This document package includes architectural drawings and specifications for the renovation of roofs and exterior cleaning at Buildings 26 and 50 located at the FDA Jefferson Laboratories facility. The scope of work involves removing and replacing the existing modified bitumen roof systems on Buildings 26 and 50 with new polyiso insulation, cover board and roof membranes. It also includes exterior masonry cleaning, sealant replacement, parapet work, skylight and equipment flashing repairs. The project is funded by the FDA and specifications reference Siplast roofing materials. Completion is required by December 2023.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPERTY LOCATION
3900 NCTR Road Jefferson, AR 72079
BUILDING 26
NCTR ROAD
NCTR PROPERTY
NCTR ROAD
NCTR ROAD
NCTR ROAD
NCTR ROAD
STAGECOACH
ROAD
NCTR CAMPUS
Copyright
Architect
WITSELL EVANS RASCO
901 West Third Street Little Rock, Arkansas 72201 501.374.5300 www.WERarch.com
BUILDING 26 ROOF REPLACEMENT
/1
/2
:0
:2
P
M
C U s e rs
\r p ia z z a
\D e s k to p \P ro je c ts
\F D
A
B ld g
R e ro o f
E x te ri o r C le a n in g \F
D A
ID
I2
.0
-F
D A
B ld g
E x t
C le a n g v r p
-1
-2
.r v t
FDA Jefferson Laboratories
AND EXTERIOR CLEANING
3900 NCTR Road, HFT_324
Jefferson, AR 72079
P ro je c t N a m e
CONSTRUCTION DOCUMENTS
02-10-2023
ARCHITECTURAL
INDEX OF DRAWINGSCAMPUS MAPLOCATION MAP
VICINITY MAP
A0.00 TITLE SHEET
A1.21 ROOF PLAN
A2.01 NORTH & SOUTH ELEVATIONS
A2.02 EAST & WEST ELEVATIONS
A2.03 EXTERIOR PHOTOS
A2.04 EXTERIOR PHOTOS
A2.05 EXTERIOR PHOTOS
A2.06 EXTERIOR PHOTOS
A2.07 EXTERIOR PHOTOS
A5.01 ROOF DETAILS
BUILDING 26
ALL EXTERIOR CLEANING REFERENCED IN THE DRAWINGS AND SPECIFICATIO0NS ARE AN ADDITIVE ALTERNATE OPTION
38'-2" V.I.F. 94'-0" V.I.F. 27'-6" V.I.F. 93'-2" V.I.F. 26'-2" V.I.F. 26'-1" V.I.F. 20'-8" V.I.F.
325'-9" V.I.F.
V
.I .F
V .I .F
V .I .F
V .I
.F
V .I .F
81'-6" V.I.F.
RD RD
RD RD
RD
RD
RD
RD
RD
RDRD RD
RD
RDRD
RD RD
EF
EF
RD
RD
RD
RD
RD
RD
FLUE
RD
TEMPORARILY REMOVE EXISTING PAVERS
FROM ROOF. CHANGE EXISTING ROOF DRAIN
LINE FROM 1 1/2" DIA. TO 4" DIA. PATCH.
REMOVE EXISTING ROOF TO DECK. PROVIDE
RIGID INSULATION AND NEW ROOF
MEMBRANE. REINSTALL PAVERS. TYPICAL
NEW WALKWAY PADS. COORD.
EXACT ROUTE WITH OWNER
EXISTING CANOPY. REMOVE EXISTING
CAULKING AT WALL AND PROVIDE NEW
SEALANT.
REMOVE EXISTING FLASHING AT WALL WHERE A RECURRING
LEAK IS PRESENT. PROVIDE NEW PREFINISHED METAL
FLASHING, COUNTER FLASHING AND SEALANT AT WALL FOR
WEATHERTIGHT CONDITION. REPAIR AND REFLASH EXISTING
WALL SCUPPER DIRECTLY ABOVE FLASHING. INVESTIGATE
SOURCE OF LEAK AND REPORT ANY PROBLEMS TO OWNER.
VTR
EXISTING STANDING SEAM
METAL ROOF TO REMAIN
SEE PARTIAL PLAN AT
STACKS ON A2.02 FOR
ROOFING AND FLASHING
REQUIREMENTS AT
PENTHOUSE ROOF
REFLASH EXISTING
ELEVATOR HOISTWAY ROOF
VENT, MANUAL OPERATION
RD
EXISTING STANDING SEAM METAL
ROOF TO REMAIN. REPLACE EXISTING
COPING AND ASSOCIATED FLASHING.
VTR
EXISTING ROOF DRAINS TO REMAIN.
PROVIDE NEW STRAINERS TYPICAL,
ZURN Z100F - NO SUBSTITUTIONS.
REFER TO PHOTOS AND
ASSOCIATED KEYED NOTES
FOR ROOF-TO-WALL FLASHING
REQUIREMENTS - TYPICAL
REFLASH CURB AT
EXISTING SKYLIGHT
REFLASH CURB AT EXISTING
EXHAUST FANS
REFLASH EXIST.
ROOF HATCH
REMOVE EXISTING PARAPET CAP. REPLACE WITH NEW
PREFINISHED ALUMINUM CAP - TYPICAL AT ALL PARAPETS
AND COPINGS. MATCH EXISTING PROFILE AND COLOR.
SUBMITTALS AND PHYSICAL COLOR SAMPLES REQUIRED.
PROVIDE NEW CONTINUOUS SILICONE SEALANT.
AREA A AREA E
AREA B AREA F
AREA C
AREA D
AREA G
AREA H
AREA J
EXISTING CANOPY. REMOVE EXISTING
CAULKING AT WALL AND PROVIDE NEW
SEALANT.
EXISTING CANOPY.
REMOVE EXISTING
CAULKING AT WALL
AND PROVIDE NEW
SEALANT.
P H
O T
O
P H
O T
O
P H
O T
O
PHOTO 7
PHOTO 8
P H
O T
O
PHOTO 10
PHOTO 11
PHOTO 12
P H
O T
O
P H O
TO
PHOTO 15
PHOTO 16
P H
O T
O
P H
O T
O
PHOTO 19
P H
O T O
RD
P H
O T
O
P H
O T
O
PHOTO 23
P H
O T
O
P H
O T
O
PHOTO 26
P H
O T
O
P H
O T
O
P H
O T O
PHOTO 30
P H
O T
O
P H
O T O
P H
O T
O
I N
T E
R
IO
R
W
IN
D O
W
P H
O T
O
I N
T E
R
IO
R
W
IN
D O
W
SEE PHOTO 36, 37
PHOTO 38
PHOTO 39
PHOTO 40
P H
O T
O
PHOTO 42
P H
O T O
PHOTO 43
PHOTO 45
P H
O T
O
P H
O T
O
P H O
TO
PHOTO 49
P
H O
T O
PH
O
TO
PHOTO 52 PHOTO 53
PHOTO 54 PHOTO 55
P H O
TO
6 PHOTO 57
PHOTO 58
P H
O T
O
P H O
T O
P H
O T
O
P H
O T
O
P H
O T
O
VTR
RD
AREA K
AREA L
SCUPPER SCUPPER SCUPPER SCUPPER
SCUPPER
SCUPPER
SCUPPER
SCUPPER
SCUPPER SCUPPER
SCUPPER SCUPPER SCUPPER SCUPPER
SCUPPER
SCUPPERSCUPPERSCUPPERSCUPPER
SCUPPERSCUPPER
SCUPPERSCUPPER
WALKPADS: CONSULT WITH
OWNER AS TO ROOF ACCESS
LOCATION. PROVIDE
WALKPADS FROM ACCESS
POINT TO EXHAUST FANS.
NOTE: SHOULD THE OWNER ELECT TO INSTALL A WINDOW WASHING SYSTEM,
INCLUDING EYE-TYPE CONNECTORS, ROOFER IS TO PROVIDE LIQUID-APPLIED
FLASHING PER MANUFACTURER'S RECOMMENDATIONS AT EACH CONNECTOR.
COORDINATE QUANTITIES WITH OWNER.
ROOF SCOPE OF WORK
ENTIRELY REMOVE EXISTING ROOF DOWN TO EXISTING STEEL DECK, INCLUDING MEMBRANE, FLASHINGS, COVER BOARD AND INSULATION.
INSPECT CONDITION OF METAL DECK. REPLACE DECK WITH NEW DECK OF MATCHING PROFILE WHERE DETERIORATED. REFER TO UNIT
PRICES IN SPECIFICATION.
REFER TO 1.04 "DESCRIPTION OF WORK" IN SPECIFICATION SECTION 07 5200. GENERALLY, THE SCOPE OF WORK WILL REQUIRE A NEW MODIFIED BITUMEN ROOF SYSTEM, INCLUDING TAPERED POLYISO INSULATION AVERAGE R20, DENSDECK OR EQUAL COVER BOARD, AND BASE AND CAP SHEETS AS SPECIFIED. REFER TO SAME SPECIFICATION SECTION FOR TYPE OF MATERIALS, FASTENERS, AND FLASHINGS
REQUIRED.
REPLACE EXISTING ROOF SCUPPERS. REFLASH PER DETAILS.
REPLACE ALL EXISTING PREFINISHED PARAPET COPINGS - TYPICAL. MATCH EXISTING PROFILE. SUBMITTALS REQUIRED. COLOR TO BE
SELECTED BY OWNER FROM MANUFACTURER'S STANDARD COLOR LINE.
REFLASH ALL EXISTING ROOFTOP EQUIPMENT, EXISTING SMOKE VENTS AND VTR's. REFER TO ROOF DETAILS AND KEYED NOTES.
TEMPORARILY RAISE ANY EXISTING ROOFTOP EQUIPMENT, PIPING, SKYLIGHTS, CONDUITS, ETC, AND ASSOCIATED SUPPORTS AS REQ'D TO ACCOMPLISH ROOF TEAR-OFF & ROOF INSTALLATION. REINSTALL AND PROVIDE NEW SUPPORTS AS NOTED.
PROVIDE CRICKETS AT 1/4" PER FOOT SLOPE WHERE REQUIRED FOR POSITIVE DRAINAGE. SUBMIT A PROPOSED DRAINAGE LAYOUT FOR
APPROVAL PRIOR TO COMMENCEMENT. REPORT ANY CONCERNS TO ARCHITECT.
PROVIDE WALKWAY PADS WHERE INDICATED. COORDINATE WALKWAY PAD ROUTES WITH OWNER.
THE CONTRACTOR IS FULLY RESPONSIBLE FOR THE MEANS AND METHODS OF DEMOLITION AND THE SAFETY OF THE EXISTING
STRUCTURE.
