Attachment 3 - Contractor Responsibility Verification.pdf

PDF 269 KB Posted

Attached to
Light Towers
Solicitation number
FA470426Q7004
Issued by

About this file

This is a Contractor Responsibility Verification form for solicitation FA470426Q7004 for Light Towers. The document serves as a template requiring prospective contractors to demonstrate their responsibility and qualifications to receive a federal contract award in accordance with Federal Acquisition Regulation (FAR) Part 9.

Contractors must affirmatively demonstrate responsibility across seven key factors: (a) adequate financial resources or ability to obtain them, evidenced through profit/loss statements, balance sheets, lines of credit, or written confirmation from financial institutions; (b) ability to comply with required or proposed delivery or performance schedules considering existing commercial and governmental commitments; (c) satisfactory performance record within the past three years, demonstrated through two past performance examples or a capability statement for new entrants, with exemptions for contractors with prior government CPARS and SPRS ratings; (d) satisfactory record of integrity and business ethics verified through SAM.gov Responsibility/Qualification section information; (e) necessary organizational structure including experience, accounting and operational controls, and technical skills; (f) adequate production, construction, and technical equipment and facilities; and (g) qualification and eligibility under applicable laws and regulations. Contractors must provide supporting documentation or confirm via checkbox certification by a company representative that they meet each responsibility factor. A final certification statement must be signed by a company representative attesting that all information provided in factors (a) through (f) is correct and accurate.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA470426Q7004 – Light Towers Attachment 3 – Contractor Responsibility Verification

Contractor Responsibility Verification

RFO 9.103

(a) Award contracts to responsible prospective contractors only.

(b) Do not award a contract award before making an affirmative determination of contractor responsibility. Without a clear indication of responsibility, make a determination of nonresponsibility. If the prospective contractor is a small business concern, comply with the subpart, Certificates of Competency and Determinations of Responsibility, at part 19.

(c) A prospective contractor must affirmatively demonstrate its responsibility, including, when necessary, the responsibility of its proposed subcontractors.

RFO 9.104

To be determined responsible, a prospective contractor must-

(a) Have adequate financial resources to perform the contract, or the ability to obtain them (see 9.104- 3(a));

(b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;

(c) Have a satisfactory performance record (see 9.104-3 (b) and part 42). Do not determine a prospective contractor responsible or nonresponsible based solely on a lack of relevant performance history;

(d) Have a satisfactory record of integrity and business ethics (see part 42);

(e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) (see 9.104-3(a));

(f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them (see 9.104-3(a)); and

(g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations (see also inverted domestic corporation prohibition at 9.108).

FA470426Q7004 – Light Towers Attachment 3 – Contractor Responsibility Verification

For each factor, please provide the following information or submit supporting documentations as applicable in order to verify the Contractor’s Responsibility IAW RFO 9.104-1:

(a) FINANCIAL RESOURCES Evidence that the contractor has financial resources to perform the contract such as Profit/Loss statement, most recent Balance Sheet, Available Line of Credit from a bank.

Alternatively, the Offeror may provide a statement from their financial institution or a responsible company official on business letterhead confirming that the offeror currently has sufficient financial resources, or the ability to obtain them, to meet this requirement.

I confirm that a responsible company official will provide documentation of adequate financial resources to support this requirement.

(b) MEETING DELIVERY REQUIREMENT

I confirm that my company is able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments

(c) PERFORMANCE RECORD

Provide in the submission two (2), at a minimum, past performance record within the last 3 years OR a capability statement for a satisfactory performance for new entrants. Exemption: Contractors that had previously satisfied contracts with the Government for which CPARS (Contractor Performance Assessment Reporting System) and SPRS (Supplier Performance Risk System) ratings were received.

I confirm that my company has satisfactorily performed similar requirements in the past 3 years I confirm that my company has, or can, provide a capability statement.

My company is exempt from this requirement.

(d) BUSINESS INTEGRITY AND ETHICS

I, , (Company Representative) certify that the information within the Responsibility/Qualification section in SAM.gov of (Company Name), which includes a summary report of any Active or Inactive Exclusions, Proceedings, and Other Responsibility & Integrity Information, are recent, correct, and accurate.

(e) ORGANIZATIONAL STRUCTURE

I confirm that my company currently has an adequate organizational structure (experience, accounting and operational controls, and technical skills), the ability to correct any potential deficiencies, and/or the ability to obtain them.

(f) PRODUCTION CAPABILITIES Provide in the submission production information on technical equipment and facilities, or the ability to obtain them.

I confirm that my company currently has the adequate production, construction, and technical equipment and facilities, and/or the ability to obtain them to fulfil this requirement.

I, , (Company Representative) certify that the information provided for factors

(a) to (f) are correct and accurate.

Contractor Responsibility Verification

Company Representative certify that the information within the:
Company Name which:
I confirm that my company currently has the adequate production construction and technical equipment:
Company Representative certify that the information provided for factors:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off