ATTACHMENT 3 AF 3052 Paving IDIQ Contractor Cost Estimate.xlsx
XLSX spreadsheet 98 KB Posted
- Attached to
- PAVING IDIQ Maxwell AFB and Gunter Annex - AMENDMENT 2 Federal contract opportunity
- Solicitation number
- FA330024R0025
About this file
This document is an attachment containing a construction cost estimate breakdown for a Paving IDIQ contract at Maxwell Air Force Base in Alabama over 5 years. The estimate includes detailed unit pricing across many construction items such as concrete, asphalt, marking, excavation, drainage, and other site work. The total proposed contract price for each year is estimated at $0.00.
The related federal contract opportunity is a competitive, set-aside solicitation for a firm-fixed-price Paving IDIQ contract at Maxwell AFB and Gunter Annex. The contract will be awarded to a Service-Disabled Veteran-Owned Small Business. A site visit is scheduled on June 6, 2024, and proposals are due by June 24, 2024. The contracting officer has determined adequate price competition is likely for this acquisition.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | ||||||
| 400 Cannon Street Maxwell Air Force Base Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Paving IDIQ - Year 1 | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Maxwell | ||||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| Project Manager | MH | $0.00 | $0.00 | $0.00 | ||||
| Mobilization | LS | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 2 (Site Work) | $0.00 | $0.00 | $0.00 | |||||
| Remove concrete | $0.00 | |||||||
| Unreinforced | $0.00 | $0.00 | $0.00 | |||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Reinforced | $0.00 | |||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Curb and Gutter | $0.00 | |||||||
| 0-500 | LF | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Sidewalk | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Saw Cut Asphalt per Inch of Sawing Depth | ||||||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| Saw Cut Unreinforced Concrete per Inch of Sawing Depth | ||||||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| Saw Cut Reinforced Concrete per Inch of Sawing Depth | ||||||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| Remove asphalt (No Milling) | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | ||||
| Cold Milling Bituminous Pavements | ||||||||
| 1" Thick | $0.00 | $0.00 | $0.00 | |||||
| (2.54 CM) | $0.00 | $0.00 | $0.00 | |||||
| 0-500 | SY | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 2" Thick | $0.00 | $0.00 | $0.00 | |||||
| (5.08 CM) | $0.00 | $0.00 | $0.00 | |||||
| 0-2000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 10001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 3" Thick | $0.00 | $0.00 | $0.00 | |||||
| (7.62 CM) | $0.00 | $0.00 | $0.00 | |||||
| 0-2000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 10001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| General Excavation | ||||||||
| Satisfactory Material | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Unsatisfactory Material | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Roadways and Airfield Excavation | ||||||||
| Satisfactory Material | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | ||||
| Unsatisfactory Material | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | ||||
| Select Material Subbase Course | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-1500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Graded Crushed Aggregate Base Course | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-750 | CY | $0.00 | $0.00 | $0.00 | ||||
| Compact Base | ||||||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 20001-100000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Topsoil | ||||||||
| 0-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | CY | $0.00 | $0.00 | $0.00 | ||||
| Concrete Sidewalks | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 5001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-25000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Concrete Handicap Ramp | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| 501-5000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Concrete Curb and Gutter | ||||||||
| 0-100 | LF | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | LF | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 2001-5000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Wire Mesh | SY | $0.00 | $0.00 | $0.00 | ||||
| Concrete Pavement | $0.00 | $0.00 | $0.00 | |||||
| Roads | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-750 | CY | $0.00 | $0.00 | $0.00 | ||||
| Airfields | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-750 | CY | $0.00 | $0.00 | $0.00 | ||||
| Bituminous Pavements for Roads and Streets | ||||||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | TON | $0.00 | $0.00 | $0.00 | ||||
| Bituminous Surface Treatment | ||||||||
| SBST | $0.00 | $0.00 | $0.00 | |||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 50001-110000 | SY | $0.00 | $0.00 | $0.00 | ||||
| DBST | ||||||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 50001-110000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Bituminous Pavements for Airfield and Heavy Duty | ||||||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | ||||
| Asphalt 327 | ||||||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | TON | $0.00 | $0.00 | $0.00 | ||||
| Tack Coat | ||||||||
| 0-500 | GAL | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | GAL | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | GAL | $0.00 | $0.00 | $0.00 | ||||
| Prime Coat | ||||||||
| 0-500 | GAL | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | GAL | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | GAL | $0.00 | $0.00 | $0.00 | ||||
| Coal-Tar Sand Slurry Sealcoat | $0.00 | $0.00 | $0.00 | |||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 50001-100000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Spall Repair (Concrete) | ||||||||
| 0-50 | SF | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | SF | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Rubber Removal | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-100000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 100001-200000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Paint Removal | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-100000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 100001-200000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, White Reflective New | $0.00 | $0.00 | $0.00 | |||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 50001-100000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, Yellow Reflective New | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, White Reflective Remarking | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 50001-200000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, Yellow Reflective Remarking | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 50001-200000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, Yellow Nonreflective | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, Red Nonreflective | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| 501-3000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Road & Street Marking, White Reflective | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-30000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Road & Street Marking,Yellow Reflective | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Thermoplastic Road and Street Markings (white, yellow) | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Parking Lot, White Reflective | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Special Traffic Markings | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| Reflective Crosswalk Tape (3M Stamark or equivalent) | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Seal Random Cracks in Bituminous Pavements | ||||||||