COORDINATE ANY ELECTRICAL SHUTDOWNS WHICH MIGHT BE NECESSARY WITH OWNER 15 DAYS IN ADVANCE. COORDINATE STAGING OF
CRANES AND OTHER LIFTING EQUIPMENT WITH OWNER 5 DAYS IN ADVANCE.
ONLY TEAR-OFF EXISTING ROOFING IN QUANTITIES AS CAN BE WEATHERPROOFED THE SAME DAY. SCHEDULE INSTALLATION APPLICATIONS SO THAT NO PARTIALLY COMPLETED SECTIONS OF ROOF ARE LEFT EXPOSED AT THE END OF THE WORKDAY.
PROTECT ADJACENT EXTERIOR MATERIAL TO REMAIN DURING DEMOLITION.
EVERY EFFORT HAS BEEN MADE TO GENERALLY IDENTIFY EXISTING FLASHING CONDITIONS AND PENETRATIONS - ROOF SCUPPERS, VTR'S, RTU'S AND PIPE PENETRATIONS. ANY ROOFTOP ITEMS NOT SPECIFICALLY IDENTIFIED ARE TO BE FLASHED PER SIMILAR DETAILS AND
NOTES AND PER MFR'S RECOMMENDATIONS. CONTRACTOR IS RESPONSIBLE FOR QUANTITIES.
CONTRACTOR IS TO VERIFY EXISTING CONDITIONS, DIMENSIONS, AND QUANTITIES PRIOR TO BIDDING.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
CONTRACTOR TO SURVEY EXISTING CONDITIONS AND COORDINATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE
DEMOLITION REQUIRED.
WHEN UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS ARE ENCOUNTERED, INVESTIGATE AND MEASURE THE
NATURE AND EXTENT OF THE CONFLICT. NOTIFY ARCHITECT IMMEDIATELY.
ALL EXISTING STRUCTURE THAT IS SHOWN IS FOR REFERENCE ONLY AND IS TO BE FIELD VERIFIED BY THE CONTRACTOR.
THE CONTRACTOR IS FULLY RESPONSIBLE FOR THE MEANS AND METHODS OF DEMOLITION AND THE SAFETY OF THE EXISTING STRUCTURE.
CONDUCT DEMOLITION OPERATIONS TO PREVENT INJURY TO PEOPLE. ENSURE SAFE PASSAGE OF PEOPLE AROUND SELECTIVE DEMOLITION
AREAS.
PROTECT WALLS, CEILINGS, FLOORS, AND OTHER EXISTING FINISH WORK THAT IS TO REMAIN AND/OR IS EXPOSED DURING SELECTIVE
DEMOLITION OPERATIONS.
DEBRIS TO BE REMOVED FROM WORK AREA TO A DUMPSTER. PROTECT ROUTE AS REQUIRED. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON ADJACENT SURFACES AND AREAS. CONTRACTOR TO VERIFY PROPOSED LOCATION OF
DUMPSTER WITH OWNER.
LOCATIONS OF ALL STRUCTURAL ELEMENTS ARE SCHEMATIC/ DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY. NO STRUCTURAL MEMBERS SHALL BE CUT, ALTERED, WITHOUT PRIOR APPROVAL BY THE ARCHITECT/STRUCTURAL ENGINEER. NOTIFY THE ARCHITECT IMMEDIATELY OF
ANY DISCREPANCIES.
PROTECT ADJACENT EXTERIOR MATERIAL TO REMAIN DURING DEMOLITION.
DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT INDICATED ON DEMOLITION PLAN AND/OR AS REQUIRED TO INSTALL NEW WORK SHOWN/SPECIFIED ELSEWHERE. USE METHODS REQUIRED TO COMPLETE WORK WITHIN LIMITATIONS OF GOVERNING
REGULATIONS.
GENERAL DEMOLITION NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
COORDINATE STAGING AREA LOCATIONS AND SIZES
WITH OWNER PRIOR TO COMMENCEMENT.
CONTRACTOR ENTRY TO STAGING AREAS AND ROOF
MUST BE SECURE AND SEPARATED FROM THE PUBLIC.
LADDERS AND LIFTS CANNOT BE ACCESSIBLE TO THE
PUBLIC. EXERCISE ALL PRECAUTIONS TO MAINTAIN
SAFETY.
CONTRACTOR WILL RESTORE DAMAGED GRASS AREAS.
TREES AND TREE ROOTS MUST BE PROTECTED FROM
DAMAGE.
CONTRACTOR TO RESTORE SIDEWALKS AND PLANTING
AREAS DAMAGED BY CONSTRUCTION.
MAINTAIN FIRE TRUCK ACCESS. COORDINATE REQUIRED
ROUTES WITH OWNER.
1.
2.
3.
4.
5.
STAGING AREA NOTES
MOISTURE RELIEF VENTS
PROVIDE NEW MOISTURE RELIEF VENTS EVERY 800 SQ. FT. OR
AS RECOMMENDED AND/OR REQUIRED BY ROOFING
MANUFACTURER. SUBMITTALS REQUIRED.
PULL TEST COMPLIANCE
CONTRACTOR TO CONSULT WITH ROOFING MANUFACTURER
PRIOR TO COMMENCEMENT REGARDING ANY ISSUES RELATED
TO COMPLIANCE WITH PULL TEST REQUIREMENTS.
ROOF SLOPE DRAINAGE CONCEPT
A CONCEPT FOR THE DIRECTION OF SLOPES AND ASSOCIATED
CRICKETS IS SHOWN ON THE ROOF PLAN. THIS CONCEPT IS
DIAGRAMMATIC. THE CONTRACTOR IS REQUIRED TO SUBMIT A
PROPOSED LAYOUT PRIOR TO COMMENCEMENT INDICATING
PITCH OF MAIN FIELDS, THICKNESS OF TAPERED POLYISO
INSULATION, AND PITCH AND CONFIGURATION OF CRICKETS.
REPORT ANY DISCREPANCIES TO OWNER.
CORES REQUIRED AT EACH ROOF AREA
PRIOR TO TEAR-OFF, CONTRACTOR IS TO CORE EACH ROOF
AREA AT HIGH SIDE OF SLOPE AND AT LOW SIDE OF SLOPE TO
DOCUMENT THICKNESS OF ROOFING SYSTEM FROM ROOF
SURFACE TO EXISTING STEEL DECK. REPORT ANY ISSUES OR
CONCERNS WITH THE THICKNESS OF NEW INSULATION / ROOF
SYSTEM AT CURBS AND/OR FLASHINGS. PATCH CORES AS
REQUIRED FOR WATERTIGHT SEAL.
EXISTING ROOF CONDITIONS
AN ATTEMPT HAS BEEN MADE TO INDICATE EXISTING ROOFTOP
EQUIPMENT - DRAINS, FLUES, VTRs, DUCTWORK, PIPING, ETC..
REFER TO ROOF PHOTOS FOR ITEMS NOT SHOWN ON ROOF
PLAN. CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE
PRIOR TO BIDDING TO VERIFY EXISTING CONDITIONS,
QUANTITIES AND DIMENSIONS. REPORT ANY DISCREPANCIES
TO THE OWNER.
ASBESTOS STATUS
SPEC SECTION 01 1210 DESCRIBES THE CONTRACTOR'S
RESPONSIBILITY FOR ASBESTOS SAMPLING. AN INDEPENDENT
ASBESTOS SURVEY HAS BEEN REQUESTED AND WILL BE MADE
AVAILABLE BY THE OWNER UPON REQUEST BY CONTRACTOR.
CONTRACTOR SHALL BE RESPONSIBLE FOR PRE DEMOLITION
ASBESTOS SAMPLING REPORT AND COST ESTIMATION.
AREAS ARE APPROX., V.I.F.,
PARAPETS NOT INCLUDED.
ROOF AREA SQ. FOOTAGES
AREA A 1,121 SF
AREA B 6,704 SF
AREA C 1,549 SF
AREA D 3,783 SF
AREA E 1,102 SF
AREA F 7,467 SF
AREA G 1,030 SF
AREA H 576 SF
AREA J 890 SF
AREA K 85 SF
AREA L 396 SF
TOTAL S.F. 24,703 NET
VENT THRU ROOF
SECTION NUMBER
SHEET LOCATION
LEGEND
15 KEYED NOTE
P H
O T
O
PHOTO KEY
VTR
A1
A5.01
SIM.
ROOF DRAINRD
PIPE SUPPORT REPLACEMENT
REGARDLESS OF WHETHER OR NOT IT IS MENTIONED ON
THESE DRAWINGS, ALL WOODEN PIPE SUPPORTS SHALL BE
REPLACED WITH DURABLOCK DB-10 @ 8'-0" O.C.
MISCELLANEOUS REPLACEMENT ITEMS
EXISTING ROOF TRIM, FASCIA, GUTTERS AND ROOF DRAIN
STRAINERS SHALL BE REPLACED WITH NEW. NEW ROOF DRAIN
STRAINERS SHALL BE ZURN Z100F - NO SUBSTITUTIONS.
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:0
:2
P
M
C U s e rs
\r p ia z z a
\D e s k to p \P ro je c ts
\F D
A
B ld g
R e ro o f
E x te ri o r C le a n in g \F
D A
ID
I2
.0
-F
D A
B ld g
E x t
C le a n g v r p
-1
-2
.r v t
FDA Jefferson Laboratories
BLDG 26 ROOF
REPLACEMENT
AND EXTERIOR
CLEANING
3900 NCTR Road, HFT_324 Jefferson, AR 72079
A1.21
ROOF PLAN
02-10-2023
FDAIDI21.04
OWNER
FDA Jefferson Laboratories
3900 NCTR Road, HFT_324 Jefferson, AR 72079
P ro je c t
N a m e
CONSTRUCTION DOCUMENTS
1/16" = 1'-0" D14
ROOF PLAN
NOT TO SCALE
A6
AERIAL PHOTO
No. Issue Date
1. CAULK MASONRY CONTROL JOINTS. REMOVE SEALANT IN THE VERTICAL AND HORIZONTAL CONTROL JOINTS. PROVIDE NEW
BACKER ROD AND SILICONE SEALANT.
2. CAULK WINDOW FRAMES. REMOVE EXISTING SEALANT AT THE EXTERIOR PERIMETER OF THE WINDOW FRAMES (METAL TO
MASONRY). PROVIDE NEW BACKER ROD AND SILICONE SEALANT.
