Attachment 3- Building Floor Plan.pdf

PDF 3 MB Posted

Attached to
AMENDMENT 0002- FY26 AFJAGS Duct Cleaning
Solicitation number
F2XT105174A001
Issued by

About this file

This is a set of HVAC (Heating, Ventilation, and Air Conditioning) design and construction drawings for an academic facility project under the U.S. Army Corps of Engineers. The drawings document a multi-floor HVAC system installation including detailed floor plans, mechanical layouts, ductwork routing, equipment specifications, and piping schedules.

The project encompasses HVAC work across multiple floors with several distinct bid items and work scopes. The drawings include 2nd floor composite plans (M-102), 1st floor plans in multiple parts (M-103, M-104A, M-104B, M-104C), and 2nd floor plans in multiple parts (M-105, M-106), each showing different bid schedule options (A, B, C). Key systems documented include air handling units (AHU-1, AHU-3), variable air volume (VAV) boxes, exhaust fans (EF-1, EF-2, EF-3, EF-5), ductwork with specified dimensions, balance dampers, fire dampers, louvers with motorized parallel blade dampers, and condensate routing. The drawings reference mechanical systems designated by codes (e.g., F-290, E-125, D-50, A-20) indicating supply, return, exhaust, and other HVAC parameters. Special provisions noted include MERV 8 in-duct filters with bottom pull access, drainable blade louvers with stainless steel bird screens, fire damper installations in penetrations, and coordination with structural truss webbing. Multiple sections contain equipment schedules and silencer specifications. The construction documents are scaled appropriately for each floor level and include north orientation indicators and match-line references for plan continuity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tectonic Copyright 2007

REF.

B

F

11109

G

C

E

B.2

2 41

5.9 8.7

D

D.3

D.7

A

E.5

F.2

A.1

5.1

6.5

6.1

11.1

14 15

DIRECTOR

ATTORNEY

ATTORNEY

JASR

DIV MGR

EXECUTIVE

OFFICER

BREAK

ROOM

ELECTRICAL

WOMEN

MEN

TEST

TRAINING

ATTORNEY

JASC

JASC

231 JASD

224 JASA

JASD/JASA

CWS

STORAGE

JANT

JSR

COMM

JASI

SIPR

CWS

214A

JASL

STAIR

S202

STAIR

S201

MECHANICAL

M200

ATTORNEY

CIV

ATTORNEY

CONFERENCE

DEPUTY

DIR

RECEPTION

LAW OFF

MGR

CORR

C 201

LOBBY

L 200A

CWS

214B

ROOF

ROOF

ROOF

ROOF

EXISTING JAG

ACADEMIC

BUILDING 694

PART A

PART B MATCH LINE

MATCH LINE

NO HVAC WORK

REQUIRED IN THIS

AREA

EXHAUST

ROOF HOOD

EXHAUST

ROOF HOOD

US Army Corps of Engineers ®

SHEET ID

U.

S.

A

RM

Y

CO

RP

S

O F

EN

G

IN

EE

RS

DR

A W

N

BY

DE

S I

G

NE

R O

F

RE

C O

RD

SU

B M

IT

TE

D

BY

SI

ZE

CH

E C

KE

D

B Y

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E

DA

TE

CO

N T

RA

CT

N O

SO

L I

CI

TA

TI

O

N

NO

PR

O

JE

CT

N

UM

BE

R :

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

DE

SC

RI

PT

IO

N

M-102

JA

G

S

CH

O O

L

EX

PA

NS

IO

N

M O

BI

LE

D

IS

T R

IC

T

BR

AN

DY

B

AK

ER

G . S ta ub

G . W hi gh am

W . K

NA

PP

M

AY

W

8R

M

6F T7

M

AX

W

EL

L

AI

R F O

RC

E

B A

SE

, A

LA

BA

M

A

M O

BI

L E

, A

LA

BA

M

A

HV

A C

ND

F

LO

O R

PL

AN

C O

M

PO

S I

TE

3/32" = 1'-0"M-102

1 HVAC 2ND FLOOR PLAN COMPOSITE

PLAN NORTH

SCALE:

3/32" = 1' - 0"