| 0-2000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 50001-125000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Seal/Reseal Joints in Concrete Pavements | $0.00 | $0.00 | $0.00 | |||||
| 0-1000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 5001-15000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Seal/Reseal Random Cracks Concrete Pavements | ||||||||
| 0-50 | LF | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | LF | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | LF | $0.00 | $0.00 | $0.00 | ||||
| Seal/Reseal Joints in Concrete, General | ||||||||
| 0-100 | LF | $0.00 | $0.00 | $0.00 | ||||
| 101-1000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Seed | ||||||||
| 0-1000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Sod | ||||||||
| 0-50 | SY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | SY | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Remove 10" Storm Drain (25.4 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Remove 18" Storm Drain (45.7 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Remove 24" Storm Drain (60.9 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Remove Storm Drain Inlets | EA | $0.00 | $0.00 | $0.00 | ||||
| Remove Existing Street Signs | EA | $0.00 | $0.00 | $0.00 | ||||
| Lime Stabilized Subgrade | ||||||||
| 0-500 | SY | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Install 12" Storm Drain (30.5 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Install 18" Storm Drain (45.7 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Install 24" Storm Drain (60.9 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Install Concrete Duct Bank (4-4") | LF | $0.00 | $0.00 | $0.00 | ||||
| Install Storm Drain Inlets | EA | $0.00 | $0.00 | $0.00 | ||||
| (Type S, Single Wing) | $0.00 | $0.00 | $0.00 | |||||
| Install 6" Sleeves (15.2 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| (PVC With Handholes) | $0.00 | $0.00 | $0.00 | |||||
| Convert Grate Inlet to Curb Inlet | EA | $0.00 | $0.00 | $0.00 | ||||
| Convert Curb Inlet to Manhole | EA | $0.00 | $0.00 | $0.00 | ||||
| Adjust Storm Drain Inlet Tops | EA | $0.00 | $0.00 | $0.00 | ||||
| 2 3/8"x4"x8" Concrete Brick Pavers | SF | $0.00 | $0.00 | $0.00 | ||||
| (With 2" Sand Bed & 4" Compacted | $0.00 | $0.00 | $0.00 | |||||
| Graded Crushed Aggregate Base Course) | $0.00 | $0.00 | $0.00 | |||||
| Tree Grate & Frames With Concrete | EA | $0.00 | $0.00 | $0.00 | ||||
| Supports | $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | |||||||
| Material Costs | $0.00 | |||||||
| Tax on Materials | 10% | $0.00 | ||||||
| TOTAL MATERIAL COST | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| Labor Cost | $0.00 | |||||||
| Insurance & Tax on Labor | 20% | $0.00 | ||||||
| TOTAL LABOR COST | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| Total Other Direct Costs | $0.00 | $0.00 | ||||||
| Total Material, Labor, Tax & Insurance | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| Overhead | 10% | $0.00 | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |
| Profit | 10% | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| Bonds | 2.5% | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| $0.00 | |||||
| I acknowledge the above cost estimate has been estimated to the best of my ability and means. |
Signature: ______________________________________
Year 2
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | ||||||
| 400 Cannon Street Maxwell Air Force Base Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Paving IDIQ - Year 2 | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Maxwell | ||||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| Project Manager | MH | $0.00 | $0.00 | $0.00 | ||||
| Mobilization | LS | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 2 (Site Work) | $0.00 | $0.00 | $0.00 | |||||
| Remove concrete | ||||||||
| Unreinforced | $0.00 | $0.00 | $0.00 | |||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Reinforced | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Curb and Gutter | ||||||||
| 0-500 | LF | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Sidewalk | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Saw Cut Asphalt per Inch of Sawing Depth | ||||||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| Saw Cut Unreinforced Concrete per Inch of Sawing Depth | ||||||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| Saw Cut Reinforced Concrete per Inch of Sawing Depth | ||||||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| Remove asphalt (No Milling) | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | ||||
| Cold Milling Bituminous Pavements | ||||||||
| 1" Thick | $0.00 | $0.00 | $0.00 | |||||
| (2.54 CM) | $0.00 | $0.00 | $0.00 | |||||
| 0-500 | SY | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 2" Thick | $0.00 | $0.00 | $0.00 | |||||
| (5.08 CM) | $0.00 | $0.00 | $0.00 | |||||
| 0-2000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 10001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 3" Thick | $0.00 | $0.00 | $0.00 | |||||
| (7.62 CM) | $0.00 | $0.00 | $0.00 | |||||
| 0-2000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 10001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| General Excavation | ||||||||
| Satisfactory Material | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Unsatisfactory Material | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Roadways and Airfield Excavation | ||||||||
| Satisfactory Material | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | ||||
| Unsatisfactory Material | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | ||||
| Select Material Subbase Course | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-1500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Graded Crushed Aggregate Base Course | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-750 | CY | $0.00 | $0.00 | $0.00 | ||||
| Compact Base | ||||||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 20001-100000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Topsoil | ||||||||
| 0-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | CY | $0.00 | $0.00 | $0.00 | ||||
| Concrete Sidewalks | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 5001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-25000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Concrete Handicap Ramp | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| 501-5000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Concrete Curb and Gutter | ||||||||
| 0-100 | LF | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | LF | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 2001-5000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Wire Mesh | SY | $0.00 | $0.00 | $0.00 | ||||
| Concrete Pavement | $0.00 | $0.00 | $0.00 | |||||
| Roads | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-750 | CY | $0.00 | $0.00 | $0.00 | ||||
| Airfields | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-750 | CY | $0.00 | $0.00 | $0.00 | ||||
| Bituminous Pavements for Roads and Streets | ||||||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | TON | $0.00 | $0.00 | $0.00 | ||||
| Bituminous Surface Treatment | ||||||||
| SBST | $0.00 | $0.00 | $0.00 | |||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 50001-110000 | SY | $0.00 | $0.00 | $0.00 | ||||
| DBST | ||||||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 50001-110000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Bituminous Pavements for Airfield and Heavy Duty | ||||||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | ||||
| Asphalt 327 | ||||||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | TON | $0.00 | $0.00 | $0.00 | ||||
| Tack Coat | ||||||||
| 0-500 | GAL | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | GAL | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | GAL | $0.00 | $0.00 | $0.00 | ||||
| Prime Coat | ||||||||
