4
16. Pay Note Summary Report
4.4.5The Pay Note Summary Reports (Gov & Contractor Versions) should provide the following information - see Attachment 3.1, Section 4.4.5
17. Contractor Modification Details
4.5.aShow Project number, modification type [predefined, selectable], modification number, initiated by, track various dates (initial and final)
4.5.bAbility to add a new schedule, including same information data fields as required in Section 2.2
4.5.cAbility to edit existing schedule/option data fields
4.5.dAbility to input for each Schedule/Option: Added CM length, Added CM lane-miles, Added Trail miles and for multiple bridges Added CM Bridge Name or No, Added Bridge length, Added Bridge sqft, as well as ability to select Bridge Construction Type (predefined, selectable)
4.5.eAbility to select pay items from master pay item list, and then add line item number, supplemental description, quantities, unit price, and assign to a schedule/option
4.5.fAbility to assign (including split) added pay item quantities to multiple accounts
4.5.gAbility to edit existing project pay items (i.e. increase/decrease existing quantities)
4.5.hAbility to modify existing price for project lump sum (LPSM) or contingent sum (CTSM) pay items
4.5.iAbility to track added or modified pay items associated with each contract modification
4.5.jAbility to modify contract time (by adding or subtracting contract days)
4.5.kAbility to provide reason/description for Modification
4.5.lProvide Work Area Affected [predefined, selectable]
4.5.mAbility to add attachments
4.5.nProvide overall increase/decrease by account due to contract modification
4.5.oProvide overall increase/decrease in funding and time due to contract modification
4.5.pProvide aggregate contract modification amount
4.5.qAbility to add remarks
4.5.rAbility to award options that were not initially awarded, as a contract modification and import all option information automatically. The information that would need to be imported would be the same as an individual project including all option pay items, quantities, awarded contractor unit prices, accounting information for those pay items, any incentives related to the option, etc.
4.5.sAbility to assign contract modification to appropriate progress payment period
4.5.tCalculate updated contract amount for each account number as well as the overall contract amount
4.5.uCalculate the Net Authorization (Obligation) Amount by Account; allowing for a user-input manual override
4.5vAbility to add contract modification issues (“issue” definition: A problem or change in the Contract Modification identified for tracking purposes)
4.5.wProvide a summarized list of pay items, including quantities, unit prices, etc. associated with each contract modification (see CM affected Pay Item Report)
4.5.xProvide the ability to identify all pay items that are added or modified by a Contract Modification with the Contract Modification number
4.5.yAbility to modify or delete Contract Modifications by Administrative Construction Team
18. Contract Modification Report
4.5.1The Contract Modification Report should include the following information - See Attachment 3.1, Section 4.5.1
19. CM Affected Pay Item Report
4.5.2The CM affected Pay Item report should include the following information - see Attachment 3.1, Section 4.5.2
20. Create Initial Estimate
4.6.1.aImport, review, and verify awarded bid schedule and awarded option(s) (Zero Estimate).
4.6.1.bRestrict the ability for users to input any information or create any records/content until awarded bid schedule and awarded option(s) have been verified.
4.6.1.cInclude ability to manually Add Pay Items (Other than Contract Modification Pay Items, i.e. for design-build project)
4.6.1.dAbility for users with appropriate rights to correct errors in awarded bid schedule and awarded option(s) and contract or accounting information without the loss of currently input data
21. Progress Payment Process
4.6.2.aAbility to track and store progress payments and reports
4.6.2.bProvide progress payment status
4.6.2.cAbility to generate progress payment using approved Pay Notes by FHWA and Contractor
4.6.2.dAbility to add and edit pay items that don't require contract modification (for example, materials on hand, material lots, material incentives, etc.)
4.6.2.eAbility to assess liquidated damages, or any other adjustment to the estimate that is not directly related to any pay item.
4.6.2.fAbility to show and edit progress payment dates
4.6.2.gAbility to adjust pay item payment quantities (i.e. retent for individual item)
4.6.2.hAbility to input Probable Quantity for each pay item (i.e.. projected final quantity for a given item)
4.6.2.iAbility to assign and edit progress payment type (initial, progress, final, interim, etc.)
4.6.2.jWhen querying previous progress payments, retain historic account expenditures with the associated progress payment period
4.6.2.kAbility to add new progress payment period (and add pay notes to it), while previous period still being processed