8' 8' 16' 24'

ENTRY

ROOF

M

AR

K

DA

TE

B

11109876

3 5

C

E

B.2

2 41

8.7

D.3

D.7

A

A.1

11.1

D.8

MECHANICAL

M100

RECEIVING

CWS

DV CHIEF

INSTRUCTOR

INSTRUCTOR

INSTRUCTOR

ELECTRICAL

SEMINAR

SEMINAR

SEMINAR

FACULTY

WORK RM

CURRICULUM

WORK

BREAK OUT

SEMINAR

SEMINAR

SEMINAR

SEMINAR

CONTROL

AV

CONTROL

DV

LOUNGE

ELECTRICAL

AHU-3

DS-1

CDS-1

UH-1

CORR

C101B

CORR

C101A

CORR

C101C

CORR

C101D

CORR

C104A

F 300

F 300 F 290

F 290 F 290

F 290 F 290

F 290

F 290

F 290 F 290

F 290

F 200

F 200

E 125

E 135

E 135E 135E 140E 125E 125

D 50

E 250

E 125

VAV-1-8 VAV-1-6

VAV-1-2

VAV-1-1

D 50 D 50

G 300

G 300

G 300

G 300

G 300

G 300

G 300

G 300

G 300

C 25C 50

E 180E 180

B 55

E 180E 180

D 75

F 180 F 180

E 140

B 50

A 20A 20A 20 A 20

B 35 D 80

A 25

E 115

A 20

TLT

VAV-1-9

A 25

VAV-1-3

B 40

A 25

VAV-1-12

A 20

D 80

VAV-1-7

OBSERVATION

I 400

I 400

VAV-1-10

PART A

MATCH LINE

13x10

14x12

12x12

14x12 14x12

12x12

10ø

14x12

16x12

9ø

12x12 12x12

7ø 8ø

12x12 12x10

8ø

22x16

18x12 16x14

6ø

12x10

10ø 10ø

10x10

7ø 12x12

14x12

6ø

6ø

12x12

14x12 16x14

12x14

10ø

10ø

26x16 20x12

10ø

10ø

14ø

10ø

10ø 18ø 10ø

10ø

10ø 10ø

12ø

12ø

16ø

28ø

20ø

50x28 48x24 44x24 38x24

50x28

12ø

B 40 D 50

D 50

6x6 8x8

10x10 14x12

12x10

18x10

8x8

12x10

10x10

60x26

36x20

4 4

4 3 3 3 3

ET-1

B-1

PART B

MATCH LINE

PART A

PART B

PART C

MATCH LINE

28x20

28ø

5ø 7ø

12ø

32x2022x16

18x12

14x127ø

6x6 6ø

12x12

D 806ø

12x12

6ø

26x20

8x8

8x8 5x5

MAL-1 OAL-2

OAL-1

20x20

32x22

14x12

M-301

STAIR

S102STAIR

S102

BALANCING

DAMPER (TYP).

KEY NOTE #7

CWP-1

CWP-1A

SCWP-1A

EF-3

FS

FS

S

S

RETURN

AIR

RETURN

AIR

EF-5

6ø

M-301

SCWP-1

ET-2 AS-2

BP-1AS-1

AHU-3

OAU-1

AHU-1

BALANCING

DAMPER (TYP).

KEY NOTE #7

EAL-3

B 35

6x6

F 290F 290 10ø10ø

S

S

FS

FS

S

32x20

M-401

CABLE

TRAY

CABLE TRAY

EM

EM

T

POINT OF

CONNECTION

FOR DUCTWORK

IN BID ITEM B & C

10x10

10x10

C 225 C 125

10x10 10x10

FIRE DAMPER

6ø

6ø

INSTALL BOILER

INTAKE/EXHAUST

PER MANUFACTURE

SPECIFICATIONS

E 140

F 200

F 200

12x12

12x12

CABLE

TRAY

RETURN

AIR

AUDITORIUM

7ø

UNDER CUT

DOOR

CABLE

TRAY

3 3 3

3 3

22x16

10x10

10x10

6x66x6

12x12

8ø

12x12 12x12 12x12

10ø

10ø

L 400

L 400

H

H

FIRST FLOOR

KEY PLAN

A

B C

US Army Corps of Engineers ®

SHEET ID

U.

