Attachment 3 Bldg 50 Roof Replacement Drawings.pdf

PDF 11 MB Posted

Attached to
Renovation of Buildings 26 and 50 Roof Replacement
Solicitation number
75F40123R00088
Issued by

About this file

This document provides details for a federal contract opportunity with the Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services. The solicitation number is 75F40123R00088 and seeks proposals for the renovation and roof replacement of Buildings 26 and 50. An attachment to the solicitation provides 11MB of drawings related to the roof replacement aspect of the work. Offerors should review the drawings to develop their responses for the renovation and roof replacement services required under the terms of this solicitation. The agency intends to award a firm-fixed price contract and responses are due by the date specified on Federal Business Opportunities.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPERTY LOCATION

3900 NCTR Road Jefferson, AR 72079

BUILDING 54

BUILDING 60 BUILDING 51

BUILDING 50

NCTR ROAD

NCTR PROPERTY

NCTR ROAD

NCTR ROAD

NCTR ROAD

NCTR ROAD

STAGECOACH

ROAD

NCTR CAMPUS

Copyright

Architect

WITSELL EVANS RASCO

901 West Third Street Little Rock, Arkansas 72201 501.374.5300 www.WERarch.com

BUILDINGS 50, 51, 54 & 60 ROOF REPLACEMENT

/1

/2

:5

:0

A

M

C

U s e rs \r p ia z z a \D e s k to p \P ro je c ts

\F D

A

R e ro o fs \F

D A

ID

I2

.0

-F

D A

B ld g s

R e ro o fs v r p

-1

-2

.r v t

FDA Jefferson Laboratories

3900 NCTR, HFT_324

Jefferson, AR 72079

P ro je c t N a m e

CONSTRUCTION DOCUMENTS

02-10-2023

ARCHITECTURAL

INDEX OF DRAWINGSCAMPUS MAPLOCATION MAP

VICINITY MAP

A0.00 TITLE SHEET

A1.01 ROOF PLAN BUILDINGS 50 & 51

A1.02 ROOF PLAN BUILDINGS 54 & 60

A1.03 ROOF NOTES

A2.01 ROOF PHOTOS

A2.02 ROOF PHOTOS

A2.03 ROOF PHOTOS

A2.04 ROOF PHOTOS

A2.05 ROOF PHOTOS

A2.06 ROOF PHOTOS

A5.01 ROOF DETAILS

BUILDING 50 IS THE ONLY BUILDING TO BE CONSIDERED AS PART OF THIS SOLICITATION. BUILDING 50 IS OPTION 1

NO WORK

THIS ROOF

RD

VTR

RD

RD

RD RD

RD RD

RDRDRD

EFCAMERA

CAMERA

EFRTU

RD RDRDRD

RD

RD

ROOFTOP EQUIP. CURB.

RD RD

ROOFTOP EQUIP. CURB. REMOVE ALL

CURBS NO LONGER IN USE ON THIS LEVEL.

RD

ROOFTOP EQUIP.

CURB.

ROOFTOP EQUIP. CURB. ROOFTOP EQUIP. CURB. REMOVE ALL

CURBS NO LONGER IN USE ON THIS LEVEL.

NEW WALKWAY PADS. COORDINATE EXACT

ROUTE WITH OWNER.

NEW WALKWAY PADS. COORDINATE

EXACT ROUTE WITH OWNER.

ROOFTOP UNIT

ROOFTOP UNIT

P H

O T

O

P H

O T

O

PHOTO 3

P H

O T

O

4PHOTO 5

P H O

TO

P H

O T

O

P H

O T

O

P H

O T

O

PH

O

TO

PHOTO 12

236'-9" V.I.F.

V .I .F

V

.I .F

V

.I .F

V .I .F

15'-6" V.I.F.

186'-3" V.I.F.

± 2'-7" V.I.F.

V

.I .F

± 16'-2" V.I.F.

P H

O T

O

P H

O T

O

P H

O T

O

P H

O T

O

P H

O T

O

NEW WALKWAY PADS. COORDINATE

EXACT ROUTE WITH OWNER.

AREA 50-A

AREA 50-B

AREA 50-D

AREA 50-E

AREA 50-C

P H

O T

O

NOTE: SHOULD THE OWNER ELECT TO INSTALL A WINDOW WASHING SYSTEM,

INCLUDING EYE-TYPE CONNECTORS, ROOFER IS TO PROVIDE LIQUID-APPLIED

FLASHING PER MANUFACTURER'S RECOMMENDATIONS AT EACH CONNECTOR.

ASSUME APPROXIMATELY 12 TO 16 CONNECTORS. COORDINATE WITH OWNER.

PROVIDE NEW STEEL

WALL-MTD LADDER. SEE

DETAIL 16/A1.03

PROVIDE NEW STEEL

WALL-MTD LADDER. SEE

DETAIL 16/A1.03

EXISTING ROOF DRAINS TO REMAIN.

PROVIDE NEW STRAINERS TYPICAL,

ZURN Z100F - NO SUBSTITUTIONS.

AWS

AWR

EF-1

EF-2

EF-3

4" AWS/SWR

6" STEAM

C S

STEAM AND STEAM

CONDENSATE LINES TO

BUILDING 5

CHILLED WATER PIPING

INTO MEZZANINE

30" DIA. DOWN THRU ROOF

(BELOW CURB) TO ERU-1,2,3

IN MEZZANINE BELOW

EXHAUST STACKS UP

EXHAUST FAN PLENUM

PLATFORM

73'-3" V.I.F.

237'-0" V.I.F.

RD

RD RD

RD

RD

RD

RD

RD

RD

RD RD RD

RD RD RD RD RD

VTR

VTR MRV

RD

FLUE

VTR

VTR

MRV

MRV

MRV

MRV MRV MRV MRV

MRV

MRV

MRV

2" COND.

EXISTING DOWNSPOUT.

PROVIDE NEW ALUM.

SPLASHBLOCK

EXISTING WALL-MTD.

LADDER. PREP & PAINT.

EXISTING STEEL RAILINGS

AT EITHER SIDE OF LADDER.

PREP & PAINT.

EXISTING STEEL STAIRS

AND RAILINGS TO REMAIN.

PREP & PAINT.

REMOVE EXISTING STEEL STAIRS.

PROVIDE NEW STEEL LADDER SIM. TO

DETAIL 16/ A1.03. SEE PHOTO 61/A2.06.

NO WORK AT EXISTING ROOFTOP

BUILDING EXCEPT TO PROVIDE NEW

ROOF-TO-WALL FLASHING ALL AROUND.

V

.I .F

-8

V

.I .F

± 18'-11" V.I.F.

V .I .F

35'-10" V.I.F. 128'-4" V.I.F. 11'-2' V.I.F.

V

.I .F

DS

DS

DS

P H

O T

O

P

H O

T O

P H

O T

O

PHOTO 21

PHOTO 22

P H

O T

O

3 P H

O T

O

P H

O T

O

PHOTO 30

P H

O T O

P H

O T

O

PHOTO 31

P H

O T

O

P H

O T

O

P H

O T

O

NEW WALKWAY PADS. COORDINATE

EXACT ROUTE WITH OWNER.

DSDS

AREA 51-D

AREA 51-C

AREA 51-F

AREA 51-E

AREA 51-A

AREA 51-B

P H

O T

O

P H

O T

O

BLDG 60

ROOF

PROVIDE NEW STEEL

WALL-MTD LADDER. SEE

DETAIL 16/A1.03

REPLACE WALL CAP WITH NEW PREFINISHED CAP/FASCIA UNIT. COLOR

TO BE SELECTED BY OWNER. FASCIA AT EXTERIOR TO HAVE 1" ANGLED

KICKOUT AT BOTTOM TO REDUCE THE AMOUNT OF WATER ONTO THE

BUILDING WALL. SUBMITTALS REQUIRED. SEE PHOTO 59/A2.05

P H

O T

O

PROVIDE NEW SCUPPER

WITH COLLECTION BOX

& DOWNSPOUT THIS

CORNER.

REPLACE

ROOF EDGE &

FASCIA - TYP.

REMOVE SCUPPER. INFILL

ROOF EDGE/FASCIA.

REWORK ROOF TO DRAIN

TO SW CORNER

CLEAN THIS ENTIRE

WALL. REFER TO

NOTE ON PHOTO

59/A2.05

DEMOLISH THIS

PIPE. CAP AT

VALVE. SEE

PHOTO 62/A2.06.

CONFIRM WITH

OWNER PRIOR

TO DEMO.

CLEAN THIS

ENTIRE WALL.

REFER TO NOTE

ON PHOTO

59/A2.05

P H

O T

O

PHOTO 63

EXISTING ROOF DRAINS TO REMAIN.

PROVIDE NEW STRAINERS TYPICAL,

ZURN Z100F - NO SUBSTITUTIONS.

Copyright

Date

Title

Sheet No.

901 West Third Street Little Rock, Arkansas 72201 501.374.5300

Seal

Job No.

www.WERarch.com

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

ARCHITECT

WER Architects/Planners

/1

/2

:5

:0

A

M

C

U s e rs \r p ia z z a \D e s k to p \P ro je c ts

\F D

A

R e ro o fs \F

D A

ID

I2

.0

-F

D A

B ld g s

R e ro o fs v r p

-1

-2

.r v t

FDA Jefferson Laboratories

BUILDING 50, 51, 54 & 60

ROOF REPLACEMENT

3900 NCTR, HFT_324

Jefferson, AR 72079

A1.01

ROOF PLAN

BUILDINGS 50 & 51

02-10-2023

FDAIDI21.07

OWNER

FDA Jefferson Laboratories

3900 NCTR Road, HFT_324 Jefferson, AR 72079

P ro je c t N a m e

CONSTRUCTION DOCUMENTS

1/8" = 1'-0"

ROOF PLAN BLDG 50

1/8" = 1'-0"

ROOF PLAN BLDG 51

NORTH

NORTH

No. Issue Date

RD

MRVMRV

RD

RDRD

RD

RD

RD

RD

RD

MRV

RD

FLUE

RD

MRV

RD

VTR

ROOFTOP

VENTILATOR

VTR

VTR

WALL MTD. LADDER TO

REMAIN. PRIME & PAINT.

RTU

VTR

ABANDONED

EQUIPMENT

CURB

REMOVE EXISTING WOOD STAIRS. REPLACE

WITH METAL STEPS (APPROX. 3 12" TREADS) &

RAILS BY PRECISION LADDERS OR APPROVED

EQUAL. SUBMITTALS REQUIRED.

POLE MTD. ANTENNA. FLASH

WITH LIQUID-APPLIED FLASHING.

RD

VTR

VTR

VTR

VTR

STEEL SUPPORT ROD/TURNBUCKLE TO

REMAIN. FLASH BASE WITH LIQUID-

APPLIED FLASHING

REMOVE EXISTING WOOD DECK. PROVIDE EXTRA

WALK PADS THIS AREA AS REQUIRED.