| 0-500 | GAL | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | GAL | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | GAL | $0.00 | $0.00 | $0.00 | ||||
| Coal-Tar Sand Slurry Sealcoat | $0.00 | $0.00 | $0.00 | |||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 50001-100000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Spall Repair (Concrete) | ||||||||
| 0-50 | SF | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | SF | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Rubber Removal | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-100000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 100001-200000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Paint Removal | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-100000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 100001-200000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, White Reflective New | $0.00 | $0.00 | $0.00 | |||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 50001-100000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, Yellow Reflective New | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, White Reflective Remarking | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 50001-200000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, Yellow Reflective Remarking | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 50001-200000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, Yellow Nonreflective | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, Red Nonreflective | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| 501-3000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Road & Street Marking, White Reflective | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-30000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Road & Street Marking,Yellow Reflective | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Thermoplastic Road and Street Markings (white, yellow) | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Parking Lot, White Reflective | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Special Traffic Markings | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| Reflective Crosswalk Tape (3M Stamark or equivalent) | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Seal Random Cracks in Bituminous Pavements | ||||||||
| 0-2000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 50001-125000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Seal/Reseal Joints in Concrete Pavements | $0.00 | $0.00 | $0.00 | |||||
| 0-1000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 5001-15000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Seal/Reseal Random Cracks Concrete Pavements | ||||||||
| 0-50 | LF | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | LF | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | LF | $0.00 | $0.00 | $0.00 | ||||
| Seal/Reseal Joints in Concrete, General | ||||||||
| 0-100 | LF | $0.00 | $0.00 | $0.00 | ||||
| 101-1000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Seed | ||||||||
| 0-1000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Sod | ||||||||
| 0-50 | SY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | SY | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Remove 10" Storm Drain (25.4 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Remove 18" Storm Drain (45.7 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Remove 24" Storm Drain (60.9 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Remove Storm Drain Inlets | EA | $0.00 | $0.00 | $0.00 | ||||
| Remove Existing Street Signs | EA | $0.00 | $0.00 | $0.00 | ||||
| Lime Stabilized Subgrade | ||||||||
| 0-500 | SY | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Install 12" Storm Drain (30.5 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Install 18" Storm Drain (45.7 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Install 24" Storm Drain (60.9 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Install Concrete Duct Bank (4-4") | LF | $0.00 | $0.00 | $0.00 | ||||
| Install Storm Drain Inlets | EA | $0.00 | $0.00 | $0.00 | ||||
| (Type S, Single Wing) | $0.00 | $0.00 | $0.00 | |||||
| Install 6" Sleeves (15.2 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| (PVC With Handholes) | $0.00 | $0.00 | $0.00 | |||||
| Convert Grate Inlet to Curb Inlet | EA | $0.00 | $0.00 | $0.00 | ||||
| Convert Curb Inlet to Manhole | EA | $0.00 | $0.00 | $0.00 | ||||
| Adjust Storm Drain Inlet Tops | EA | $0.00 | $0.00 | $0.00 | ||||
| 2 3/8"x4"x8" Concrete Brick Pavers | SF | $0.00 | $0.00 | $0.00 | ||||
| (With 2" Sand Bed & 4" Compacted | $0.00 | $0.00 | $0.00 | |||||
| Graded Crushed Aggregate Base Course) | $0.00 | $0.00 | $0.00 | |||||
| Tree Grate & Frames With Concrete | EA | $0.00 | $0.00 | $0.00 | ||||
| Supports | $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 |
| Material Costs | $0.00 | |
| Tax on Materials | 10% | $0.00 |
| TOTAL MATERIAL COST | $0.00 |
| Labor Cost | $0.00 | |
| Insurance & Tax on Labor | 20% | $0.00 |
| TOTAL LABOR COST | $0.00 |
| Total Other Direct Costs | $0.00 |
| Total Material, Labor, Tax & Insurance | $0.00 |
TOTAL DIRECT COSTS $0.00
| Overhead | 10% | $0.00 |
| Subtotal | $0.00 | |
| Profit | 10% | $0.00 |
| Sub Total | $0.00 | |
| TOTAL | $0.00 | |
| Bonds | 2.5% | $0.00 |
| TOTAL | $0.00 |
I acknowledge the above cost estimate has been estimated to the best of my ability and means.
Signature: ______________________________________
Year 3
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | ||||||
| 400 Cannon Street Maxwell Air Force Base Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Paving IDIQ - Year 3 | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Maxwell | ||||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| Project Manager | MH | $0.00 | $0.00 | $0.00 | ||||
| Mobilization | LS | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 2 (Site Work) | $0.00 | $0.00 | $0.00 | |||||
| Remove concrete | ||||||||
| Unreinforced | $0.00 | $0.00 | $0.00 | |||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Reinforced | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Curb and Gutter | ||||||||
| 0-500 | LF | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Sidewalk | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Saw Cut Asphalt per Inch of Sawing Depth | ||||||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| Saw Cut Unreinforced Concrete per Inch of Sawing Depth | ||||||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| Saw Cut Reinforced Concrete per Inch of Sawing Depth | ||||||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | ||||
| Remove asphalt (No Milling) | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | ||||
| Cold Milling Bituminous Pavements | ||||||||
| 1" Thick | $0.00 | $0.00 | $0.00 | |||||
| (2.54 CM) | $0.00 | $0.00 | $0.00 | |||||
| 0-500 | SY | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 2" Thick | $0.00 | $0.00 | $0.00 | |||||
| (5.08 CM) | $0.00 | $0.00 | $0.00 | |||||
| 0-2000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 10001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 3" Thick | $0.00 | $0.00 | $0.00 | |||||
| (7.62 CM) | $0.00 | $0.00 | $0.00 | |||||
| 0-2000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 10001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| General Excavation | ||||||||
| Satisfactory Material | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Unsatisfactory Material | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Roadways and Airfield Excavation | ||||||||
| Satisfactory Material | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | ||||
| Unsatisfactory Material | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | ||||
| Select Material Subbase Course | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-1500 | CY | $0.00 | $0.00 | $0.00 | ||||
| Graded Crushed Aggregate Base Course | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-750 | CY | $0.00 | $0.00 | $0.00 | ||||
