Attachment 3 APLs.pdf
PDF 90 KB Posted
- Solicitation number
- SP4510-26-Q-1013
- Issued by
-
Defense Logistics Agency
About this file
Acceptable Performance Levels Summary
This document establishes performance standards and metrics for a Logistics Asset Management System (LAMS) maintenance and support contract. The contract encompasses four primary deliverables: visitor log sign-in procedures, inspection and preventive maintenance of LAMS equipment, repair request fulfillment, and callback services for troubleshooting ineffective repairs.
The visitor log requirement mandates that contractors sign in prior to commencing services each scheduled day, with an acceptable performance level allowing no more than two failures per performance period. Inspection and preventive maintenance of all CLIN 1 items must be completed within 150 days of work start, with a final report submitted to the Contracting Officer's Representative (COR) within 5 business days, requiring 100% inspection completion on the requested date. The contractor's site visits are scheduled in two 180-day cycles following base year task order award and subsequent option year awards. Repair requests require onsite support with repairs completed within 2 days of arrival and final reports submitted within 30 days, with an acceptable performance level of 90% timeliness and accuracy. Callback services must troubleshoot ineffective repairs within three business days of notification, with an acceptable performance level of no more than two failures per performance period. All deliverables enforce a payment withhold mechanism—payment cannot be made until acceptable performance levels are achieved. The document references specific PWS clauses (PWS 2.a, PWS 2, PWS 2.c, and PWS 2.d) for each requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 Price Schedule .xlsx | XLSX spreadsheet | |
| Attachment 1 Performance Work Statement.pdf | ||
| Attachment 4 Past Performance Questionairre.doc | DOC document | |
| Attachment 5 Wage Determination 2015-5635.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. Acceptable Performance Levels:
Deliverable Standard Time Frame Clause Acceptable Performance
Level
Reduction for failed
APL
Sign in on visitor log
Sign visitor log upon arrival for any service
Prior to commencing services on a scheduled day
PWS 2.a. No more than two
(2) failures during each period of performance.
Payment may not be made until APL is achieved.
Inspection/Pre ventive Maintenance of LAMS all items under CLIN 1 must be completed
Within 150 days of start of work and 30 days to complete the final report which include summary status of site equipment. The contractors site visits are based on TWO 180 DAY cycles after task order award of base year, and task order awards for option years thereafter.
PWS 2. 100% inspection completed on date requested. Report of finding submitted to COR within 5 business days.
Payment may not be made
Repairs requests
Provide onsite support.
Within 15 days, complete repairs, and 30 days to complete the final reports
PWS 2 c. Repairs are completed within 2 days of arrival onsite and reports are 90% timely and accurate.
Payment may not be made
Call Back Service
Troubleshoo t ineffective repairs
Within three (3) business days of notification
PWS 2.d. No more than two
(2) failures during each period of performance.
Payment may not be made achieved
File details come from the government source that posted it. Updated .