STEEL SUPPORT ROD/TURNBUCKLE TO

REMAIN. FLASH BASE WITH LIQUID-

APPLIED FLASHING

STEEL SUPPORT ROD/TURNBUCKLE TO

REMAIN. FLASH BASE WITH LIQUID-

APPLIED FLASHING

EXISTING RAIL, SIDING, AND GALVANIZED FLASHING

TO REMAIN. ROOF AROUND RAIL AND PROVIDE

LIQUID-APPLIED FLASHING AT ALL PENETRATIONS.

REMOVE EXISTING WOOD STEP. REPLACE

WITH STEPS & RAILS BY PRECISION LADDERS

OR EQUAL. SUBMITTALS REQUIRED.

CU1

CU2

CU2

R T

U

AHU AND PLATFORM

BASE TO REMAIN.

REFLASH BASE.

REMOVE EXISTING EDGE METAL AND ASSOCIATED

FASCIA. PROVIDE NEW PREFINISHED ALUMINUM

FASCIA / EDGE TO MATCH EXISTING PROFILE -

TYPICAL. COLOR TO BE SELECTED BY OWNER

FROM MFR'S STANDARD COLOR LINE.

EXHAUST

FAN

EXISTING METAL CANOPY AND ASSOCIATED

COLUMNS TO REMAIN.

NO WORK

THIS ROOF

NO WORK

THIS ROOF

P H

O T

O

P H

O T

O

PHOTO 33

P H

O T

O

PHOTO 34

P H

O T

O

PH

O

TO

P H

O T

O

P H

O T O

P H

O T O

P H

O T

O

1 P H

O T O

P H

O T

O

PHOTO 46P

H

O T

O

P H

O T

O

P H

O T

O

P H

O T

O

P H

O T

O

PHOTO 51

P H

O T

O

PH

O

TO

PHOTO 54

P H

O T

O

P H

O T

O

NEW WALKWAY PADS. COORDINATE

EXACT ROUTE WITH OWNER.

NO WORK

THIS ROOF

AREA 54-A

AREA 54-B

AREA 54-C

AREA 54-D

AREA 53 - NO

WORK THIS

ROOF

AREA 54-F

AREA 54-F

A R

E A

-F

AREA 54-F

EXISTING EXPANSION

JOINT TO REMAIN

REPLACE EXISTING

EXPANSION JOINT. SEE

KEYED NOTE #56

PROVIDE NEW STEEL WALL-MTD

LADDER TO BLDG 53 ROOF SIMILAR

TO DETAILS SHEET A1.03. VERIFY

EXACT LOCATION WITH OWNER. PH

O

TO

PHOTO 65P

H

O T

O

PHOTO 70

P

H O

T O

PHOTO 67

PHOTO 69

BLDG 50

BLDG 62

AREA 54-F

REPLACE EXISTING EXPANSION JOINT PER DETAILS.

REMOVE EXISTING ROOF-TO-WALL OR ROOF-

TO-PARAPET FLASHING DURING TEAR-OFF.

REPLACE WITH NEW FLASHING PER DETAILS

AND SPECIFICATION. SEE PHOTO 40.

P H

O T

O

REMOVE EXISTING TWO DOWNSPOUTS

AT EAST SIDE OF PORCH DECK. CLOSE

DRAIN OPENINGS. REPLACE WITH

SCUPPER OPENING AT NORTH END

THROUGH RAIL WITH COLLECTION BOX

AND DOWNSPOUT. SEE PHOTO 64/A2.06

TYPICAL ALL ROOFS: ALL EXISTING

ROOF TRIM, FASCIA, GUTTERS,

DOWNSPOUTS AND ROOF DRAIN

STRAINERS TO BE REPLACED WITH

NEW. REPLACE ALL WOOD SUPPORT

BLOCKS WITH DURABLOCK SUPPORTS.

AT CU1, 2 & 3, REPLACE WOOD OR CMU

SUPPORTS WITH DURABLOCK.

EXISTING ROOF DRAINS TO REMAIN.

PROVIDE NEW STRAINERS TYPICAL,

ZURN Z100F - NO SUBSTITUTIONS.

NOTE: REPLACE ALL EXISTING PVC

CONDENSATE PIPING WITH COPPER PIPE -

TYPICAL ALL ROOFS THIS PROJECT.

ALL WOODEN PIPE SUPPORTS

SHALL BE REPLACED WITH

DURABLOCK DB-10 @ 8'-0" O.C.

ALL WOODEN PIPE SUPPORTS

SHALL BE REPLACED WITH

DURABLOCK DB-10 @ 8'-0" O.C.

REPLACE PIPE SUPPORTS WITH UNISTRUT

& DURABLOCK DB-10 @ 8'-0" O.C.

MRV MRV MRV

VTR

VTR

RD RD

MRVMRV

MRV

EXISTING

EXHAUST

DUCT

EXISTING

EXHAUST

DUCT

EXISTING

INTAKE

DUCT

VTR

RD

P H

O T

O

PHOTO 30

P H

O T O

P H

O T

O

PHOTO 31

P H

O T

O

P H

O T

O

P H

O T

O

NEW WALKWAY PADS.

COORDINATE EXACT ROUTE

WITH OWNER.

AREA 60-A

AREA 60-B

PHOTO 71

REPLACE ALL WOOD

SUPPORT BLOCKS WITH

DURABLOCK SUPPORTS -

TYPICAL ALL ROOFS

PROVIDE NEW SCUPPER

WITH COLLECTION BOX &

DOWNSPOUT THIS

CORNER. REWORK SLOPE

TO DRAIN TO THIS

SCUPPER.

PROVIDE NEW CONT.

TERMINATION BAR WITH

SEALANT AND COUNTER

FLASHING AT WALL.

REMOVE EXISTING ROOF EDGE/FASCIA ALL

SIDES. PROVIDE NEW PREFINISHED ROOF

EDGE/FASCIA. COLOR TO BE SELECTED BY

OWNER FROM MFR'S STANDARD COLOR

LINE. SUBMITTALS REQUIRED.

EXISTING ROOF DRAINS TO

REMAIN. PROVIDE NEW

STRAINERS TYPICAL, ZURN

Z100F - NO SUBSTITUTIONS.

Copyright

Date

Title

Sheet No.

901 West Third Street Little Rock, Arkansas 72201 501.374.5300

Seal

Job No.

www.WERarch.com

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

ARCHITECT

WER Architects/Planners

/1

/2

:5

:0

A

M

C

U s e rs \r p ia z z a \D e s k to p \P ro je c ts

\F D

A

R e ro o fs \F

D A

ID

I2

.0

-F

D A

B ld g s

R e ro o fs v r p

-1

-2

.r v t

FDA Jefferson Laboratories

BUILDING 50, 51, 54 & 60

ROOF REPLACEMENT

3900 NCTR, HFT_324

Jefferson, AR 72079

A1.02

ROOF PLAN

BUILDINGS 54 & 60

02-10-2023

FDAIDI21.07

OWNER

FDA Jefferson Laboratories

3900 NCTR Road, HFT_324 Jefferson, AR 72079

P ro je c t N a m e

CONSTRUCTION DOCUMENTS

1/8" = 1'-0"

ROOF PLAN BLDG 54

1/8" = 1'-0"

ROOF PLAN BLDG 60

NORTH

NORTH

CONTRACTOR TO SURVEY EXISTING CONDITIONS AND COORDINATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF

SELECTIVE DEMOLITION REQUIRED.

WHEN UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS ARE ENCOUNTERED, INVESTIGATE AND MEASURE THE

NATURE AND EXTENT OF THE CONFLICT. NOTIFY ARCHITECT IMMEDIATELY.

ALL EXISTING STRUCTURE THAT IS SHOWN IS FOR REFERENCE ONLY AND IS TO BE FIELD VERIFIED BY THE CONTRACTOR.

THE CONTRACTOR IS FULLY RESPONSIBLE FOR THE MEANS AND METHODS OF DEMOLITION AND THE SAFETY OF THE EXISTING

STRUCTURE.

CONDUCT DEMOLITION OPERATIONS TO PREVENT INJURY TO PEOPLE. ENSURE SAFE PASSAGE OF PEOPLE AROUND SELECTIVE

DEMOLITION AREAS.

PROTECT WALLS, CEILINGS, FLOORS, AND OTHER EXISTING FINISH WORK THAT IS TO REMAIN AND/OR IS EXPOSED DURING SELECTIVE

DEMOLITION OPERATIONS.

DEBRIS TO BE REMOVED FROM WORK AREA TO A DUMPSTER. PROTECT ROUTE AS REQUIRED. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON ADJACENT SURFACES AND AREAS. CONTRACTOR TO VERIFY PROPOSED LOCATION OF

DUMPSTER WITH OWNER.

LOCATIONS OF ALL STRUCTURAL ELEMENTS ARE SCHEMATIC/ DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY. NO STRUCTURAL MEMBERS SHALL BE CUT, ALTERED, WITHOUT PRIOR APPROVAL BY THE ARCHITECT/STRUCTURAL ENGINEER. NOTIFY THE ARCHITECT IMMEDIATELY

OF ANY DISCREPANCIES.

PROTECT ADJACENT EXTERIOR MATERIAL TO REMAIN DURING DEMOLITION.

DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT INDICATED ON DEMOLITION PLAN AND/OR AS REQUIRED TO INSTALL NEW WORK SHOWN/SPECIFIED ELSEWHERE. USE METHODS REQUIRED TO COMPLETE WORK WITHIN LIMITATIONS OF GOVERNING

REGULATIONS.

GENERAL DEMOLITION NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

1. ENTIRELY REMOVE EXISTING ROOF DOWN TO EXISTING DECK, INCLUDING MEMBRANE, FLASHINGS, COVER BOARD AND INSULATION.

THICKNESS OF EXISTING ROOF SYSTEM FROM DECK TO CAP SHEET VARIES. SEE CORE REQUIREMENTS THIS SHEET.

2. INSTALL NEW MODIFIED BITUMEN ROOF SYSTEM PER DETAILS, ASSEMBLY AS FOLLOWS:

A. Existing deck.

B. High performance, heavy duty base sheet (torched to primed deck).

C. Adhesive layer applied to base sheet.

D. 2” polyiso rigid insulation set in adhesive.

E. Adhesive layer applied to iso board.

F. ½” Densdeck or equal cover board set in adhesive.

G. High performance mod bit base sheet torched to densdeck.

H. Granulated Cap sheet torched to base sheet.

3. EXISTING ROOF DRAINS TO REMAIN. REFLASH PER DETAILS. REPORT ANY EXISTING DETERIORATION TO ARCHITECT.

4. EXISTING GUTTERS AND DOWNSPOUTS ARE TO BE REPLACED WITH NEW. INSTALL PER DETAILS AND TO ACCOMMODATE NEW INCREASED THICKNESS OF ROOF SYSTEM. PROVIDE NEW PREFINISHED ALUMINUM EDGE FLASHED INTO ROOF AND EXTENDING BEHIND GUTTER. MATCH EXISTING COLOR. COLOR TO BE SELECTED FROM MFR'S STANDARD COLOR LINE. SUBMITTALS AND SAMPLES

REQUIRED.