S.

A

RM

Y

CO

RP

S

O F

EN

G

IN

EE

RS

DR

A W

N

BY

DE

S I

G

NE

R O

F

RE

C O

RD

SU

B M

IT

TE

D

BY

SI

ZE

CH

E C

KE

D

B Y

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E

DA

TE

CO

N T

RA

CT

N O

SO

L I

CI

TA

TI

O

N

NO

PR

O

JE

CT

N

UM

BE

R :

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

DE

SC

RI

PT

IO

N

M-103

JA

G

S

CH

O O

L

EX

PA

NS

IO

N

M O

BI

LE

D

IS

T R

IC

T

BR

AN

DY

B

AK

ER

G . S ta ub

G . W hi gh am

W . K

NA

PP

M

AY

W

8R

M

6F T7

M

AX

W

EL

L

AI

R F O

RC

E

B A

SE

, A

LA

BA

M

A

M O

BI

L E

, A

LA

BA

M

A

HV

AC

ST

F L O

O R

P L

AN

P

AR

T A

1/8" = 1'-0"M-103

1 HVAC 1ST FLOOR PLAN PART A

KEY NOTES:

1. OUTSIDE AIR DUCT UP TO SECOND FLOOR PROVIDE FIRE DAMPER IN

PENETRATION

2. ROUTE DUCT WORK BETWEEN STRUCTURAL TRUSS WEBBING

3. 20x12 TRANSFER DUCT

4. 12X10 TRANSFER DUCT

5. DRAINABLE BLADE LOUVER WITH STAINLESS STEEL BIRD SCREEN

AND MOTORIZED PARALLEL BLADE DAMPER BEHIND LOUVER.

6. SEE PLUMBING FOR CONDENSATE ROUTING.

7. PROVIDE BALANCE DAMPERS ON ALL DUCT BRANCHES & DUCT TAPS.

8. AMBIENT AIR TEMPERATURE SENSOR. MOUNT HEIGHT MIN. 10' ABOVE

FINISH GRADE AWAY FROM LIGHTS AND EXHAUST AIR LOUVERS/FANS.

9. MERV 8 IN DUCT FILTER WITH BOTTOM PULL

PLAN NORTH

SCALE:

0 8' 16'

1/8" = 1' - 0"

8' 16'

M

AR

K

F

11109

G

E

5.9 8.7

E.5

5.1

LARGE

CONF

LARGE

CONF

COMM

STORAGE

WOMEN

TOILET

MEN

TOILET

STUDENT

LOUNGE

STAIR

S101

CDS-2 CDS-3CDS-4

LOBBY

L100

E 230E 230

F 345 F 345

F 345F 345E 230E 230

E 230

E 230

F 345 F 345

F 260

F 260

F 260F 260F 260

F 260

VAV-1-14

D 50

H 125H 125

D 50

JANT

ELEV EQPT

M102

E 225 E 225

E 140

EF-1

VAV-1-13

DS-2 16x14

16x10

12x10

8x8

UP

UP

A 30

12x10

8x8 8x8

6x6

12x1212x10

16x14

12x12

16x14

10x10

16x10

8ø

12x10

8ø

8ø 12x10

8ø

16x14

12ø

14x12

12x12

12x12 14x12

18x12

10x12

10x12

EAL-1

PART B

MATCHLINE

K 55

DS-4

16x12 16x14

24x16

22x1616x14 32x20

8x8 8x8

8x88x8

5x5

8x8 8x8

14ø

10x10

10x10

10x12

24x16

16x16

E 225 E 225

VAV-1-12

6ø

M-301

BALANCING

DAMPER (TYP)

PART C

MATCHLINE

10x10 10x10

10x10 10x10

10x1010x1010x10

CABLE

TRAY

CABLE

TRAY

CABLE

TRAY

VAV-1-11

VAV

1-15

J 200

J 200

J 200

J 200 J 200

X 250

X 350

X 245

C 125 C 225

K 225 K 125

10ø

10x10

3 3 3

ICE MACHINE

CONDENSER

ICE MACHINE

E

11.1

13 14 15

E.1

E.3

D.8

F 345

EXISTING JAG ACADEMIC

BUILDING 694

NO HVAC WORK

CONNECTOR

CORRIDOR

C102

BID ITEM A

OPEN CONNECTOR CORRIDOR

NO HVAC REQUIRED10x10

PART C MATCHLINE

FIRST FLOOR

KEY PLAN

A

B C

FIRST FLOOR

KEY PLAN

A

B C

US Army Corps of Engineers ®

SHEET ID

U.