| Compact Base | ||||||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 20001-100000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Topsoil | ||||||||
| 0-100 | CY | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | CY | $0.00 | $0.00 | $0.00 | ||||
| Concrete Sidewalks | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 5001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-25000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Concrete Handicap Ramp | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| 501-5000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Concrete Curb and Gutter | ||||||||
| 0-100 | LF | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | LF | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 2001-5000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Wire Mesh | SY | $0.00 | $0.00 | $0.00 | ||||
| Concrete Pavement | $0.00 | $0.00 | $0.00 | |||||
| Roads | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-750 | CY | $0.00 | $0.00 | $0.00 | ||||
| Airfields | ||||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||||
| 201-750 | CY | $0.00 | $0.00 | $0.00 | ||||
| Bituminous Pavements for Roads and Streets | ||||||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | TON | $0.00 | $0.00 | $0.00 | ||||
| Bituminous Surface Treatment | ||||||||
| SBST | $0.00 | $0.00 | $0.00 | |||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 50001-110000 | SY | $0.00 | $0.00 | $0.00 | ||||
| DBST | ||||||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 50001-110000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Bituminous Pavements for Airfield and Heavy Duty | ||||||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | ||||
| Asphalt 327 | ||||||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | TON | $0.00 | $0.00 | $0.00 | ||||
| Tack Coat | ||||||||
| 0-500 | GAL | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | GAL | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | GAL | $0.00 | $0.00 | $0.00 | ||||
| Prime Coat | ||||||||
| 0-500 | GAL | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | GAL | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | GAL | $0.00 | $0.00 | $0.00 | ||||
| Coal-Tar Sand Slurry Sealcoat | $0.00 | $0.00 | $0.00 | |||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 50001-100000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Spall Repair (Concrete) | ||||||||
| 0-50 | SF | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | SF | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Rubber Removal | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-100000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 100001-200000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Paint Removal | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-100000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 100001-200000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, White Reflective New | $0.00 | $0.00 | $0.00 | |||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 50001-100000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, Yellow Reflective New | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, White Reflective Remarking | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 50001-200000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, Yellow Reflective Remarking | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 50001-200000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, Yellow Nonreflective | ||||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Airfield Marking, Red Nonreflective | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| 501-3000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Road & Street Marking, White Reflective | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-30000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Road & Street Marking,Yellow Reflective | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Thermoplastic Road and Street Markings (white, yellow) | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Parking Lot, White Reflective | ||||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Special Traffic Markings | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| Reflective Crosswalk Tape (3M Stamark or equivalent) | ||||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||||
| 501-2000 | SF | $0.00 | $0.00 | $0.00 | ||||
| Seal Random Cracks in Bituminous Pavements | ||||||||
| 0-2000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 2001-10000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 10001-50000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 50001-125000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Seal/Reseal Joints in Concrete Pavements | $0.00 | $0.00 | $0.00 | |||||
| 0-1000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | LF | $0.00 | $0.00 | $0.00 | ||||
| 5001-15000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Seal/Reseal Random Cracks Concrete Pavements | ||||||||
| 0-50 | LF | $0.00 | $0.00 | $0.00 | ||||
| 51-100 | LF | $0.00 | $0.00 | $0.00 | ||||
| 101-500 | LF | $0.00 | $0.00 | $0.00 | ||||
| Seal/Reseal Joints in Concrete, General | ||||||||
| 0-100 | LF | $0.00 | $0.00 | $0.00 | ||||
| 101-1000 | LF | $0.00 | $0.00 | $0.00 | ||||
| Seed | ||||||||
| 0-1000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 1001-5000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 5001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Sod | ||||||||
| 0-50 | SY | $0.00 | $0.00 | $0.00 | ||||
| 51-200 | SY | $0.00 | $0.00 | $0.00 | ||||
| 201-1000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Remove 10" Storm Drain (25.4 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Remove 18" Storm Drain (45.7 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Remove 24" Storm Drain (60.9 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Remove Storm Drain Inlets | EA | $0.00 | $0.00 | $0.00 | ||||
| Remove Existing Street Signs | EA | $0.00 | $0.00 | $0.00 | ||||
| Lime Stabilized Subgrade | ||||||||
| 0-500 | SY | $0.00 | $0.00 | $0.00 | ||||
| 501-1000 | SY | $0.00 | $0.00 | $0.00 | ||||
| 1001-10000 | SY | $0.00 | $0.00 | $0.00 | ||||
| Install 12" Storm Drain (30.5 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Install 18" Storm Drain (45.7 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Install 24" Storm Drain (60.9 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| Install Concrete Duct Bank (4-4") | LF | $0.00 | $0.00 | $0.00 | ||||
| Install Storm Drain Inlets | EA | $0.00 | $0.00 | $0.00 | ||||
| (Type S, Single Wing) | $0.00 | $0.00 | $0.00 | |||||
| Install 6" Sleeves (15.2 CM) | LF | $0.00 | $0.00 | $0.00 | ||||
| (PVC With Handholes) | $0.00 | $0.00 | $0.00 | |||||
| Convert Grate Inlet to Curb Inlet | EA | $0.00 | $0.00 | $0.00 | ||||
| Convert Curb Inlet to Manhole | EA | $0.00 | $0.00 | $0.00 | ||||
| Adjust Storm Drain Inlet Tops | EA | $0.00 | $0.00 | $0.00 | ||||
| 2 3/8"x4"x8" Concrete Brick Pavers | SF | $0.00 | $0.00 | $0.00 | ||||
| (With 2" Sand Bed & 4" Compacted | $0.00 | $0.00 | $0.00 | |||||
| Graded Crushed Aggregate Base Course) | $0.00 | $0.00 | $0.00 | |||||
| Tree Grate & Frames With Concrete | EA | $0.00 | $0.00 | $0.00 | ||||
| Supports | $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 |
| Material Costs | $0.00 | |
| Tax on Materials | 10% | $0.00 |
| TOTAL MATERIAL COST | $0.00 |
| Labor Cost | $0.00 | |
| Insurance & Tax on Labor | 20% | $0.00 |
| TOTAL LABOR COST | $0.00 |
| Total Other Direct Costs | $0.00 |
| Total Material, Labor, Tax & Insurance | $0.00 |
TOTAL DIRECT COSTS $0.00
| Overhead | 10% | $0.00 |
| Subtotal | $0.00 | |
| Profit | 10% | $0.00 |
| Sub Total | $0.00 | |
| TOTAL | $0.00 | |
| Bonds | 2.5% | $0.00 |
| TOTAL | $0.00 |
I acknowledge the above cost estimate has been estimated to the best of my ability and means.