5. REFLASH PARAPETS, METAL ROUND FLUES, VTR's, PIPE AND CONDUIT PENETRATIONS, ROOFTOP ANCHORS, BUILT-IN LADDER SUPPORTS, AND OTHER MISC. ROOFTOP ITEMS. REFER TO ROOF DETAILS. REUSE EXISTING SPLASH PANS AT DOWNSPOUT

DISCHARGE. PROVIDE EXTRA CAP SHEET MEMBER BELOW SPLASH PANS.

6. TEMPORARILY RAISE EXISTING ROOFTOP CONDUITS AND ASSOCIATED RUBBER AND/OR WOOD SUPPORTS AS REQUIRED TO ACCOMPLISH ROOF TEAR-OFF AND ROOF INSTALLATION. REMOVE ALL WOOD SUPPORTS AT CONDUIT AND PIPING AND PROVIDE NEW DURA-BLOCK TYPE SUPPORTS. REINSTALL CONDUITS AND PIPING AFTER NEW ROOF IS INSTALLED.

7. PROVIDE CRICKETS AT 1/2" PER FOOT SLOPE WHERE REQUIRED.

8. THE CONTRACTOR IS FULLY RESPONSIBLE FOR THE MEANS AND METHODS OF DEMOLITION AND THE SAFETY OF THE EXISTING

STRUCTURE.

9. COORDINATE ANY ELECTRICAL SHUTDOWNS WHICH MIGHT BE NECESSARY WITH OWNER 14 DAYS IN ADVANCE. COORDINATE STAGING

OF CRANES AND OTHER LIFTING EQUIPMENT WITH OWNER 14 DAYS IN ADVANCE.

10. EXERCISE EXTREME CAUTION TO PROTECT ADJACENT EXTERIOR MATERIAL TO REMAIN DURING DEMOLITION AND NEW INSTALLATION.

11. ONLY TEAR-OFF EXISTING ROOFING IN QUANTITIES AS CAN BE WEATHERPROOFED THE SAME DAY. SCHEDULE INSTALLATION APPLICATIONS SO THAT NO PARTIALLY COMPLETED SECTIONS OF ROOF ARE LEFT EXPOSED AT THE END OF THE WORKDAY.

12. EVERY EFFORT HAS BEEN MADE TO IDENTIFY AND SHOW EXISTING FLASHING CONDITIONS AND PENETRATIONS - ROOF DRAINS, VTR'S, MASONRY FLUES, ROUND OR SQUARE GALV. FLUES, TIE-OFF ANCHORS AND PIPE PENETRATIONS. ANY ROOFTOP ITEMS NOT SHOWN

ARE TO REMAIN AND WILL BE FLASHED PER SIMILAR DETAILS AND NOTES.

13., CONTRACTOR IS TO VERIFY EXISTING CONDITIONS, DIMENSIONS, AND QUANTITIES PRIOR TO BIDDING.

ROOF SCOPE OF WORK

COORDINATE STAGING AREA LOCATIONS AND SIZES

WITH OWNER PRIOR TO COMMENCEMENT.

CONTRACTOR ENTRY TO STAGING AREAS AND ROOF

MUST BE SECURE AND SEPARATED FROM THE PUBLIC.

LADDERS AND LIFTS CANNOT BE ACCESSIBLE TO THE

PUBLIC. EXERCISE ALL PRECAUTIONS TO MAINTAIN

SAFETY.

CONTRACTOR WILL RESTORE DAMAGED GRASS AREAS.

TREES AND TREE ROOTS MUST BE PROTECTED FROM

DAMAGE.

CONTRACTOR TO RESTORE SIDEWALKS AND PLANTING

AREAS DAMAGED BY CONSTRUCTION.

MAINTAIN FIRE TRUCK ACCESS. COORDINATE REQUIRED

ROUTES WITH OWNER.

1.

2.

3.

4.

5.

STAGING AREA NOTESMOISTURE RELIEF VENTS

PROVIDE NEW MOISTURE RELIEF VENTS EVERY 800 SQ. FT. OR

AS RECOMMENDED AND/OR REQUIRED BY ROOFING

MANUFACTURER. SUBMITTALS REQUIRED.

PULL TEST COMPLIANCE

CONTRACTOR TO CONSULT WITH ROOFING MANUFACTURER

PRIOR TO COMMENCEMENT REGARDING ANY ISSUES RELATED

TO COMPLIANCE WITH PULL TEST REQUIREMENTS.

ROOF SLOPE DRAINAGE CONCEPT

A CONCEPT FOR THE DIRECTION OF SLOPES AND

ASSOCIATED CRICKETS IS SHOWN ON THE ROOF PLAN. THIS

CONCEPT IS DIAGRAMMATIC. THE CONTRACTOR IS REQUIRED

TO SUBMIT A PROPOSED LAYOUT PRIOR TO COMMENCEMENT

INDICATING PITCH OF MAIN FIELDS, THICKNESS OF TAPERED

POLYISO INSULATION, AND PITCH AND CONFIGURATION OF

CRICKETS. REPORT ANY DISCREPANCIES TO ARCHITECT.

CORES REQUIRED AT EACH ROOF AREA

PRIOR TO TEAR-OFF, CONTRACTOR IS TO CORE EACH ROOF

AREA AT HIGH SIDE OF SLOPE AND AT LOW SIDE OF SLOPE TO

DOCUMENT THICKNESS OF ROOFING SYSTEM FROM ROOF

SURFACE TO EXISTING DECK. REPORT ANY ISSUES OR

CONCERNS WITH THE THICKNESS OF NEW INSULATION /

ROOF SYSTEM AT CURBS AND/OR FLASHINGS. PATCH CORES

AS REQUIRED FOR WATERTIGHT SEAL.

EXISTING ROOF CONDITIONS

AN ATTEMPT HAS BEEN MADE TO INDICATE EXISTING ROOFTOP

EQUIPMENT - DRAINS, FLUES, VTRs, DUCTWORK, PIPING, ETC..

REFER TO ROOF PHOTOS FOR ITEMS NOT SHOWN ON ROOF

PLAN. CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE

PRIOR TO BIDDING TO VERIFY EXISTING CONDITIONS,

QUANTITIES AND DIMENSIONS. REPORT ANY DISCREPANCIES

TO THE ARCHITECT.

VENT THRU ROOF

SECTION NUMBER

SHEET LOCATION

LEGEND

15 KEYED NOTE

P H

O T

O

PHOTO KEY

VTR

A1

A5.01

SIM.

MOISTURE RELIEF VENTMRV

ROOFTOP UNITRTU

ROOF DRAINRD

NO ROOFTOP EQUIPMENT DISRUPTIONS

ROOFTOP EQUIPMENT IS TO REMAIN OPERATIONAL DURING

REROOF. IF EQUIPMENT MUST BE TEMPORARILY OUT OF

SERVICE WHILE CURBS ARE BEING RAISED, THE DOWN TIME

SHALL NOT EXCEED 24 HOURS. THE OWNER IS TO BE

NOTIFIED FOURTEEN DAYS IN ADVANCE OF ANY SUCH

DISRUPTIONS. DISRUPTION MIGHT BE REQUIRED TO OCCUR

AFTER NORMAL BUSINESS HOURS OR ON WEEKENDS PER

OWNER'S PREFERENCE.

AREAS ARE APPROX., V.I.F.,

PARAPETS NOT INCLUDED

IN CALCULATIONS.

BUILDING 50 ROOF AREA_____

AREA 50-A 2,488 SF

AREA 50-B 6,253 SF

AREA 50-C 3,330 SF

AREA 50-D 491 SF

AREA 50-E 441 SF

TOTAL (NET) 13,003 SF

AREAS ARE APPROX., V.I.F.,

PARAPETS NOT INCLUDED

IN CALCULATIONS.

BUILDING 51 ROOF AREA______

AREA 51-A 1,121 SF

AREA 51-B 5,140 SF

AREA 51-C 12,965 SF

AREA 51-D 2,272 SF

AREA 51-E 285 SF

AREA 51-F 102 SF

TOTAL (NET) 21,885 SF

AREAS ARE APPROX., V.I.F.,

PARAPETS NOT INCLUDED

IN CALCULATIONS.

BUILDING 54 ROOF AREA______

AREA 54-A 1,113 SF

AREA 54-B 6,599 SF

AREA 54-C 396 SF

AREA 54-D 2,067 SF

AREA 54-E 1,230 SF

AREA 54-F 3,488 SF

TOTAL (NET) 14,893 SF

AREAS ARE APPROX., V.I.F.,

PARAPETS NOT INCLUDED

IN CALCULATIONS.

BUILDING 60 ROOF AREA______

AREA 60-A 6,170 SF

AREA 60-B 46 SF

TOTAL (NET) 6,216 SF

ROOF AREA SUMMARY RECAP

BUILDING 50 ROOF AREA 13,003 SF

BUILDING 51 ROOF AREA 21,885 SF

BUILDING 54 ROOF AREA 14,893 SF

BUILDING 60 ROOF AREA 6,216 SF

TOTAL (NET) 55,997 SF

2'-0" MIN.

3/8" THICK BY 3" GALVANIZED

STEEL BAR

RADIUS CORNERS AT TOP AND

BOTTOM OF STEEL BARS

ROOF SURFACE

3/4" DIAMETER SKID

RESISTANT GALVANIZED

STEEL RUNGS WELDED TO

3/8" THICK BY 3" STEEL

VERTICAL BARS

ROOF SURFACE

3/4" DIAMETER SKID

RESISTANT GALVANIZED

STEEL RUNGS WELDED

TO VERTICAL BARS

MAINTAIN APPROX. 10" CLEARANCE

FROM ROOF SURFACE TO BOTTOM OF

STEEL BAR. VERIFY FIELD CONDITIONS

PRIOR TO FABRICATION

3/8" THICK BY 3" GALVANIZED

STEEL SUPPORT BAR AT EACH

SIDE WELDED 1/2" PLATE

ANCHORED TO WALL WITH

FOUR EXPANSION BOLTS.

SUBMITTALS REQUIRED.

3/8" THICK BY 3" GALVANIZED

STEEL BAR

S U

B M

IT

T

A L S

R E

Q U

IR

E

D

A P

P R

O X

IM

A

T E

D

IM

E N

S

IO

N

V

E R

IF

Y

F

IE

L D

C O

N D

T

IO

N S

T

Y P

1'-10"

3" 1'-4" 3"

MISCELLANEOUS REPLACEMENT ITEMS

EXISTING ROOF TRIM, FASCIA, GUTTERS AND ROOF DRAIN

STRAINERS SHALL BE REPLACED WITH NEW. NEW ROOF DRAIN

STRAINERS SHALL BE ZURN Z100F - NO SUBSTITUTIONS.

