Attachment 3_806CM3028_CBNC_Bid Set_Plans_Part1.pdf
PDF 17 MB Posted
- Solicitation number
- 36C78622B0023
About this file
This solicitation is for a construction project to expand the Camp Butler National Cemetery. The Department of Veterans Affairs, National Cemetery Administration seeks to construct 1,000 inground cremains burial sites, 1,500 niche columbarium plaza, and 150 marker memorial wall. Work includes general conditions, structures, grading, utilities and other construction tasks. Offerors must complete the work within 480 calendar days of the notice to proceed. The project value is estimated between $1,000,000 to $5,000,000. The NAICS code is 237990 and the size standard is $39.5 million. The solicitation is set aside 100% for verified Service-Disabled Veteran-Owned Small Businesses. Firms must register in SAM, VetBiz, and acknowledge any amendments on the website to receive updates. The point of contact is Shane Hilts at shane.hilts@va.gov and questions will not be accepted by phone.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRAVESITE YIELD SUMMARY
COLUMBARIUM
NICHES
TOTAL NUMBER
OF GRAVESITES
IN-GROUND CREMAIN
SITES (4'x4')
- 1,5001,000
CREMAIN PLOTS
MEMORIAL MARKERS
MEMORIAL SITES
PRE-PLACED
DOUBLE-DEPTH
CRYPTS
CASKET PLOTS
PRE-PLACED
OVERSIZED
CRYPTS
PRIVATE VAULTS /
OVERSIZE PLOTS
- 2,650
5063 CAMP BUTLER ROAD, SPRINGFIELD, SANGAMON COUNTY, ILLINOIS
GRAVESITE EXPANSION
PROJECT NUMBER: 806CM3028
BID DOCUMENTS
LOCATION MAP
1" = 1,000'
VICINITY MAP
N.T.S.
CONSULTANTS
DRAWING INDEX
SITE/CIVIL
1. GI001 COVER SHEET
2. GI002 GENERAL NOTES, SYMBOLS & ABBREVIATIONS
3. VL100 EXISTING CONDITIONS PLAN
4. BI100 BORING LOCATION PLAN
5. BI101 BORING LOGS
6. GC101 EROSION & SEDIMENT CONTROL PLAN
7. GC501 EROSION & SEDIMENT CONTROL DETAILS
8. CD100 SITE DEMOLITION PLAN
9. CS101 SITE AND UTILITY PLAN AREA 1
10. CS102 SITE AND UTILITY PLAN AREA 2
11. CS110 BURIAL SECTION 5 NUMBERING PLAN
12. CG101 GRADING AND DRAINAGE PLAN 1
13. CG102 GRADING AND DRAINAGE PLAN 2
14. CG110 BURIAL SECTION 5 GRADING ENLARGEMENT
15. CT201 ROAD CENTERLINE PROFILE
16. CT202 ENTRANCE ENLARGEMENT PROFILES
17. CU260 STORM PROFILES
18. CU261 STORM COMPUTATIONS
19. CJ101 STORMWATER MANAGEMENT PLAN
20. CJ500 STORMWATER MANAGEMENT NARRATIVE & DETAILS
21. DT500 SITE DETAILS
22. DT501 SITE DETAILS
23. DT502 SITE DETAILS
24. DT503 SITE DETAILS
25. DT504 SITE DETAILS
26. DT505 SITE DETAILS
27. CI100 SITE SIGNAGE PLAN
28. CI101 SIGNAGE DETAILS
29. CI102 SIGNAGE DETAILS
30. CS401 COLUMBARIUM AND MEMORIAL WALL LAYOUT ENLARGEMENT
31. CS402 ENTRY GATE LAYOUT ENLARGEMENT
32. CG401 COLUMBARIUM AND MEMORIAL WALL GRADING ENLARGEMENT
33. CG402 COLUMBARIUM AND MEMORIAL WALL DRAINAGE ENLARGEMENT
34. CG403 ENTRY GATE GRADING ENGLARGMENT
35. CI500 SITE & FURNISHINGS DETAILS-1
36. CI501 SITE & FURNISHINGS DETAILS-2
37. CI502 SITE & FURNISHINGS DETAILS-3
38. CI503 SITE & FURNISHINGS DETAILS-4
39. CI504 SITE & FURNISHINGS DETAILS-5
40. CI700 COLUMBARIUM ELEVATIONS
41. CI701 COLUMBARIUM DETAILS-1
42. CI702 COLUMBARIUM DETAILS-2
43. CI703 COLUMBARIUM DETAILS-3
44. CI704 COLUMBARIUM DETAILS-4
45. CI705 COLUMBARIUM DETAILS-5
46. CI706 COLUMBARIUM DETAILS-6
47. CI720 MEMORIAL WALL ELEVATIONS
48. CI721 MEMORIAL WALL DETAILS-1
49. CI722 MEMORIAL WALL DETAILS-2
50. CI723 MEMORIAL WALL DETAILS-3
51. CI724 MEMORIAL WALL DETAILS-4
52. CI725 MEMORIAL WALL DETAILS-5
53. CI740 ENTRY GATE AND FENCE COLUMN ELEVATIONS
54. CI741 ENTRY GATE AND FENCE DETAILS-1
55. CI742 ENTRY GATE AND FENCE DETAILS-2
56. CI743 ENTRY GATE AND FENCE DETAILS-3
57. CI744 ENTRY GATE AND FENCE DETAILS-4
58. CI745 ENTRY GATE AND FENCE DETAILS-5
LANDSCAPE
59. LP100 LANDSCAPE, SITE FURNISHINGS AND PERIMETER FENCE PLAN-1
60. LP101 LANDSCAPE, SITE FURNISHINGS AND PERIMETER FENCE PLAN-2
61. LP500 LANDSCAPE DETAILS AND SCHEDULE
IRRIGATION
62. LI100 IRRIGATION NOTES AND LEGEND
63. LI101 IRRIGATION PLAN 1
64. LI102 IRRIGATION PLAN 2
65. LI501 IRRIGATION DETAILS 1
66. LI502 IRRIGATION DETAILS 2
67. LI503 IRRIGATION DETAILS 3
STRUCTURAL
68. S-001 STRUCTURAL GENERAL NOTES AND INDEX
69. S-002 COLUMBARIUM FOUNDATION PLAN AND DETAILS
70. S-003 MEMORIAL WALL FOUNDATION PLAN AND DETAILS
71. S-004 ENTRY GATE & FENCE COLUMN FOUNDATION PLAN AND DETAILS
NO. DRAWING DRAWING TITLE
Know what's
R
NORTH
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
SPRINGFIELD, ILLINOIS
Dwg. of 71
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CAMP BUTLER NATIONAL CEMETERY
GRAVESITE EXPANSION
806CM3028
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\06
\P
LA
NS
\G I-0
.D
W G
DCW ATNJULY 25, 2022
BID DOCUMENTS
BID DOCUMENTS SUBMISSION
3944 JFK Parkway, Unit 12C Fort Collins, CO 80525-3089 970.229.9668 www.aquaengineering.com
PREPARED BY
Gordon 148 S. Queen St, Suite 201 Martinsburg, WV 25401
(304) 725-8456
The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
PROJECT
LOCATION
PROJECT
LOCATION
GI001
COVER SHEET
U.S. DEPARTMENT
OF VETERANS AFFAIRS
MICHIGAN
INDIANA
KENTUCKY
MISSOURI
IOWA
NORTH
*THE LIMITS OF THE PHASE 1 NET BURIAL AREA IS 1.6+/- ACRES.