Signature: ______________________________________
Year 4
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | ||||||
| 400 Cannon Street Maxwell Air Force Base Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Paving IDIQ - Year 4 | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Maxwell | ||||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| Project Manager | MH | $0.00 | $0.00 | $0.00 | ||||
| Mobilization | LS | $0.00 | $0.00 | $0.00 |
| DIVISION 2 (Site Work) | $0.00 | $0.00 | $0.00 | ||
| Remove concrete | |||||
| Unreinforced | $0.00 | $0.00 | $0.00 | ||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | |
| 51-100 | CY | $0.00 | $0.00 | $0.00 | |
| 101-500 | CY | $0.00 | $0.00 | $0.00 | |
| Reinforced | |||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | |
| 51-100 | CY | $0.00 | $0.00 | $0.00 | |
| 101-500 | CY | $0.00 | $0.00 | $0.00 | |
| Curb and Gutter | |||||
| 0-500 | LF | $0.00 | $0.00 | $0.00 | |
| 501-2000 | LF | $0.00 | $0.00 | $0.00 | |
| 2001-10000 | LF | $0.00 | $0.00 | $0.00 | |
| Sidewalk | |||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | |
| 501-1000 | SF | $0.00 | $0.00 | $0.00 | |
| 1001-5000 | SF | $0.00 | $0.00 | $0.00 | |
| Saw Cut Asphalt per Inch of Sawing Depth | |||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | |
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | |
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | |
| Saw Cut Unreinforced Concrete per Inch of Sawing Depth | |||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | |
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | |
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | |
| Saw Cut Reinforced Concrete per Inch of Sawing Depth | |||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | |
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | |
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | |
| Remove asphalt (No Milling) | |||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | |
| 51-200 | CY | $0.00 | $0.00 | $0.00 | |
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | |
| Cold Milling Bituminous Pavements | |||||
| 1" Thick | $0.00 | $0.00 | $0.00 | ||
| (2.54 CM) | $0.00 | $0.00 | $0.00 | ||
| 0-500 | SY | $0.00 | $0.00 | $0.00 | |
| 501-2000 | SY | $0.00 | $0.00 | $0.00 | |
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | |
| 2" Thick | $0.00 | $0.00 | $0.00 | ||
| (5.08 CM) | $0.00 | $0.00 | $0.00 | ||
| 0-2000 | SY | $0.00 | $0.00 | $0.00 | |
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | |
| 10001-20000 | SY | $0.00 | $0.00 | $0.00 | |
| 3" Thick | $0.00 | $0.00 | $0.00 | ||
| (7.62 CM) | $0.00 | $0.00 | $0.00 | ||
| 0-2000 | SY | $0.00 | $0.00 | $0.00 | |
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | |
| 10001-20000 | SY | $0.00 | $0.00 | $0.00 | |
| General Excavation | |||||
| Satisfactory Material | |||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | |
| 51-100 | CY | $0.00 | $0.00 | $0.00 | |
| 101-500 | CY | $0.00 | $0.00 | $0.00 | |
| Unsatisfactory Material | |||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | |
| 51-100 | CY | $0.00 | $0.00 | $0.00 | |
| 101-500 | CY | $0.00 | $0.00 | $0.00 | |
| Roadways and Airfield Excavation | |||||
| Satisfactory Material | |||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | |
| 51-200 | CY | $0.00 | $0.00 | $0.00 | |
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | |
| Unsatisfactory Material | |||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | |
| 51-200 | CY | $0.00 | $0.00 | $0.00 | |
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | |
| Select Material Subbase Course | |||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | |
| 51-200 | CY | $0.00 | $0.00 | $0.00 | |
| 201-1500 | CY | $0.00 | $0.00 | $0.00 | |
| Graded Crushed Aggregate Base Course | |||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | |
| 51-200 | CY | $0.00 | $0.00 | $0.00 | |
| 201-750 | CY | $0.00 | $0.00 | $0.00 | |
| Compact Base | |||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | |
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | |
| 20001-100000 | SY | $0.00 | $0.00 | $0.00 | |
| Topsoil | |||||
| 0-100 | CY | $0.00 | $0.00 | $0.00 | |
| 101-500 | CY | $0.00 | $0.00 | $0.00 | |
| 501-1000 | CY | $0.00 | $0.00 | $0.00 | |
| Concrete Sidewalks | |||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | |
| 1001-5000 | SF | $0.00 | $0.00 | $0.00 | |
| 5001-10000 | SF | $0.00 | $0.00 | $0.00 | |
| 10001-25000 | SF | $0.00 | $0.00 | $0.00 | |
| Concrete Handicap Ramp | |||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | |
| 501-5000 | SF | $0.00 | $0.00 | $0.00 | |
| Concrete Curb and Gutter | |||||
| 0-100 | LF | $0.00 | $0.00 | $0.00 | |
| 101-500 | LF | $0.00 | $0.00 | $0.00 | |
| 501-2000 | LF | $0.00 | $0.00 | $0.00 | |
| 2001-5000 | LF | $0.00 | $0.00 | $0.00 | |
| Wire Mesh | SY | $0.00 | $0.00 | $0.00 | |
| Concrete Pavement | $0.00 | $0.00 | $0.00 | ||
| Roads | |||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | |
| 51-200 | CY | $0.00 | $0.00 | $0.00 | |
| 201-750 | CY | $0.00 | $0.00 | $0.00 | |
| Airfields | |||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | |
| 51-200 | CY | $0.00 | $0.00 | $0.00 | |
| 201-750 | CY | $0.00 | $0.00 | $0.00 | |
| Bituminous Pavements for Roads and Streets | |||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | |
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | |
| 1001-5000 | TON | $0.00 | $0.00 | $0.00 | |
| Bituminous Surface Treatment | |||||
| SBST | $0.00 | $0.00 | $0.00 | ||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | |
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | |
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | |
| 50001-110000 | SY | $0.00 | $0.00 | $0.00 | |
| DBST | |||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | |
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | |
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | |
| 50001-110000 | SY | $0.00 | $0.00 | $0.00 | |
| Bituminous Pavements for Airfield and Heavy Duty | |||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | |
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | |
| Asphalt 327 | |||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | |
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | |
| 1001-5000 | TON | $0.00 | $0.00 | $0.00 | |
| Tack Coat | |||||
| 0-500 | GAL | $0.00 | $0.00 | $0.00 | |