S.

A

RM

Y

CO

RP

S

O F

EN

G

IN

EE

RS

DR

A W

N

BY

DE

S I

G

NE

R O

F

RE

C O

RD

SU

B M

IT

TE

D

BY

SI

ZE

CH

E C

KE

D

B Y

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E

DA

TE

CO

N T

RA

CT

N O

SO

L I

CI

TA

TI

O

N

NO

PR

O

JE

CT

N

UM

BE

R :

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

DE

SC

RI

PT

IO

N

M-104A

JA

G

S

CH

O O

L

EX

PA

NS

IO

N

M O

BI

LE

D

IS

T R

IC

T

BR

AN

DY

B

AK

ER

G . S ta ub

G . W hi gh am

W . K

NA

PP

M

AY

W

8R

M

6F T7

M

AX

W

EL

L

AI

R F O

RC

E

B A

SE

, A

LA

BA

M

A

M O

BI

L E

, A

LA

BA

M

A

H V

AC

ST

F L O

O R

P L

AN

P

AR

T B

PA

R T

C B

ID

S

CH

ED

UL

E

A

1/8" = 1'-0"M-104A

1 HVAC 1ST FLOOR PLAN PART B

1/8" = 1'-0"M-104A

2 HVAC 1ST FLOOR PART C BID SCHEDULE A

PLAN NORTH

SCALE:

0 8' 16'

1/8" = 1' - 0"

8' 16'

KEY NOTES:

1. ROUTE DUCT WORK BETWEEN STRUCTURAL TRUSS WEBBING

2. 20x12 TRANSFER DUCT

3. 12X10 TRANSFER DUCT

4. DRAINABLE BLADE LOUVER WITH STAINLESS STEEL BIRD SCREEN

AND MOTORIZED PARALLEL BLADE DAMPER BEHIND LOUVER.

5. LINEAR SLOT DIFFUSER SEE ARCHITECTURAL DRAWINGS FOR

DETAILS

6. SEE PLUMBING FOR CONDENSATE ROUTING.

7. PROVIDE BALANCE DAMPERS ON ALL DUCT BRANCHES & DUCT TAPS.

M

AR

K

E

11.1

14 15

E.1

E.3

D.8

EXISTING JAG ACADEMIC

BUILDING 694

NO HVAC WORK REQUIRED

CONNECTOR

CORRIDOR

C102

BID ITEM B:

ENCLOSED WALKWAY

14x14 10x12F 100F 100 F 100

F 100

6x6 B 45

18x14

F 100

VAV-1-19

3 -HOUR

FIRE DAMPERPOC

POC

12ø

REFERENCE SHEET M-104A

FOR DETAILS IN THIS AREA

PART C

MATCHLINE

FIRST FLOOR

KEY PLAN

A

B C

US Army Corps of Engineers ®

SHEET ID

U.

S.

A

RM

Y

CO

RP

S

O F

EN

G

IN

EE

RS

DR

A W

N

BY

DE

S I

G

NE

R O

F

RE

C O

RD

SU

B M

IT

TE

D

BY

SI

ZE

CH

E C

KE

D

B Y

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E

DA

TE

CO

N T

RA

CT

N O

SO

L I

CI

TA

TI

O

N

NO

PR

O

JE

CT

N

UM

BE

R :