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
SPRINGFIELD, ILLINOIS
Dwg. of 71
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CAMP BUTLER NATIONAL CEMETERY
GRAVESITE EXPANSION
806CM3028
Fil eP ath
\19 2.1
.8.
6\V
OL
1\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\06
\P
LA
NS
\G
I-0
.D W
G
DCW ATNJULY 25, 2022
BID DOCUMENTS
BID DOCUMENTS SUBMISSION
GI002
GENERAL NOTES, SYMBOLS &
ABBREVIATIONS
GENERAL NOTES:
1. PROPOSED SITE IMPROVEMENTS FOR 'CAMP BUTLER NATIONAL CEMETERY GRAVESITE EXPANSION' INCLUDES, BUT IS NOT LIMITED TO, THE CONSTRUCTION OF A 1,500 NICHE
COLUMBARIUM PLAZA, 150 MARKER MEMORIAL WALL, AND 1,000 IN-GROUND CREMAINS BURIAL SECTION. OTHER IMPROVEMENTS INCLUDE ASPHALT PAVEMENT, CONCRETE CURB & GUTTER, CONCRETE WALKS, STORM DRAIN INFRASTRUCTURE, SITE FURNISHINGS, LANDSCAPING, AND IRRIGATION. THE PROJECT IS LOCATED IN SPRINGFIELD, SANGAMON COUNTY, ILLINOIS. PROPOSED LAND DISTURBANCE IS 9.14 ACRES.
2. THE TOPOGRAPHIC CONTOUR INTERVAL IS ONE (1) FOOT. TOPOGRAPHIC INFORMATION PROVIDED BY THE U.S. DEPARTMENT OF VETERANS AFFAIRS AND WAS COMPILED FROM AN ALTA/NSPS LAND TITLE SURVEY OF CAMP BUTLER RD, SPRINGFIELD, IL 62707 PREPARED BY RSM GEOSPATIAL, INC., DATED 01-03-2022 AND FIELD WORK COMPLETED ON 12-29-2021. BEARINGS ARE BASED ON THE SOUTH LINE OF THE SOUTHEAST QUARTER OF SECTION 17 WITH AN ASSUMED BEARING OF N89°54'59"W. THE SURVEYOR DID NOT ABSTRACT PROPERTY. SURVEY IS BASED ON LEGAL DESCRIPTIONS SUPPLIED BY TITLE COMPANY. EASEMENTS, BUILDING LINES, ETC., SHOWN IN THE EXISTING SURVEY ARE AS IDENTIFIED BY FILE NO. 20181324 OF FIDELITY NATIONAL TITLE INSURANCE COMPANY, WITH AN EFFECTIVE DATE OF OCTOBER 1, 2018.
ELEVATIONS WERE OBTAINED FROM GPS OBSERVATION USING ILLINOIS WEST ZONE (1202) AND POST PROCESSED USING OPUS (NAD83 - HORIZONTAL) (NAVD88 - VERTICAL). UTILITIES SHOWN ARE FROM ABOVE GROUND EVIDENCE COMBINES WITH MARKINGS ON THE GROUND, IF PRESENT AT THE TIME OF THE SURVEY, OR BY DRAWINGS PROVIDED BY UTILITY COMPANIES. THERE IS NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED. CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING UTILITIES, BOTH HORIZONTALLY AND VERTICALLY.
3. THE SUBJECT PROPERTY IS LOCATED ON F.E.M.A. MAP 17167C0260F DATED AUGUST 2, 2007. NO PORTION OF THIS PROPERTY IS LOCATED WITHIN THE 100-YEAR FLOODPLAIN
AREA (ZONE A). THE PROPERTY IS IN ZONE X.
4. SEE THIS SHEET FOR LEGEND OF SYMBOLS AND ABBREVIATIONS USED HEREIN.
5. BURIAL CEREMONIES WILL BE SCHEDULED THROUGHOUT THE COURSE OF THIS PROJECT. DURING ALL CEREMONIES, WORK SHALL STOP, ESPECIALLY WHEN HEAVY EQUIPMENT ACTIVITY OR NOISE PRODUCING WORK IS BEING DONE. LIGHT WORK ACTIVITY MAY CONTINUE IF IT DOES NOT CREATE NOISE OR DISTRACTIONS TO THE CEREMONY.
COORDINATE DAILY ACTIVITIES WITH THE CEMETERY DIRECTOR OR HIS APPROVED REPRESENTATIVE TO ACCOMMODATE SCHEDULED BURIALS.
6. DUE TO THE SENSITIVE NATURE OF THE CEMETERY SITE, CONTRACTOR SHALL MAINTAIN EACH WORK AREA IN A CLEAN AND ORDERLY APPEARANCE. TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF EACH DAY AND/OR MORE
FREQUENTLY AS REQUIRED.
7. EFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMAL AND SHALL BE COORDINATED WITH THE CEMETERY DIRECTOR. ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS. CONTRACTOR SHALL PROVIDE TWO SIGNS SIMILAR TO THE CEMETERY'S "PARDON OUR APPEARANCE" SIGNS. SIZE TO BE A MINIMUM OF 4'X5' HIGH MOUNTED ON TWO 4"X4" POSTS, PLACED IN A LOCATION AS DETERMINED BY THE CEMETERY DIRECTOR. TEXT SIZE SHALL BE MAXIMUM SIZE PROPORTIONAL TO WIDTH/HEIGHT OF SIGN. TEXT WILL BE PROVIDED BY CEMETERY DIRECTOR.
8. THERE SHALL BE AT ALL TIMES WHEN WORK IS BEING DONE, A COMPETENT PERSON WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE.
THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.
9. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AN ENTRANCE PERMIT FROM ILLINOIS DEPARTMENT OF TRANSPORTATION (IDOT), DISTRICT 6. CONTRACTOR SHALL
PROVIDE HIGHWAY PERMIT BOND AS REQUIRED BY IDOT TO GUARANTEE WORK.
CONSTRUCTION NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE CONSTRUCTION DOCUMENTS PRIOR TO CONSTRUCTION AND NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CIRCUMSTANCES FOUND WITHIN THESE PLANS IN NEED OF VERIFICATION SO THAT APPROPRIATE REVISIONS CAN BE MADE, IF WARRANTED.
2. DEVELOPMENT OF THE SITE INCLUDING CONSTRUCTION AND MATERIALS SHALL BE IN CONFORMANCE WITH THE U.S. DEPARTMENT OF VETERANS AFFAIRS REQUIREMENTS AND THE ILLINOIS DEPARTMENT OF TRANSPORTATION CONSTRUCTION STANDARDS AND SPECIFICATIONS, WHERE APPLICABLE.
3. THE CONTRACTOR SHALL CONTACT ILLINOIS ONE CALL SYSTEM, INC. AT 1-800-892-0123 OR 811 A MINIMUM OF SEVENTY-TWO (72) HOURS PRIOR TO ANY EXCAVATION, DEMOLITION OR OTHER EARTH DISTURBING ACTIVITIES WITHIN AREAS SERVED BY UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE
PRESENCE OF ANY UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.