PIPE SUPPORT REPLACEMENT

REGARDLESS OF WHETHER OR NOT IT IS MENTIONED ON

THESE DRAWINGS, ALL WOODEN PIPE SUPPORTS SHALL BE

REPLACED WITH DURABLOCK DB-10 @ 8'-0" O.C.

ASBESTOS STATUS

SPEC SECTION 01 1210 DESCRIBES THE CONTRACTOR'S

RESPONSIBILITY FOR ASBESTOS SAMPLING. AN INDEPENDENT

ASBESTOS SURVEY HAS BEEN REQUESTED AND WILL BE MADE

AVAILABLE BY THE OWNER UPON REQUEST BY CONTRACTOR.

CONTRACTOR SHALL BE RESPONSIBLE FOR PRE DEMOLITION

ASBESTOS SAMPLING REPORT AND COST ESTIMATION.

Copyright

Date

Title

Sheet No.

901 West Third Street Little Rock, Arkansas 72201 501.374.5300

Seal

Job No.

www.WERarch.com

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

ARCHITECT

WER Architects/Planners

/1

/2

:5

:0

A

M

C

U s e rs \r p ia z z a \D e s k to p \P ro je c ts

\F D

A

R e ro o fs \F

D A

ID

I2

.0

-F

D A

B ld g s

R e ro o fs v r p

-1

-2

.r v t

FDA Jefferson Laboratories

BUILDING 50, 51, 54 & 60

ROOF REPLACEMENT

3900 NCTR, HFT_324

Jefferson, AR 72079

A1.03

ROOF NOTES

02-10-2023

FDAIDI21.07

OWNER

FDA Jefferson Laboratories

3900 NCTR Road, HFT_324 Jefferson, AR 72079

P ro je c t N a m e

CONSTRUCTION DOCUMENTS

3/4" = 1'-0"

LADDER DETAIL

5 5 45

13 15

PROVIDE NEW STEEL LADDER.

SEE DETAIL ON SHEET A1.02

1 6

X

8 8

1 EXISTING EXHAUST FAN AND/OR ROOFTOP EQUIPMENT TO REMAIN. RAISE CURB IF REQUIRED TO

ACCOMMODATE NEW INCREASED ROOF THICKNESS. FLASH PER ROOFING MFR'S

RECOMMENDATIONS.

2 REMOVE EXISTING ALUMINUM PARAPET CAP. REPLACE WITH NEW PRE-FINISHED ALUMINUM CAP - TYPICAL ALL PARAPETS AND COPINGS. MATCH EXISTING PROFILE AND COLOR. SUBMITTALS AND PHYSICAL COLOR SAMPLES REQUIRED. PROVIDE NEW SILICONE SEALANT. COLOR TO BE SELECTED BY OWNER FROM MFR'S STANDARD COLOR LINE - TYPICAL FOR ALL ALUMINUM APPLICATIONS THIS

PROJECT. REFER TO FLASHING DETAILS FOR FLASHING BENEATH COPING.

3 EXISTING SECURITY CAMERA TO REMAIN. FLASH PENETRATION WITH LIQUID-APPLIED FLASHING

EQUAL TO SIPLAST PARAPRO.

4 EXISTING LIGHTNING PROTECTION SYSTEM TO REMAIN. TEMPORARILY REMOVE PORTIONS OF

SYSTEM AS MAY BE REQUIRED FOR NEW ROOFING INSTALLATION. REINSTALL AFTERWARD.

5 EXISTING STANDING SEAM METAL ROOF, METAL FASCIAS, SOFFITS AND SIDING TO REMAIN. PROTECT

FROM DAMAGE DURING CONSTRUCTION.

6 EXISTING PITCH POCKET AT ELECTRICAL PENETRATION TO REMAIN. REMOVE SEALANT AND/OR MASTIC AND REFILL PITCH PAN WITH APPROVED POURABLE SEALANT. FLASH OUTSIDE OF PITCH

POCKET WITH APPROVED LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO.

7 EXISTING METAL SILL AT BOTTOM OF SIDING TO REMAIN. EXTEND NEW VERAL OR APPROVED EQUAL FLASHING UP UNDER SILL AS FAR AS POSSIBLE. PROVIDE SEALANT FOR WATER-TIGHT CONDITION.

8 TEAR OFF EXISTING MOD BIT ROOF AND INSULATION TO EXISTING DECK BELOW. REPLACE WITH POLYISO INSULATION, COVER BOARD, AND MOD BIT ROOF SYSTEM PER SPECIFICATION - TYP. AT ALL

FOUR ROOF REPLACEMENTS THIS PROJECT.

9 REMOVE EXISTING ROOF-TO-WALL OR ROOF-TO-PARAPET FLASHING DURING TEAR-OFF. REPLACE

WITH NEW FLASHING PER DETAILS AND SPECIFICATION.

10 EXISTING WALKWAY PADS TO BE REMOVED DURING ROOF TEAR-OFF. REFER TO ROOF PLANS A1.01 &

A1.02 FOR PROPOSED ROUTE OF NEW WALKWAY PADS TO REPLACE EXISTING WALKWAY PADS.

COORDINATE ROUTE WITH OWNER PRIOR TO INSTALLATION.

11 EXISTING ROOFTOP UNITS TO REMAIN. EXTEND NEW VERAL OR APPROVED EQUAL FLASHING UP UNDER EXISTING UNIT'S COUNTER FLASHING AS FAR AS POSSIBLE. PROVIDE SEALANT FOR WATER-

TIGHT CONDITION.

12 REMOVE EXISTING EQUIPMENT SUPPORT PEDESTALS WHICH ARE NO LONGER IN USE. PROVIDE

TREATED WOOD DECK INFILL IF THERE IS AN OPENING IN CONCRETE ROOF DECK. PROVIDE

ADEQUATE ANCHORAGE FOR NEW INFILL. ROOF OVER WITH NEW ROOF SYSTEM.

13 REPLACE EXISTING WOOD AND BLOCK-TYPE SUPPORTS AT PIPING WITH NEW ROOFTOP BLOCK STAND WITH PIPE CRADLE AND SLEEPER CURB (MFR: ROOFTOP SLEEPER SUPPORT) OR WITH DURA- BLOCK DB10 PIPE SUPPORT & UNISTRUT AT ALL EXISTING BLOCK-TYPE SUPPORTS. SELECT SIZE TO

SUIT CONDITIONS.

14 EXISTING CANOPY TO REMAIN. NO WORK REQUIRED.

15 EXISTING WALL-MTD. STEEL LADDER TO REMAIN. PREP & PAINT. COLOR TO BE SELECTED BY OWNER.

16 EXISTING COLLECTION BOX AND DOWNSPOUT TO REMAIN AT BLDG 50. REPLACE COLLECTION BOXES

AND DOWNSPOUTS AT BUILDINGS 51, 54 & 60. MATCH EXISTING PROFILES AND SIZES.

17 EXISTING ROOF DRAIN TO REMAIN - TYPICAL. REPLACE EXISTING STRAINER WITH NEW. REFLASH

DRAIN PER DETAILS AND IN ACCORDANCE WITH ROOF MFR'S RECOMMENDATIONS. SECONDARY

(EMERGENCY OVERFLOW) DRAINS ARE NOT REQUIRED.

18 REPLACE EXISTING OVERFLOW SCUPPER PER MFR'S RECOMMENDATIONS & SCUPPER DETAIL SHEET A5.01.

19 PIPE SUPPORTS TO REMAIN. REMOVE UMBRELLA. REMOVE SEALANT AND/OR MASTIC AND REFILL

PITCH POCKET WITH APPROVED POURABLE SEALANT. FLASH OUTSIDE OF PITCH POCKET WITH

APPROVED LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO. PROVIDE NEW UMBRELLA.

20 EXISTING STEEL BEAM TO REMAIN. PREP AND PAINT.

21 REFLASH EXISTING EQUIPMENT SUPPORT PEDESTALS.

22 TEMPORARILY RAISE OR REMOVE DUCT SUPPORTS DURING ROOF TEAR-OFF AND REROOF. REPLACE SUPPORTS AFTER ROOF IS INSTALLED. PROVIDE EXTRA MEMBRANE BENEATH BASE OF SUPPORTS.

23 EXISTING VTR (VENT THRU ROOF) AND/OR FLUE TO REMAIN. PROVIDE NEW FLASHING KIT PER MFR'S

RECOMMENDATIONS. EXTEND HEIGHT AS REQUIRED FOR ROOF WARRANTY.

24 EXIST. PIPING AND/OR CONDUIT TO REMAIN UNLESS NOTED OTHERWISE. PROTECT FROM DAMAGE.

REPLACE WOOD SUPPORTS WITH DURA-BLOCK TYPE SUPPORTS OF SIZE REQUIRED.

25 EXISTING COUNTER FLASHING TO BE REMOVED AND REPLACED WITH NEW - TYPICAL AT ROOF-TO-

WALL CONDITIONS. TURN NEW MEMBRANE UP UNDER NEW COUNTER FLASHING. ATTACH

MEMBRANE PER ROOFING MFR'S RECOMMENDATIONS. PROVIDE CONTINUOUS SEALANT.

26 REMOVE EXISTING EDGE METAL AND ASSOCIATED FASCIA. PROVIDE NEW PREFINISHED ALUMINUM EDGE AND FASCIA TO MATCH EXISTING PROFILE. COLOR TO BE SELECTED BY OWNER FROM MFR'S

STANDARD COLOR LINE.

27 NO WORK AT EXISTING ROOFTOP BUILDING EXCEPT TO PROVIDE NEW ROOF-TO-WALL FLASHING ALL

AROUND.

28 EXISTING CANOPY TO REMAIN. REMOVE BASE AND CAP SHEET AND REPLACE WITH NEW BASE AND

CAP SHEET.

29 REMOVE EXISTING STEEL STAIRS. PROVIDE NEW STEEL LADDER SIM. TO DETAIL 16/ A1.03.

30 NO WORK AT SURROUNDING METAL CANOPIES.

31 REWORK EXISTING SCUPPER WITH NEW FLASHING. COLLECTION BOX AND DOWNSPOUT TO REMAIN.

32 ROOF TO SLOPE UP TO EXISTING EDGE ALL FOUR SIDES. SEE ROOF PLAN.

33 EXISTING STEEL RAILINGS AT EITHER SIDE OF LADDER. PREP & PAINT.

34 EXISTING PITCH POCKETS AT FRAME SUPPORTING ELECTRICAL PANELS TO REMAIN. REMOVE

SEALANT AND/OR MASTIC AND REFILL PITCH PAN WITH APPROVED POURABLE SEALANT.

35 EXISTING DURA-BLOCK SUPPORTS TO REMAIN. TEMPORARILY REMOVE FOR ROOF TEAR OFF AND

REROOF. REINSTALL AFTER ROOF IS INSTALLED.

36 EXISTING EXHAUST STACKS AND PLATFORM WITH CURB. REFLASH CURB PER DETAILS.

37 EXISTING COUNTER FLASHING TO REMAIN AT THIS PARAPET. TURN NEW MEMBRANE UP UNDER NEW

COUNTER FLASHING. ATTACH MEMBRANE PER ROOFING MFR'S RECOMMENDATIONS. PROVIDE

CONTINUOUS SEALANT.