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

DE

SC

RI

PT

IO

N

M-104B

JA

G

S

CH

O O

L

EX

PA

NS

IO

N

M O

BI

LE

D

IS

T R

IC

T

BR

AN

DY

B

AK

ER

G . S ta ub

G . W hi gh am

W . K

NA

PP

M

AY

W

8R

M

6F T7

M

AX

W

EL

L

AI

R F O

RC

E

B A

SE

, A

LA

BA

M

A

M O

BI

L E

, A

LA

BA

M

A

H V

AC

ST

F L O

O R

P L

AN

P

AR

T C

B I D

SC

HE

DU

LE

B E

NC

L O

SE

D

W

AL

KW

AY

1/8" = 1'-0"M-104B

1 HVAC 1ST FLOOR PART C BID SCHEDULE B

PLAN NORTH

SCALE:

0 8' 16'

1/8" = 1' - 0"

8' 16'

M

AR

K

G

E

5.9 8.7

5.1

LARGE

CONF

LARGE

CONF

COMM

STORAGE

WOMEN

TOILET

MEN

TOILET

STUDENT

LOUNGE

STAIR

S101

CDS-2 CDS-3CDS-4

LOBBY

L100

VAV-1-14

JANT

ELEV EQPT

M102

EF-1

VAV-1-13

DS-2

UP

UP

EAL-1

PART B

MATCHLINE

K 55

BID ITEM C:

ENHANCED ENTRY

NO HVAC REQUIRED

M-301

CABLE

TRAY

CABLE

TRAY

CABLE

TRAY

VAV-1-12

VAV-1-11

DS-4

REFERENCE SHEET M-104A

FOR DETAILS IN THIS AREA

REFERENCE SHEET M-104A

FOR DETAILS IN THIS AREA

REFERENCE SHEET M-104A

FOR DETAILS IN THIS AREAREFERENCE SHEET M-104A

FOR DETAILS IN THIS AREA

11109

E

11.1

14 15

E.1

E.3

D.8

LARGE

CONF

EXISTING JAG ACADEMIC

BUILDING 694

NO HVAC WORK REQUIRED

CONNECTOR

CORRIDOR

C102

BID ITEM C:

ENCLOSED WALKWAY

14x14 10x12

F 100F 100

F 100

F 100

6x6 B 45

18x14

F 100

VAV-1-19

3 HR

FIRE DAMPER

POC

POC

REFERENCE SHEET M-104A

FOR DETAILS IN THIS AREA

FIRST FLOOR

KEY PLAN

A

B C

US Army Corps of Engineers ®

SHEET ID

U.

S.

A

RM

Y

CO

RP

S

O F

EN

G

IN

EE

RS

DR

A W

N

BY

DE

S I

G

NE

R O

F

RE

C O

RD

SU

B M

IT

TE

D

BY

SI

ZE

CH

E C

KE

D

B Y

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E

DA

TE

CO

N T

RA

CT

N O

SO

L I

CI

TA

TI

O

N

NO

PR

O

JE

CT

N

UM

BE

R :

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

DE

SC

RI

PT

IO

N

M-104C

JA

G

S

CH

O O

L

EX

PA

NS

IO

N

M O

BI

LE

D

IS

T R

IC

T

BR

AN

DY

B

AK

ER

G . S ta ub

G . W hi gh am

W . K

NA

PP

M

AY

W

8R

M

6F T7

M

AX

W

EL

L

AI

R F O

RC

E

B A

SE

, A

LA

BA

M

A

M O

BI

L E

, A

LA

BA

M

A

HV

AC

S T

F

LO

O R

P

AR

T B

B

ID

S

CH

E D

UL

E C

EN

HA

NC

ED

E N T

RA

N C

E

PA

R T C

B I D

S

CH

ED

UL

E C

E

NC

LO

SE

D W

AL

KW

AY

1/8" = 1'-0"M-104C

1 HVAC 1ST FLOOR PART B BID SCHEDULE C

1/8" = 1'-0"M-104C

2 HVAC 1ST FLOOR PART C BID SCHEDULE C

PLAN NORTH

SCALE:

0 8' 16'

1/8" = 1' - 0"

8' 16'