4. EXISTING UNDERGROUND UTILITIES SHOWN HEREIN HAVE BEEN LOCATED BASED ON THE ALTA/NSPS LAND TITLE SURVEY PREPARED BY LANDCO, L.P., DATED 10-24-18 AND FIELD WORK COMPLETED ON 10-7-2018, AS PROVIDED BY THE U.S. DEPARTMENT OF VETERANS AFFAIRS. UTILITIES SHOULD BE VERIFIED BY APPROPRIATE UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION. GORDON DOES NOT CERTIFY TO THE LOCATION OR THE EXISTENCE OF EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING CONSTRUCTION. IF CONDITIONS ARE FOUND IN THE FIELD WHICH ARE MATERIALLY DIFFERENT FROM
THE PLANS, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER.
5. GORDON DOES NOT CERTIFY TO THE LOCATION OF OR THE EXISTENCE OF EXISTING UNDERGROUND UTILITIES. ANY UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE RECORDS. THIS DOES NOT CONSTITUTE A GUARANTEE OF THEIR ACTUAL LOCATIONS OR THAT THEY HAVE ALL BEEN SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING CONSTRUCTION. THESE TEST HOLES WILL BE MADE TO VERIFY ALL CROSSINGS BETWEEN NEW AND EXISTING FACILITIES AND AT CRITICAL GRADE CHANGES. IF CONDITIONS ARE FOUND IN THE FIELD WHICH ARE MATERIALLY DIFFERENT FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY GORDON, SO THAT APPROPRIATE REVISIONS IF WARRANTED CAN BE MADE TO THE PLANS.
6. GORDON DOES NOT CERTIFY TO THE SUB-SURFACE CONDITIONS OF THE SITE, THE LOCATION OF UNDERLYING ROCK, OR THE LOCATION OF POTENTIAL SINKHOLES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES TO VERIFY SUB-SURFACE CONDITIONS PRIOR TO BEGINNING ANY CONSTRUCTION. IF SINKHOLES ARE FOUND IN THE FIELD, REMEDIATION WILL BE REQUIRED AS SPECIFIED BY A QUALIFIED GEOTECHNICAL ENGINEERING FIRM.
7. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING FIRM AND PAID FOR BY THE CONTRACTOR.
8. ALL PROPOSED GRADES AS SHOWN HEREIN ARE FINISHED GRADE UNLESS OTHERWISE NOTED ON THE PLAN.
9. EROSION AND SEDIMENT CONTROL DEVICES ARE TO BE IN PLACE PRIOR TO ANY CONSTRUCTION. REFER TO EROSION AND SEDIMENT CONTROL PLANS FOR PHASING AND
DETAILS.
10. ALL LAND ON OR OFF-SITE WHICH IS DISTURBED BY CONSTRUCTION AND WHICH IS NOT BUILT UPON OR SURFACED SHALL BE ADEQUATELY STABILIZED TO CONTROL EROSION
AND SEDIMENTATION.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE CONTRACTING OFFICER REPRESENTATIVE OF ANY CHANGES OR CONDITIONS ATTACHED TO PERMITS
REQUIRED FOR CONSTRUCTION.
12. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR EQUIPMENT OF MUD AND DEBRIS, PRIOR TO ENTERING PAVED AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS OF MUD AND/OR LAYING DUST AND TO TAKE ALL APPROPRIATE MEASURES NECESSARY TO ENSURE THAT STREETS ARE
KEPT IN A CLEAN AND DUST FREE CONDITION AT ALL TIMES.
13. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION ACTIVITIES.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE CONTRACTING OFFICER OF ANY CONDITIONS FOUND IN THE FIELD PRIOR TO STAKEOUT THAT VARY FROM THE APPROVED PLANS OR THAT MAKE CONSTRUCTABILITY IMPOSSIBLE. ANY OBSERVATIONS REGARDING APPARENT INCONSISTENCIES IN THE PLANS SHALL BE BROUGHT TO THE CONTRACTING OFFICER REPRESENTATIVES ATTENTION FOR VERIFICATION PRIOR TO STAKEOUT.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE PERFORMANCE OF ITS WORK AND THE WORK OF ITS SUBCONTRACTORS. THE VA SHALL NOT HAVE CONTROL OVER, CHARGE OF, OR RESPONSIBILITY FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A SAFE WORK AREA AT ALL TIMES. TEMPORARY BARRICADES, ROAD CLOSURE SIGNAGE, FENCES AND OTHER WARNING DEVICES SHALL BE USED TO PREVENT PUBLIC ACCESS TO CONSTRUCTION WORK AREAS. VA MAINTENANCE OPERATIONS SHALL NOT BE UNDULY IMPEDED BY THE
CONTRACTOR'S OPERATIONS.
17. THE CONTRACTOR SHALL NOTIFY THE CEMETERY DIRECTOR AND THE CONTRACTING OFFICER REPRESENTATIVE TWO DAYS BEFORE ANY DEMOLITION WORK BEGINS. ANY PLANNED INTERRUPTIONS IN SERVICES SHALL BE COORDINATED WITH THE CONTRACTING OFFICER AT LEAST TWO DAYS IN ADVANCE.
18. THE CONTRACTOR SHALL CONFINE HIS EQUIPMENT AND OPERATIONS TO THE LIMITS OF CONSTRUCTION SHOWN. THE CONTRACTOR ASSUMES FULL RESPONSIBILITY FOR THE
SAFETY AND SECURITY OF ALL MATERIALS AND EQUIPMENT ON SITE.
19. THE CONTRACTOR SHALL USE ONLY APPROVED ROADWAYS FOR CONSTRUCTION AND DELIVERY ACCESS. DAMAGE TO THE EXISTING ROADS SHALL BE REPAIRED AT NO COST
TO THE OWNER.
20. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR OF DAMAGE TO THE EXISTING CEMETERY GROUNDS DUE TO CONSTRUCTION ACTIVITY.
EXISTING PROPOSED
BOUNDARY/RIGHT-OF-WAY LINE
ADJACENT BOUNDARY LINE
EASEMENT LINE
ROAD CENTERLINE
HEADER CURB
CURB & GUTTER
EDGE OF PAVEMENT
CHAIN LINK FENCE
OVERHEAD UTILITY LINE
UNDERGROUND UTILITY LINE
WATER MAIN
BUILDINGS
SIDEWALK
SANITARY SEWER MAIN
STORM SEWER LINE
TREES/SHRUBS
LIMITS OF WORK
INDEX CONTOUR LINE
INTERMEDIATE CONTOUR LINE
SPOT ELEVATIONS
MISCELLANEOUS SIGNS
SITE LIGHT WITH POLE
DRIP LINE OF TREES
REVERSE CURB
543.6
TO BE
REMOVED
TO
REMAIN
BOARD FENCE
8" W/M8" W/M
8" PVC SAN. SEW.
15" HDPE
TRANS.CURB
SOIL BOUNDARY
HbB HgC
WIRE FENCE
EDGE OF GRAVEL
GUARDRAIL
CIVIL LEGEND:
EDGE OF CONCRETE
SANITARY SEWER CLEAN-OUT
SANITARY SEWER MANHOLE
STORM SEWER MANHOLE
STORM SEWER DROP INLET
STORM SEWER CURB INLET
STORM SEWER RIP-RAP
STORM SEWER END SECTION
FIRE HYDRANT
WATER VALVE
WATER METER
MAIL BOX
UTILITY POLE
FEATURE WALL
OVERHEAD COMMUNICATIONS LINE
UNDERGROUND COMMUNICATIONS LINE
BUILDING MOUNTED LIGHT
UTILITY POLE GUY WIRE
SANITARY SEWER FORCE MAIN
8" PVC SAN. SEW.