| 501-2000 | GAL | $0.00 | $0.00 | $0.00 | |
| 2001-10000 | GAL | $0.00 | $0.00 | $0.00 | |
| Prime Coat | |||||
| 0-500 | GAL | $0.00 | $0.00 | $0.00 | |
| 501-2000 | GAL | $0.00 | $0.00 | $0.00 | |
| 2001-10000 | GAL | $0.00 | $0.00 | $0.00 | |
| Coal-Tar Sand Slurry Sealcoat | $0.00 | $0.00 | $0.00 | ||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | |
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | |
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | |
| 50001-100000 | SY | $0.00 | $0.00 | $0.00 | |
| Spall Repair (Concrete) | |||||
| 0-50 | SF | $0.00 | $0.00 | $0.00 | |
| 51-200 | SF | $0.00 | $0.00 | $0.00 | |
| 201-1000 | SF | $0.00 | $0.00 | $0.00 | |
| Rubber Removal | |||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | |
| 10001-100000 | SF | $0.00 | $0.00 | $0.00 | |
| 100001-200000 | SF | $0.00 | $0.00 | $0.00 | |
| Paint Removal | |||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | |
| 10001-100000 | SF | $0.00 | $0.00 | $0.00 | |
| 100001-200000 | SF | $0.00 | $0.00 | $0.00 | |
| Airfield Marking, White Reflective New | $0.00 | $0.00 | $0.00 | ||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | |
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | |
| 50001-100000 | SF | $0.00 | $0.00 | $0.00 | |
| Airfield Marking, Yellow Reflective New | |||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | |
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | |
| Airfield Marking, White Reflective Remarking | |||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | |
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | |
| 50001-200000 | SF | $0.00 | $0.00 | $0.00 | |
| Airfield Marking, Yellow Reflective Remarking | |||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | |
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | |
| 50001-200000 | SF | $0.00 | $0.00 | $0.00 | |
| Airfield Marking, Yellow Nonreflective | |||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | |
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | |
| Airfield Marking, Red Nonreflective | |||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | |
| 501-3000 | SF | $0.00 | $0.00 | $0.00 | |
| Road & Street Marking, White Reflective | |||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | |
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | |
| 10001-30000 | SF | $0.00 | $0.00 | $0.00 | |
| Road & Street Marking,Yellow Reflective | |||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | |
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | |
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | |
| Thermoplastic Road and Street Markings (white, yellow) | |||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | |
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | |
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | |
| Parking Lot, White Reflective | |||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | |
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | |
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | |
| Special Traffic Markings | |||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | |
| Reflective Crosswalk Tape (3M Stamark or equivalent) | |||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | |
| 501-2000 | SF | $0.00 | $0.00 | $0.00 | |
| Seal Random Cracks in Bituminous Pavements | |||||
| 0-2000 | LF | $0.00 | $0.00 | $0.00 | |
| 2001-10000 | LF | $0.00 | $0.00 | $0.00 | |
| 10001-50000 | LF | $0.00 | $0.00 | $0.00 | |
| 50001-125000 | LF | $0.00 | $0.00 | $0.00 | |
| Seal/Reseal Joints in Concrete Pavements | $0.00 | $0.00 | $0.00 | ||
| 0-1000 | LF | $0.00 | $0.00 | $0.00 | |
| 1001-5000 | LF | $0.00 | $0.00 | $0.00 | |
| 5001-15000 | LF | $0.00 | $0.00 | $0.00 | |
| Seal/Reseal Random Cracks Concrete Pavements | |||||
| 0-50 | LF | $0.00 | $0.00 | $0.00 | |
| 51-100 | LF | $0.00 | $0.00 | $0.00 | |
| 101-500 | LF | $0.00 | $0.00 | $0.00 | |
| Seal/Reseal Joints in Concrete, General | |||||
| 0-100 | LF | $0.00 | $0.00 | $0.00 | |
| 101-1000 | LF | $0.00 | $0.00 | $0.00 | |
| Seed | |||||
| 0-1000 | SY | $0.00 | $0.00 | $0.00 | |
| 1001-5000 | SY | $0.00 | $0.00 | $0.00 | |
| 5001-10000 | SY | $0.00 | $0.00 | $0.00 | |
| Sod | |||||
| 0-50 | SY | $0.00 | $0.00 | $0.00 | |
| 51-200 | SY | $0.00 | $0.00 | $0.00 | |
| 201-1000 | SY | $0.00 | $0.00 | $0.00 | |
| Remove 10" Storm Drain (25.4 CM) | LF | $0.00 | $0.00 | $0.00 | |
| Remove 18" Storm Drain (45.7 CM) | LF | $0.00 | $0.00 | $0.00 | |
| Remove 24" Storm Drain (60.9 CM) | LF | $0.00 | $0.00 | $0.00 | |
| Remove Storm Drain Inlets | EA | $0.00 | $0.00 | $0.00 | |
| Remove Existing Street Signs | EA | $0.00 | $0.00 | $0.00 | |
| Lime Stabilized Subgrade | |||||
| 0-500 | SY | $0.00 | $0.00 | $0.00 | |
| 501-1000 | SY | $0.00 | $0.00 | $0.00 | |
| 1001-10000 | SY | $0.00 | $0.00 | $0.00 | |
| Install 12" Storm Drain (30.5 CM) | LF | $0.00 | $0.00 | $0.00 | |
| Install 18" Storm Drain (45.7 CM) | LF | $0.00 | $0.00 | $0.00 | |
| Install 24" Storm Drain (60.9 CM) | LF | $0.00 | $0.00 | $0.00 | |
| Install Concrete Duct Bank (4-4") | LF | $0.00 | $0.00 | $0.00 | |
| Install Storm Drain Inlets | EA | $0.00 | $0.00 | $0.00 | |
| (Type S, Single Wing) | $0.00 | $0.00 | $0.00 | ||
| Install 6" Sleeves (15.2 CM) | LF | $0.00 | $0.00 | $0.00 | |
| (PVC With Handholes) | $0.00 | $0.00 | $0.00 | ||
| Convert Grate Inlet to Curb Inlet | EA | $0.00 | $0.00 | $0.00 | |
| Convert Curb Inlet to Manhole | EA | $0.00 | $0.00 | $0.00 | |
| Adjust Storm Drain Inlet Tops | EA | $0.00 | $0.00 | $0.00 | |
| 2 3/8"x4"x8" Concrete Brick Pavers | SF | $0.00 | $0.00 | $0.00 | |
| (With 2" Sand Bed & 4" Compacted | $0.00 | $0.00 | $0.00 | ||
| Graded Crushed Aggregate Base Course) | $0.00 | $0.00 | $0.00 | ||
| Tree Grate & Frames With Concrete | EA | $0.00 | $0.00 | $0.00 | |
| Supports | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 |
| Material Costs | $0.00 | |
| Tax on Materials | 10% | $0.00 |
| TOTAL MATERIAL COST | $0.00 |
| Labor Cost | $0.00 | |
| Insurance & Tax on Labor | 20% | $0.00 |
| TOTAL LABOR COST | $0.00 |
| Total Other Direct Costs | $0.00 |
| Total Material, Labor, Tax & Insurance | $0.00 |
TOTAL DIRECT COSTS $0.00
| Overhead | 10% | $0.00 |
| Subtotal | $0.00 | |
| Profit | 10% | $0.00 |
| Sub Total | $0.00 | |
| TOTAL | $0.00 | |
| Bonds | 2.5% | $0.00 |
| TOTAL | $0.00 |
I acknowledge the above cost estimate has been estimated to the best of my ability and means.