M

AR

K

B

1110987

C

B.2

5.9 8.7

D

A

11.1

D.8

DIRECTOR

ATTORNEY

ATTORNEY

JASR

DIV MGR

EXECUTIVE

OFFICER

BREAK

ROOM

CWS

214A

JASL

STAIR

S202

MECHANICAL

M200

ATTORNEY

CIV

ATTORNEY

CONFERENCE

DEPUTY

DIR

RECEPTION

LAW OFF

MGR

CORR

C 201

AHU-2

UH-2

CWS

214B

VAV-2-5

VAV-2-6

VAV-2-3

VAV-2-1

VAV-2-10

E 380

F 200

F 200E 100

E 100

F 250

E 150

D 150

E 150 E 150 E 185 E 185

B 50

D 125

E 190

E 200

D 50

D 125

F 275

F 250

F 275

F 275

F 245

D 50

E 130E 115E 115D 100

D 120

D 120

F 380

F 380

ROOF

ROOF

48x20

ROOF .

A 15 A 15 A 15 A 30

VAV-2-8

VAV-2-9

A 15

A 35 A 15

A 15

A 25 A 15

A 30

E 150B 85

D 80

E 125

E 11512x10

8x8

8x8

8x8

8x10

14x10

8x8

10ø

14x12 8ø

8x8

14x12 4ø

4ø

4ø 4x6

10x10

14x12

10x8 8x10

8x8 6ø

8x8

16x10

8ø

10x10 10x10

10x10 10x10

14x10

16ø

10x10 16x10

20x12

6x6

6x4 8x8

8x8 8x8 10x10 16x10

8ø

8x8

10x10 14x8

6x6

8x8

6x6

20x12

6x6

10x10 8x10

6x6

18x12

26x1420x12

48x20

26x14

32x24

10x8 10x8

12x8

6ø

6x6

6x4

6x4

4x4

6x4

6x4 6x4

6x6

16x10

12x10

10x10

46x30

14x12

M-301

M-301

RETURN

AIR

S FS

S

H

DP

PART A

PART B

D 125

8x6

16x10

12x8

F 275

EXHAUST

ROOF HOOD

F 200 F 200

VAV-2-7

VAV-2-2

VAV-2-4

A 45

A 35

A 30

EF-4

EAL-2

24x24 14x12

MOTORIZED

DAMPER

(TYP)

ERH-1

10x8 8x8 24x12

6x6 6x6

FD

2 2

12x8

10x8 10x8

VAV-2-13

16ø

MATCHLINE

A

B

SECOND FLOOR

KEY PLAN

US Army Corps of Engineers ®

SHEET ID

U.

S.

A

RM

Y

CO

RP

S

O F

EN

G

IN

EE

RS

DR

A W

N

BY

DE

S I

G

NE

R O

F

RE

C O

RD

SU

B M

IT

TE

D

BY

SI

ZE

CH

E C

KE

D

B Y

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E

DA

TE

CO

N T

RA

CT

N O

SO

L I

CI

TA

TI

O

N

NO

PR

O

JE

CT

N

UM

BE

R :

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

DE

SC

RI

PT

IO

N

M-105

JA

G

S

CH

O O

L

EX

PA

NS

IO

N

M O

BI

LE

D

IS

T R

IC

T

BR

AN

DY

B

AK

ER

G . S ta ub

G . W hi gh am

W . K

NA

PP

M

AY

W

8R

M

6F T7

M

AX

W

EL

L

AI

R F O

RC

E

B A

SE

, A

LA

BA

M

A

M O

BI

L E

, A

LA

BA

M

A

HV

AC

ND

F L O

O R

P L

AN

P

AR

T A

1/8" = 1'-0"M-105

1 HVAC 2ND FLOOR PLAN PART A

PLAN NORTH

SCALE:

0 8' 16'

1/8" = 1' - 0"

8' 16'

KEY NOTES:

1. 20x12 TRANSFER (T.A.) DUCT

2. 12X10 TRANSFER (T.A.) DUCT

3. DRAINABLE BLADE LOUVER WITH STAINLESS STEEL BIRD SCREEN

AND MOTORIZED PARALLEL BLADE DAMPER BEHIND LOUVER.