15" HDPE
EX. CC RBF
CONCRETE MONUMENT/IRON REBAR
TBSCC-TBSIPF
UNDERGROUND GAS LINE
C3
CO
45 0
GS 45 0
TC 45 0
INV
EX.
EX.
X
CO
MB
MON
EX. VDH
ABBREVIATIONS:
HEADSTONE FACE DIRECTION
BURIAL CRYPT PLOTS
GRAVESITE GRID MONUMENT
CONCRETE SECTION MARKER
DRAINAGE FLOW ARROW
DETAIL LABEL
KEYNOTE REFERENCE LABEL
GRANITE SECTION MARKER
F
PRE-PLACED CRYPTS
INTERIOR CRYPT (TYP.)
PERIMETER CRYPT (TYP.)
LIMITS OF GRADING
LIMITS OF CLEARING
XX
XXXXX
WETLANDS
IN-GROUND CREMAIN SITES
FLAG SLEEVES
FLAG POLEF
DETAIL NO.
SHEET REFERENCE
DIRECTION OF TRAFFIC ARROWS
FEATURE WALL
33 32
TEST PIT LOCATION
A AREA OR ARC
AC ACRE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AGE ABOVE GROUND ELECTRIC
AGEC ABOVE GROUND ELECTRIC CONDUIT
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
AST ABOVE-GROUND STORAGE TANK
ATS ACTIVE TREATMENT SYSTEM
AVE AVENUE
AWWA AMERICAN WATER WORKS ASSOCIATION
A/C AIR CONDITIONING
BC BOTTOM OF CURB
BF BASEMENT FLOOR
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BL BASE LINE
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK, BASELINE MARKER
BMP BEST MANAGEMENT PRACTICE
BOE BOTTOM OF EXCAVATION
BOV BLOW OFF VALVE
BRG BEARING
BRL BUILDING RESTRICTION LINE
BV BALL VALVE
BW BOTTOM OF WALL
C COEFFICIENT OF RUNOFF
CALC CALCULATE
CB CATCH BASIN OR CHORD BEARING
CC CENTER TO CENTER
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS, CONTRACT DOCUMENTS OR CHECK DAM
CDW CHILLED DRINKING WATER
CDWR CHILLED DRINKING WATER RETURN
CDWS CHILLED DRINKING WATER SUPPLY
CE CONSTRUCTION ENTRANCE
CEM CEMENT OR CEMETERY
CF CONTRACTOR FURNISHED
CFS CUBIC FEET PER SECOND OR COMPOST FILTER SOCK
CG CURB AND GUTTER
CHD CHORD
CIP CAST IRON PIPE OR CULVERT INLET PROTECTION
CJ CONTRACTION JOINT
CL CENTERLINE, CLASS
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CN CURVE NUMBER
CND CONDUIT
CNR CORNER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
COND CONDITION OR CONDENSER
CONF CONFERENCE
CONN CONNECTION
CON CONTAMINATED
CONSTR CONSTRUCTION
CONT CONTINUATION
CONTR CONTRACT OR CONTRACTOR
COR CONTRACTING OFFICER'S REPRESENTATIVE
COTG CLEANOUT TO GRADE
COV COVER OF CUT OFF VALVE
CPv CHANNEL PROTECTION VOLUME
CPPE CONSERVATION PRACTICE PHYSICAL EFFECTS
CPP CORRUGATED PLASTIC PIPE
CRN CROWN
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSS COMMITTAL SERVICE SHELTER
CSP CONCRETE SEWER PIPE
CT COURT
CTR CENTER OR CONTOUR
CTRL CONTROL
CTS COOLING TOWER SUPPLY
CTV CABLE TELEVISION
CV CONTROL VALVE
CW CLOCKWISE OR CONCRETE WASHOUT
CWP COLD WATER PIPING
D DEPTH
DAT DATUM
DB DEED BOOK; DESIGN-BUILD; DRAIN BASIN
DBL DOUBLE
DD DIVERSION DIKE
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DESC DESCRIPTION
DET DETAIL
DI DROP INLET
DIA DIAMETER
DIFF DIFFERENCE
DIP DUCTILE IRON PIPE
DIST DISTANCE
DM DROP MANHOLE
DOC DOCUMENT
DOM DOMESTIC
DR DRIVE
DRE DECOMPOSED ROCK ELEVATION
DS DOWNSPOUT
DWG DRAWING
D/W DRIVEWAY
D DELTA
EA EACH
EBL EAST BOUND LANE
EC EDGE OF CONCRETE
ECL EROSION CONTROL LOG
EG EDGE OF GUTTER
EJ EXPANSION JOINT
ELEV ELEVATION
ELEC ELECTRICAL
ENTR ENTRANCE
EOI END OF INFORMATION
EP EDGE OF PAVEMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
E&S EROSION & SEDIMENT
ES END SECTION
ESMT EASEMENT
ETO EARLY TURNOVER
EPT EXTERNAL PIPE THREAD
EQ EQUAL
EW END WALL
EXP EXPANSION
EX EXISTING
EXT EXTERIOR
FAR FLOOR AREA RATIO
FC FACE OF CURB
FD FOUNTAIN DRAIN
FF FIRST FLOOR OR FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FIN FINISHED
FLR FLOOR
FN FENCE
FP FLOOD PLAIN
FOC FACE OF CURB
FOTG FIELD OFFICE TECHNICAL GUIDE
FOY FOYER
FP FLAG POLE OR FIRE PROTECTION
FPS FEET PER SECOND
FR FROM
FS FILTER SOCK
FT FEET
FWS FLOWER WATERING STATION
G GAS
GAL GALLON
GDR GUARD RAIL
GEN GENERATOR
GFA GROSS FLOOR AREA
GIP GALVANIZED IRON PIPE
GL GROUND LEVEL
GOVT GOVERNMENT
GR GRADE
GR GUARD RAIL
GS GROUND SHOT
H HORIZONTAL
HC HANDICAP
HCP HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HDR HEADER
HDWL HEADWALL
HGL HYDRAULIC GRADE LINE
HH HAND HOLE
HLBC HOT LAID BITUMINOUS CONCRETE
HMA MOT-MIX ASPHALT
HP HIGH POINT OR HIGH PRESSURE
HR HAND RAIL
HT HEIGHT
HW HOT WATER
HWSR HOT WATER SUPPLY & RETURN
HWY HIGHWAY
HYD HYDRANT
HYDR HYDRAULIC
I RAINFALL INTENSITY
ID INSIDE DIAMETER
IGC IN-GROUND CRYPT
IN INCH
INV INVERT
IP IRON PIPE OR INLET PROTECTION
IPF IRON PIPE FOUND
IPS IRON PIPE SET
IRR IRRIGATION
IW IRRIGATION WATER
JB JUNCTION BOX
K ONE THOUSAND (KILO)
KWY KEYWAY
L LENGTH
LAT LATERAL
LF LINEAR FEET
LOC LOCATION
LONG LONGITUDE
LOS LINE OF SIGHT
LP LOW POINT OR LOW PRESSURE
LT LIGHT OR LEFT
LL LOWER LEVEL
M MARKER
MAINT MAINTENANCE
MAT MATERIAL
MAX MAXIMUM
MB MAIL BOX
MECH MECHANICAL
MED MEDIUM
MEMO MEMORANDUM
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFG MANUFACTURING
MGT MANAGEMENT
MH MANHOLE
MI MILE
MIN MINIMUM
MISC MISCELLANEOUS
ML MATERIALS LIST
MN MAGNETIC NORTH
MOD MODEL OR MODIFY
MON MONUMENT
MS MEDIAN STRIP
MSL MEAN SEA LEVEL
MTG MEETING
MTL MATERIAL
MULT MULTIPLE
MUNIC MUNICIPAL
N NORTH
N/F NOW OR FORMERLY