Signature: ______________________________________
Year 5
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | ||||||
| 400 Cannon Street Maxwell Air Force Base Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Paving IDIQ - Year 5 | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Maxwell | ||||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| Project Manager | MH | $0.00 | $0.00 | $0.00 | ||||
| Mobilization | LS | $0.00 | $0.00 | $0.00 |
| DIVISION 2 (Site Work) | $0.00 | $0.00 | $0.00 | |||
| Remove concrete | ||||||
| Unreinforced | $0.00 | $0.00 | $0.00 | |||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||
| Reinforced | ||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||
| Curb and Gutter | ||||||
| 0-500 | LF | $0.00 | $0.00 | $0.00 | ||
| 501-2000 | LF | $0.00 | $0.00 | $0.00 | ||
| 2001-10000 | LF | $0.00 | $0.00 | $0.00 | ||
| Sidewalk | ||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||
| 501-1000 | SF | $0.00 | $0.00 | $0.00 | ||
| 1001-5000 | SF | 1 | $0.00 | $0.00 | $0.00 | |
| Saw Cut Asphalt per Inch of Sawing Depth | ||||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | ||
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | ||
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | ||
| Saw Cut Unreinforced Concrete per Inch of Sawing Depth | ||||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | ||
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | ||
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | ||
| Saw Cut Reinforced Concrete per Inch of Sawing Depth | ||||||
| 0-250 | LF/IN | $0.00 | $0.00 | $0.00 | ||
| 251-1000 | LF/IN | $0.00 | $0.00 | $0.00 | ||
| 1001-5000 | LF/IN | $0.00 | $0.00 | $0.00 | ||
| Remove asphalt (No Milling) | ||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | ||
| Cold Milling Bituminous Pavements | ||||||
| 1" Thick | $0.00 | $0.00 | $0.00 | |||
| (2.54 CM) | $0.00 | $0.00 | $0.00 | |||
| 0-500 | SY | $0.00 | $0.00 | $0.00 | ||
| 501-2000 | SY | $0.00 | $0.00 | $0.00 | ||
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | ||
| 2" Thick | $0.00 | $0.00 | $0.00 | |||
| (5.08 CM) | $0.00 | $0.00 | $0.00 | |||
| 0-2000 | SY | $0.00 | $0.00 | $0.00 | ||
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | ||
| 10001-20000 | SY | $0.00 | $0.00 | $0.00 | ||
| 3" Thick | $0.00 | $0.00 | $0.00 | |||
| (7.62 CM) | $0.00 | $0.00 | $0.00 | |||
| 0-2000 | SY | $0.00 | $0.00 | $0.00 | ||
| 2001-10000 | SY | $0.00 | $0.00 | $0.00 | ||
| 10001-20000 | SY | $0.00 | $0.00 | $0.00 | ||
| General Excavation | ||||||
| Satisfactory Material | ||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||
| Unsatisfactory Material | ||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||
| 51-100 | CY | $0.00 | $0.00 | $0.00 | ||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||
| Roadways and Airfield Excavation | ||||||
| Satisfactory Material | ||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | ||
| Unsatisfactory Material | ||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||
| 201-1000 | CY | $0.00 | $0.00 | $0.00 | ||
| Select Material Subbase Course | ||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||
| 201-1500 | CY | $0.00 | $0.00 | $0.00 | ||
| Graded Crushed Aggregate Base Course | ||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||
| 201-750 | CY | $0.00 | $0.00 | $0.00 | ||
| Compact Base | ||||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||
| 20001-100000 | SY | $0.00 | $0.00 | $0.00 | ||
| Topsoil | ||||||
| 0-100 | CY | $0.00 | $0.00 | $0.00 | ||
| 101-500 | CY | $0.00 | $0.00 | $0.00 | ||
| 501-1000 | CY | $0.00 | $0.00 | $0.00 | ||
| Concrete Sidewalks | ||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||
| 1001-5000 | SF | $0.00 | $0.00 | $0.00 | ||
| 5001-10000 | SF | $0.00 | $0.00 | $0.00 | ||
| 10001-25000 | SF | $0.00 | $0.00 | $0.00 | ||
| Concrete Handicap Ramp | ||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||
| 501-5000 | SF | $0.00 | $0.00 | $0.00 | ||
| Concrete Curb and Gutter | ||||||
| 0-100 | LF | $0.00 | $0.00 | $0.00 | ||
| 101-500 | LF | $0.00 | $0.00 | $0.00 | ||
| 501-2000 | LF | $0.00 | $0.00 | $0.00 | ||
| 2001-5000 | LF | $0.00 | $0.00 | $0.00 | ||
| Wire Mesh | SY | $0.00 | $0.00 | $0.00 | ||
| Concrete Pavement | $0.00 | $0.00 | $0.00 | |||
| Roads | ||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||
| 201-750 | CY | $0.00 | $0.00 | $0.00 | ||
| Airfields | ||||||
| 0-50 | CY | $0.00 | $0.00 | $0.00 | ||
| 51-200 | CY | $0.00 | $0.00 | $0.00 | ||
| 201-750 | CY | $0.00 | $0.00 | $0.00 | ||
| Bituminous Pavements for Roads and Streets | ||||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | ||
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | ||
| 1001-5000 | TON | $0.00 | $0.00 | $0.00 | ||
| Bituminous Surface Treatment | ||||||
| SBST | $0.00 | $0.00 | $0.00 | |||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | ||
| 50001-110000 | SY | $0.00 | $0.00 | $0.00 | ||
| DBST | ||||||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | ||
| 50001-110000 | SY | $0.00 | $0.00 | $0.00 | ||
| Bituminous Pavements for Airfield and Heavy Duty | ||||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | ||
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | ||
| Asphalt 327 | ||||||
| 0-500 | TON | $0.00 | $0.00 | $0.00 | ||
| 501-1000 | TON | $0.00 | $0.00 | $0.00 | ||
| 1001-5000 | TON | $0.00 | $0.00 | $0.00 | ||
| Tack Coat | ||||||
| 0-500 | GAL | $0.00 | $0.00 | $0.00 | ||
| 501-2000 | GAL | $0.00 | $0.00 | $0.00 | ||
| 2001-10000 | GAL | $0.00 | $0.00 | $0.00 | ||
| Prime Coat | ||||||
| 0-500 | GAL | $0.00 | $0.00 | $0.00 | ||
| 501-2000 | GAL | $0.00 | $0.00 | $0.00 | ||
| 2001-10000 | GAL | $0.00 | $0.00 | $0.00 | ||
