ATTACHMENT 10 - Task Order AF 3052 Cost Estimate Breakdown PNQS-24-4806 Repair Parking Lot Bldg 804.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
PAVING IDIQ Maxwell AFB and Gunter Annex - AMENDMENT 2
Solicitation number
FA330024R0025
Issued by

About this file

This document is an Attachment 10 - Task Order AF 3052 Cost Estimate Breakdown, which provides a detailed cost breakdown for a parking lot repair project at Maxwell Air Force Base, Alabama under Project Number PNQS 24-4806. The total proposed contract price is $0.00, with line items for materials, labor, overhead, profit, and bonds. The related federal contract opportunity is a solicitation (Solicitation Number FA330024R0025) for a Paving IDIQ contract at Maxwell AFB and Gunter Annex. This will be a competitive Total Service-Disabled Veteran Owned Small Business set-aside firm-fixed-price contract. The solicitation provides details on the site visit, question submission deadline of June 13, 2024, and proposal submission deadline of June 24, 2024. Interested offerors are encouraged to visit the site and submit all pertinent questions.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTORDATEADDRESS
9-May-24400 Cannon Street Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0.00
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
Maxwell AFB, ALPNQS 24-4806Maxwell AFB
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITAVERAGEDIRECTLINE
TOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
SuperintendentMH$0.00$0.00$0.00
DIVISION 2 (Site Work)$0.00$0.00$0.00
804 Parking Lot$0.00$0.00$0.00
Mill and OverlaySY$0.00$0.00$0.00
Full Depth RepairSY$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
Material Costs$0.00$0.00
Tax on Materials10%$0.00$0.00
TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
Labor Cost$0.00$0.00
Insurance & Tax on Labor20%$0.00$0.00
TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Total Material, Labor, Tax & Insurance$0.00$0.00
TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
Overhead10%$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00
Profit10%$0.00$0.00$0.00
Sub Total$0.00$0.00
TOTAL$0.00$0.00$0.00
Bonds2.5%$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00$0.00
I acknowledge the above cost estimate has been estimated to the best of my ability and means.

Signature: ______________________________________ Gov't Coord___________________________________

File details come from the government source that posted it. Updated .