3. TUCKPOINTING. REMOVE EXISTING MORTAR AT DEFECTIVE MORTAR JOINTS. JOINTS WILL BE TUCKPOINTED WITH MORTAR TO MATCH EXISTING. SAMPLES REQUIRED. IDENTIFY ALL SUCH DEFECTIVE JOINTS AND REFER TO SPECIFICATION SECTIONS 01
2100 ALLOWANCES AND 01 2200 UNIT PRICES.
4. POWER WASH MASONRY. POWER WASH EXTERIOR MASONRY. SAMPLE WASH SMALL AREA OF BLDG 51 FOR APPROVAL PRIOR TO PROCEEDING WITH BLDG 26. APPLY TWO COATS OF CLEANING DETERGENT IN HEAVILY STAINED/SOILED AREAS.
5. CAULK MASONRY CONTROL JOINTS IN PARAPET WALL. REMOVE EXISTING SEALANT IN THE PAINTED MASONRY ON THE
BACKSIDE OF PARAPET WALLS.
6. CAULK FLASHING. REMOVE EXISTING SEALANT ABOVE THE ROOF FLASHING. INSTALL NEW BACKER ROD AND SEALANT.
PROVIDE URETHANE SEALANT AT FLASHING ON PAINTED CMU. PROVIDE SILICONE SEALANT AT FLASHING ON UNPAINTED CMU.
7. WASH AND COAT BLOCK PARAPET. POWER WASH THE BACKSIDE OF PARAPET WALLS. APPLY TWO COATS OF ELASTOMERIC
COATING.
A. APPLY WATER REPELLENT. APPLY CLEAR WATER REPELLENT TO WASHED EXTERIOR CMU PER APPROVED SAMPLE ON BLDG 51.
B. CAULK PARAPET CAP. REMOVE EXISTING CAULKING AT FLASHING CAP AND INSTALL NEW SILICONE SEALANT.
EXTERIOR CLEANING AND SEALANT APPLICATION - SCOPE OF WORK
EXTERIOR CLEANING - ALTERNATES
1. CONTRACTOR TO EXERCISE CAUTION TO PROTECT EXISTING LAWN AND PAVER AREAS. CONTRACTOR WILL BE RESPONSIBLE
FOR RESTORING AREAS DAMAGED BY CONSTRUCTION.
2. STAGING AREAS MUST BE SECURE AND SEPARATED FROM THE PUBLIC. LADDERS AND LIFTS MUST NOT BE ACCESSIBLE TO THE
PUBLIC. EXERCISE ALL PRECAUTIONS TO MAINTAIN SAFETY.
3. CONTRACTOR TO COORDINATE SIZES AND LOCATIONS OF STAGING AREAS WITH OWNER.
4. CONTRACTOR IS RESPONSIBLE FOR QUANTITIES OF SCOPE ITEMS.
GENERAL NOTES
POWER WASH MASONRY ENTIRE
BUILDING. SEE SCOPE FOR
AREAS THAT ARE HEAVILY
SOILED AND STAINED.
CAULK MASONRY CONTROL
JOINTS - TYPICAL
CAULK MASONRY CONTROL
JOINTS AT BACK SIDE OF
PARAPET - TYPICAL
PROVIDE SEALANT AT ALL ROOF-
TO-WALL FLASHINGS. REMOVE
EXISTING CAULK AND PROVIDE
BACKER ROD AND SEALANT. SEE
SCOPE OF WORK AND PHOTOS
POWER WASH BACK SIDE OF
PARAPET. APPLY ELASTOMERIC
COATING TO BACKSIDE OF WALL.
DASHED LINE
INDICATES OPENINGS
TO RE-SEALED.
POWER WASH BACK SIDE OF
PARAPET. APPLY ELASTOMERIC
COATING TO BACKSIDE OF WALL.
PROVIDE SEALANT AT ALL ROOF-
TO-WALL FLASHINGS. REMOVE
EXISTING CAULK AND PROVIDE
BACKER ROD AND SEALANT. SEE
SCOPE OF WORK AND PHOTOS
CAULK MASONRY CONTROL
JOINTS AT BACK SIDE OF
PARAPET - TYPICAL
CAULK MASONRY CONTROL
JOINTS - TYPICAL
POWER WASH MASONRY ENTIRE
BUILDING. SEE SCOPE FOR AREAS
THAT ARE HEAVILY SOILED AND
STAINED.
DASHED LINE
INDICATES OPENINGS
TO RE-SEALED.
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:0
:2
P
M
C U s e rs
\r p ia z z a
\D e s k to p \P ro je c ts
\F D
A
B ld g
R e ro o f
E x te ri o r C le a n in g \F
D A
ID
I2
.0
-F
D A
B ld g
E x t
C le a n g v r p
-1
-2
.r v t
FDA Jefferson Laboratories
BLDG 26 ROOF
REPLACEMENT
AND EXTERIOR
CLEANING
3900 NCTR Road, HFT_324 Jefferson, AR 72079
A2.01
NORTH & SOUTH
ELEVATIONS
02-10-2023
FDAIDI21.04
OWNER
FDA Jefferson Laboratories
3900 NCTR Road, HFT_324 Jefferson, AR 72079
P ro je c t
N a m e
CONSTRUCTION DOCUMENTS
3/32" = 1'-0" A5
North Elevation
3/32" = 1'-0" A10
South Elevaton
CAULK MASONRY CONTROL
JOINTS - TYPICAL
POWER WASH MASONRY ENTIRE
BUILDING. SEE SCOPE FOR
AREAS THAT ARE HEAVILY
SOILED AND STAINED.
CAULK MASONRY CONTROL
JOINTS AT BACK SIDE OF
PARAPET - TYPICAL
POWER WASH BACK SIDE OF
PARAPET. APPLY ELASTOMERIC
COATING TO BACKSIDE OF WALL.
PROVIDE SEALANT AT ALL ROOF-
TO-WALL FLASHINGS. REMOVE
EXISTING CAULK AND PROVIDE
BACKER ROD AND SEALANT. SEE
SCOPE OF WORK AND PHOTOS
DASHED LINE
INDICATES OPENINGS
TO RE-SEALED.
1. CAULK MASONRY CONTROL JOINTS. REMOVE SEALANT IN THE VERTICAL AND HORIZONTAL CONTROL JOINTS. PROVIDE NEW
BACKER ROD AND SILICONE SEALANT.
2. CAULK WINDOW FRAMES. REMOVE EXISTING SEALANT AT THE EXTERIOR PERIMETER OF THE WINDOW FRAMES (METAL TO
MASONRY). PROVIDE NEW BACKER ROD AND SILICONE SEALANT.
3. TUCKPOINTING. REMOVE EXISTING MORTAR AT DEFECTIVE MORTAR JOINTS. JOINTS WILL BE TUCKPOINTED WITH MORTAR TO MATCH EXISTING. SAMPLES REQUIRED. IDENTIFY ALL SUCH DEFECTIVE JOINTS AND REFER TO SPECIFICATION SECTIONS 01
2100 ALLOWANCES AND 01 2200 UNIT PRICES.
4. POWER WASH MASONRY. POWER WASH EXTERIOR MASONRY. SAMPLE WASH SMALL AREA OF BLDG 51 FOR APPROVAL PRIOR TO PROCEEDING WITH BLDG 26. APPLY TWO COATS OF CLEANING DETERGENT IN HEAVILY STAINED/SOILED AREAS.
5. CAULK MASONRY CONTROL JOINTS IN PARAPET WALL. REMOVE EXISTING SEALANT IN THE PAINTED MASONRY ON THE
BACKSIDE OF PARAPET WALLS.
6. CAULK FLASHING. REMOVE EXISTING SEALANT ABOVE THE ROOF FLASHING. INSTALL NEW BACKER ROD AND SEALANT.
PROVIDE URETHANE SEALANT AT FLASHING ON PAINTED CMU. PROVIDE SILICONE SEALANT AT FLASHING ON UNPAINTED CMU.
7. WASH AND COAT BLOCK PARAPET. POWER WASH THE BACKSIDE OF PARAPET WALLS. APPLY TWO COATS OF ELASTOMERIC
COATING.
A. APPLY WATER REPELLENT. APPLY CLEAR WATER REPELLENT TO WASHED EXTERIOR CMU PER APPROVED SAMPLE ON BLDG 51.
B. CAULK PARAPET CAP. REMOVE EXISTING CAULKING AT FLASHING CAP AND INSTALL NEW SILICONE SEALANT.
EXTERIOR CLEANING AND SEALANT APPLICATION - SCOPE OF WORK
EXTERIOR CLEANING - ALTERNATES
1. CONTRACTOR TO EXERCISE CAUTION TO PROTECT EXISTING LAWN AND PAVER AREAS. CONTRACTOR WILL BE RESPONSIBLE
FOR RESTORING AREAS DAMAGED BY CONSTRUCTION.
2. STAGING AREAS MUST BE SECURE AND SEPARATED FROM THE PUBLIC. LADDERS AND LIFTS MUST NOT BE ACCESSIBLE TO THE
PUBLIC. EXERCISE ALL PRECAUTIONS TO MAINTAIN SAFETY.
3. CONTRACTOR TO COORDINATE SIZES AND LOCATIONS OF STAGING AREAS WITH OWNER.
4. CONTRACTOR IS RESPONSIBLE FOR QUANTITIES OF SCOPE ITEMS.
GENERAL NOTES
DUCT PENETRATIONS.
DUCT PENETRATIONS.
P H
O T
O
P H
O T
O
P H O
TO
REMOVE ROOF AND INSULATION AND REPLACE WITH NEW
INSULATION AND MOD. BIT. ROOF SYSTEM PER SPECS.
REMOVE CAULKING AT ALL PENETRATIONS AND REPLACE
WITH FIRE BARRIER CAULK AS SPECIFIED. MAINTAIN
EXISTING FIRE RATING.
PENTHOUSE ROOF - SCOPE OF WORK
1.
2.
FIRE BARRIER SEAL IS TO BE RESTORED AT ALL PENETRATIONS AT THE
PENTHOUSE FLOOR SLAB. A TIGHT SEAL IS REQUIRED FOR BOTH FIRE
RATING REQUIREMENT AND FOR ELIMINATING INFILTRATION.
ENTIRELY REMOVE EXISTING CAULK AND REPLACE WITH THE
APPROPRIATELY LABELED FIRE BARRIER CAULK AT DUCT AND PIPE
PENETRATIONS.
AT EXISTING DUCT PENETRATIONS, TEMPORARILY REMOVE ANGLE
SUPPORTS NEAR SLAB, ENTIRELY REMOVE EXISTING CAULK AND
PROVIDE FIRE BARRIER CAULK PER MFR'S RECOMMENDATIONS.