38 CONTRACTOR IS TO CONSULT WITH OWNER FOR TEMPORARY DISCONNECTION AND TEMPORARY

RELOCATION OF PIPING ALONG PARAPET TO FACILITATE ROOF TEAR-OFF, REROOF AND ROOF-TO-

WALL FLASHING THIS AREA. OWNER MAY CHOOSE PERMANENT REROUTING OF PIPING AND/OR

PERMANENT RAISING OF PIPING TO KEEP PIPING OFF ROOF FOR FUTURE. COORDINATE POTENTIAL SHUT-DOWNS WITH OWNER. PROVIDE 2 WEEKS NOTICE TO OWNER PRIOR TO SHUT-DOWN. PIPING

WORK WILL BE PERFORMED UNDER THIS CONTRACT BY A LICENSED HVAC CONTRACTOR.

39 EXISTING EXHAUST DUCT TO REMAIN. DUCT DISCHARGES ABOVE HIGH ROOF LEVEL AT BLDG 51.

REFLASH CURB PER DETAILS AND MFR'S RECOMMENDATIONS.

40 EXISTING EXHAUST DUCT TO REMAIN. REFLASH CURB PER DETAILS AND MFR'S RECOMMENDATIONS.

41 REMOVE EXISTING MOISTURE RELIEF VENT AND REPLACE WITH NEW MRV AS SPECIFIED.

42 EXISTING CONDUIT TO REMAIN. REPLACE SUPPORTS WITH DURA-BLOCK SUPPORTS.

43 EXISTING INTAKE DUCT TO REMAIN. REFLASH CURB PER DETAILS AND MFR'S RECOMMENDATIONS.

44 REFLASH CURB AT PIPING PENETRATIONS THIS ROOF. SOME CONDITIONS MIGHT REQUIRE LIQUID- APPLIED FLASHING THIS AREA. CONTRACTOR TO REPORT CONDITIONS TO OWNER AND PROPOSE A

FLASHING SOLUTION.

45 STEEL SUPPORT ROD/TURNBUCKLE TO REMAIN. FLASH BASE WITH LIQUID-APPLIED FLASHING.

46 EXISTING FLUE AND PITCH POCKET TO REMAIN. REMOVE SEALANT AND/OR MASTIC AND REFILL PITCH

PAN WITH APPROVED POURABLE SEALANT. FLASH OUTSIDE OF PITCH POCKET WITH APPROVED

LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO.

47 EXISTING RAIL, SIDING, AND GALVANIZED FLASHING TO REMAIN. ROOF AROUND RAIL AND PROVIDE

LIQUID-APPLIED FLASHING AT ALL PENETRATIONS.

48 REMOVE EXISTING WOOD DECK. PROVIDE EXTRA WALK PADS THIS AREA AS REQUIRED.

49 ALL ROOFTOP CONDENSERS TO REMAIN - TYP. REFLASH PER DETAILS & MFR'S RECOMMENDATIONS.

50 PROVIDE APPROVED LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO AT ROOF-TO-WALL

CONDITION.

51 EXISTING STEPS TO REMAIN. CONTRACTOR TO INVESTIGATE CONDITIONS AND ROOF UNDER OR UP

TO STEPS ACCORDINGLY. REPORT DISCREPANCIES TO OWNER.

52 REPLACE FLASHING COVER WITH NEW PREFINISHED ALUMINUM TO MATCH EXISTING PROFILE.

ANCHOR TO CMU WALL AT 12" O.C.. PROVIDE CONT. SEALANT.

53 POLE MTD. ANTENNA. FLASH WITH LIQUID-APPLIED FLASHING.

54 REMOVE EXISTING WOOD STAIRS. REPLACE WITH STEPS & RAILS BY PRECISION LADDERS OR EQUAL.

SUBMITTALS REQUIRED.

55 REMOVE EXISTING ABANDONED ROOF CURB. PROVIDE TREATED WOOD PLYWOOD DECKING AND

WOOD FRAMING AS REQUIRED AT OPENING. PROVIDE NEW ROOFING OVER INFILL.

56 REPLACE EXISTING EXPANSION JOINT PER DETAILS.

57 EXISTING DISCONNECT SWITCH STAND TO BE REPLACED. PROVIDE UNISTRUT CHANNEL AND DURA- BLOCK DB-10 PIPE SUPPORT BLOCK AT FEET OF STAND - TYPICAL ALL SIMILAR CONDITIONS.

58 PROVIDE LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO AT PIPING PENETRATIONS.

59 REPLACE EXISTING GUTTER AND ASSOCIATED DOWNSPOUTS WITH NEW PREFINISHED ALUMINUM.

MATCH EXISTING SIZE AND PROFILE.

60 PROVIDE NEW PREFINISHED ALUMINUM PARAPET CAP. TURN MEMBRANE UP AND OVER PARAPET

BENEATH CAP PER DETAILS AND MFR'S RECOMMENDATIONS.

KEYED NOTES FOR ROOF PHOTOS

Copyright

Date

Title

Sheet No.

901 West Third Street Little Rock, Arkansas 72201 501.374.5300

Seal

Job No.

www.WERarch.com

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

ARCHITECT

WER Architects/Planners

/1

/2

:5

:1

A

M

C

U s e rs \r p ia z z a \D e s k to p \P ro je c ts

\F D

A

R e ro o fs \F

D A

ID

I2

.0

-F

D A

B ld g s

R e ro o fs v r p

-1

-2

.r v t

FDA Jefferson Laboratories

BUILDING 50, 51, 54 & 60

ROOF REPLACEMENT

3900 NCTR, HFT_324

Jefferson, AR 72079

A2.01

ROOF PHOTOS

02-10-2023

FDAIDI21.07

OWNER

FDA Jefferson Laboratories

3900 NCTR Road, HFT_324 Jefferson, AR 72079

P ro je c t N a m e

CONSTRUCTION DOCUMENTS

PHOTO 1 PHOTO 2 PHOTO 3

PHOTO 4 PHOTO 5 PHOTO 6

PHOTO 7 PHOTO 8 PHOTO 9

PHOTO 10 PHOTO 11 PHOTO 12

BUILDING 50 BUILDING 50 BUILDING 50

BUILDING 50 BUILDING 50 BUILDING 50

BUILDING 50 BUILDING 50 BUILDING 50

BUILDING 50 BUILDING 50 BUILDING 51

1818 8

26 18

TYP.

24 29

XX

X

23 X

34 35

26 274

PROVIDE NEW STEEL WALL-MTD

LADDER. SEE ROOF PLAN

2/A1.01 & DETAILS SHEET A1.03

TYP.

X

X

X

1 EXISTING EXHAUST FAN AND/OR ROOFTOP EQUIPMENT TO REMAIN. RAISE CURB IF REQUIRED TO

ACCOMMODATE NEW INCREASED ROOF THICKNESS. FLASH PER ROOFING MFR'S

RECOMMENDATIONS.

2 REMOVE EXISTING ALUMINUM PARAPET CAP. REPLACE WITH NEW PRE-FINISHED ALUMINUM CAP - TYPICAL ALL PARAPETS AND COPINGS. MATCH EXISTING PROFILE AND COLOR. SUBMITTALS AND PHYSICAL COLOR SAMPLES REQUIRED. PROVIDE NEW SILICONE SEALANT. COLOR TO BE SELECTED BY OWNER FROM MFR'S STANDARD COLOR LINE - TYPICAL FOR ALL ALUMINUM APPLICATIONS THIS

PROJECT. REFER TO FLASHING DETAILS FOR FLASHING BENEATH COPING.

3 EXISTING SECURITY CAMERA TO REMAIN. FLASH PENETRATION WITH LIQUID-APPLIED FLASHING

EQUAL TO SIPLAST PARAPRO.

4 EXISTING LIGHTNING PROTECTION SYSTEM TO REMAIN. TEMPORARILY REMOVE PORTIONS OF

SYSTEM AS MAY BE REQUIRED FOR NEW ROOFING INSTALLATION. REINSTALL AFTERWARD.

5 EXISTING STANDING SEAM METAL ROOF, METAL FASCIAS, SOFFITS AND SIDING TO REMAIN. PROTECT

FROM DAMAGE DURING CONSTRUCTION.

6 EXISTING PITCH POCKET AT ELECTRICAL PENETRATION TO REMAIN. REMOVE SEALANT AND/OR MASTIC AND REFILL PITCH PAN WITH APPROVED POURABLE SEALANT. FLASH OUTSIDE OF PITCH

POCKET WITH APPROVED LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO.

7 EXISTING METAL SILL AT BOTTOM OF SIDING TO REMAIN. EXTEND NEW VERAL OR APPROVED EQUAL FLASHING UP UNDER SILL AS FAR AS POSSIBLE. PROVIDE SEALANT FOR WATER-TIGHT CONDITION.

8 TEAR OFF EXISTING MOD BIT ROOF AND INSULATION TO EXISTING DECK BELOW. REPLACE WITH POLYISO INSULATION, COVER BOARD, AND MOD BIT ROOF SYSTEM PER SPECIFICATION - TYP. AT ALL

FOUR ROOF REPLACEMENTS THIS PROJECT.

9 REMOVE EXISTING ROOF-TO-WALL OR ROOF-TO-PARAPET FLASHING DURING TEAR-OFF. REPLACE

WITH NEW FLASHING PER DETAILS AND SPECIFICATION.

10 EXISTING WALKWAY PADS TO BE REMOVED DURING ROOF TEAR-OFF. REFER TO ROOF PLANS A1.01 &

A1.02 FOR PROPOSED ROUTE OF NEW WALKWAY PADS TO REPLACE EXISTING WALKWAY PADS.

COORDINATE ROUTE WITH OWNER PRIOR TO INSTALLATION.

11 EXISTING ROOFTOP UNITS TO REMAIN. EXTEND NEW VERAL OR APPROVED EQUAL FLASHING UP UNDER EXISTING UNIT'S COUNTER FLASHING AS FAR AS POSSIBLE. PROVIDE SEALANT FOR WATER-

TIGHT CONDITION.

12 REMOVE EXISTING EQUIPMENT SUPPORT PEDESTALS WHICH ARE NO LONGER IN USE. PROVIDE

TREATED WOOD DECK INFILL IF THERE IS AN OPENING IN CONCRETE ROOF DECK. PROVIDE

ADEQUATE ANCHORAGE FOR NEW INFILL. ROOF OVER WITH NEW ROOF SYSTEM.

13 REPLACE EXISTING WOOD AND BLOCK-TYPE SUPPORTS AT PIPING WITH NEW ROOFTOP BLOCK STAND WITH PIPE CRADLE AND SLEEPER CURB (MFR: ROOFTOP SLEEPER SUPPORT) OR WITH DURA- BLOCK DB10 PIPE SUPPORT & UNISTRUT AT ALL EXISTING BLOCK-TYPE SUPPORTS. SELECT SIZE TO

SUIT CONDITIONS.