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NBC NATIONAL BUILDING CODE
NBL NORTH BOUND LANE
NCA NATIONAL CEMETERY ADMINISTRATION
NCPS NATIONAL CONSERVATION PRACTICE STANDARDS
NCTCOG NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS
NDOR NEBRASKA DEPARTMENT OF ROADS
NDOT NEBRASKA DEPARTMENT OF TRANSPORTATION
NE NOT EXCEEDING
NFA NET FLOOR AREA
NHCP NATIONAL HANDBOOK OF CONSERVATION PRACTICES
NIC NOT IN CONTRACT
NO NUMBER
NOI NOTICE OF INTENT
NOM NOMINAL
NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
NRCP NON-REINFORCED CONCRETE PIPE
NRCS NATURAL RESOURCES CONSERVATION SERVICE
NTP NOT TO PROCEED
NTS NOT TO SCALE
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OFB ORGANIC FILTER BERM
OFD OVERFLOW DRAIN
OFT ORGANIC FILTER TUBE
OH OVERHANG
OHC OVERHEAD COMMUNICATIONS
OHE OVERHEAD ELECTRIC
OP OUTLET PROTECTION
OS OVER-SIZED
OZ OUNCE
P PERIMETER, RAINFALL DEPTH
PAR PARALLEL
PAT PATTERN
PB PULL BOX
PC POINT OF CURVATURE
PCA PORTLAND CEMENT ASSOCIATION
PCC POINT OF COMPOUND CURVE
PCEP POINT OF CURVE, EDGE OF PAVEMENT
PCT PERCENT
PCTC POINT OF CURVE, TOP OF CURB
PERF PERFORATED
PED PEDESTAL
PG PAGE
PGL POINT OF GRADE LINE
PH PROFILE HOLE
PI POINT OF INTERSECTION
PIC PUBLIC INFORMATION CENTER
PIV POST INDICATOR VALVE
PL PROPERTY LINE
POTW POTABLE WATER
PP POLYPROPYLENE (PLASTIC)
PPC PRE-PLACED CRYPT
PRC POINT OF REVERSE CURVE
PRELIM PRELIMINARY
POTW PUBLICLY-OWNED TREATMENT WORKS
PROP PROPOSED
PSI POUNDS PER SQUARE INCH
PSL PIPE SLEEVE
PT POINT OF TANGENCY
PTS PASSIVE TREATMENT SYSTEM
PV PRIVATE VAULT
PVC POLY VINYL CHLORIDE (PLASTIC PIPE)
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
P&P PLAN AND PROFILE
Q FLOW, AMOUNT OF RUNOFF
Qf EXTREME FLOOD VOLUME Qp OVERBANK FLOOD PROTECTION VOLUME
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RISER, RADIUS
RAD RADIANS
RCN RUNOFF CURVE NUMBER
RCP REINFORCED CONCRETE PIPE, REFLECTED CEILING PLAN
RD ROAD, ROOF DRAIN
RDC REDUCER
RE RESIDENT ENGINEER
REP REPAIR
REQ REQUIRED
REV REVISION
REv RECHARGE VOLUME
RGP ROUGH GRADING PLAN
RPA RESOURCE PROTECTION AREA
RR RAILROAD
RTE ROUTE
RT RIGHT
RV RELIEF VALVE
RW RETAINING WALL
R/W RIGHT-OF-WAY
SAN SANITARY
SB SPLASH BLOCK OR SEDIMENT BASIN
SBL SOUTH BOUND LANE
SCF SEDIMENT CONTROL FENCE
SCHED SCHEDULE
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SEC SECTION
SEG SEGMENT
SEL SELECT
SEW SEWER
SF SQUARE FEET OR SILT FENCE
SSF SUPER SILT FENCE
SJ SCORED JOINT
SLV SLEEVE
SM SECTION MARKER
SMH STEAM MANHOLE
SOV SHUT OFF VALVE
SP SITE PLAN
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ SQUARE
SS SANITARY SEWER, STORM SEWER OR STEAM SUPPLY
ST STREET OR SEDIMENT TRAP
STA STATION
STD STANDARD
STE STEAM
STK STACK
STM STORM
SUPT SUPPORT
SURV SURVEY
SVC SERVICE
SWM STORMWATER MANAGEMENT
S/W SIDEWALK
SWPPP STORM WATER POLLUTION PREVENTION PLAN (SWP3)
SWG SEWAGE
Sx CROSS SLOPE
SYM SYMBOL
T TANGENT
T&M TIME AND MATERIALS
TB TEST BORE
TC TOP OF CURB
Tc TIME OF CONCENTRATION
TCEQ TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
TCP TERRA COTTA PIPE, TRAFFIC CONTROL PLAN
TELE TELEPHONE
TH TEST HOLE
TNL TUNNEL
TOB TOP OF BANK
TOC TOP OF CURB
TOP TOP OF PAVEMENT
TOPO TOPOGRAPHY
TP TEST PIT, TELEPHONE POLE, OR TREE PROTECTION
TPDES TEXAS POLLUTANT DISCHARGE ELIMINATION SYSTEM
TW TOP OF WALL
TXDOT TEXAS DEPARTMENT OF TRANSPORTATION
TYP TYPICAL
UD UNDERDRAIN
U/G UNDERGROUND
UGC UNDERGROUND COMMUNICATIONS
UGE UNDERGROUND ELECTRIC
UFC UNIFORM FIRE CODE
UL UPPER LEVEL
UON UNLESS OTHERWISE NOTED
UP UTILITY POLE
USACE U.S. ARMY CORPS OF ENGINEERS
USDA U.S. DEPARTMENT OF AGRICULTURE
UTIL UTILITY
V VERTICAL
VA VETERANS ADMINISTRATION, VIRGINIA
VAR VARIES
VC VERTICAL CURVE
VEL VELOCITY
VERT VERTICAL
VF VERTICAL FOOT
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VOL VOLUME
W WATER, WEST OR WIDE
W/ WITH
W/O WITHOUT
WBL WEST BOUND LANE
WI WROUGHT IRON
WL WATER LINE
WM WATER MAIN OR WATER METER
WO WORK ORDER
WQv WATER QUALITY VOLUME
WSE WATER SURFACE ELEVATION
WT WATER TIGHT
WW WASTE WATER
X-ING CROSSING
YI YARD INLET
YR YEAR
Z SIDE SLOPES
WW
WWWWWWWWW
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OHE
OHE
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
C
N
°5 4'5
9" W
2.2
7'( R)
(M
N
°5 4'5
9" W
7.5
9'( R)
(M
N 00°00'41" E 1262.04'(R)(M)
N
°4 4'4
3" E
4.4
4'( R)
(M
S 00°00'41" W 1367.26'(R)(M)
BR
AS
S
DI
SK
SE
C
OR
-1
6-
PO
IN
T
OF
C
OM
ME
NC
EM
EN
T
CA
MP
BU
TL
ER
(7
0'w )R
OA
D
452.11'
SQUIRES
15-17.0-400-038
2007R40468
DAVIS
15-17.0-400-010
2002R75558
NO
RF
OL
K
SO
UT
HE
RN
RA
ILR
OA
D
(W
ID
TH
VA
RI
ES
N
°5 9'3
1" E
5.5
7'( M)
N
°5 9'3
1" E
7.5
9'( M)
5/ 8"
IR
ON
PI
PE
(A
SP
HA
LT
)(P
UB
LIC
)(2
9'±
PA
VE
ME
NT
W
ID
TH
XXXXXXXXX
XX
X
XXX
XXX
XXX
XXX
XXX
XXX
XXX XXX
XX
X
XXX
XXXXXXXXXXXXXXXXXXXXXXXX
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XXX XXX XXX XXX XXX XXX XXX XXX XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
5/8" IRON PIPE
5/8" IRON PIPE
5/8" IRON PIPE
(POINT ON LINE)
5/8" IRON PIPE
5/8" IRON PIPE
TELE. ESMT.