REINSTALL ANGLE SUPPORTS.
AT EXISTING PIPING AND ALL SIMILAR PENETRATIONS, ENTIRELY REMOVE
EXISTING CAULK AND PROVIDE FIRE BARRIER CAULK PER MFR'S
RECOMMENDATIONS.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES BY VISITING
SITE PRIOR TO BIDDING.
PENTHOUSE - SCOPE OF WORK
1.
2.
3.
4.
5.
FIRE BARRIER SEAL IS TO BE RESTORED AT ALL PENETRATIONS AT THE
PENTHOUSE FLOOR SLAB. A TIGHT SEAL IS REQUIRED FOR BOTH FIRE
RATING REQUIREMENT AND FOR ELIMINATING INFILTRATION.
ENTIRELY REMOVE EXISTING CAULK AND REPLACE WITH THE
APPROPRIATELY LABELED FIRE BARRIER CAULK AT DUCT AND PIPE
PENETRATIONS.
AT EXISTING DUCT PENETRATIONS, TEMPORARILY REMOVE ANGLE
SUPPORTS NEAR SLAB, ENTIRELY REMOVE EXISTING CAULK AND
PROVIDE FIRE BARRIER CAULK PER MFR'S RECOMMENDATIONS.
REINSTALL ANGLE SUPPORTS.
AT EXISTING PIPING AND ALL SIMILAR PENETRATIONS, ENTIRELY
REMOVE EXISTING CAULK AND PROVIDE FIRE BARRIER CAULK PER MFR'S
RECOMMENDATIONS.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES BY VISITING
SITE PRIOR TO BIDDING.
PENTHOUSE - SCOPE OF WORK
1.
2.
3.
4.
5.
CAULK MASONRY CONTROL
JOINTS - TYPICAL
POWER WASH MASONRY ENTIRE
BUILDING. SEE SCOPE FOR
AREAS THAT ARE HEAVILY
SOILED AND STAINED.
CAULK MASONRY CONTROL
JOINTS AT BACK SIDE OF
PARAPET - TYPICAL
POWER WASH BACK SIDE OF
PARAPET. APPLY ELASTOMERIC
COATING TO BACKSIDE OF WALL.
PROVIDE SEALANT AT ALL ROOF-
TO-WALL FLASHINGS. REMOVE
EXISTING CAULK AND PROVIDE
BACKER ROD AND SEALANT. SEE
SCOPE OF WORK AND PHOTOS
DASHED LINE
INDICATES OPENINGS
TO RE-SEALED.
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:0
:3
P
M
C U s e rs
\r p ia z z a
\D e s k to p \P ro je c ts
\F D
A
B ld g
R e ro o f
E x te ri o r C le a n in g \F
D A
ID
I2
.0
-F
D A
B ld g
E x t
C le a n g v r p
-1
-2
.r v t
FDA Jefferson Laboratories
BLDG 26 ROOF
REPLACEMENT
AND EXTERIOR
CLEANING
3900 NCTR Road, HFT_324 Jefferson, AR 72079
A2.02
EAST & WEST
ELEVATIONS
02-10-2023
FDAIDI21.04
OWNER
FDA Jefferson Laboratories
3900 NCTR Road, HFT_324 Jefferson, AR 72079
P ro je c t
N a m e
CONSTRUCTION DOCUMENTS
3/32" = 1'-0" H10
West Elevation
1/32" = 1'-0" A5
ROOF PLAN
1/32" = 1'-0" C7
PENTHOUSE PLAN - EAST SIDE
1/32" = 1'-0"
A11
PENTHOUSE PLAN - WEST SIDE
3/32" = 1'-0" H5
East Elevation
1 TEAR OFF EXISTING MOD BIT ROOF AND INSULATION TO METAL DECK BELOW. REPLACE WITH POLYISO INSULATION, COVER BOARD AND MOD BIT ROOF SYSTEM PER SPECIFICATION - TYP. AT
ROOF AREAS A, B & C.
2 REFER TO "PARTIAL PLAN AT STACKS" SHEET A2.02 FOR PENTHOUSE ROOF WORK.
3 EXISTING STANDING SEAM METAL ROOF TO REMAIN. REPLACE COPING AND SIDING AT ATRIUM.
4 CAULK WINDOW FRAMES. REMOVE EXISTING SEALANT AT THE EXTERIOR PERIMETER OF THE
WINDOW FRAMES (METAL TO MASONRY). PROVIDE NEW BACKER ROD AND SILICONE SEALANT.
TYPICAL ALL WINDOWS.
5 EXISTING CANOPY TO REMAIN. CAULK FLASHING. REMOVE EXISTING SEALANT ABOVE THE CANOPY FLASHING. INSTALL NEW BACKER ROD AND SEALANT. PROVIDE SILICONE SEALANT AT FLASHING ON
UNPAINTED CMU.
6 REMOVE EXISTING PARAPET CAP. REPLACE WITH NEW PREFINISHED ALUMINUM CAP - TYPICAL AT ALL PARAPETS AND COPINGS. MATCH EXISTING PROFILE AND COLOR. SUBMITTALS AND PHYSICAL
COLOR SAMPLES REQUIRED. PROVIDE NEW SILICONE SEALANT.
7 PROVIDE ADDITIONAL PREFINISHED METAL FLASHING ABOVE COPING AT SIDES. FLASHING TO WRAP CORNERS. COLOR TO MATCH EXISTING. PROVIDE TERMINATION BAR AND SEALANT. SUBMITTALS
REQUIRED.
8 PROVIDE NEW PREFINISHED METAL SILL. SUBMITTALS REQUIRED. COLOR TO MATCH EXISTING SILL.
PROVIDE FLASHING AT SIDES OF SILL.
9 CLEAN FLASHING AT EXISTING SKYLIGHT. REMOVE EXISTING CAULKING AND PROVIDE NEW SEALANT.
10 EXISTING DUCT PENETRATIONS. REFER TO PENTHOUSE PLANS, SHEET A2.02. VERIFY QUANTITIES.
11 TEMPORARILY REMOVE EXISTING SUPPORT ANGLES TO ALLOW ACCESS TO EXISTING FIRE BARRIER
CAULKING AT DUCT PENETRATION.
12 REMOVE EXISTING FIRE BARRIER CAULK AND PROVIDE NEW FIRE BARRIER CAULK PER MFR'S RECOMMENDATIONS. MAINTAIN EXISTING FIRE RATING. ELIMINATE ANY AIR INFILTRATION AT
PENETRATION.
13 EXISTING PENTHOUSE FLOOR SLAB.
14 EXISTING EXHAUST DUCTS. REFER TO "PARTIAL PLAN AT STACKS" SHEET A2.02 FOR PENETRATIONS
AT ROOF SLAB.
15 REMOVE EXISTING CAULK AT COUNTER FLASHING. PROVIDE NEW BACKER ROD AND SEALANT. USE
URETHANE SEALANT ON PAINTED CMU. USE SILICONE SEALANT AT UNPAINTED CMU.
16 EXISTING REGLET EXTENDED INTO MORTAR JOINT TO REMAIN. INSPECT JOINTS BETWEEN LENGTHS
OF REGLETS AND ADJUST FOR TIGHT FIT.
17 REMOVE EXISTING ROOF-TO-WALL FLASHING DURING ROOF TEAR-OFF. REPLACE WITH NEW
FLASHING PER DETAILS AND SPECIFICATION.
18 EXISTING WALKWAY PADS TO BE REMOVED WITH ROOF TEAR-OFF. REFER TO A1.21. ROOF PLAN FOR
PROPOSED ROUTE OF NEW WALKWAY PADS TO REPLACE EXISTING WALKWAY PADS. COORDINATE
ROUTE WITH OWNER PRIOR TO INSTALLATION.
19 EXISTING LIGHTNING PROTECTION SYSTEM TO REMAIN. TEMPORARILY REMOVE PORTIONS OF
SYSTEM AS MAY BE REQUIRED FOR NEW ROOFING INSTALLATION. REINSTALL AFTERWARD.
20 EXISTING CMU WALL. POWER WASH AND APPLY TWO COATS OF ELASTOMERIC COATING - TYPICAL.
21 REMOVE EXISTING FLASHING. PROVIDE NEW ROOF-TO-WALL FLASHING WITH CONTINUOUS
TERMINATION BAR AND SEALANT. PROVIDE CONTINUOUS COUNTERFLASHING OVER TERMINATION
BAR ATTACHED TO SUBSTRATE DIRECTLY BELOW METAL SIDING BASE TRIM. REPORT ANY
DISCREPANCIES OR CONCERNS TO OWNER PRIOR TO INSTALLATION.
22 EXISTING METAL SIDING AND BASE TRIM TO REMAIN. REMOVE EXISTING SEALANT AND PROVIDE
CLEAR SEALANT AT THE BASE TRIM AGAINST THE SIDING.
23 EXISTING ROOF DRAIN TO REMAIN -TYPICAL. REPLACE EXISTING STRAINER WITH NEW. REFLASH PER
DETAILS AND IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SECONDARY (
EMERGENCY OVERFLOW) DRAINS ARE NOT REQUIRED.
24 EXISTING EXHAUST FAN TO REMAIN. RAISE CURB IF REQUIRED TO ACCOMMODATE NEW
INCREASED ROOF THICKNESS. FLASH PER ROOFING MANUFACTURER'S RECOMMENDATIONS.
25 REPLACE EXISTING OVERFLOW SCUPPER PER MFR'S RECOMMENDATIONS & DETAIL E14/A5.01.
26 EXISTING SKYLIGHT TO REMAIN. REFLASH EXISTING CURB. RAISE CURB IF REQUIRED TO
ACCOMMODATE NEW INCREASED ROOF THICKNESS. FLASH PER ROOFING MANUFACTURER'S
RECOMMENDATIONS.
27 VERIFY THIS ITEM. IF IT IS A MOISTURE RELIEF VENT, REPLACE WITH NEW MOISTURE RELIEF VENT. IF IT IS A VTR (VENT THRU ROOF), PROVIDE NEW FLASHING KIT PER MFR'S RECOMMENDATIONS.
EXTEND HEIGHT AS REQUIRED FOR ROOF WARRANTY. IF IT IS ASSOCIATED WITH THE LIGHTNING PROTECTION SYSTEM, IT IS TO REMAIN. FLASH WITH SIPLAST PARAPRO LIQUID-APPLIED FLASHING
OR EQUAL.