14 EXISTING CANOPY TO REMAIN. NO WORK REQUIRED.

15 EXISTING WALL-MTD. STEEL LADDER TO REMAIN. PREP & PAINT. COLOR TO BE SELECTED BY OWNER.

16 EXISTING COLLECTION BOX AND DOWNSPOUT TO REMAIN AT BLDG 50. REPLACE COLLECTION BOXES

AND DOWNSPOUTS AT BUILDINGS 51, 54 & 60. MATCH EXISTING PROFILES AND SIZES.

17 EXISTING ROOF DRAIN TO REMAIN - TYPICAL. REPLACE EXISTING STRAINER WITH NEW. REFLASH

DRAIN PER DETAILS AND IN ACCORDANCE WITH ROOF MFR'S RECOMMENDATIONS. SECONDARY

(EMERGENCY OVERFLOW) DRAINS ARE NOT REQUIRED.

18 REPLACE EXISTING OVERFLOW SCUPPER PER MFR'S RECOMMENDATIONS & SCUPPER DETAIL SHEET A5.01.

19 PIPE SUPPORTS TO REMAIN. REMOVE UMBRELLA. REMOVE SEALANT AND/OR MASTIC AND REFILL

PITCH POCKET WITH APPROVED POURABLE SEALANT. FLASH OUTSIDE OF PITCH POCKET WITH

APPROVED LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO. PROVIDE NEW UMBRELLA.

20 EXISTING STEEL BEAM TO REMAIN. PREP AND PAINT.

21 REFLASH EXISTING EQUIPMENT SUPPORT PEDESTALS.

22 TEMPORARILY RAISE OR REMOVE DUCT SUPPORTS DURING ROOF TEAR-OFF AND REROOF. REPLACE SUPPORTS AFTER ROOF IS INSTALLED. PROVIDE EXTRA MEMBRANE BENEATH BASE OF SUPPORTS.

23 EXISTING VTR (VENT THRU ROOF) AND/OR FLUE TO REMAIN. PROVIDE NEW FLASHING KIT PER MFR'S

RECOMMENDATIONS. EXTEND HEIGHT AS REQUIRED FOR ROOF WARRANTY.

24 EXIST. PIPING AND/OR CONDUIT TO REMAIN UNLESS NOTED OTHERWISE. PROTECT FROM DAMAGE.

REPLACE WOOD SUPPORTS WITH DURA-BLOCK TYPE SUPPORTS OF SIZE REQUIRED.

25 EXISTING COUNTER FLASHING TO BE REMOVED AND REPLACED WITH NEW - TYPICAL AT ROOF-TO-

WALL CONDITIONS. TURN NEW MEMBRANE UP UNDER NEW COUNTER FLASHING. ATTACH

MEMBRANE PER ROOFING MFR'S RECOMMENDATIONS. PROVIDE CONTINUOUS SEALANT.

26 REMOVE EXISTING EDGE METAL AND ASSOCIATED FASCIA. PROVIDE NEW PREFINISHED ALUMINUM EDGE AND FASCIA TO MATCH EXISTING PROFILE. COLOR TO BE SELECTED BY OWNER FROM MFR'S

STANDARD COLOR LINE.

27 NO WORK AT EXISTING ROOFTOP BUILDING EXCEPT TO PROVIDE NEW ROOF-TO-WALL FLASHING ALL

AROUND.

28 EXISTING CANOPY TO REMAIN. REMOVE BASE AND CAP SHEET AND REPLACE WITH NEW BASE AND

CAP SHEET.

29 REMOVE EXISTING STEEL STAIRS. PROVIDE NEW STEEL LADDER SIM. TO DETAIL 16/ A1.03.

30 NO WORK AT SURROUNDING METAL CANOPIES.

31 REWORK EXISTING SCUPPER WITH NEW FLASHING. COLLECTION BOX AND DOWNSPOUT TO REMAIN.

32 ROOF TO SLOPE UP TO EXISTING EDGE ALL FOUR SIDES. SEE ROOF PLAN.

33 EXISTING STEEL RAILINGS AT EITHER SIDE OF LADDER. PREP & PAINT.

34 EXISTING PITCH POCKETS AT FRAME SUPPORTING ELECTRICAL PANELS TO REMAIN. REMOVE

SEALANT AND/OR MASTIC AND REFILL PITCH PAN WITH APPROVED POURABLE SEALANT.

35 EXISTING DURA-BLOCK SUPPORTS TO REMAIN. TEMPORARILY REMOVE FOR ROOF TEAR OFF AND

REROOF. REINSTALL AFTER ROOF IS INSTALLED.

36 EXISTING EXHAUST STACKS AND PLATFORM WITH CURB. REFLASH CURB PER DETAILS.

37 EXISTING COUNTER FLASHING TO REMAIN AT THIS PARAPET. TURN NEW MEMBRANE UP UNDER NEW

COUNTER FLASHING. ATTACH MEMBRANE PER ROOFING MFR'S RECOMMENDATIONS. PROVIDE

CONTINUOUS SEALANT.

38 CONTRACTOR IS TO CONSULT WITH OWNER FOR TEMPORARY DISCONNECTION AND TEMPORARY

RELOCATION OF PIPING ALONG PARAPET TO FACILITATE ROOF TEAR-OFF, REROOF AND ROOF-TO-

WALL FLASHING THIS AREA. OWNER MAY CHOOSE PERMANENT REROUTING OF PIPING AND/OR

PERMANENT RAISING OF PIPING TO KEEP PIPING OFF ROOF FOR FUTURE. COORDINATE POTENTIAL SHUT-DOWNS WITH OWNER. PROVIDE 2 WEEKS NOTICE TO OWNER PRIOR TO SHUT-DOWN. PIPING

WORK WILL BE PERFORMED UNDER THIS CONTRACT BY A LICENSED HVAC CONTRACTOR.

39 EXISTING EXHAUST DUCT TO REMAIN. DUCT DISCHARGES ABOVE HIGH ROOF LEVEL AT BLDG 51.

REFLASH CURB PER DETAILS AND MFR'S RECOMMENDATIONS.

40 EXISTING EXHAUST DUCT TO REMAIN. REFLASH CURB PER DETAILS AND MFR'S RECOMMENDATIONS.

41 REMOVE EXISTING MOISTURE RELIEF VENT AND REPLACE WITH NEW MRV AS SPECIFIED.

42 EXISTING CONDUIT TO REMAIN. REPLACE SUPPORTS WITH DURA-BLOCK SUPPORTS.

43 EXISTING INTAKE DUCT TO REMAIN. REFLASH CURB PER DETAILS AND MFR'S RECOMMENDATIONS.

44 REFLASH CURB AT PIPING PENETRATIONS THIS ROOF. SOME CONDITIONS MIGHT REQUIRE LIQUID- APPLIED FLASHING THIS AREA. CONTRACTOR TO REPORT CONDITIONS TO OWNER AND PROPOSE A

FLASHING SOLUTION.

45 STEEL SUPPORT ROD/TURNBUCKLE TO REMAIN. FLASH BASE WITH LIQUID-APPLIED FLASHING.

46 EXISTING FLUE AND PITCH POCKET TO REMAIN. REMOVE SEALANT AND/OR MASTIC AND REFILL PITCH

PAN WITH APPROVED POURABLE SEALANT. FLASH OUTSIDE OF PITCH POCKET WITH APPROVED

LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO.

47 EXISTING RAIL, SIDING, AND GALVANIZED FLASHING TO REMAIN. ROOF AROUND RAIL AND PROVIDE

LIQUID-APPLIED FLASHING AT ALL PENETRATIONS.

48 REMOVE EXISTING WOOD DECK. PROVIDE EXTRA WALK PADS THIS AREA AS REQUIRED.

49 ALL ROOFTOP CONDENSERS TO REMAIN - TYP. REFLASH PER DETAILS & MFR'S RECOMMENDATIONS.

50 PROVIDE APPROVED LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO AT ROOF-TO-WALL

CONDITION.

51 EXISTING STEPS TO REMAIN. CONTRACTOR TO INVESTIGATE CONDITIONS AND ROOF UNDER OR UP

TO STEPS ACCORDINGLY. REPORT DISCREPANCIES TO OWNER.

52 REPLACE FLASHING COVER WITH NEW PREFINISHED ALUMINUM TO MATCH EXISTING PROFILE.

ANCHOR TO CMU WALL AT 12" O.C.. PROVIDE CONT. SEALANT.

53 POLE MTD. ANTENNA. FLASH WITH LIQUID-APPLIED FLASHING.

54 REMOVE EXISTING WOOD STAIRS. REPLACE WITH STEPS & RAILS BY PRECISION LADDERS OR EQUAL.

SUBMITTALS REQUIRED.

55 REMOVE EXISTING ABANDONED ROOF CURB. PROVIDE TREATED WOOD PLYWOOD DECKING AND

WOOD FRAMING AS REQUIRED AT OPENING. PROVIDE NEW ROOFING OVER INFILL.

56 REPLACE EXISTING EXPANSION JOINT PER DETAILS.

57 EXISTING DISCONNECT SWITCH STAND TO BE REPLACED. PROVIDE UNISTRUT CHANNEL AND DURA- BLOCK DB-10 PIPE SUPPORT BLOCK AT FEET OF STAND - TYPICAL ALL SIMILAR CONDITIONS.

58 PROVIDE LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO AT PIPING PENETRATIONS.

59 REPLACE EXISTING GUTTER AND ASSOCIATED DOWNSPOUTS WITH NEW PREFINISHED ALUMINUM.

MATCH EXISTING SIZE AND PROFILE.

60 PROVIDE NEW PREFINISHED ALUMINUM PARAPET CAP. TURN MEMBRANE UP AND OVER PARAPET

BENEATH CAP PER DETAILS AND MFR'S RECOMMENDATIONS.

KEYED NOTES FOR ROOF PHOTOS

Copyright

Date

Title

Sheet No.

901 West Third Street Little Rock, Arkansas 72201 501.374.5300

Seal

Job No.

www.WERarch.com

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

ARCHITECT

WER Architects/Planners

/1

/2

:5

:1

A

M

C

U s e rs \r p ia z z a \D e s k to p \P ro je c ts

\F D

A

R e ro o fs \F

D A

ID

I2

.0

-F

D A

B ld g s

R e ro o fs v r p

-1

-2

.r v t

FDA Jefferson Laboratories

BUILDING 50, 51, 54 & 60

ROOF REPLACEMENT

3900 NCTR, HFT_324

Jefferson, AR 72079

A2.02

ROOF PHOTOS

02-10-2023

FDAIDI21.07

OWNER

FDA Jefferson Laboratories

3900 NCTR Road, HFT_324 Jefferson, AR 72079

P ro je c t N a m e

CONSTRUCTION DOCUMENTS

PHOTO 14 PHOTO 15

PHOTO 16 PHOTO 17 PHOTO 18

PHOTO 19 PHOTO 20 PHOTO 21

PHOTO 22 PHOTO 23 PHOTO 24

PHOTO 17

PHOTO 13 BUILDING 51 BUILDING 51 BUILDING 51

BUILDING 50 BUILDING 50 BUILDING 50

BUILDING 50 BUILDING 50 BUILDING 51

BUILDING 51 BUILDING 51 BUILDING 51

40 26

4026 X

TYP.