DOC. 1980R851359
EDGE OF PAVEMENT
POINT OF BEGINNING
18" CMP
C.L.F.
GATEWOOD FENCE
GATE
WOOD FENCE
GATE
TREE LINE
CL R.O.W. ESMT.
DOC. 140214
FIBER
MARKER
20'w TELE. ESMT.
DOC. 1993R40138
ESMT. FOR ELEC.
TRANSMISSION
DOC. 184476
POWER POLE
(TYP.)
WATER METER
(TYP.)
ARCHAEOLOGICALLY
SENSITIVE AREA
(TYP.)
ARCHAEOLOGICALLY
SENSITIVE AREA
(TYP.)
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
SPRINGFIELD, ILLINOIS
Dwg. of 71
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CAMP BUTLER NATIONAL CEMETERY
GRAVESITE EXPANSION
806CM3028
Fil e P ath
2.1
.8.
6\V
OL
1\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\06
\P
LA
NS
\V
L-1
.D W
G
DCW ATNJULY 25, 2022
BID DOCUMENTS
BID DOCUMENTS SUBMISSION
EXISTING CONDITIONS PLAN
NORTH
GRAPHICAL SCALE: 1"=50'
50 25 0 50 100 150
NKEY MAP
(NOT TO SCALE)
VL100
SITE NOTES:
1. COORDINATE INFORMATION SHOWN IS BASED ON THE HORIZONTAL DATUM ILLINOIS
WEST ZONE NAD83 AND VERTICAL DATUM NAVD88.
2. THE TOPOGRAPHIC CONTOUR INTERVAL IS ONE (1) FOOT. TOPOGRAPHIC
INFORMATION PROVIDED BY THE U.S. DEPARTMENT OF VETERANS AFFAIRS AND
WAS COMPILED FROM AN ALTA/NSPS LAND TITLE SURVEY PREPARED BY
LANDCO, L.P., DATED 10-24-18 AND FIELD WORK COMPLETED ON 10-7-2018.
BEARINGS ARE BASED ON THE SOUTH LINE OF THE SOUTHEAST QUARTER OF
SECTION 17 WITH AN ASSUMED BEARING OF N89°54'59"W. THE SURVEYOR DID
NOT ABSTRACT PROPERTY. SURVEY IS BASED ON LEGAL DESCRIPTIONS
SUPPLIED BY TITLE COMPANY. EASEMENTS, BUILDING LINES, ETC., SHOWN IN THE
EXISTING SURVEY ARE AS IDENTIFIED BY FILE NO. 20181324 OF FIDELITY
NATIONAL TITLE INSURANCE COMPANY, WITH AN EFFECTIVE DATE OF OCTOBER 1,
2018. UTILITIES SHOWN ARE FROM ABOVE GROUND EVIDENCE COMBINES WITH
MARKINGS ON THE GROUND, IF PRESENT AT THE TIME OF THE SURVEY, OR BY
DRAWINGS PROVIDED BY UTILITY COMPANIES. THERE IS NO GUARANTEE THAT
THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN
SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT
THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING UTILITIES, BOTH HORIZONTALLY AND
VERTICALLY.
3. UTILITIES SHOWN ARE FROM ABOVE GROUND EVIDENCE COMBINED WITH
MARKINGS ON THE GROUND, IF PRESENT AT THE TIME OF THE SURVEY, OR BY
DRAWINGS PROVIDED BY UTILITY COMPANIES. THERE IS NO GUARANTEE THAT
THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN
SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT
THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING UTILITIES, BOTH HORIZONTALLY AND
VERTICALLY.
GRAPHIC LEGEND:
PROPERTY LINE
SURVEY MONUMENT
ARCHAEOLOGICALLY
SENSITIVE AREA
XXXXXX
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OHE
OHE
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
C
N
°5 4'5
9" W
2.2
7'( R)
(M
N
°5 4'5
9" W
7.5
9'( R)
(M
N 00°00'41" E 1262.04'(R)(M)
N
°4 4'4
3" E
4.4
4'( R)
(M
S 00°00'41" W 1367.26'(R)(M)
BR
AS
S
DI
SK
SE
CO
R
-16
-4
PO
IN
T
OF
CO
MM
EN
CE
ME
NT
CA
MP
BU
TL
ER
(7
0'w )R
OA
D
452.11'
SQUIRES
15-17.0-400-038
2007R40468
DAVIS
15-17.0-400-010
2002R75558
NO
RF
OL
K
SO
UT
HE
RN
RA
ILR
OA
D
(W
ID
TH
VA
RI
ES
N
°5 9'3
1" E
5.5
7'( M)
N
°5 9'3
1" E
7.5
9'( M)
5/8 "I
RO
N
PI
PE
(A
SP
HA
LT
)(P
UB
LIC
)(2
9'±
PA
VE
ME
NT
W
ID
TH
XXXXXXXXX
XX
X
XXX
XXX
XXX
XXX
XXX
XXX
XXX XXX
XX
X
XXX
XXXXXXXXXXXXXXXXXXXXXXXX
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XXX XXX XXX XXX XXX XXX XXX XXX XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
5/8" IRON PIPE
5/8" IRON PIPE
5/8" IRON PIPE
(POINT ON LINE)
5/8" IRON PIPE
5/8" IRON PIPE
TELE. ESMT.
DOC. 1980R851359
EDGE OF PAVEMENT
POINT OF BEGINNING
18" CMP
C.L.F.
GATEWOOD FENCE
GATE
WOOD FENCE
GATE
TREE LINE
CL R.O.W. ESMT.
DOC. 140214
FIBER
MARKER
20'w TELE. ESMT.
DOC. 1993R40138
ESMT. FOR ELEC.
TRANSMISSION
DOC. 184476
POWER POLE
(TYP.)
