Attachment__3_Delivery_Installation_Instructions.docx
DOCX document 34 KB Posted
- Attached to
- USPO Processing and Distribution
- Solicitation number
- 03-0812B
- Issued by
- California
About this file
This is a Delivery and Installation Instructions attachment for an Informal Competitive Request for Quotation (RFQ #03-0812) issued by the State of California for the USPO Processing and Distribution facility located at 1675 7th Street, Oakland, CA 94615. The solicitation requests three (3) cold food vending machines. Delivery and installation must be completed within five weeks (35 calendar days) after receipt of order, with all equipment required to be in place and fully operational by the 35th day. Bidders must coordinate delivery at least two weeks in advance with BEP Vendor and BEC to arrange access to restricted areas, verify machine placement, and confirm security clearance requirements. Installation requirements include setting machines in place side by side and banded together, leveling, testing for proper function, removal of all crating and packaging materials, disposal of three existing vending machines through an approved recycling center, and training on operational features and preventative maintenance procedures.
All vending machines must be newly manufactured goods, with no used or reconditioned equipment permitted. Bidders must include in their proposal the cost of delivery via truck with liftgate, installation, setup, testing, training, and either a trade-in value for existing equipment or an offer to move existing machines to a recycler. Barcodes from removed machines must be submitted with the invoice along with recycling receipts to authorize payment. Invoices must include complete descriptions of each unit, including delivery location number and address, brand, model, serial number, and warranty information on parts and labor. No equipment substitutions are permitted without advance written consent from the buyer. Failure to meet delivery requirements or notify the state within 10 days of receiving the order if deadlines cannot be met may result in contract termination for default.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Post-Consumer_Recycled_Content_Certification.pdf | ||
| Q___A.pdf | ||
| RFQ_Letterhead.docx | DOCX document | |
| std204.pdf | ||
| Bidder_Declaration.docx | DOCX document | |
| DGS_PD_843.pdf | ||
| Attachment__1_-_Request_for_Quote_Requirements_(VM).docx | DOCX document | |
| DR815_Request_for_Quote.pdf | ||
| Attachment__2_Specifications_for_Vending_Machines.docx | DOCX document | |
| Darfur_Contracting_Act_Cert_form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USPO Processing and Distribution
RFQ # 03-0812
Informal Competitive
ATTACHMENT #3 DELIVERY / INSTALLATION REQUIREMENTS
Location:
USPO Processing and Distribution 1675 7th Street.
Oakland, CA. 94615
Delivery Instructions:
1. Must contact BEP Vendor and BEC to obtain access to restricted areas, arrange delivery and installation.
2. Truck w/ Liftgate Required.
3. Remove all crating and packaging materials, dispose off-site.
4. No substitutes without a written consultation.
5. Please include in your bid the potential to remove old vending machines, 3 must be disposed.
6. Dispose machines through an approved recycling center.
7. Bar code and recycling receipt must be submitted with invoice to be paid; invoices will be signed upon completion of all PO requirements.
8. For new machines must set up, level, test for function for all 3 new machines.
9. To expedite payment, invoices must include a complete description of each unit, including delivery location number and address, brand, model, serial number, warranty on parts and labor.
Scheduling:
MUST BE COORDINATED 2 WEEKS IN ADVANCE. Must contact BEP Vendor and BEC to coordinate delivery date and time, verify machine placement, configurations, and security / clearance requirements.
Delivery And Installation Requirements:
Equipment to be delivered, set-in-place, installed as per manufacturer’s instructions, remove existing unit(s) and all packing material. Installation must include testing to ensure proper working condition and training of operational features, including suggested operating procedures for coin mechanisms and bill validators, as well as preventative maintenance of vending units (proper cleaning of machine(s), air filters, inlet screens, etc.). It is imperative Supplier provide all necessary components required to complete delivery, set-up, and programming of new machine(s).
NOTE: Vending machines to be set in place, side by side, and banded together at time of installation.
Delivery Terms:
Delivery terms, as specified in paragraph 15 of the General Terms and Conditions, indicates Contractor’s responsibility for the furnishing of equipment and completed installation within 5 weeks (35 calendar days) After Receipt of Order (ARO). Upon the 35th day, equipment specified in this order is to be in place and fully operational. Contractor shall strictly adhere to the delivery terms and schedule as specified in this solicitation. Failure to comply with the delivery requirements may be considered a breach of contract under paragraph 24, entitled “Termination for Default” and paragraph 26, entitled “Rights and Remedies of the State for Default”, resulting in contract termination.
NOTE: In the event delivery terms cannot be met as specified, the awarded Contractor is responsible for notifying BEP within 10 days of receiving this order.
Existing Equipment:
Bid must include an offer for trade-in value OR declaration to move existing equipment to recycler. Prior to equipment transfer, the barcodes, as noted below, must be removed, and returned to the department at the time of invoicing, with a recycling receipt (if applicable). Payment will be delayed if barcodes are not received with invoice. Supplier shall NOT accept any substituted machines or barcodes for removal from premises.
Substitutions, Inspection, Acceptance, and Rejection:
As noted in paragraphs 16, and 17 of the General Terms and Conditions, substitution of goods may not be tendered without advance written consent of the Buyer. All goods may be subject to inspection by the State or its authorized representatives, therefore subject to rejection.
Newly Manufactured Goods:
All Goods furnished under this contract shall be newly manufactured Goods; used or reconditioned Goods are prohibited.
Attachment #3 – USPO Processing and Distribution Page 1 of 3
File details come from the government source that posted it. Updated .