8 26

TYP.

826 40

TYP.

39 1043 8

TYP.

SEE PHOTO 64/A2.06 FOR

SIDING AND DOWNSPOUTS

47 8 45

17 54

REPLACE WOOD OR CMU SUPPORTS

AT THESE THREE CONDENSERS

WITH DURABLOCK SUPPORTS.

SEE PHOTO

64/A2.06 FOR

SIDING AND

DOWN-

SPOUTS

X50 51 50

1 EXISTING EXHAUST FAN AND/OR ROOFTOP EQUIPMENT TO REMAIN. RAISE CURB IF REQUIRED TO

ACCOMMODATE NEW INCREASED ROOF THICKNESS. FLASH PER ROOFING MFR'S

RECOMMENDATIONS.

2 REMOVE EXISTING ALUMINUM PARAPET CAP. REPLACE WITH NEW PRE-FINISHED ALUMINUM CAP - TYPICAL ALL PARAPETS AND COPINGS. MATCH EXISTING PROFILE AND COLOR. SUBMITTALS AND PHYSICAL COLOR SAMPLES REQUIRED. PROVIDE NEW SILICONE SEALANT. COLOR TO BE SELECTED BY OWNER FROM MFR'S STANDARD COLOR LINE - TYPICAL FOR ALL ALUMINUM APPLICATIONS THIS

PROJECT. REFER TO FLASHING DETAILS FOR FLASHING BENEATH COPING.

3 EXISTING SECURITY CAMERA TO REMAIN. FLASH PENETRATION WITH LIQUID-APPLIED FLASHING

EQUAL TO SIPLAST PARAPRO.

4 EXISTING LIGHTNING PROTECTION SYSTEM TO REMAIN. TEMPORARILY REMOVE PORTIONS OF

SYSTEM AS MAY BE REQUIRED FOR NEW ROOFING INSTALLATION. REINSTALL AFTERWARD.

5 EXISTING STANDING SEAM METAL ROOF, METAL FASCIAS, SOFFITS AND SIDING TO REMAIN. PROTECT

FROM DAMAGE DURING CONSTRUCTION.

6 EXISTING PITCH POCKET AT ELECTRICAL PENETRATION TO REMAIN. REMOVE SEALANT AND/OR MASTIC AND REFILL PITCH PAN WITH APPROVED POURABLE SEALANT. FLASH OUTSIDE OF PITCH

POCKET WITH APPROVED LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO.

7 EXISTING METAL SILL AT BOTTOM OF SIDING TO REMAIN. EXTEND NEW VERAL OR APPROVED EQUAL FLASHING UP UNDER SILL AS FAR AS POSSIBLE. PROVIDE SEALANT FOR WATER-TIGHT CONDITION.

8 TEAR OFF EXISTING MOD BIT ROOF AND INSULATION TO EXISTING DECK BELOW. REPLACE WITH POLYISO INSULATION, COVER BOARD, AND MOD BIT ROOF SYSTEM PER SPECIFICATION - TYP. AT ALL

FOUR ROOF REPLACEMENTS THIS PROJECT.

9 REMOVE EXISTING ROOF-TO-WALL OR ROOF-TO-PARAPET FLASHING DURING TEAR-OFF. REPLACE

WITH NEW FLASHING PER DETAILS AND SPECIFICATION.

10 EXISTING WALKWAY PADS TO BE REMOVED DURING ROOF TEAR-OFF. REFER TO ROOF PLANS A1.01 &

A1.02 FOR PROPOSED ROUTE OF NEW WALKWAY PADS TO REPLACE EXISTING WALKWAY PADS.

COORDINATE ROUTE WITH OWNER PRIOR TO INSTALLATION.

11 EXISTING ROOFTOP UNITS TO REMAIN. EXTEND NEW VERAL OR APPROVED EQUAL FLASHING UP UNDER EXISTING UNIT'S COUNTER FLASHING AS FAR AS POSSIBLE. PROVIDE SEALANT FOR WATER-

TIGHT CONDITION.

12 REMOVE EXISTING EQUIPMENT SUPPORT PEDESTALS WHICH ARE NO LONGER IN USE. PROVIDE

TREATED WOOD DECK INFILL IF THERE IS AN OPENING IN CONCRETE ROOF DECK. PROVIDE

ADEQUATE ANCHORAGE FOR NEW INFILL. ROOF OVER WITH NEW ROOF SYSTEM.

13 REPLACE EXISTING WOOD AND BLOCK-TYPE SUPPORTS AT PIPING WITH NEW ROOFTOP BLOCK STAND WITH PIPE CRADLE AND SLEEPER CURB (MFR: ROOFTOP SLEEPER SUPPORT) OR WITH DURA- BLOCK DB10 PIPE SUPPORT & UNISTRUT AT ALL EXISTING BLOCK-TYPE SUPPORTS. SELECT SIZE TO

SUIT CONDITIONS.

14 EXISTING CANOPY TO REMAIN. NO WORK REQUIRED.

15 EXISTING WALL-MTD. STEEL LADDER TO REMAIN. PREP & PAINT. COLOR TO BE SELECTED BY OWNER.

16 EXISTING COLLECTION BOX AND DOWNSPOUT TO REMAIN AT BLDG 50. REPLACE COLLECTION BOXES

AND DOWNSPOUTS AT BUILDINGS 51, 54 & 60. MATCH EXISTING PROFILES AND SIZES.

17 EXISTING ROOF DRAIN TO REMAIN - TYPICAL. REPLACE EXISTING STRAINER WITH NEW. REFLASH

DRAIN PER DETAILS AND IN ACCORDANCE WITH ROOF MFR'S RECOMMENDATIONS. SECONDARY

(EMERGENCY OVERFLOW) DRAINS ARE NOT REQUIRED.

18 REPLACE EXISTING OVERFLOW SCUPPER PER MFR'S RECOMMENDATIONS & SCUPPER DETAIL SHEET A5.01.

19 PIPE SUPPORTS TO REMAIN. REMOVE UMBRELLA. REMOVE SEALANT AND/OR MASTIC AND REFILL

PITCH POCKET WITH APPROVED POURABLE SEALANT. FLASH OUTSIDE OF PITCH POCKET WITH

APPROVED LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO. PROVIDE NEW UMBRELLA.

20 EXISTING STEEL BEAM TO REMAIN. PREP AND PAINT.

21 REFLASH EXISTING EQUIPMENT SUPPORT PEDESTALS.

22 TEMPORARILY RAISE OR REMOVE DUCT SUPPORTS DURING ROOF TEAR-OFF AND REROOF. REPLACE SUPPORTS AFTER ROOF IS INSTALLED. PROVIDE EXTRA MEMBRANE BENEATH BASE OF SUPPORTS.

23 EXISTING VTR (VENT THRU ROOF) AND/OR FLUE TO REMAIN. PROVIDE NEW FLASHING KIT PER MFR'S

RECOMMENDATIONS. EXTEND HEIGHT AS REQUIRED FOR ROOF WARRANTY.

24 EXIST. PIPING AND/OR CONDUIT TO REMAIN UNLESS NOTED OTHERWISE. PROTECT FROM DAMAGE.

REPLACE WOOD SUPPORTS WITH DURA-BLOCK TYPE SUPPORTS OF SIZE REQUIRED.

25 EXISTING COUNTER FLASHING TO BE REMOVED AND REPLACED WITH NEW - TYPICAL AT ROOF-TO-

WALL CONDITIONS. TURN NEW MEMBRANE UP UNDER NEW COUNTER FLASHING. ATTACH

MEMBRANE PER ROOFING MFR'S RECOMMENDATIONS. PROVIDE CONTINUOUS SEALANT.

26 REMOVE EXISTING EDGE METAL AND ASSOCIATED FASCIA. PROVIDE NEW PREFINISHED ALUMINUM EDGE AND FASCIA TO MATCH EXISTING PROFILE. COLOR TO BE SELECTED BY OWNER FROM MFR'S

STANDARD COLOR LINE.

27 NO WORK AT EXISTING ROOFTOP BUILDING EXCEPT TO PROVIDE NEW ROOF-TO-WALL FLASHING ALL

AROUND.

28 EXISTING CANOPY TO REMAIN. REMOVE BASE AND CAP SHEET AND REPLACE WITH NEW BASE AND

CAP SHEET.

29 REMOVE EXISTING STEEL STAIRS. PROVIDE NEW STEEL LADDER SIM. TO DETAIL 16/ A1.03.

30 NO WORK AT SURROUNDING METAL CANOPIES.

31 REWORK EXISTING SCUPPER WITH NEW FLASHING. COLLECTION BOX AND DOWNSPOUT TO REMAIN.

32 ROOF TO SLOPE UP TO EXISTING EDGE ALL FOUR SIDES. SEE ROOF PLAN.

33 EXISTING STEEL RAILINGS AT EITHER SIDE OF LADDER. PREP & PAINT.

34 EXISTING PITCH POCKETS AT FRAME SUPPORTING ELECTRICAL PANELS TO REMAIN. REMOVE

SEALANT AND/OR MASTIC AND REFILL PITCH PAN WITH APPROVED POURABLE SEALANT.

35 EXISTING DURA-BLOCK SUPPORTS TO REMAIN. TEMPORARILY REMOVE FOR ROOF TEAR OFF AND

REROOF. REINSTALL AFTER ROOF IS INSTALLED.

36 EXISTING EXHAUST STACKS AND PLATFORM WITH CURB. REFLASH CURB PER DETAILS.

37 EXISTING COUNTER FLASHING TO REMAIN AT THIS PARAPET. TURN NEW MEMBRANE UP UNDER NEW

COUNTER FLASHING. ATTACH MEMBRANE PER ROOFING MFR'S RECOMMENDATIONS. PROVIDE

CONTINUOUS SEALANT.

38 CONTRACTOR IS TO CONSULT WITH OWNER FOR TEMPORARY DISCONNECTION AND TEMPORARY

RELOCATION OF PIPING ALONG PARAPET TO FACILITATE ROOF TEAR-OFF, REROOF AND ROOF-TO-

WALL FLASHING THIS AREA. OWNER MAY CHOOSE PERMANENT REROUTING OF PIPING AND/OR

PERMANENT RAISING OF PIPING TO KEEP PIPING OFF ROOF FOR FUTURE. COORDINATE POTENTIAL SHUT-DOWNS WITH OWNER. PROVIDE 2 WEEKS NOTICE TO OWNER PRIOR TO SHUT-DOWN. PIPING

WORK WILL BE PERFORMED UNDER THIS CONTRACT BY A LICENSED HVAC CONTRACTOR.

