Attachment__3_Delivery_Installation_Instructions.docx

DOCX document 34 KB Posted

Attached to
RFQ 03-0812 USPO Processing and Distribution
Solicitation number
03-0812A
Issued by
Alameda County, California

About this file

This is a Delivery and Installation Instructions document for an Informal Competitive RFQ #03-0812 issued by the State of California for the USPO Processing and Distribution facility located at 1675 7th Street, Oakland, CA 94615. The solicitation requests three cold food vending machines. The contractor must complete all delivery, installation, setup, and testing of the new machines within 5 weeks (35 calendar days) after receipt of order, with equipment fully operational by day 35. Installation must include leveling, function testing, training on operational features, coin mechanisms, bill validators, and preventative maintenance procedures. The contractor is responsible for removing three existing vending machines and disposing of them through an approved recycling center. Delivery scheduling must be coordinated at least 2 weeks in advance with the BEP Vendor and BEC to verify machine placement, configurations, and security clearance requirements. All goods must be newly manufactured; used or reconditioned equipment is prohibited. Substitutions are not permitted without advance written consent from the buyer.

Delivery requirements include a truck with lift-gate capability, removal of all crating and packaging materials, and disposal of materials off-site. The contractor must provide barcodes and recycling receipts with invoices, which will be signed only upon completion of all purchase order requirements. Invoices must include complete unit descriptions with delivery location, address, brand, model, serial number, and warranty information on parts and labor. The bid must include either a trade-in value offer for existing equipment or a declaration to move existing equipment to a recycler. New machines must be set in place side by side and banded together at installation. Failure to meet delivery terms may result in contract termination for default under the General Terms and Conditions. The contractor is responsible for notifying BEP within 10 days if delivery terms cannot be met.

View the file

Other files

File Type Posted
RFQ_Letterhead.docx DOCX document
Attachment__2_Specifications_for_Vending_Machines.docx DOCX document
DVBE_INCENTIVE_FORM.pdf PDF
Post-Consumer_Recycled_Content_Certification.pdf PDF
Attachment__1_-_Request_for_Quote_Requirements_(VM).docx DOCX document
Bidder_Declaration.docx DOCX document
DGS_PD_843.pdf PDF
DR815_Request_for_Quote.pdf PDF
Darfur_Contracting_Act_Cert_form.docx DOCX document
Invitation_for_Bid_No._25-075-230.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USPO Processing and Distribution

RFQ # 03-0812

Informal Competitive

ATTACHMENT #3 DELIVERY / INSTALLATION REQUIREMENTS

Location:

USPO Processing and Distribution 1675 7th Street.

Oakland, CA. 94615

Delivery Instructions:

1. Must contact BEP Vendor and BEC to obtain access to restricted areas, arrange delivery and installation.

2. Truck w/ Lift-Gate Required.

3. Remove all crating and packaging materials, dispose off-site.

4. No substitutes without a written consultation.

5. Please include in your bid the potential to remove old vending machines, 3 must be disposed.

6. Dispose machines through an approved recycling center.

7. Bar code and recycle receipt must be submitted with invoice to be paid; invoices will be signed upon completion of all PO requirements.

8. For new machines must set up, level, test for function for all 3 new machines.

9. To expedite payment, invoices must include a complete description of each unit, including delivery location number and address, brand, model, serial number, warranty on parts and labor.

Scheduling:

MUST BE COORDINATED 2 WEEKS IN ADVANCE. Must contact BEP Vendor and BEC to coordinate delivery date and time, verify machine placement, configurations, and security / clearance requirements.

Delivery And Installation Requirements:

Equipment to be delivered, set-in-place, installed as per manufacturer’s instructions, remove existing unit(s) and all packing material. Installation must include testing to ensure proper working condition and training of operational features, including suggested operating procedures for coin mechanisms and bill validators, as well as preventative maintenance of vending units (proper cleaning of machine(s), air filters, inlet screens, etc.). It is imperative Supplier provide all necessary components required to complete delivery, set-up, and programming of new machine(s).

NOTE: Vending machines to be set in place, side by side, and banded together at time of installation.

Delivery Terms:

Delivery terms, as specified in paragraph 15 of the General Terms and Conditions, indicates Contractor’s responsibility for the furnishing of equipment and completed installation within 5 weeks (35 calendar days) After Receipt of Order (ARO). Upon the 35th day, equipment specified in this order is to be in place and fully operational. Contractor shall strictly adhere to the delivery terms and schedule as specified in this solicitation. Failure to comply with the delivery requirements may be considered a breach of contract under paragraph 24, entitled “Termination for Default” and paragraph 26, entitled “Rights and Remedies of the State for Default”, resulting in contract termination.

NOTE: In the event delivery terms cannot be met as specified, the awarded Contractor is responsible for notifying BEP within 10 days of receiving this order.

Existing Equipment:

Bid must include an offer for trade-in value OR declaration to move existing equipment to recycler. Prior to equipment transfer, the barcodes, as noted below, must be removed, and returned to the department at the time of invoicing, with a recycling receipt (if applicable). Payment will be delayed if barcodes are not received with invoice. Supplier shall NOT accept any substituted machines or barcodes for removal from premises.

Substitutions, Inspection, Acceptance, and Rejection:

As noted in paragraphs 16, and 17 of the General Terms and Conditions, substitution of goods may not be tendered without advance written consent of the Buyer. All goods may be subject to inspection by the State or its authorized representatives, therefore subject to rejection.

Newly Manufactured Goods:

All Goods furnished under this contract shall be newly manufactured Goods; used or reconditioned Goods are prohibited.

Attachment #3 – USPO Processing and Distribution Page 1 of 3