28 EXISTING VTR'S TO REMAIN. PROVIDE KIT TO INCREASE HEIGHT OF VTR'S TO MEET CODE REQUIREMENTS - TYP. REFER TO ROOF DETAILS FOR FLASHING. WHERE LIGHTNING PROTECTION IS
GROUNDED TO PIPE, TEMPORARILY REMOVE GROUND AND REINSTALL WHEN ROOFING IS
COMPLETE.
29 CAULK MASONRY CONTROL JOINTS. REMOVE SEALANT IN THE VERTICAL AND HORIZONTAL CONTROL
JOINTS. PROVIDE NEW BACKER ROD AND SILICONE SEALANT.
30 REMOVE EXISTING FLASHING AT WALL WHERE A RECURRING LEAK IS PRESENT. PROVIDE NEW PREFINISHED METAL FLASHING, COUNTER FLASHING AND SEALANT AT WALL FOR WEATHERTIGHT
CONDITION. REPAIR AND REFLASH EXISTING WALL SCUPPER DIRECTLY ABOVE FLASHING.
INVESTIGATE SOURCE OF LEAK AND REPORT ANY PROBLEMS TO OWNER.
31 POWER WASH EXISTING EXTERIOR MASONRY. SAMPLE WASH SMALL AREA OF BLDG 51 FOR
APPROVAL PRIOR TO PROCEEDING WITH BLDG 26. APPLY TWO COATS OF CLEANING DETERGENT IN
HEAVILY STAINED/SOILED AREAS. TYPICAL ALL EXPOSED EXTERIOR MASONRY. APPLY CLEAR
MASONRY WATER REPELLENT AT ALL EXPOSED EXTERIOR MASONRY AFTER POWER WASHED.
32 PROVIDE FLASHING WITH TERMINATION BAR AND SEALANT AT END OF PARAPET CAP AT WALL.
33 REFLASH EXISTING ELEVATOR HOISTWAY ROOF VENT.
34 PROVIDE NEW DOOR SILL. TURN ROOF FLASHING UP BEHIND DOOR SILL.
35 REPAIR LEAK CAUSED BY UNDER-SIZED ROOF DRAIN LINE. CHANGE EXISTING ROOF DRAIN LINE FROM 1 1/2" DIA. TO 4" DIAMETER. REPLACE DAMAGED CEILING TILE. TEMPORARILY REMOVE EXISTING PAVERS FROM ROOF. REMOVE EXISTING ROOF TO DECK. PROVIDE RIGID INSULATION AND
NEW ROOF MEMBRANE. REINSTALL PAVERS. TYPICAL AT ROOFS ADJACENT TO SKYLIGHTS.
36 SEAL AROUND PIPE RAIL FLANGES AT CMU WALL - TYPICAL. PREP AND PAINT PIPE RAILS & FLANGES.
37 REPAIRS TO INTERIOR DAMAGED GYP. BD AND WINDOW SILLS ARE NOT IN THIS SCOPE AND WILL BE
ACCOMPLISHED BY THE OWNER.
38 CAREFULLY REMOVE EXISTING COUNTER FLASHING CURRENTLY ATTACHED TO EXISTING EMBEDDED REGLET. INSTALL NEW COUNTER FLASHING AND INTERLOCK TO REGLET PER DETAILS A5, F5 &
M5/A5.01. REPORT ANY ISSUES TO OWNER.
KEYED NOTES FOR PHOTOS
2 31
EXISTING STANDING SEAM METAL ROOF
TO REMAIN. REPLACE EXISTING COPING
AND ASSOCIATED FLASHING. COLOR
SELECTED BY OWNER. SUBMITTALS REQ'D. 2 3
SIM.
163817
21 22
6 19
7 36
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:0
:3
P
M
C U s e rs
\r p ia z z a
\D e s k to p \P ro je c ts
\F D
A
B ld g
R e ro o f
E x te ri o r C le a n in g \F
D A
ID
I2
.0
-F
D A
B ld g
E x t
C le a n g v r p
-1
-2
.r v t
FDA Jefferson Laboratories
BLDG 26 ROOF
REPLACEMENT
AND EXTERIOR
CLEANING
3900 NCTR Road, HFT_324 Jefferson, AR 72079
A2.03
EXTERIOR
PHOTOS
02-10-2023
FDAIDI21.04
OWNER
FDA Jefferson Laboratories
3900 NCTR Road, HFT_324 Jefferson, AR 72079
P ro je c t
N a m e
CONSTRUCTION DOCUMENTS
PHOTO 1 PHOTO 2 PHOTO 3 PHOTO 4
PHOTO 5 PHOTO 6 PHOTO 7
PHOTO 8 PHOTO 9 PHOTO 10
PHOTO 11 PHOTO 12 PHOTO 13
626 2323 2525
2662527 23
286 2823
16 38 17
15 18
3 2
2825 196
EXISTING ROOF DRAINS TO REMAIN. PROVIDE NEW
STRAINERS TYPICAL, ZURN Z100F - NO SUBSTITUTIONS.
19 28 23 25 6
1 TEAR OFF EXISTING MOD BIT ROOF AND INSULATION TO METAL DECK BELOW. REPLACE WITH POLYISO INSULATION, COVER BOARD AND MOD BIT ROOF SYSTEM PER SPECIFICATION - TYP. AT
ROOF AREAS A, B & C.
2 REFER TO "PARTIAL PLAN AT STACKS" SHEET A2.02 FOR PENTHOUSE ROOF WORK.
3 EXISTING STANDING SEAM METAL ROOF TO REMAIN. REPLACE COPING AND SIDING AT ATRIUM.
4 CAULK WINDOW FRAMES. REMOVE EXISTING SEALANT AT THE EXTERIOR PERIMETER OF THE
WINDOW FRAMES (METAL TO MASONRY). PROVIDE NEW BACKER ROD AND SILICONE SEALANT.
TYPICAL ALL WINDOWS.
5 EXISTING CANOPY TO REMAIN. CAULK FLASHING. REMOVE EXISTING SEALANT ABOVE THE CANOPY FLASHING. INSTALL NEW BACKER ROD AND SEALANT. PROVIDE SILICONE SEALANT AT FLASHING ON
UNPAINTED CMU.
6 REMOVE EXISTING PARAPET CAP. REPLACE WITH NEW PREFINISHED ALUMINUM CAP - TYPICAL AT ALL PARAPETS AND COPINGS. MATCH EXISTING PROFILE AND COLOR. SUBMITTALS AND PHYSICAL
COLOR SAMPLES REQUIRED. PROVIDE NEW SILICONE SEALANT.
7 PROVIDE ADDITIONAL PREFINISHED METAL FLASHING ABOVE COPING AT SIDES. FLASHING TO WRAP CORNERS. COLOR TO MATCH EXISTING. PROVIDE TERMINATION BAR AND SEALANT. SUBMITTALS
REQUIRED.
8 PROVIDE NEW PREFINISHED METAL SILL. SUBMITTALS REQUIRED. COLOR TO MATCH EXISTING SILL.
PROVIDE FLASHING AT SIDES OF SILL.
9 CLEAN FLASHING AT EXISTING SKYLIGHT. REMOVE EXISTING CAULKING AND PROVIDE NEW SEALANT.
10 EXISTING DUCT PENETRATIONS. REFER TO PENTHOUSE PLANS, SHEET A2.02. VERIFY QUANTITIES.
11 TEMPORARILY REMOVE EXISTING SUPPORT ANGLES TO ALLOW ACCESS TO EXISTING FIRE BARRIER
CAULKING AT DUCT PENETRATION.
12 REMOVE EXISTING FIRE BARRIER CAULK AND PROVIDE NEW FIRE BARRIER CAULK PER MFR'S RECOMMENDATIONS. MAINTAIN EXISTING FIRE RATING. ELIMINATE ANY AIR INFILTRATION AT
PENETRATION.
13 EXISTING PENTHOUSE FLOOR SLAB.
14 EXISTING EXHAUST DUCTS. REFER TO "PARTIAL PLAN AT STACKS" SHEET A2.02 FOR PENETRATIONS
AT ROOF SLAB.
15 REMOVE EXISTING CAULK AT COUNTER FLASHING. PROVIDE NEW BACKER ROD AND SEALANT. USE
URETHANE SEALANT ON PAINTED CMU. USE SILICONE SEALANT AT UNPAINTED CMU.
16 EXISTING REGLET EXTENDED INTO MORTAR JOINT TO REMAIN. INSPECT JOINTS BETWEEN LENGTHS
OF REGLETS AND ADJUST FOR TIGHT FIT.
17 REMOVE EXISTING ROOF-TO-WALL FLASHING DURING ROOF TEAR-OFF. REPLACE WITH NEW
FLASHING PER DETAILS AND SPECIFICATION.
18 EXISTING WALKWAY PADS TO BE REMOVED WITH ROOF TEAR-OFF. REFER TO A1.21. ROOF PLAN FOR
PROPOSED ROUTE OF NEW WALKWAY PADS TO REPLACE EXISTING WALKWAY PADS. COORDINATE
ROUTE WITH OWNER PRIOR TO INSTALLATION.
19 EXISTING LIGHTNING PROTECTION SYSTEM TO REMAIN. TEMPORARILY REMOVE PORTIONS OF
SYSTEM AS MAY BE REQUIRED FOR NEW ROOFING INSTALLATION. REINSTALL AFTERWARD.
20 EXISTING CMU WALL. POWER WASH AND APPLY TWO COATS OF ELASTOMERIC COATING - TYPICAL.
21 REMOVE EXISTING FLASHING. PROVIDE NEW ROOF-TO-WALL FLASHING WITH CONTINUOUS
TERMINATION BAR AND SEALANT. PROVIDE CONTINUOUS COUNTERFLASHING OVER TERMINATION
BAR ATTACHED TO SUBSTRATE DIRECTLY BELOW METAL SIDING BASE TRIM. REPORT ANY
DISCREPANCIES OR CONCERNS TO OWNER PRIOR TO INSTALLATION.
22 EXISTING METAL SIDING AND BASE TRIM TO REMAIN. REMOVE EXISTING SEALANT AND PROVIDE
CLEAR SEALANT AT THE BASE TRIM AGAINST THE SIDING.
23 EXISTING ROOF DRAIN TO REMAIN -TYPICAL. REPLACE EXISTING STRAINER WITH NEW. REFLASH PER
DETAILS AND IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SECONDARY
(EMERGENCY OVERFLOW) DRAINS ARE NOT REQUIRED.
24 EXISTING EXHAUST FAN TO REMAIN. RAISE CURB IF REQUIRED TO ACCOMMODATE NEW
INCREASED ROOF THICKNESS. FLASH PER ROOFING MANUFACTURER'S RECOMMENDATIONS.
