Attachment 3 - BOM Solarpanels.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Foldable Solar Panels
Solicitation number
12760424Q0179
Issued by

About this file

This document is an Attachment 3 - BOM Solarpanels.xlsx file that provides instructions and a template for a Bill of Materials (BOM) related to a federal contract opportunity for Foldable Solar Panels.

The key details are:

  • The federal contract opportunity is Solicitation Number 12760424Q0179, issued by the Department of Agriculture Forest Service, for Foldable Solar Panels.
  • The BOM template includes labor categories, loaded labor rates, travel costs, supplies (with options for different models), other direct costs, and total estimated costs for the base year and three option years.
  • The BOM template is to be completed by the offeror, with instructions provided for filling out the various sections.
  • The template does not include any specific details on the technical or performance requirements, but rather provides the format for the offeror to submit pricing and cost information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Services
Labor CategoriesEnter ALL proposed labor categories
Labor RatesUse loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
TravelUse an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Cumulative TotalDelete total from any/all unused option periods after completing chart
Period Of PerformanceIf your period of performance for the Base and/or Option Period(s) is less than 12 Months - reflect actual month total in column header
Instructions for Supplies
ColumnsComplete all columns. If there is no serial/product number enter "N/A"
Item(s)Add/delete rows as applicable (ensure item subtotal includes amounts from added rows). Identify and group items by Brand
OptionsComplete as applicable. If the option 3 and 4 page does not apply to your requirement, do not submit with your final IGCE.
Other Direct Costs (ODCs)Itemize all applicable ODCs (such as installation or special equipment) Not all requirements will have ODCs.
TravelUse an overall estimated cost for travel. Combine elements as air fare, per diem, and local travel multiplied by the # of trips.

Supplies

Vendor Offer for Supplies
Estimator Name:William ForsythProject Title:BPA Foldable Solar Panels NFES 4184
Date:4/16/24Project Manger:William Forsyth
BaseYear 1 - 3 Options of 60 eaYear 2- 3 Options of 60 eaYear 3 - 3 Options of 60 eaYear 4 - 3 Options of 60 ea
Item(s)Serial/Product No.QuantityUnit CostAmountQuantityUnit CostAmountQuantityUnit CostAmountQuantityUnit CostAmountQuantityUnit CostAmount
60W Flexible Solar PanelF16-3600-SAE-DESERT -LMT60180180180180
with laminated panels
and sae connector
Item Subtotal
ODCs
Travel
ODC/Travel Subtotal
Period Total
Cumulative TOTAL

File details come from the government source that posted it. Updated .