| Coal-Tar Sand Slurry Sealcoat | $0.00 | $0.00 | $0.00 | |||
| 0-5000 | SY | $0.00 | $0.00 | $0.00 | ||
| 5001-20000 | SY | $0.00 | $0.00 | $0.00 | ||
| 20001-50000 | SY | $0.00 | $0.00 | $0.00 | ||
| 50001-100000 | SY | $0.00 | $0.00 | $0.00 | ||
| Spall Repair (Concrete) | ||||||
| 0-50 | SF | $0.00 | $0.00 | $0.00 | ||
| 51-200 | SF | $0.00 | $0.00 | $0.00 | ||
| 201-1000 | SF | $0.00 | $0.00 | $0.00 | ||
| Rubber Removal | ||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||
| 10001-100000 | SF | $0.00 | $0.00 | $0.00 | ||
| 100001-200000 | SF | $0.00 | $0.00 | $0.00 | ||
| Paint Removal | ||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||
| 10001-100000 | SF | $0.00 | $0.00 | $0.00 | ||
| 100001-200000 | SF | $0.00 | $0.00 | $0.00 | ||
| Airfield Marking, White Reflective New | $0.00 | $0.00 | $0.00 | |||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||
| 50001-100000 | SF | $0.00 | $0.00 | $0.00 | ||
| Airfield Marking, Yellow Reflective New | ||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||
| Airfield Marking, White Reflective Remarking | ||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||
| 50001-200000 | SF | $0.00 | $0.00 | $0.00 | ||
| Airfield Marking, Yellow Reflective Remarking | ||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||
| 50001-200000 | SF | $0.00 | $0.00 | $0.00 | ||
| Airfield Marking, Yellow Nonreflective | ||||||
| 0-10000 | SF | $0.00 | $0.00 | $0.00 | ||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||
| Airfield Marking, Red Nonreflective | ||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||
| 501-3000 | SF | $0.00 | $0.00 | $0.00 | ||
| Road & Street Marking, White Reflective | ||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||
| 10001-30000 | SF | $0.00 | $0.00 | $0.00 | ||
| Road & Street Marking,Yellow Reflective | ||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||
| Thermoplastic Road and Street Markings (white, yellow) | ||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||
| Parking Lot, White Reflective | ||||||
| 0-1000 | SF | $0.00 | $0.00 | $0.00 | ||
| 1001-10000 | SF | $0.00 | $0.00 | $0.00 | ||
| 10001-50000 | SF | $0.00 | $0.00 | $0.00 | ||
| Special Traffic Markings | ||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||
| Reflective Crosswalk Tape (3M Stamark or equivalent) | ||||||
| 0-500 | SF | $0.00 | $0.00 | $0.00 | ||
| 501-2000 | SF | $0.00 | $0.00 | $0.00 | ||
| Seal Random Cracks in Bituminous Pavements | ||||||
| 0-2000 | LF | $0.00 | $0.00 | $0.00 | ||
| 2001-10000 | LF | $0.00 | $0.00 | $0.00 | ||
| 10001-50000 | LF | $0.00 | $0.00 | $0.00 | ||
| 50001-125000 | LF | $0.00 | $0.00 | $0.00 | ||
| Seal/Reseal Joints in Concrete Pavements | $0.00 | $0.00 | $0.00 | |||
| 0-1000 | LF | $0.00 | $0.00 | $0.00 | ||
| 1001-5000 | LF | $0.00 | $0.00 | $0.00 | ||
| 5001-15000 | LF | $0.00 | $0.00 | $0.00 | ||
| Seal/Reseal Random Cracks Concrete Pavements | ||||||
| 0-50 | LF | $0.00 | $0.00 | $0.00 | ||
| 51-100 | LF | $0.00 | $0.00 | $0.00 | ||
| 101-500 | LF | $0.00 | $0.00 | $0.00 | ||
| Seal/Reseal Joints in Concrete, General | ||||||
| 0-100 | LF | $0.00 | $0.00 | $0.00 | ||
| 101-1000 | LF | $0.00 | $0.00 | $0.00 | ||
| Seed | ||||||
| 0-1000 | SY | $0.00 | $0.00 | $0.00 | ||
| 1001-5000 | SY | $0.00 | $0.00 | $0.00 | ||
| 5001-10000 | SY | $0.00 | $0.00 | $0.00 | ||
| Sod | ||||||
| 0-50 | SY | $0.00 | $0.00 | $0.00 | ||
| 51-200 | SY | $0.00 | $0.00 | $0.00 | ||
| 201-1000 | SY | $0.00 | $0.00 | $0.00 | ||
| Remove 10" Storm Drain (25.4 CM) | LF | $0.00 | $0.00 | $0.00 | ||
| Remove 18" Storm Drain (45.7 CM) | LF | $0.00 | $0.00 | $0.00 | ||
| Remove 24" Storm Drain (60.9 CM) | LF | $0.00 | $0.00 | $0.00 | ||
| Remove Storm Drain Inlets | EA | $0.00 | $0.00 | $0.00 | ||
| Remove Existing Street Signs | EA | $0.00 | $0.00 | $0.00 | ||
| Lime Stabilized Subgrade | ||||||
| 0-500 | SY | $0.00 | $0.00 | $0.00 | ||
| 501-1000 | SY | $0.00 | $0.00 | $0.00 | ||
| 1001-10000 | SY | $0.00 | $0.00 | $0.00 | ||
| Install 12" Storm Drain (30.5 CM) | LF | $0.00 | $0.00 | $0.00 | ||
| Install 18" Storm Drain (45.7 CM) | LF | $0.00 | $0.00 | $0.00 | ||
| Install 24" Storm Drain (60.9 CM) | LF | $0.00 | $0.00 | $0.00 | ||
| Install Concrete Duct Bank (4-4") | LF | $0.00 | $0.00 | $0.00 | ||
| Install Storm Drain Inlets | EA | $0.00 | $0.00 | $0.00 | ||
| (Type S, Single Wing) | $0.00 | $0.00 | $0.00 | |||
| Install 6" Sleeves (15.2 CM) | LF | $0.00 | $0.00 | $0.00 | ||
| (PVC With Handholes) | $0.00 | $0.00 | $0.00 | |||
| Convert Grate Inlet to Curb Inlet | EA | $0.00 | $0.00 | $0.00 | ||
| Convert Curb Inlet to Manhole | EA | $0.00 | $0.00 | $0.00 | ||
| Adjust Storm Drain Inlet Tops | EA | $0.00 | $0.00 | $0.00 | ||
| 2 3/8"x4"x8" Concrete Brick Pavers | SF | $0.00 | $0.00 | $0.00 | ||
| (With 2" Sand Bed & 4" Compacted | $0.00 | $0.00 | $0.00 | |||
| Graded Crushed Aggregate Base Course) | $0.00 | $0.00 | $0.00 | |||
| Tree Grate & Frames With Concrete | EA | $0.00 | $0.00 | $0.00 | ||
| Supports | $0.00 | $0.00 | ||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 |
| Material Costs | $0.00 | |
| Tax on Materials | 10% | $0.00 |
| TOTAL MATERIAL COST | $0.00 |
| Labor Cost | $0.00 | |
| Insurance & Tax on Labor | 20% | $0.00 |
| TOTAL LABOR COST | $0.00 |
| Total Other Direct Costs | $0.00 |
| Total Material, Labor, Tax & Insurance | $0.00 |
TOTAL DIRECT COSTS $0.00
| Overhead | 10% | $0.00 |
| Subtotal | $0.00 | |
| Profit | 10% | $0.00 |
| Sub Total | $0.00 | |
| TOTAL | $0.00 | |
| Bonds | 2.5% | $0.00 |
| TOTAL | $0.00 |
I acknowledge the above cost estimate has been estimated to the best of my ability and means.
Signature: ______________________________________
File details come from the government source that posted it. Updated .