25 REPLACE EXISTING OVERFLOW SCUPPER PER MFR'S RECOMMENDATIONS & DETAIL E14/A5.01.
26 EXISTING SKYLIGHT TO REMAIN. REFLASH EXISTING CURB. RAISE CURB IF REQUIRED TO
ACCOMMODATE NEW INCREASED ROOF THICKNESS. FLASH PER ROOFING MANUFACTURER'S
RECOMMENDATIONS.
27 VERIFY THIS ITEM. IF IT IS A MOISTURE RELIEF VENT, REPLACE WITH NEW MOISTURE RELIEF VENT. IF IT IS A VTR (VENT THRU ROOF), PROVIDE NEW FLASHING KIT PER MFR'S RECOMMENDATIONS.
EXTEND HEIGHT AS REQUIRED FOR ROOF WARRANTY. IF IT IS ASSOCIATED WITH THE LIGHTNING PROTECTION SYSTEM, IT IS TO REMAIN. FLASH WITH SIPLAST PARAPRO LIQUID-APPLIED FLASHING
OR EQUAL.
28 EXISTING VTR'S TO REMAIN. PROVIDE KIT TO INCREASE HEIGHT OF VTR'S TO MEET CODE REQUIREMENTS - TYP. REFER TO ROOF DETAILS FOR FLASHING. WHERE LIGHTNING PROTECTION IS
GROUNDED TO PIPE, TEMPORARILY REMOVE GROUND AND REINSTALL WHEN ROOFING IS
COMPLETE.
29 CAULK MASONRY CONTROL JOINTS. REMOVE SEALANT IN THE VERTICAL AND HORIZONTAL CONTROL
JOINTS. PROVIDE NEW BACKER ROD AND SILICONE SEALANT.
30 REMOVE EXISTING FLASHING AT WALL WHERE A RECURRING LEAK IS PRESENT. PROVIDE NEW PREFINISHED METAL FLASHING, COUNTER FLASHING AND SEALANT AT WALL FOR WEATHERTIGHT
CONDITION. REPAIR AND REFLASH EXISTING WALL SCUPPER DIRECTLY ABOVE FLASHING.
INVESTIGATE SOURCE OF LEAK AND REPORT ANY PROBLEMS TO OWNER.
31 POWER WASH EXISTING EXTERIOR MASONRY. SAMPLE WASH SMALL AREA OF BLDG 51 FOR
APPROVAL PRIOR TO PROCEEDING WITH BLDG 26. APPLY TWO COATS OF CLEANING DETERGENT IN
HEAVILY STAINED/SOILED AREAS. TYPICAL ALL EXPOSED EXTERIOR MASONRY. APPLY CLEAR
MASONRY WATER REPELLENT AT ALL EXPOSED EXTERIOR MASONRY AFTER POWER WASHED.
32 PROVIDE FLASHING WITH TERMINATION BAR AND SEALANT AT END OF PARAPET CAP AT WALL.
33 REFLASH EXISTING ELEVATOR HOISTWAY ROOF VENT.
34 PROVIDE NEW DOOR SILL. TURN ROOF FLASHING UP BEHIND DOOR SILL.
35 REPAIR LEAK CAUSED BY UNDER-SIZED ROOF DRAIN LINE. CHANGE EXISTING ROOF DRAIN LINE FROM 1 1/2" DIA. TO 4" DIAMETER. REPLACE DAMAGED CEILING TILE. TEMPORARILY REMOVE EXISTING PAVERS FROM ROOF. REMOVE EXISTING ROOF TO DECK. PROVIDE RIGID INSULATION AND
NEW ROOF MEMBRANE. REINSTALL PAVERS. TYPICAL AT ROOFS ADJACENT TO SKYLIGHTS.
36 SEAL AROUND PIPE RAIL FLANGES AT CMU WALL - TYPICAL. PREP AND PAINT PIPE RAILS & FLANGES.
37 REPAIRS TO INTERIOR DAMAGED GYP. BD AND WINDOW SILLS ARE NOT IN THIS SCOPE AND WILL BE
ACCOMPLISHED BY THE OWNER.
38 CAREFULLY REMOVE EXISTING COUNTER FLASHING CURRENTLY ATTACHED TO EXISTING EMBEDDED REGLET. INSTALL NEW COUNTER FLASHING AND INTERLOCK TO REGLET PER DETAILS A5, F5 &
M5/A5.01. REPORT ANY ISSUES TO OWNER.
KEYED NOTES FOR PHOTOS
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:0
:4
P
M
C U s e rs
\r p ia z z a
\D e s k to p \P ro je c ts
\F D
A
B ld g
R e ro o f
E x te ri o r C le a n in g \F
D A
ID
I2
.0
-F
D A
B ld g
E x t
C le a n g v r p
-1
-2
.r v t
FDA Jefferson Laboratories
BLDG 26 ROOF
REPLACEMENT
AND EXTERIOR
CLEANING
3900 NCTR Road, HFT_324 Jefferson, AR 72079
A2.04
EXTERIOR
PHOTOS
02-10-2023
FDAIDI21.04
OWNER
FDA Jefferson Laboratories
3900 NCTR Road, HFT_324 Jefferson, AR 72079
P ro je c t
N a m e
CONSTRUCTION DOCUMENTS
PHOTO 14 PHOTO 15 PHOTO 16 PHOTO 17
PHOTO 18 PHOTO 19 PHOTO 20
PHOTO 21 PHOTO 22 PHOTO 23
PHOTO 24 PHOTO 25 PHOTO 26
2519 30
2531 32
22 33
X
X
374 374 35
1 TEAR OFF EXISTING MOD BIT ROOF AND INSULATION TO METAL DECK BELOW. REPLACE WITH POLYISO INSULATION, COVER BOARD AND MOD BIT ROOF SYSTEM PER SPECIFICATION - TYP. AT
ROOF AREAS A, B & C.
2 REFER TO "PARTIAL PLAN AT STACKS" SHEET A2.02 FOR PENTHOUSE ROOF WORK.
3 EXISTING STANDING SEAM METAL ROOF TO REMAIN. REPLACE COPING AND SIDING AT ATRIUM.
4 CAULK WINDOW FRAMES. REMOVE EXISTING SEALANT AT THE EXTERIOR PERIMETER OF THE
WINDOW FRAMES (METAL TO MASONRY). PROVIDE NEW BACKER ROD AND SILICONE SEALANT.
TYPICAL ALL WINDOWS.
5 EXISTING CANOPY TO REMAIN. CAULK FLASHING. REMOVE EXISTING SEALANT ABOVE THE CANOPY FLASHING. INSTALL NEW BACKER ROD AND SEALANT. PROVIDE SILICONE SEALANT AT FLASHING ON
UNPAINTED CMU.
6 REMOVE EXISTING PARAPET CAP. REPLACE WITH NEW PREFINISHED ALUMINUM CAP - TYPICAL AT ALL PARAPETS AND COPINGS. MATCH EXISTING PROFILE AND COLOR. SUBMITTALS AND PHYSICAL
COLOR SAMPLES REQUIRED. PROVIDE NEW SILICONE SEALANT.
7 PROVIDE ADDITIONAL PREFINISHED METAL FLASHING ABOVE COPING AT SIDES. FLASHING TO WRAP CORNERS. COLOR TO MATCH EXISTING. PROVIDE TERMINATION BAR AND SEALANT. SUBMITTALS
REQUIRED.
8 PROVIDE NEW PREFINISHED METAL SILL. SUBMITTALS REQUIRED. COLOR TO MATCH EXISTING SILL.
PROVIDE FLASHING AT SIDES OF SILL.
9 CLEAN FLASHING AT EXISTING SKYLIGHT. REMOVE EXISTING CAULKING AND PROVIDE NEW SEALANT.
10 EXISTING DUCT PENETRATIONS. REFER TO PENTHOUSE PLANS, SHEET A2.02. VERIFY QUANTITIES.
11 TEMPORARILY REMOVE EXISTING SUPPORT ANGLES TO ALLOW ACCESS TO EXISTING FIRE BARRIER
CAULKING AT DUCT PENETRATION.
12 REMOVE EXISTING FIRE BARRIER CAULK AND PROVIDE NEW FIRE BARRIER CAULK PER MFR'S RECOMMENDATIONS. MAINTAIN EXISTING FIRE RATING. ELIMINATE ANY AIR INFILTRATION AT
PENETRATION.
13 EXISTING PENTHOUSE FLOOR SLAB.
14 EXISTING EXHAUST DUCTS. REFER TO "PARTIAL PLAN AT STACKS" SHEET A2.02 FOR PENETRATIONS
AT ROOF SLAB.
15 REMOVE EXISTING CAULK AT COUNTER FLASHING. PROVIDE NEW BACKER ROD AND SEALANT. USE
URETHANE SEALANT ON PAINTED CMU. USE SILICONE SEALANT AT UNPAINTED CMU.
16 EXISTING REGLET EXTENDED INTO MORTAR JOINT TO REMAIN. INSPECT JOINTS BETWEEN LENGTHS
OF REGLETS AND ADJUST FOR TIGHT FIT.
17 REMOVE EXISTING ROOF-TO-WALL FLASHING DURING ROOF TEAR-OFF. REPLACE WITH NEW
FLASHING PER DETAILS AND SPECIFICATION.
18 EXISTING WALKWAY PADS TO BE REMOVED WITH ROOF TEAR-OFF. REFER TO A1.21. ROOF PLAN FOR
PROPOSED ROUTE OF NEW WALKWAY PADS TO REPLACE EXISTING WALKWAY PADS. COORDINATE
ROUTE WITH OWNER PRIOR TO INSTALLATION.
19 EXISTING LIGHTNING PROTECTION SYSTEM TO REMAIN. TEMPORARILY REMOVE PORTIONS OF
SYSTEM AS MAY BE REQUIRED FOR NEW ROOFING INSTALLATION. REINSTALL AFTERWARD.
20 EXISTING CMU WALL. POWER WASH AND APPLY TWO COATS OF ELASTOMERIC COATING - TYPICAL.
21 REMOVE EXISTING FLASHING. PROVIDE NEW ROOF-TO-WALL FLASHING WITH CONTINUOUS
TERMINATION BAR AND SEALANT. PROVIDE CONTINUOUS COUNTERFLASHING OVER TERMINATION
BAR ATTACHED TO SUBSTRATE DIRECTLY BELOW METAL SIDING BASE TRIM. REPORT ANY
DISCREPANCIES OR CONCERNS TO OWNER PRIOR TO INSTALLATION.