WATER METER
(TYP.)
ARCHAEOLOGICALLY
SENSITIVE AREA
(TYP.)
ARCHAEOLOGICALLY
SENSITIVE AREA
(TYP.)
XXXXXXXXX
XX
X
XXX
XXX
XXX
XXX
XXX
XXX
XXX XXX
XX
X
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXXXXXXXXXXXXXXXXXXXXXXXXXX
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XXX XXX XXX XXX XXX XXX XXX XXX
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
NEW GRAVEL ROAD
x
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
SPRINGFIELD, ILLINOIS
Dwg. of 71
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CAMP BUTLER NATIONAL CEMETERY
GRAVESITE EXPANSION
806CM3028
Fil eP ath :G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\06
\P
LA
NS
\B I-1
.D
W G
DCW ATNJULY 25, 2022
BID DOCUMENTS
BID DOCUMENTS SUBMISSION
BORING LOCATION PLAN
NORTH
GRAPHICAL SCALE: 1"=50'
50 25 0 50 100 150
NKEY MAP
(NOT TO SCALE)
SOIL BORING LOCATION / REFERENCE #
SUBSURFACE LEGEND:
NOTES:
1. REFER TO "GEOTECHNICAL ENGINEERING REPORT - PROPOSED GRAVESITE
EXPANSION - CAMP BUTLER NATIONAL CEMETERY" BY ECS MIDWEST, LLC, DATED
MARCH 29, 2022, FOR BORING LOG INFORMATION AND RECOMMENDATIONS.
SOIL PROFILE BOUNDARY
SOIL PROFILE SYMBOL
SOIL DESCRIPTIONS
17A KEOMAH SILT LOAM, 0 TO 2 PERCENT SLOPES - HSG C/D
119C2 ELCO SILT LOAM, 5 TO 10 % SLOPES, ERODED - HSG C
257A CLARKSDALE SILT LOAM, 0 TO 2 % SLOPES - HSG C/D
279B ROZETTA SILT LOAM, 2 TO 5 % SLOPES - HSG B
BI100
BI101
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
SPRINGFIELD, ILLINOIS
Dwg. of 71
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CAMP BUTLER NATIONAL CEMETERY
GRAVESITE EXPANSION
806CM3028
Fi le
Pa th:
G :\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\06
\P
LA
NS
\B
I-1
.D W
G
DCW ATNJULY 25, 2022
BID DOCUMENTS
BID DOCUMENTS SUBMISSION
BORING LOGS
XXXXXXXXX
XX
X
XXX
XXX
XXX
XXX
XXX
XXX
XXX XXX
XX
X
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXXXXXXXXXXXXXXXXXXXXXXXXXX
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XXX XXX XXX XXX XXX XXX XXX XXX
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
NEW GRAVEL ROAD
x
ST
ST
WW
WWWWWWWWW
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OHE
OHE
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
C
N
°5 4'5
9" W
N
°5 4'5
9" W
7.5
9'( R)
(M
N 00°00'41" E 1262.04'(R)(M)
N
°4 4'4
3" E
4.4
4'( R)
(M
S 00°00'41" W 1367.26'(R)(M)
CA
MP
BU
TL
ER
(7
0'w )R
OA
D
452.11'
SQUIRES
15-17.0-400-038
2007R40468
DAVIS
15-17.0-400-010
2002R75558
NO
RF
OL
K
SO
UT
HE
RN
RA
ILR
OA
D
(W
ID
TH
VA
RI
ES
5.5
7'( M)
N
°5 9'3
1" E
7.5
9'( M)
(A
SP
HA
LT
)(P
UB
LIC
)(2
9'±
PA
VE
ME
NT
W
ID
TH
XXXXXXXXX
XX
X
XXX
XXX
XXX
XXX
XXX
XXX
XXX XXX
XX
X
XXX
XXXXXXXXXXXXXXXXXXXXXXXX
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XXX XXX XXX XXX XXX XXX XXX XXX XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
5/8" IRON PIPE
5/8" IRON PIPE
5/8" IRON PIPE
(POINT ON LINE)
5/8" IRON PIPE
5/8" IRON PIPE
TELE. ESMT.
DOC. 1980R851359
EDGE OF PAVEMENT
POINT OF BEGINNING
18" CMP
C.L.F.
GATEWOOD FENCE
GATE
WOOD FENCE
GATE
TREE LINE
CL R.O.W. ESMT.
DOC. 140214
FIBER
MARKER
20'w TELE. ESMT.
DOC. 1993R40138
ESMT. FOR ELEC.
TRANSMISSION
DOC. 184476
POWER POLE
(TYP.)
WATER METER
(TYP.)
ARCHAEOLOGICALLY
SENSITIVE AREA
(TYP.)
ARCHAEOLOGICALLY
SENSITIVE AREA
(TYP.)
ST
2.4%
2.4%
BO
TT
OM
O
F
TR
AP
=5
.00
#1
6.0' STONE
WEIR OUTLET57
SF
SFSFSFSFSFSFSFSFSFSFSFSF
SF
SF
SF
SF
SF SF SF SF SF SF
SF SF SF SF SF SF SF SF SF SF
LS
CONSTRUCTION
STAGING AREA
SILT FENCESF
CONSTRUCTION ENTRANCE
LIMITS OF DISTURBANCE
CONCRETE WASHOUT
LEGEND:
E&S NOTES:
1. THE IMPLEMENTATION OF THESE EROSION AND SEDIMENT CONTROL (E&S)
PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND
UPGRADING OF THESE E&S FACILITIES IS THE RESPONSIBILITY OF THE
CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED.
2. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE
CLEARLY FLAGGED BY SURVEY TAPE OR FENCING PRIOR TO CONSTRUCTION.
DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE
CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE
MAINTAINED BY THE CONTRACTOR FOR THE DURATION OF CONSTRUCTION.
3. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE
BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE
PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH
SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED
AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT
OCCUR FOR THE DURATION OF THE PROJECT.
4. THE E&S FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR
TO OR IN CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO
ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS,
DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED.
5. THE E&S FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS
FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD,
THESE E&S FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED
STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE
CONDITIONS AS DIRECTED BY COTR.
6. THE E&S FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND
MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING. WRITTEN
RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE E&S FACILITIES.
7. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT
WILL NOT BE DISTURBED FOR TWO CONSECUTIVE DAYS DURING THE WET
SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY
STABILIZED WITH THE APPROVED E&S METHODS (E.G., SEEDING, MULCHING,
PLASTIC COVERING, ETC.).
8. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO
ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE
LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION
SHALL NOT FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM
SYSTEM.
9. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED
AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN
PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED
WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
10. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING THE NPDES PERMIT.
CONTRACTOR SHALL COORDINATE E&S CONTROLS WITH ILLINOIS
ENVIRONMENTAL PROTECTION AGENCY SWPPP REQUIREMENTS.