4.6.2.lAbility to propagate (carry forward) input data to new or future progress payments when current progress payment is finalized
4.6.2.mProvide Government Receiving Report (Just pay items with account splits, no approval pages or subcontractor payment info.)
4.5.2.nProvide standardized progress payment report in PDF and excel and csv format
4.6.2.oProvide Progress Payment report without probable (Contractor Version)
4.6.2.pProvide remark fields on progress payment report
22. Government Receiving Report
4.6.3The Government Receiving Report should include the following information - see Attachment 3.1, Section 4.6.3
23. Progress Payment Summary View
4.6.4The Progress Payment Summary View should include the following - See Attachment 3.1, Section 4.6.4
24. Progress Payment Approval Process
4.6.5.aAbility for PE in field to approve and submit progress payment to office for further processing
4.6.5.bAbility for office staff to approve and update submitted quantities before finalizing the estimate
4.6.5.cAbility for office staff to comment and return to PE for adjustment and resubmission
4.6.5.dAbility to track progress payment approval (submittal date, submitter name, approval date, approver name)
4.6.5.eAfter progress payment is approved, mark all approved pay notes in that estimate as paid and not available for future estimate.
4.6.5.fAbility to add or change approvers in approval workflow
4.6.5.gApproval works flow should include automatic emails sent to the next reviewer/approver in the workflow process
25. Progress Payment Report
4.6.6The Progress Payment Report should include the following information - see Attachment 3.1, Section 4.6.6
26. Progress Payment Schedule Summary Report
4.6.7The Progress Payment Schedule Summary Report should include the following - see Attachment 3.1, Section 4.6.7
27. Track Claims
4.7Track request for Equitable Adjustments (REAs), Claims, and Freedom of Information Act (FOIA) requests should include the following - See Attachment 3.1, Section 4.7
28. Batch Reporting
4.8Construction Project-Specific Reports should include the following information - see Attachment 3.1, Section 4.8
29. Construction Contract Status Information
4.8.1.aThe Construction Contract Status (CSTATUS) should include the following - see Attachment 3.1, Section 4.8.1.a
4.8.1.bAbility to input data and add remarks: Contract Paused Dates – Winter Shutdown Start and Finish Dates, Stop Work Start and Finish Dates, Suspension Start and Finish Dates, and others (via editable pick list)
4.8.1.cFor each schedule/option show all the bridges constructed [based on Awarded schedule/option bridge data + Added by CM schedule/option bridge data], including Bridge Name or No., Bridge length,
30. Construction Status Report
4.8.2The Construction Status Report should include the following information - see Attachment 3.1, Section 4.8.2
31. Construction Mobile Application
4.8.3.aProvide the ability to download project documents such as PDF plan sets, and other Acrobat PDF and Microsoft Office documents (Word, Excel, PowerPoint, etc.) from the Document Management System to the mobile device while connected to the internet, and working within the application.
4.8.3.bProvide the ability to annotate or comment on downloaded PDFs and edit Microsoft Office documents
4.8.3.cProvide the ability to create, edit, and approve contractor daily reports, inspection daily reports (including labor and equipment, project work item), daily diaries, and other information while connected or not connected to the internet, and working within the application – approvals may be synced when back online
4.8.3.dProvide the ability to create, review, and approve Pay Notes – approvals may be synced when back online
4.8.3.eProvide the option to sync the information manually or automatically on the mobile device back to the main project database when the user is able to reconnect back to the internet. The syncing with the main database should only require a few steps to complete, or occur automatically, after the user is reconnected to system.
4.8.3.fProvide the ability to take pictures with the mobile device and store them with the project information to be uploaded when reconnected
4.8.3.gProvide the ability to retain or remove metadata associated with photos taken
4.8.3.hProvide the ability to capture GIS data from the mobile device into the construction documents.
4.8.3.iProvide the ability to markup pictures (add text and basic graphics such as arrows, rectangles and circles)
4.8.3.jProvide support for at least the Apple iPad.
4.8.3.kProvide support for non-Apple mobile devices.
4.8.3.lProvide the ability to dictate in any report or annotation text box using the mobile devices voice recognition capabilities.
4.8.3.mAbility to review and approve pay estimates on the mobile device – approval to be synced with back online
4.8.3.nProvide the ability to easily select the information that will be downloaded to the mobile device

