attachment-3-bid-2617-23-0.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
CONTRACT: Vehicle Glass Replacement and Installation Service
Solicitation number
2617-23
Issued by
New Hampshire

About this file

This file is a quarterly usage report template for the New Hampshire Department of Administrative Services' Vehicle Glass Replacement and Installation Service contract (Bid Number 2617-23), which covers all ten counties throughout the state. The report is organized into four sections tracking windshield replacements, windshield chip repairs, balance of product line items, and municipalities and non-profit usage spend, with each section requiring date, sales order number, agency name, item number, item price, quantity ordered, and total cost information. The contract was awarded to Marbucco Corp. (operating as Granite State Glass) on the basis of the lowest bid submission and commenced on July 1, 2023, with an initial five-year term and potential two-year renewal options. Estimated annual requirements include 89 windshield replacements and 13 chip repairs across nine counties, plus 32 windshield replacements and 3 chip repairs in Coos County, with all services required to meet National Auto Glass Specifications (NAGS) requirements and include both on-site and drop-off service options.

The successful vendor's bid of $34,350.00 was evaluated based on pricing, discount rates from the NAGS pricing standard, and comprehensive service capabilities, with pricing structured around the total net high discount from the NAGS Calculator/Price Listing & Catalog. The awarded contractor must maintain commercial general liability insurance of at least $1,000,000 per occurrence and $2,000,000 aggregate, along with workers' compensation insurance, and is required to provide a one-year warranty covering 100% of repair or replacement costs. Vendors must submit hourly labor rates, material costs, and overall discounts from NAGS pricing standards, with payment made via ACH or procurement card within thirty days of invoice receipt and service acceptance. The contract is non-exclusive, permitting the State to retain additional contractors at its discretion. A green procurement section requires documentation of recycled materials content and waste recycling throughout the manufacturing process where applicable.

View the file

Other files

File Type Posted
bid-2617-23--2-.pdf PDF
attachment-3-bid-2617-23-0.xlsx XLSX spreadsheet
attachment-2-bid-2617-23-0.pdf PDF
bid-2617-23-award--1-.pdf PDF
attachment-1-bid-2617-23-0.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quarter#4

xxx Quarter (xxx 1st to xxx 30th) Usage for Vehicle Glass Supply, Installation and Repair, Contract# XXX
Section 1: Vehicle Windshield Replacment
DateSales Order#Agency NameItem#ItemPriceQTY orderedTotal Cost
Section 2: Vehicle Windshield Chip Repairs
DateSales Order#Agency NameItem#ItemPriceQTY orderedTotal Cost
Section 3: Balance of Product line items
DateSales Order#Agency NameItem#ItemPriceQTY orderedTotal Cost
Section 4: Municipalities and Non-profit Usage Spend
DateSales Order#Agency NameItem#ItemPriceQTY orderedTotal Cost

Green Procurement

Green Procurement
Recycling documentation with respect to content used in the manufacture, development and distribution process of goods and services sold. This report shall include but not be limited to: (If applicable for your contract)
o Percentage of recycled materials contained within finished products
o Percentage of waste recycled throughout the manufacturing process
o Types and volume of packaging used for transportN/A
o Any associated material avoided and/or recycled as applicable under contractN/A

File details come from the government source that posted it. Updated .