39 EXISTING EXHAUST DUCT TO REMAIN. DUCT DISCHARGES ABOVE HIGH ROOF LEVEL AT BLDG 51.

REFLASH CURB PER DETAILS AND MFR'S RECOMMENDATIONS.

40 EXISTING EXHAUST DUCT TO REMAIN. REFLASH CURB PER DETAILS AND MFR'S RECOMMENDATIONS.

41 REMOVE EXISTING MOISTURE RELIEF VENT AND REPLACE WITH NEW MRV AS SPECIFIED.

42 EXISTING CONDUIT TO REMAIN. REPLACE SUPPORTS WITH DURA-BLOCK SUPPORTS.

43 EXISTING INTAKE DUCT TO REMAIN. REFLASH CURB PER DETAILS AND MFR'S RECOMMENDATIONS.

44 REFLASH CURB AT PIPING PENETRATIONS THIS ROOF. SOME CONDITIONS MIGHT REQUIRE LIQUID- APPLIED FLASHING THIS AREA. CONTRACTOR TO REPORT CONDITIONS TO OWNER AND PROPOSE A

FLASHING SOLUTION.

45 STEEL SUPPORT ROD/TURNBUCKLE TO REMAIN. FLASH BASE WITH LIQUID-APPLIED FLASHING.

46 EXISTING FLUE AND PITCH POCKET TO REMAIN. REMOVE SEALANT AND/OR MASTIC AND REFILL PITCH

PAN WITH APPROVED POURABLE SEALANT. FLASH OUTSIDE OF PITCH POCKET WITH APPROVED

LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO.

47 EXISTING RAIL, SIDING, AND GALVANIZED FLASHING TO REMAIN. ROOF AROUND RAIL AND PROVIDE

LIQUID-APPLIED FLASHING AT ALL PENETRATIONS.

48 REMOVE EXISTING WOOD DECK. PROVIDE EXTRA WALK PADS THIS AREA AS REQUIRED.

49 ALL ROOFTOP CONDENSERS TO REMAIN - TYP. REFLASH PER DETAILS & MFR'S RECOMMENDATIONS.

50 PROVIDE APPROVED LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO AT ROOF-TO-WALL

CONDITION.

51 EXISTING STEPS TO REMAIN. CONTRACTOR TO INVESTIGATE CONDITIONS AND ROOF UNDER OR UP

TO STEPS ACCORDINGLY. REPORT DISCREPANCIES TO OWNER.

52 REPLACE FLASHING COVER WITH NEW PREFINISHED ALUMINUM TO MATCH EXISTING PROFILE.

ANCHOR TO CMU WALL AT 12" O.C.. PROVIDE CONT. SEALANT.

53 POLE MTD. ANTENNA. FLASH WITH LIQUID-APPLIED FLASHING.

54 REMOVE EXISTING WOOD STAIRS. REPLACE WITH STEPS & RAILS BY PRECISION LADDERS OR EQUAL.

SUBMITTALS REQUIRED.

55 REMOVE EXISTING ABANDONED ROOF CURB. PROVIDE TREATED WOOD PLYWOOD DECKING AND

WOOD FRAMING AS REQUIRED AT OPENING. PROVIDE NEW ROOFING OVER INFILL.

56 REPLACE EXISTING EXPANSION JOINT PER DETAILS.

57 EXISTING DISCONNECT SWITCH STAND TO BE REPLACED. PROVIDE UNISTRUT CHANNEL AND DURA- BLOCK DB-10 PIPE SUPPORT BLOCK AT FEET OF STAND - TYPICAL ALL SIMILAR CONDITIONS.

58 PROVIDE LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO AT PIPING PENETRATIONS.

59 REPLACE EXISTING GUTTER AND ASSOCIATED DOWNSPOUTS WITH NEW PREFINISHED ALUMINUM.

MATCH EXISTING SIZE AND PROFILE.

60 PROVIDE NEW PREFINISHED ALUMINUM PARAPET CAP. TURN MEMBRANE UP AND OVER PARAPET

BENEATH CAP PER DETAILS AND MFR'S RECOMMENDATIONS.

KEYED NOTES FOR ROOF PHOTOS

Copyright

Date

Title

Sheet No.

901 West Third Street Little Rock, Arkansas 72201 501.374.5300

Seal

Job No.

www.WERarch.com

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

ARCHITECT

WER Architects/Planners

/1

/2

:5

:2

A

M

C

U s e rs \r p ia z z a \D e s k to p \P ro je c ts

\F D

A

R e ro o fs \F

D A

ID

I2

.0

-F

D A

B ld g s

R e ro o fs v r p

-1

-2

.r v t

FDA Jefferson Laboratories

BUILDING 50, 51, 54 & 60

ROOF REPLACEMENT

3900 NCTR, HFT_324

Jefferson, AR 72079

A2.03

ROOF PHOTOS

02-10-2023

FDAIDI21.07

OWNER

FDA Jefferson Laboratories

3900 NCTR Road, HFT_324 Jefferson, AR 72079

P ro je c t N a m e

CONSTRUCTION DOCUMENTS

PHOTO 27

PHOTO 28 PHOTO 29 PHOTO 30

PHOTO 32

PHOTO 33

PHOTO 34 PHOTO 35 PHOTO 36

PHOTO 25 PHOTO 26

PHOTO 31 PHOTO 33

BUILDING 60 BUILDING 60 BUILDING 60

BUILDING 60 BUILDING 60 BUILDING 60

BUILDING 60 BUILDING 60 BUILDING 54

BUILDING 54 BUILDING 54 BUILDING 54

26 8

238 17 242117 54

AREA 54-D

BLDG 53 -

NO WORK

THIS ROOF

BLDG 53 -

NO WORK

THIS ROOF

AREA 54-F

NO WORK THIS ROOF

BLDG 53 - NO

WORK THIS ROOF

AREA 54-D

BLDG 53 - NO WORK THIS ROOF

BLDG 53 -

NO WORK

THIS ROOF

BLDG 53 - NO WORK

THIS ROOF

AREA 54-D

BLDG 53 - NO WORK THIS ROOF

AREA 54-D

SEE PHOTO 64/A2.06 FOR

SIDING AND DOWNSPOUTS

BLDG 53 - NO WORK THIS ROOF

AREA 54-D

BLDG 53 - NO WORK THIS ROOF

AREA 54-D

AREA 54-F BLDG 53 -

NO WORK

THIS ROOF

AREA 54-D

NOTE: REPLACE ALL EXIST. PVC CONDENSATE PIPING

WITH COPPER PIPE - TYPICAL ALL ROOFS THIS PROJECT

1 EXISTING EXHAUST FAN AND/OR ROOFTOP EQUIPMENT TO REMAIN. RAISE CURB IF REQUIRED TO

ACCOMMODATE NEW INCREASED ROOF THICKNESS. FLASH PER ROOFING MFR'S

RECOMMENDATIONS.

2 REMOVE EXISTING ALUMINUM PARAPET CAP. REPLACE WITH NEW PRE-FINISHED ALUMINUM CAP - TYPICAL ALL PARAPETS AND COPINGS. MATCH EXISTING PROFILE AND COLOR. SUBMITTALS AND PHYSICAL COLOR SAMPLES REQUIRED. PROVIDE NEW SILICONE SEALANT. COLOR TO BE SELECTED BY OWNER FROM MFR'S STANDARD COLOR LINE - TYPICAL FOR ALL ALUMINUM APPLICATIONS THIS

PROJECT. REFER TO FLASHING DETAILS FOR FLASHING BENEATH COPING.

3 EXISTING SECURITY CAMERA TO REMAIN. FLASH PENETRATION WITH LIQUID-APPLIED FLASHING

EQUAL TO SIPLAST PARAPRO.

4 EXISTING LIGHTNING PROTECTION SYSTEM TO REMAIN. TEMPORARILY REMOVE PORTIONS OF

SYSTEM AS MAY BE REQUIRED FOR NEW ROOFING INSTALLATION. REINSTALL AFTERWARD.

5 EXISTING STANDING SEAM METAL ROOF, METAL FASCIAS, SOFFITS AND SIDING TO REMAIN. PROTECT

FROM DAMAGE DURING CONSTRUCTION.

6 EXISTING PITCH POCKET AT ELECTRICAL PENETRATION TO REMAIN. REMOVE SEALANT AND/OR MASTIC AND REFILL PITCH PAN WITH APPROVED POURABLE SEALANT. FLASH OUTSIDE OF PITCH

POCKET WITH APPROVED LIQUID-APPLIED FLASHING EQUAL TO SIPLAST PARAPRO.

7 EXISTING METAL SILL AT BOTTOM OF SIDING TO REMAIN. EXTEND NEW VERAL OR APPROVED EQUAL FLASHING UP UNDER SILL AS FAR AS POSSIBLE. PROVIDE SEALANT FOR WATER-TIGHT CONDITION.

8 TEAR OFF EXISTING MOD BIT ROOF AND INSULATION TO EXISTING DECK BELOW. REPLACE WITH POLYISO INSULATION, COVER BOARD, AND MOD BIT ROOF SYSTEM PER SPECIFICATION - TYP. AT ALL

FOUR ROOF REPLACEMENTS THIS PROJECT.

9 REMOVE EXISTING ROOF-TO-WALL OR ROOF-TO-PARAPET FLASHING DURING TEAR-OFF. REPLACE

WITH NEW FLASHING PER DETAILS AND SPECIFICATION.

10 EXISTING WALKWAY PADS TO BE REMOVED DURING ROOF TEAR-OFF. REFER TO ROOF PLANS A1.01 &

A1.02 FOR PROPOSED ROUTE OF NEW WALKWAY PADS TO REPLACE EXISTING WALKWAY PADS.

COORDINATE ROUTE WITH OWNER PRIOR TO INSTALLATION.

11 EXISTING ROOFTOP UNITS TO REMAIN. EXTEND NEW VERAL OR APPROVED EQUAL FLASHING UP UNDER EXISTING UNIT'S COUNTER FLASHING AS FAR AS POSSIBLE. PROVIDE SEALANT FOR WATER-

TIGHT CONDITION.

12 REMOVE EXISTING EQUIPMENT SUPPORT PEDESTALS WHICH ARE NO LONGER IN USE. PROVIDE

TREATED WOOD DECK INFILL IF THERE IS AN OPENING IN CONCRETE ROOF DECK. PROVIDE

ADEQUATE ANCHORAGE FOR NEW INFILL. ROOF OVER WITH NEW ROOF SYSTEM.

13 REPLACE EXISTING WOOD AND BLOCK-TYPE SUPPORTS AT PIPING WITH NEW ROOFTOP BLOCK STAND WITH PIPE CRADLE AND SLEEPER CURB (MFR: ROOFTOP SLEEPER SUPPORT) OR WITH DURA- BLOCK DB10 PIPE SUPPORT & UNISTRUT AT ALL EXISTING BLOCK-TYPE SUPPORTS. SELECT SIZE TO

SUIT CONDITIONS.

14…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .