This document is a set of conceptual architectural floor plans for renovation of aircrew quarters at Davis-Monthan Air Force Base in Arizona. The drawings detail renovation plans for multiple restroom areas (SOSM and SSQR), including specific demolition and construction keynotes for bathroom infrastructure. Key renovation elements include:
Specific renovation details include installing a new 60" x 36" x 80" pre-manufactured solid surface shower pan, ADA-compliant floor-mounted toilet with commercial flush valve, new shower head positioned at 7'-0" height, extending hot and cold water lines, installing wall-mounted access panels, and addressing water hammer issues. The plans show detailed floor plans for demolition and new construction, with notes on moisture barriers, sound insulation, tile work, and plumbing modifications. The project is associated with the 355th Civil Engineer Squadron at Davis-Monthan AFB and is part of the Aircrew Quarters Renovation project (Project Number FBNV250038).
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOSM DEMO PLAN
Scale: 1/2" = 1'
SOSM FLOOR PLAN
Scale: 1/2" = 1'
DEMO PLAN KEYNOTES
LEGEND
EXISTING WALL OR FURRING TO REMAIN
ITEM TO BE DEMOLISHED
1. (E) WALL TO REMAIN
2. DEMO (E) WALL
3. DEMO (E) DOOR
4. DEMO (E) PLAM DESK
5. REMOVE (E) SINK AND VANITY AND CAP ROUGH PLUMBING
6. DASHED LINE INDICATES SECTION OF (E) DRYWALL TO BE REMOVED TO ACCOMMODATE PLUMBING
INSTALLATION AND/OR BE REPLACED WITH MOISTURE RESISTANT DRYWALL, TYP AT ALL WET WALL
LOCATIONS
7. REMOVE SHOWER DRAIN AND ASSOCIATED BRANCH LINE BACK TO (E) 4" MAIN
8. REMOVE (E) TOILET AND ASSOCIATED WASTE LINE BACK TO MAIN. REMOVE WATER HAMMER
ARRESTOR AND ACCESS PANEL
9. REMOVE (E) SHOWER SURROUND AND IN-WALL ROUGH PLUMBING
10. (E) ALERT LIGHTING TO REMAIN ACTIVE
11. REMOVE DRYWALL AS REQUIRED TO ACCESS TOILET VENT PIPE FOR SINK DRAIN LINE TIE-IN.
LEGEND
NEW STEEL STUD FRAMED WALL OR FURRING
EXISTING WALL
FLOOR PLAN KEYNOTES
1. (N) WALL MOUNT SINK AND VANITY. PROVIDE 18"W X 30" TALL WALL MOUNTED MIRROR CENTERED OVER
SINK. TIE DRAIN LINE INTO EXISTING TOILET VENT PIPE.
2. NEW CLEANOUT.
3. NEW 60" X 36" X 80" PRE-MANUFACTURED SOLID SURFACE SHOWER PAN AND SURROUND, CONNECT TO
EXISTING DRAIN, INSTALL OVER NEW "REDGUARD" DRAINAGE SYSTEM.
4. (N) SHOWER HEAD AND CONTROLS AT THIS LOCATION. HEAD SHALL BE 7'-0" AFF AND CONTROLS SHALL
BE 3'-6" AFF, CENTERED IN WALL.
5. EXTEND HW AND CW LINES OVERHEAD AND DOWN FURRED WALL TO SUPPLY LOCATION. ROUTE (N)
VENT LINE WITHIN FURRED WALL AND CONNECT ABOVE CEILING TO EXISTING VENT LINE. PROVIDE WALL
CLEANOUT.
6. (N) FLOOR MOUNTED ADA TOILET WITH COMMERCIAL FLUSH VALVE
7. (N) 2'-8" X 7'-0" SOLID WOOD POCKET DOOR WITH PAINTED WOOD CASED OPENING ON ALL SIDES. CLEAR
OPENING WHEN DOOR IS FULLY OPEN SHALL BE 2'-8" WIDE. FRAME POCKET WALL WITH 20GA 2-1/2" COLD
ROLLED STEEL STUDS.
8. NEW WALL CONSTRUCTION, RELOCATE (E) LIGHT AND (E) FAN CONTROLS, SEE GENERAL NOTES BELOW, PROVIDE FULL DEPTH MINERAL WOOL SOUND BATTS
9. INSTALL NEW WALL MOUNTED ACCESS PANEL AND WATER HAMMER ARRESTOR OVER TOILET
10. PATCH, TEXTURE, AND PAINT AREAS AFFECTED BY SINK REMOVAL
11. (E) ALERT LIGHTING TO REMAIN IN PLACE
12. REPAIR DRYWALL REMOVED FOR SINK DRAIN LINE TIE-IN. TEXTURE AND PAINT TO MATCH EXISTING, PAINT ENTIRE WALL AS REQUIRED FOR UNIFORM FINISH
GENERAL NOTES
1. PROVIDE MOISTURE RESISTANT DRYWALL AT ALL WET WALLS AND SHOWER WALLS
2. AT ALL AREAS THAT REQUIRE DRYWALL PATCH, TAPE AND TEXTURE TO MATCH EXISTING ADJACENT
WALLS. WALL PAINT TO MATCH WALLS IN ADJACENT LOUNGE.
3. ALL BATHROOM WALLS TO RECEIVE 6" CERAMIC TILE COVE BASE
4. WALL TEXTURE AT SLEEPING AREA TO MATCH EXISTING
5. SLEEPING AREA TO RECEIVE 24"X24" CARPET TILE AND 4" RUBBER WALL BASE TO MATCH EXISTING IN
LOUNGE
6. U.O.N., NEW INTERIOR WALLS SHALL BE FRAMED WITH 24 GA COLD ROLLED STEEL STUD. GC TO VERIFY
THAT WALL CAVITY WILL ACCOMMODATE ANY VENT, WASTE, OR SUPPLY PIPING.
7. MAINTAIN (E) FIRE ALARM SYSTEM AND PROVIDE REQUIRED HORNS, STROBES, MONITORING, AND
PROGRAMMING AS REQ BY BASE FIRE DEPARTMENT.
8. CURRENTLY, THE FACILITY EXPERIENCES WATER HAMMER FOLLOWING TOILET FLUSHING. CONTRACTOR
TO INVESTIGATE AND PROVIDE HAMMER ARRESTOR SIZED PER PDI-WH201 OR PROVIDE OTHER
MITIGATION.
9. CONTRACTOR SHALL SIZE ALL PLUMBING SUPPLY, WASTE, AND VENT LINES PER APPLICABLE UFC AND
DMAFB CPG.
10. CONTRACTOR TO PROVIDE AND INSTALL TOILET ACCESSORIES INCLUDING HAND TOWEL HOOK, TOWEL
HOOK, TP DISPENSER, HAND SOAP DISPENSER, SHOWER ROD AND CURTAIN.
11. INSTALL WALL BACKING AS REQUIRED FOR ALL ACCESSORIES OR WALL MOUNTED EQUIPMENT.
12. AT SHOWER ENCLOSURE, CONTRACTOR SHALL PROVIDE A WATERTIGHT INSTALLATION. DECK MUD
SHALL SLOPE TO DRAIN AND ALL TILE BACKER BOARD JOINTS AND SCREW HOLES SHALL BE TAPED AND MUDDED TO A SMOOTH FINISH. INSTALL LIQUID APPLIED MOISTURE BARRIER (REDGUARD OR APPROVED EQ) TO WALLS UP TO 6" ABOVE SHOWER HEAD AND AT FLOOR DECK. INSTALL PER MANUFACTURER
RECOMMENDATIONS. CONTRACTOR SHALL PERFORM A WATER LEAKAGE TEST PRIOR TO TILE
INSTALLATION.
13. NOTE THAT ALL WALLS SURROUNDING TOILET / SHOWER ROOM ARE TO RECEIVE FULL DEPTH SOUND ATTENUATING BATT INSULATION. WALL CAVITIES WILL BE ACCESSIBLE DUE TO DEMOLITION OF EXISTING
DRYWALL OR BECAUSE OF NEW WALL CONSTRUCTION.
14. PROVIDE REPLACEMENT 100 CFM EXHAUST FANS INCLUDING DUCT WORK TO EXTERIOR OF FACILITY WITH
WEATHER TIGHT LOUVERS FOR ALL THREE BATHROOMS.
DEFINITIONS:
SOSM SINGLE OCCUPANT SLEEPING ROOM
SSQR SHARED SLEEPING QUARTERS RESTROOM
(E)RR
(E)SOSM (E
)L
O U
N G
E
CONCEPTUAL PLAN - NOT FOR CONSTRUCTION
KEY PLAN
SAP ROOM WORK IN THIS AREA
NTS
****ADDITIONAL SCOPE: NOTE THAT THE EXISTING ADA
RESTROOM LOCATED HERE ALSO EXPERIENCES WATER
HAMMER. CONTRACTOR TO REPLACE HAMMER ARRESTOR
SIZED PER PDI-WH201 OR PROVIDE OTHER MITIGATION.
U.S. AIR FORCE
H 5 T5
ND
EINE RNEIV L G
SQIC
A
IR
C O
M B
A T
C O
M M
A N
D
SHEET NO.
D A
V
IS
-M O
N
TH
A N
A
FB
A R
IZ
O
N A
E . M
A D
E R
A S
T, B
LD
G
R E
V
IS
IO
N
S
D A
TE
D
E S
C R
IP
TI
O N
P R
O
JE
C T M
A N
A G
E M
E N
T C
E S
/C E
N M
F B
N V
B
SAP ROOM
FLOOR PLANS
Q U
A R
T E
R S
N
D A
C A
D E
T
R E
N O
V A
T E
A L E
R T A
IR
C
R E
W
A1
(E)SSQR
SSQR DEMO PLAN
Scale: 1/2" = 1'
SSQR FLOOR PLAN
Scale: 1/2" = 1'
RESTROOM WORK IN THIS AREA
DEMO PLAN KEYNOTES
LEGEND
EXISTING WALL OR FURRING TO REMAIN
ITEM TO BE DEMOLISHED
1. (E) WALL TO REMAIN
2. DEMO (E) WALL
3. NOT USED
4. NOT USED
5. NOT USED
6. DASHED LINE INDICATES SECTION OF (E) DRYWALL TO BE REMOVED TO ACCOMMODATE PLUMBING
INSTALLATION AND/OR BE REPLACED WITH MOISTURE RESISTANT DRYWALL, TYP AT ALL WET WALL
LOCATIONS
7. REMOVE SHOWER DRAIN AND ASSOCIATED BRANCH LINE BACK TO (E) 4" MAIN
8. REMOVE (E) TOILET AND ASSOCIATED WASTE LINE BACK TO MAIN. REMOVE WATER HAMMER
ARRESTOR AND ACCESS PANEL
9. REMOVE (E) SHOWER SURROUND AND IN-WALL ROUGH PLUMBING
LEGEND
NEW STEEL STUD FRAMED WALL OR FURRING
EXISTING WALL
FLOOR PLAN KEYNOTES
1. NOT USED
2. NOT USED
3. NEW 60" X 36" X 80" PRE-MANUFACTURED SOLID SURFACE SHOWER PAN AND SURROUND, CONNECT TO
EXISTING DRAIN, INSTALL OVER NEW "REDGUARD" DRAINAGE SYSTEM.
4. (N) SHOWER HEAD AND CONTROLS AT THIS LOCATION. HEAD SHALL BE 7'-0" AFF AND CONTROLS SHALL
BE 3'-6" AFF, CENTERED IN WALL.
5. EXTEND HW AND CW LINES OVERHEAD AND DOWN FURRED WALL TO SUPPLY LOCATION. ROUTE (N)
VENT LINE WITHIN FURRED WALL AND CONNECT ABOVE CEILING TO EXISTING VENT LINE. PROVIDE WALL
CLEANOUT.
6. (N) FLOOR MOUNTED ADA TOILET WITH COMMERCIAL FLUSH VALVE
7. NOT USED
8. NOT USED
9. INSTALL WALL MOUNTED ACCESS PANEL AND WATER HAMMER ARRESTOR OVER TOILET
10. NOT USED
11. NOT USED
(E)SSQR
AutoCAD SHX Text 2'-8"
AutoCAD SHX Text 2'-8"
AutoCAD SHX Text 1'-9"
AutoCAD SHX Text 1'-9"
AutoCAD SHX Text 3"
AutoCAD SHX Text 5'-0"
AutoCAD SHX Text 3'-0"
AutoCAD SHX Text 1'-6"
| Sheets and Views |
| A1 |
File details come from the government source that posted it. Updated .