&G

&"Calibri,Regular"&K0079C1Your Preferred Source for IT Acquisition Across the DoD | &K003A63www.esi.mil 1 ESICOMPASS081811

Functional Requirements_Sec. 5 Request for Proposal No. 693JJ321R000013

Attachment 3.1 Requirements Reference System Requirements

1. Document Management - General Information
5.1.aAbility to add documents
5.1.bAbility to rename or delete document
5.1.cAbility to edit documents
5.1.dAbility to associate the document with a project(s)
5.1.eAbility to build a folder structure in the system for each project
5.1.fAbility to develop and use folder type structure templates
5.1.gAbility to search document contents (key words, dates, status, originator, last action date)
5.1.hAbility to define meta data for documents
5.1.iAbility to make meta data items required or optional on an item by item basis
5.1.jAbility to drop and drag documents
5.1.kAbility to capture pictures from mobile devices
5.1.lAbility to capture images from scanners
5.1.mProvides a document viewer for image and picture files
5.1.nAbility to combine or archive all or some project documents into a package for archiving or distribution. The system should provide the ability to select all documents and the ability to select documents and folders by selecting or unselecting documents.
5.1.oTracks who and when changes are made to documents
5.1.pTracks who and when documents are downloaded/exported
5.1.qAbility to link documents to each other
5.1.rAbility to control who has access to the documents (ex: project personnel, supervisors, system administrators). Most access would be based on roles in the system. Users without explicit rights will not be able to see the documents.
5.1.sAbility to select documents to upload/download to/from the mobile device
5.1.tAbility to lock documents so they cannot be annotated or edited
2. Document Management Workflow
5.2.aProvide a document status field, showing where document is in the workflow
5.2.bAbility to route a document for approval or review by one or multiple parties
5.2.cNotify user via the system and email when there is an action they need to take in the system.
5.2.dAbility to develop workflow templates for different types of documents
5.2.eAbility to develop multiple routing workflows for the same type of submittal
5.2.fAbility to lock a routing template (Only changeable by users with elevated system rights)
5.2.gAbility to generate a report showing the status of all documents on a selected project
5.2.hAbility to lock a document as Final or Complete, which is no longer able to be annotated or edited
52.iAbility for a user with elevated rights to unlock a document
5.2.jAbility to return a document to the previous user in the workflow, when not approved
5.2.kProvide time stamps showing when documents are submitted, when documents are approved or returned, when a document is final, locked or unlocked
5.2.lRecord the name of the user who takes each of the actions listed above
5.2.mProvide a report showing all of the actions taken on a specific document
5.2.nAbility to filter documents by due date, status, location/user in approval workflow
3. Dashboards
5.3.aProvide configurable Dashboard views that can be arranged by: User – For a specific project, User – For all the project the user is assigned to, Project Lead – Show all documents requiring action soon and those that are have past the due date, Management – A overview of document status for a particular user or group of users.
5.3.bAbility to show a list of documents needing action and highlight any past the due date
5.3.cAbility to show cost and status information
4. Archive Projects
5.4.aAbility to archive a project after final construction closeout, ensuring that the project no longer appears with the active projects
5.4.bEnsure archived projects, as well as the entire project’s data, are viewable and that all ad hoc reporting capabilities still can access the archived projects.
5. Records Management
5.5Ability to delete designated project data and documents, after a certain number of years (per FLH Records Management)
6. Extracting Project Data
5.6.aAbility to export all or select project information including attachments and documents
5.6.bEnsure exported information is viewable using Adobe Acrobat or Microsoft Office programs. Picture data should be viewable using standard image viewing programs.