22 EXISTING METAL SIDING AND BASE TRIM TO REMAIN. REMOVE EXISTING SEALANT AND PROVIDE
CLEAR SEALANT AT THE BASE TRIM AGAINST THE SIDING.
23 EXISTING ROOF DRAIN TO REMAIN -TYPICAL. REPLACE EXISTING STRAINER WITH NEW. REFLASH PER
DETAILS AND IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SECONDARY (
EMERGENCY OVERFLOW) DRAINS ARE NOT REQUIRED.
24 EXISTING EXHAUST FAN TO REMAIN. RAISE CURB IF REQUIRED TO ACCOMMODATE NEW
INCREASED ROOF THICKNESS. FLASH PER ROOFING MANUFACTURER'S RECOMMENDATIONS.
25 REPLACE EXISTING OVERFLOW SCUPPER PER MFR'S RECOMMENDATIONS & DETAIL E14/A5.01.
26 EXISTING SKYLIGHT TO REMAIN. REFLASH EXISTING CURB. RAISE CURB IF REQUIRED TO
ACCOMMODATE NEW INCREASED ROOF THICKNESS. FLASH PER ROOFING MANUFACTURER'S
RECOMMENDATIONS.
27 VERIFY THIS ITEM. IF IT IS A MOISTURE RELIEF VENT, REPLACE WITH NEW MOISTURE RELIEF VENT. IF IT IS A VTR (VENT THRU ROOF), PROVIDE NEW FLASHING KIT PER MFR'S RECOMMENDATIONS.
EXTEND HEIGHT AS REQUIRED FOR ROOF WARRANTY. IF IT IS ASSOCIATED WITH THE LIGHTNING PROTECTION SYSTEM, IT IS TO REMAIN. FLASH WITH SIPLAST PARAPRO LIQUID-APPLIED FLASHING
OR EQUAL.
28 EXISTING VTR'S TO REMAIN. PROVIDE KIT TO INCREASE HEIGHT OF VTR'S TO MEET CODE REQUIREMENTS - TYP. REFER TO ROOF DETAILS FOR FLASHING. WHERE LIGHTNING PROTECTION IS
GROUNDED TO PIPE, TEMPORARILY REMOVE GROUND AND REINSTALL WHEN ROOFING IS
COMPLETE.
29 CAULK MASONRY CONTROL JOINTS. REMOVE SEALANT IN THE VERTICAL AND HORIZONTAL CONTROL
JOINTS. PROVIDE NEW BACKER ROD AND SILICONE SEALANT.
30 REMOVE EXISTING FLASHING AT WALL WHERE A RECURRING LEAK IS PRESENT. PROVIDE NEW PREFINISHED METAL FLASHING, COUNTER FLASHING AND SEALANT AT WALL FOR WEATHERTIGHT
CONDITION. REPAIR AND REFLASH EXISTING WALL SCUPPER DIRECTLY ABOVE FLASHING.
INVESTIGATE SOURCE OF LEAK AND REPORT ANY PROBLEMS TO OWNER.
31 POWER WASH EXISTING EXTERIOR MASONRY. SAMPLE WASH SMALL AREA OF BLDG 51 FOR
APPROVAL PRIOR TO PROCEEDING WITH BLDG 26. APPLY TWO COATS OF CLEANING DETERGENT IN
HEAVILY STAINED/SOILED AREAS. TYPICAL ALL EXPOSED EXTERIOR MASONRY. APPLY CLEAR
MASONRY WATER REPELLENT AT ALL EXPOSED EXTERIOR MASONRY AFTER POWER WASHED.
32 PROVIDE FLASHING WITH TERMINATION BAR AND SEALANT AT END OF PARAPET CAP AT WALL.
33 REFLASH EXISTING ELEVATOR HOISTWAY ROOF VENT.
34 PROVIDE NEW DOOR SILL. TURN ROOF FLASHING UP BEHIND DOOR SILL.
35 REPAIR LEAK CAUSED BY UNDER-SIZED ROOF DRAIN LINE. CHANGE EXISTING ROOF DRAIN LINE FROM 1 1/2" DIA. TO 4" DIAMETER. REPLACE DAMAGED CEILING TILE. TEMPORARILY REMOVE EXISTING PAVERS FROM ROOF. REMOVE EXISTING ROOF TO DECK. PROVIDE RIGID INSULATION AND
NEW ROOF MEMBRANE. REINSTALL PAVERS. TYPICAL AT ROOFS ADJACENT TO SKYLIGHTS.
36 SEAL AROUND PIPE RAIL FLANGES AT CMU WALL - TYPICAL. PREP AND PAINT PIPE RAILS & FLANGES.
37 REPAIRS TO INTERIOR DAMAGED GYP. BD AND WINDOW SILLS ARE NOT IN THIS SCOPE AND WILL BE
ACCOMPLISHED BY THE OWNER.
38 CAREFULLY REMOVE EXISTING COUNTER FLASHING CURRENTLY ATTACHED TO EXISTING EMBEDDED REGLET. INSTALL NEW COUNTER FLASHING AND INTERLOCK TO REGLET PER DETAILS A5, F5 &
M5/A5.01. REPORT ANY ISSUES TO OWNER.
KEYED NOTES FOR PHOTOS
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:0
:4
P
M
C U s e rs
\r p ia z z a
\D e s k to p \P ro je c ts
\F D
A
B ld g
R e ro o f
E x te ri o r C le a n in g \F
D A
ID
I2
.0
-F
D A
B ld g
E x t
C le a n g v r p
-1
-2
.r v t
FDA Jefferson Laboratories
BLDG 26 ROOF
REPLACEMENT
AND EXTERIOR
CLEANING
3900 NCTR Road, HFT_324 Jefferson, AR 72079
A2.05
EXTERIOR
PHOTOS
02-10-2023
FDAIDI21.04
OWNER
FDA Jefferson Laboratories
3900 NCTR Road, HFT_324 Jefferson, AR 72079
P ro je c t
N a m e
CONSTRUCTION DOCUMENTS
PHOTO 27 PHOTO 28 PHOTO 29 PHOTO 30
PHOTO 31 PHOTO 32 PHOTO 33
PHOTO 34 PHOTO 35 PHOTO 36
PHOTO 37 PHOTO 38 PHOTO 39
4 4 56 25 66 6 46
366 6 466
X
7 6
44 66
74 6366 6
46 6317 3625
6 64 64254
2525 664 4
254 25 646
3 625 25 6325
4 446 46 2563 4625 4
1 TEAR OFF EXISTING MOD BIT ROOF AND INSULATION TO METAL DECK BELOW. REPLACE WITH POLYISO INSULATION, COVER BOARD AND MOD BIT ROOF SYSTEM PER SPECIFICATION - TYP. AT
ROOF AREAS A, B & C.
2 REFER TO "PARTIAL PLAN AT STACKS" SHEET A2.02 FOR PENTHOUSE ROOF WORK.
3 EXISTING STANDING SEAM METAL ROOF TO REMAIN. REPLACE COPING AND SIDING AT ATRIUM.
4 CAULK WINDOW FRAMES. REMOVE EXISTING SEALANT AT THE EXTERIOR PERIMETER OF THE
WINDOW FRAMES (METAL TO MASONRY). PROVIDE NEW BACKER ROD AND SILICONE SEALANT.
TYPICAL ALL WINDOWS.
5 EXISTING CANOPY TO REMAIN. CAULK FLASHING. REMOVE EXISTING SEALANT ABOVE THE CANOPY FLASHING. INSTALL NEW BACKER ROD AND SEALANT. PROVIDE SILICONE SEALANT AT FLASHING ON
UNPAINTED CMU.
6 REMOVE EXISTING PARAPET CAP. REPLACE WITH NEW PREFINISHED ALUMINUM CAP - TYPICAL AT ALL PARAPETS AND COPINGS. MATCH EXISTING PROFILE AND COLOR. SUBMITTALS AND PHYSICAL
COLOR SAMPLES REQUIRED. PROVIDE NEW SILICONE SEALANT.
7 PROVIDE ADDITIONAL PREFINISHED METAL FLASHING ABOVE COPING AT SIDES. FLASHING TO WRAP CORNERS. COLOR TO MATCH EXISTING. PROVIDE TERMINATION BAR AND SEALANT. SUBMITTALS
REQUIRED.
8 PROVIDE NEW PREFINISHED METAL SILL. SUBMITTALS REQUIRED. COLOR TO MATCH EXISTING SILL.
PROVIDE FLASHING AT SIDES OF SILL.
9 CLEAN FLASHING AT EXISTING SKYLIGHT. REMOVE EXISTING CAULKING AND PROVIDE NEW SEALANT.
10 EXISTING DUCT PENETRATIONS. REFER TO PENTHOUSE PLANS, SHEET A2.02. VERIFY QUANTITIES.
11 TEMPORARILY REMOVE EXISTING SUPPORT ANGLES TO ALLOW ACCESS TO EXISTING FIRE BARRIER
CAULKING AT DUCT PENETRATION.
12 REMOVE EXISTING FIRE BARRIER CAULK AND PROVIDE NEW FIRE BARRIER CAULK PER MFR'S RECOMMENDATIONS. MAINTAIN EXISTING FIRE RATING. ELIMINATE ANY AIR INFILTRATION AT
PENETRATION.
13 EXISTING PENTHOUSE FLOOR SLAB.
14 EXISTING EXHAUST DUCTS. REFER TO "PARTIAL PLAN AT STACKS" SHEET A2.02 FOR PENETRATIONS
AT ROOF SLAB.
15 REMOVE EXISTING CAULK AT COUNTER FLASHING. PROVIDE NEW BACKER ROD AND SEALANT. USE
URETHANE SEALANT ON PAINTED CMU. USE SILICONE SEALANT AT UNPAINTED CMU.
16 EXISTING REGLET EXTENDED INTO MORTAR JOINT TO REMAIN. INSPECT JOINTS BETWEEN LENGTHS
OF REGLETS AND ADJUST FOR TIGHT FIT.
17 REMOVE EXISTING ROOF-TO-WALL FLASHING DURING ROOF TEAR-OFF. REPLACE WITH NEW
FLASHING PER DETAILS AND SPECIFICATION.
18 EXISTING WALKWAY PADS TO BE REMOVED WITH ROOF TEAR-OFF. REFER TO A1.21. ROOF PLAN FOR
PROPOSED ROUTE OF NEW WALKWAY PADS TO REPLACE EXISTING WALKWAY PADS. COORDINATE
ROUTE WITH OWNER PRIOR TO INSTALLATION.
