This is an amendment to a solicitation for roof replacement services at two buildings located at the National Center for Toxicological Research campus. The amendment extends the due date for receipt of offers to August 17, 2023 at 1:00 PM Central Time. It also provides answers to questions from prospective offerors. Services required include asbestos inspection and roof replacement at Buildings 26 and 50. The prime contractor will be responsible for any necessary roof repairs after asbestos sampling. Core sampling will be required for asbestos inspection. Pressure washing of building exteriors is also included. Offerors must acknowledge receipt of the amendment. The Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services issued the solicitation.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

75F40123R00088 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

HFT-323

JEFFERSON AR 72079

3900 NCTR ROAD

OAGS - Field Operations Branch

FDA/OO/OFBA/OAGS/DAP

08/10/20230003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/14/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to extend the due date for receipt of Offers and provide answers to questions received.

The due date for receipt of offers including past performance evaluation questionnaires completed by the references is extended until 1:00PM Central Time (Jefferson, AR) on August

17, 2023.

Questions and answers:

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NICHOLAS E. SARTAIN

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

1. For the asbestos inspection, will roof core sampling be required or will standard sampling practices be accepted?

Response: Core sampling.

2. Who will be responsible for repairing the roof after the asbestos sampling is completed? The prime contractor is ultimately responsible for the repair.

Response: The prime contractor is responsible for the repair.

3. How many layers of roofing are on each structure?

Response: We estimate only one layer on each.

4. Is there an available asbestos inspection report for Building 26?

Response: Report for Bldg. 26 asbestos was provided with amendment 2 in attachment 1.

5. Is NCTR aware that the asbestos inspection that was performed of Building 50 which was provided in the bid documents was not performed by a Certified Asbestos Inspector and is not considered a valid thorough inspection per ADEE Regulation 21?

Response: The contractor will be required to perform asbestos sampling.

6. Amendment 1 states that the exterior cleaning does not include the masonry restoration, caulking, sealing, etc. The water repellent is listed as an alternate on the elevation sheets along with caulking of the parapet cap. Is the masonry restoration and caulking of the control joints and windows included with the roofing price and the exterior cleaning, water repellent, and caulking of the parapet listed individually alternates? .

Response: Price for pressure washing the exterior only.

7. Can the plants at the north canopy be removed by others to allow access for a lift? (See image below)

This will be the contractor’s responsibility to remove and replace any plants disturbed during this contract. I would also state that if the contractor uses a lift to clean the east end of Bldg. 26, they must protect the pavers and grass on the east end of the building in the mall area.

75F40123R00088 Amendment 3 2 of 6

Response: Any damage (rutting, depressions, cracks) to the pavers will be the responsibility of the contractor to repair. Also, rutting of any grass around the perimeter of the building will be repaired by the contractor.

75F40123R00088 Amendment 3 3 of 6

8. Can the trees/vegetation that are touching the building be trimmed by others to allow access to the exterior wall? (See image below)

Response: Yes, the trees/vegetation will be trimmed by another contractor under a different contract.

9. Is the low wall at the ramp and entry included in the area to be cleaned? (See image below)

Response: Yes.

10. Please confirm that the sidewalk to the building is not a part of the scope of work. (See image below)

75F40123R00088 Amendment 3 4 of 6

Response: The sidewalks under the awning in front of building 26 would be included if this option is exercised

11. The current roof drains are Wade brand, but the specifications and plans call for Zurn Z100F with no substitutions (Drawing A2.04, photo 23). The Zurn will not fit on a Wade roof drain.

Response: Please submit the Wade Roof Drain that would work for this application and specification.

The designer will review to make sure it meets the specification.

12. The roof curbs for the exhaust fans have an adapter on them to make them fit already. Please confirm if you want a new roof curb for the exhaust fans or curb adapters.

Response: As long as the existing roof curb is not damaged or compromised, it can be left and adapted to the new exhaust fans with the appropriate curb adapter.

13. During the visit to the site, it was noticed that some sections of insulation on the pipes connecting the rooftop units in building 50 are in poor condition and could potentially result in leaks and infiltration issues. Should the contractor include the cost of removing and reinstalling the existing pipe insulation?

(See image below).

75F40123R00088 Amendment 3 5 of 6

Response: No.

14. Regarding Part II Recent and Relevant Past Performance Information on page 51:

Would you like us to attach the PPEQ (unfilled except for Section 1) and the Client Letter we sent out to our three customers in that section to Part II? Our three customers will be sending the filled questionnaires to you and we will not receive a filled copy. So the only document we can think to include in Part II is the Unfilled PPEQ and the Client Letter.

Response: That is correct. The offeror will complete section 1 of the PPEQ for each reference with the remaining sections unfilled and provide a copy of the client letter sent.

15. Regarding L-7 Submission of Offers paragraph 3: This section mentions a 20-page limit on the proposal packet. Will this be strictly enforced? After compiling just one section of the necessary information we’re seeing that we will be exceeding that limitation.

Response: The 20-page limit is for part 1 technical approach only. Part II Recent and Relevant Past Performance Information and Part III Price Proposal Instructions are not included in the page limit.

75F40123R00088 Amendment 3 6 of 6