&G

&"Calibri,Regular"&K0079C1Your Preferred Source for IT Acquisition Across the DoD | &K003A63www.esi.mil 1 ESICOMPASS081811

Functional Requirements_Sec. 6 Request for Proposal No. 693JJ321R000013

Attachment 3.1 Requirements Reference System Requirements

1. User and Role Management
6.1Provide User and Role Management including the abilities listed below - see attachment 3.1, Section 6.1
2. Pre-defined, Selectable List Administration
6.2.aAbility to manage system pre-defined, selectable lists (i.e. add new selections, modify existing selections, delete or hide from use. Delete or hide selections but still keep the selection information for projects that already use that selection.)
6.2.bAbility to manage pre-defined selections without affecting historical data (i.e. archiving selections).
3. Master Pay Item List(s)
6.3.aAbility to add unique Master Pay Item List for multiple specification books (i.e. each spec book has its own master pay item list
6.3.bAbility to import Master Pay Item lists from a spreadsheet
6.3.cProvide at least the following fields for Pay Items:

--Pay Item data must include: Pay Item Number, Pay Item Name, Pay Item Description, Pay Unit, Material Incentive (Yes/No), Spec Book Version;

-- Pay Item data must include: Date pay item created, Date pay item modified, Division Requested, Remarks

6.3.eProvide the ability Add/Modify Pay Items to Master Pay Lists as needed
6.3.fAbility to handle separate US or Metric Pay Item Descriptions and Units
6.3.gFor the special pay item unit of FXHR, which is assigned to some pay items, the system must automatically fill in the Engineer’s Estimate unit price and calculated amount in Acquisitions in Acquisitions module (i.e. bidders cannot enter their own unit price)
6.3.hFor the special pay item unit of CTSM, which is assigned to some pay items, the system must fill in the Engineer’s Estimate amount in Acquisitions (i.e. bidders cannot enter their own amount)
6.3.iAbility to view Master Pay Item lists even when not in a project
6.3.jAbility to set default Bid Decimals and Pay Decimals (for quantities) for each pay item on the Master list. Describe how your system handles Bid and Pay Decimals for quantities
4. Inflation Tool
6.4.aProvide a method of Inflation Prices for Historical Bid Unit Prices
6.4.bAbility to add multiple Inflation Indices (i.e. Colorado DOT CCI, Caltrans CCI) for inflation calculations).
5. Database Reporting Capabilities
C.5.5.1.a

Martin, Jeffrey (FHWA): Martin, Jeffrey (FHWA):

Is C still valid here? Ability to perform Ad Hoc Bid History/Unit Price Analysis outside/separate from a specific project (See Subsection C.2.3 for functionality).

6. User Account Query
6.5.2.1.aProvide ability to select and further filter the following fields - see Attachment 3.1, Section 6.5.2.1.a
7. System Role Query
6.5.2.1.bThe System Role Query will include the ability to select and further filter the following fields - see Attachment 3.1, Section 6.5.2.1.b
8. Project Role Query
6.5.2.1.cThe Project Role Query will include the ability to select and further filter the following fields - see Attachment 3.1, Section 6.5.2.1.c
9. Picklist Query
6.5.2.1.dThe Picklist Query will include the ability to select and further filter the following fields - see Attachment 3.1, Section 6.5.2.1.d
10. Master Pay Item Query
6.5.2.1.eThe Master Pay Item Query will include the ability to select and further filter the following fields - see Attachment 3.1, Section 6.5.2.1.e
11. Bid History Query
6.5.2.2.aThe Bid History Query will include the ability to select and further filter the following fields - see Attachment 3.1, Section 6.5.2.2.a
12. GIS Query
6.5.2.2.bThe GIS Query will include the ability to select and further filter the following fields - see Attachment 3.1, Section 6.5.2.2.b
13. Bid Query
6.5.2.2.cThe Bridge Query will include the ability to select and further filter the following fields - see Attachment 3.1, Section 6.5.2.2.c
14. Project List Query
6.5.2.2.dThe Project List Query will include the ability to select and further filter the following fields - see Attachment 3.1, Section 6.5.2.2.d
15. Estimate Total Query