19 EXISTING LIGHTNING PROTECTION SYSTEM TO REMAIN. TEMPORARILY REMOVE PORTIONS OF
SYSTEM AS MAY BE REQUIRED FOR NEW ROOFING INSTALLATION. REINSTALL AFTERWARD.
20 EXISTING CMU WALL. POWER WASH AND APPLY TWO COATS OF ELASTOMERIC COATING - TYPICAL.
21 REMOVE EXISTING FLASHING. PROVIDE NEW ROOF-TO-WALL FLASHING WITH CONTINUOUS
TERMINATION BAR AND SEALANT. PROVIDE CONTINUOUS COUNTERFLASHING OVER TERMINATION
BAR ATTACHED TO SUBSTRATE DIRECTLY BELOW METAL SIDING BASE TRIM. REPORT ANY
DISCREPANCIES OR CONCERNS TO OWNER PRIOR TO INSTALLATION.
22 EXISTING METAL SIDING AND BASE TRIM TO REMAIN. REMOVE EXISTING SEALANT AND PROVIDE
CLEAR SEALANT AT THE BASE TRIM AGAINST THE SIDING.
23 EXISTING ROOF DRAIN TO REMAIN -TYPICAL. REPLACE EXISTING STRAINER WITH NEW. REFLASH PER
DETAILS AND IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SECONDARY (
EMERGENCY OVERFLOW) DRAINS ARE NOT REQUIRED.
24 EXISTING EXHAUST FAN TO REMAIN. RAISE CURB IF REQUIRED TO ACCOMMODATE NEW
INCREASED ROOF THICKNESS. FLASH PER ROOFING MANUFACTURER'S RECOMMENDATIONS.
25 REPLACE EXISTING OVERFLOW SCUPPER PER MFR'S RECOMMENDATIONS & DETAIL E14/A5.01.
26 EXISTING SKYLIGHT TO REMAIN. REFLASH EXISTING CURB. RAISE CURB IF REQUIRED TO
ACCOMMODATE NEW INCREASED ROOF THICKNESS. FLASH PER ROOFING MANUFACTURER'S
RECOMMENDATIONS.
27 VERIFY THIS ITEM. IF IT IS A MOISTURE RELIEF VENT, REPLACE WITH NEW MOISTURE RELIEF VENT. IF IT IS A VTR (VENT THRU ROOF), PROVIDE NEW FLASHING KIT PER MFR'S RECOMMENDATIONS.
EXTEND HEIGHT AS REQUIRED FOR ROOF WARRANTY. IF IT IS ASSOCIATED WITH THE LIGHTNING PROTECTION SYSTEM, IT IS TO REMAIN. FLASH WITH SIPLAST PARAPRO LIQUID-APPLIED FLASHING
OR EQUAL.
28 EXISTING VTR'S TO REMAIN. PROVIDE KIT TO INCREASE HEIGHT OF VTR'S TO MEET CODE REQUIREMENTS - TYP. REFER TO ROOF DETAILS FOR FLASHING. WHERE LIGHTNING PROTECTION IS
GROUNDED TO PIPE, TEMPORARILY REMOVE GROUND AND REINSTALL WHEN ROOFING IS
COMPLETE.
29 CAULK MASONRY CONTROL JOINTS. REMOVE SEALANT IN THE VERTICAL AND HORIZONTAL CONTROL
JOINTS. PROVIDE NEW BACKER ROD AND SILICONE SEALANT.
30 REMOVE EXISTING FLASHING AT WALL WHERE A RECURRING LEAK IS PRESENT. PROVIDE NEW PREFINISHED METAL FLASHING, COUNTER FLASHING AND SEALANT AT WALL FOR WEATHERTIGHT
CONDITION. REPAIR AND REFLASH EXISTING WALL SCUPPER DIRECTLY ABOVE FLASHING.
INVESTIGATE SOURCE OF LEAK AND REPORT ANY PROBLEMS TO OWNER.
31 POWER WASH EXISTING EXTERIOR MASONRY. SAMPLE WASH SMALL AREA OF BLDG 51 FOR
APPROVAL PRIOR TO PROCEEDING WITH BLDG 26. APPLY TWO COATS OF CLEANING DETERGENT IN
HEAVILY STAINED/SOILED AREAS. TYPICAL ALL EXPOSED EXTERIOR MASONRY. APPLY CLEAR
MASONRY WATER REPELLENT AT ALL EXPOSED EXTERIOR MASONRY AFTER POWER WASHED.
32 PROVIDE FLASHING WITH TERMINATION BAR AND SEALANT AT END OF PARAPET CAP AT WALL.
33 REFLASH EXISTING ELEVATOR HOISTWAY ROOF VENT.
34 PROVIDE NEW DOOR SILL. TURN ROOF FLASHING UP BEHIND DOOR SILL.
35 REPAIR LEAK CAUSED BY UNDER-SIZED ROOF DRAIN LINE. CHANGE EXISTING ROOF DRAIN LINE FROM 1 1/2" DIA. TO 4" DIAMETER. REPLACE DAMAGED CEILING TILE. TEMPORARILY REMOVE EXISTING PAVERS FROM ROOF. REMOVE EXISTING ROOF TO DECK. PROVIDE RIGID INSULATION AND
NEW ROOF MEMBRANE. REINSTALL PAVERS. TYPICAL AT ROOFS ADJACENT TO SKYLIGHTS.
36 SEAL AROUND PIPE RAIL FLANGES AT CMU WALL - TYPICAL. PREP AND PAINT PIPE RAILS & FLANGES.
37 REPAIRS TO INTERIOR DAMAGED GYP. BD AND WINDOW SILLS ARE NOT IN THIS SCOPE AND WILL BE
ACCOMPLISHED BY THE OWNER.
38 CAREFULLY REMOVE EXISTING COUNTER FLASHING CURRENTLY ATTACHED TO EXISTING EMBEDDED REGLET. INSTALL NEW COUNTER FLASHING AND INTERLOCK TO REGLET PER DETAILS A5, F5 &
M5/A5.01. REPORT ANY ISSUES TO OWNER.
KEYED NOTES FOR PHOTOS
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:0
:5
P
M
C U s e rs
\r p ia z z a
\D e s k to p \P ro je c ts
\F D
A
B ld g
R e ro o f
E x te ri o r C le a n in g \F
D A
ID
I2
.0
-F
D A
B ld g
E x t
C le a n g v r p
-1
-2
.r v t
FDA Jefferson Laboratories
BLDG 26 ROOF
REPLACEMENT
AND EXTERIOR
CLEANING
3900 NCTR Road, HFT_324 Jefferson, AR 72079
A2.06
EXTERIOR
PHOTOS
02-10-2023
FDAIDI21.04
OWNER
FDA Jefferson Laboratories
3900 NCTR Road, HFT_324 Jefferson, AR 72079
P ro je c t
N a m e
CONSTRUCTION DOCUMENTS
PHOTO 40 PHOTO 41 PHOTO 42 PHOTO 43
PHOTO 44 PHOTO 45
PHOTO 47 PHOTO 48
PHOTO 50 PHOTO 51
PHOTO 46
PHOTO 49
PHOTO 52
254 6 3 6 4 6 4
4 25 6 3 6 4
4 25 6 316430
30 6 4
625 4 6 4 25 6
66 36 25 662525
366 63 25
7 6
34 63625631318
SIM.
7 6 366 4 65 3131 37 6 6
SIM.
3136 25 664 3131 X3 66 7
SIM.
16 23
1 TEAR OFF EXISTING MOD BIT ROOF AND INSULATION TO METAL DECK BELOW. REPLACE WITH POLYISO INSULATION, COVER BOARD AND MOD BIT ROOF SYSTEM PER SPECIFICATION - TYP. AT
ROOF AREAS A, B & C.
2 REFER TO "PARTIAL PLAN AT STACKS" SHEET A2.02 FOR PENTHOUSE ROOF WORK.
3 EXISTING STANDING SEAM METAL ROOF TO REMAIN. REPLACE COPING AND SIDING AT ATRIUM.
4 CAULK WINDOW FRAMES. REMOVE EXISTING SEALANT AT THE EXTERIOR PERIMETER OF THE
WINDOW FRAMES (METAL TO MASONRY). PROVIDE NEW BACKER ROD AND SILICONE SEALANT.
TYPICAL ALL WINDOWS.
5 EXISTING CANOPY TO REMAIN. CAULK FLASHING. REMOVE EXISTING SEALANT ABOVE THE CANOPY FLASHING. INSTALL NEW BACKER ROD AND SEALANT. PROVIDE SILICONE SEALANT AT FLASHING ON
UNPAINTED CMU.
6 REMOVE EXISTING PARAPET CAP. REPLACE WITH NEW PREFINISHED ALUMINUM CAP - TYPICAL AT ALL PARAPETS AND COPINGS. MATCH EXISTING PROFILE AND COLOR. SUBMITTALS AND PHYSICAL
COLOR SAMPLES REQUIRED. PROVIDE NEW SILICONE SEALANT.
7 PROVIDE ADDITIONAL PREFINISHED METAL FLASHING ABOVE COPING AT SIDES. FLASHING TO WRAP CORNERS. COLOR TO MATCH EXISTING. PROVIDE TERMINATION BAR AND SEALANT. SUBMITTALS
REQUIRED.
8 PROVIDE NEW PREFINISHED METAL SILL. SUBMITTALS REQUIRED. COLOR TO MATCH EXISTING SILL.
PROVIDE FLASHING AT SIDES OF SILL.
9 CLEAN FLASHING AT EXISTING SKYLIGHT. REMOVE EXISTING CAULKING AND PROVIDE NEW SEALANT.
10 EXISTING DUCT PENETRATIONS. REFER TO PENTHOUSE PLANS, SHEET A2.02. VERIFY QUANTITIES.
11 TEMPORARILY REMOVE EXISTING SUPPORT ANGLES TO ALLOW ACCESS TO EXISTING FIRE BARRIER
CAULKING AT DUCT PENETRATION.
12 REMOVE EXISTING FIRE BARRIER CAULK AND PROVIDE NEW FIRE BARRIER CAULK PER MFR'S RECOMMENDATIONS. MAINTAIN EXISTING FIRE RATING. ELIMINATE ANY AIR INFILTRATION AT
PENETRATION.
13 EXISTING PENTHOUSE FLOOR SLAB.
14 EXISTING EXHAUST DUCTS. REFER TO "PARTIAL PLAN AT STACKS" SHEET A2.02 FOR PENETRATIONS
AT ROOF SLAB.
15 REMOVE EXISTING CAULK AT COUNTER FLASHING. PROVIDE NEW BACKER ROD AND SEALANT. USE
URETHANE SEALANT ON PAINTED CMU.