4. SEE PLUMBING FOR CONDENSATE ROUTING.

5. PROVIDE BALANCE DAMPERS ON ALL DUCT BRANCHES & DUCT TAPS.

M

AR

K

11109

G

E

5.9 8.7

E.5

F.2

5.1

12 14 15

E.1

E.3

ELECTRICAL

WOMEN

MEN

TEST

TRAINING

ATTORNEY

JASC

JASC

JASD

JASA

JASD/JASA

CWS

STORAGE

JANT

JSR

COMM

JASI

SIPR

STAIR

S201

LOBBY

L 200A

DS-3

VAV-2-11

E 240 E 240

E 215

D 125

E 165 E 165

E 165 E 165

E 200

E 200E 215

E 215

F 380

F 380

F 380

F 380

E 380

A 25

D 70

B 40

E 100

B 50

B 50

E 100

B 80

16x12

F 380

ROOF .

ROOF

10x10

MATCH LINEPART A

PART B

8x8

M-301

20x12

26x14 10x10

24x12

10x10

10x10

14x12

10x10

8ø

6ø

4ø

20x12

6ø10x6

12x10

6ø

10x10

14x12

9ø6ø4ø6ø

10x10 10x10

10x10 ø10 ø10 10x10

4ø

8x8

8x8 6x6

8x104x6

10x8

6ø

14x12 12x10

14x12

6ø

4ø

6ø10x10

10x10

J 120

J 120

8ø

8ø 10x10

6x8

12x12

12x12

6x6

4ø

A 15

B 80

A 25

A 15

6ø

A 15

E 150

A 15

D 60

A 30

A 15

B 65

UP TO ROOF

EXHAUST HOOD

(ERH-2)

EF-2

VAV

2-12

B 40

X 210

K 95

X 280

24x12

TA

TA

12ø

12ø

UNDER CUT

DOOR

6x6

A

B

SECOND FLOOR

KEY PLAN

F

5.9

5.1

E.2

F.1

F.3

E.4

WOMEN

MEN

ATTORNEY

STORAGE

JANT

JSR

STAIR

S201

LOBBY

L 200A

EF-2

TA

TA

9x6

K 25

US Army Corps of Engineers ®

SHEET ID

U.

S.

A

RM

Y

CO

RP

S

O F

EN

G

IN

EE

RS

DR

A W

N

BY

DE

S I

G

NE

R O

F

RE

C O

RD

SU

B M

IT

TE

D

BY

SI

ZE

CH

E C

KE

D

B Y

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E

DA

TE

CO

N T

RA

CT

N O

SO

L I

CI

TA

TI

O

N

NO

PR

O

JE

CT

N

UM

BE

R :

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

DE

SC

RI

PT

IO

N

M-106

JA

G

S

CH

O O

L

EX

PA

NS

IO

N

M O

BI

LE

D

IS

T R

IC

T

BR

AN

DY

B

AK

ER

G . S ta ub

G . W hi gh am

W . K

NA

PP

M

AY

W

8R

M

6F T7

M

AX

W

EL

L

AI

R F O

RC

E

B A

SE

, A

LA

BA

M

A

M O

BI

L E

, A

LA

BA

M

A

HV

AC

ND

F L O

O R

P L

AN

P

AR

T B

1/8" = 1'-0"M-106

1 HVAC 2ND FLOOR PLAN PART B

PLAN NORTH

SCALE:

0 8' 16'

1/8" = 1' - 0"

8' 16'

1. OUTSIDE AIR DUCT

2. ROUTE DUCT WORK BETWEEN STRUCTURAL TRUSS WEBBING

3. 18x10 TRANSFER (T.A.) DUCT

4. 12X10 TRANSFER (T.A.) DUCT

5. DRAINABLE BLADE LOUVER WITH STAINLESS STEEL BIRD SCREEN AND MOTORIZED PARALLEL

BLADE DAMPER BEHIND LOUVER.

6. SEE PLUMBING FOR CONDENSATE ROUTING.

7. PROVIDE BALANCE DAMPERS ON ALL DUCT BRANCHES & DUCT TAPS.

8. PROVIDED BALANCE DAMPER IN GRILLE.

KEY NOTES:

1/8" = 1'-0"M-106

2 HVAC 2ND FLOOR PLAN PART B BID ITEM C

M

AR

K

DA

TE

POC

12X12

694 A plan
694 M-2
694 M-3
694 M-4

File details come from the government source that posted it. Updated .