CWS
CULVERT INLET PROTECTION
OUTLET PROTECTION
TEMPORARY DIVERSION DIKE
INLET PROTECTION
CD ROCK CHECK DAM
LEVEL SPREADERLS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
SPRINGFIELD, ILLINOIS
Dwg. of 71
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CAMP BUTLER NATIONAL CEMETERY
GRAVESITE EXPANSION
806CM3028
Fil e P ath
\1
.16 8.8
.12 6\V
OL
1\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\06
\P
LA
NS
\G
C-
1.D W
G
DCW ATNJULY 25, 2022
BID DOCUMENTS
BID DOCUMENTS SUBMISSION
EROSION & SEDIMENT CONTROL
PLAN
GC101
NORTH
GRAPHICAL SCALE: 1"=50'
50 25 0 50 100 150
NKEY MAP
(NOT TO SCALE)
TREE CLEARING NOTE:
NOT TO SCALE
TEMPORARY DIVERSION DIKE1 NOT TO SCALE
INLET PROTECTION - LOG TYPE2 NOT TO SCALE
INLET PROTECTIO - DROP-IN PROTECTION3
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
SPRINGFIELD, ILLINOIS
Dwg. of 71
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CAMP BUTLER NATIONAL CEMETERY
GRAVESITE EXPANSION
806CM3028
Fil e P ath
\1
.16 8.8
.12 6\V
OL
1\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\06
\P
LA
NS
\G
C-
1.D W
G
DCW ATNJULY 25, 2022
BID DOCUMENTS
BID DOCUMENTS SUBMISSION
GC501
EROSION & SEDIMENT CONTROL
DETAILS
NOT TO SCALE
CONSTRUCTION ENTRANCE1 NOT TO SCALE
CONCRETE WASHOUT2 NOT TO SCALE
STANDARD SILT FENCE3 NOT TO SCALE
CONSTRUCTION ROAD STABILIZATION4
NOT TO SCALE
ROCK CHECK DAM5 NOT TO SCALE
SILT TRAP - ROCK OUTLET PROTECTION6 NOT TO SCALE
CULVERT INLET PROTECTION7
6"
1.5'
15'
578.00 1.5'
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OHE
OHE
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
C
N
°5 4'5
9" W
2.2
7'( R)
(M
N
°5 4'5
9" W
7.5
9'( R)
(M
N 00°00'41" E 1262.04'(R)(M)
N
°4 4'4
3" E
4.4
4'( R)
(M
S 00°00'41" W 1367.26'(R)(M)
BR
AS
S
DI
SK
SE
C
OR
7-
-4
PO
IN
T
OF
C
OM
ME
NC
EM
EN
T
CA
MP
BU
TL
ER
(7
0'w )R
OA
D
452.11'
SQUIRES
15-17.0-400-038
2007R40468
DAVIS
15-17.0-400-010
2002R75558
NO
RF
OL
K
SO
UT
HE
RN
RA
ILR
OA
D
(W
ID
TH
VA
RI
ES
N
°5 9'3
1" E
5.5
7'( M)
N
°5 9'3
1" E
7.5
9'( M)
5/8 " I
RO
N
PI
PE
(A
SP
HA
LT
)(P
UB
LIC
)(2
9'±
PA
VE
ME
NT
W
ID
TH
XXXXXXXXX
XX
X
XXX
XXX
XXX
XXX
XXX
XXX
XXX XXX
XX
X
XXX
XXXXXXXXXXXXXXXXXXXXXXXX
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XXX XXX XXX XXX XXX XXX XXX XXX XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
5/8" IRON PIPE
5/8" IRON PIPE
5/8" IRON PIPE
(POINT ON LINE)
5/8" IRON PIPE
5/8" IRON PIPE
TELE. ESMT.
DOC. 1980R851359
EDGE OF PAVEMENT
POINT OF BEGINNING
18" CMP
C.L.F.
GATEWOOD FENCE
GATE
WOOD FENCE
GATE
TREE LINE
CL R.O.W. ESMT.
DOC. 140214
FIBER
MARKER
20'w TELE. ESMT.
DOC. 1993R40138
ESMT. FOR ELEC.
TRANSMISSION
DOC. 184476
POWER POLE
(TYP.)
WATER METER
(TYP.)
ARCHAEOLOGICALLY
SENSITIVE AREA
(TYP.)
ARCHAEOLOGICALLY
SENSITIVE AREA
(TYP.)
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
SPRINGFIELD, ILLINOIS
Dwg. of 71
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CAMP BUTLER NATIONAL CEMETERY
GRAVESITE EXPANSION
806CM3028
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\06
\P
LA
NS
\C D-
0.D
W G
DCW ATNJULY 25, 2022
BID DOCUMENTS
BID DOCUMENTS SUBMISSION
SITE DEMOLITION PLAN
NORTH
GRAPHICAL SCALE: 1"=50'
50 25 0 50 100 150
CD100
CLEAR EXISTING TREES AND VEGETATION
SAW CUT EX. ASPHALT PAVEMENT
DEMOLITION LEGEND:
KEY NOTE LEGEND:
KEY NO. DESCRIPTION
SAWCUT EXISTING ASPHALT PAVEMENT TO PROVIDE
CLEAN EDGE
CLEAR EXISTING TREES AND VEGETATION
SITE DEMOLITION NOTES:
NKEY MAP
(NOT TO SCALE)
SAW CUT EX. ASPHALT PAVEMENT
WWW
WWWWWWWWWWW
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
EOHE
OHE
OHE
OHE
C
N
°5 4'5
9" W
2.2
7'( R)
(M
N
°5 4'5
9" W
7.5
9'( R)
(M
N 00°00'41" E 1262.04'(R)(M)
S 00°00'41" W
1367.26'(R)(M)
BR
A
SE
C
OR
PO
IN
T
OF
C
OM
ME
N
CA
MP
BU
TL
ER
(7
0'w )R
OA
D
SQUIRES
15-17.0-400-038
2007R40468
DAVIS
15-17.0-400-010
2002R75558
5.5
7'( M)
N
°5 9'3
1" E
7.5
9'( M)
(A
SP
HA
LT
)(P
UB
LIC
)(2
9'±
PA
VE
ME
NT
W
ID
TH
XXXXXXXXXXXXXXX
XX
X
XX
X
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXXXX
X
XXX XXX
XXX
XXX
XXX
XXX
XXXXXXXXXXXXXXX
XXX XXX XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXXXXXXXXXXXXXX
XX
X
XX
X
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXXXX
X
XXX XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXXXXXXXXXXXXXXXXX
XXX XXX XXX
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
9' 9'
33'R
33'R12
6'
6'
388'R
412'R
26'R
'R
138'R
182'R
'R
'R
262'R
238'R
194'R
206'R
406'R
394'R
NEW ROAD 'A'
NEW GRAVEL ROAD
xx
ST
ST
ST ST
ST
ST
4'R
9'
5'R
5'R
5'R
5'R
5'R 5'R
5'R
SECTION 5
1,000 IN-GROUND CREMAIN
SITES (WITHIN 4'x4' PLOTS)
48'
90°'
4' AISLE
(TYP.)
WWW
WWWWWWWWWWW
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
EOHE
OHE
OHE
OHE
C
N
°5 4'5
9" W
2.2
7'( R)
(M
N
°5 4'5
9" W
7.5
9'( R)
(M
N 00°00'41" E 1262.04'(R)(M)
S 00°00'41" W
1367.26'(R)(M)
BR
A
SE
C
OR
PO
IN
T
OF
C
OM
ME
N
CA
MP
BU
TL
ER
(7
0'w )R
OA
D
SQUIRES
15-17.0-400-038
2007R40468
DAVIS
15-17.0-400-010
2002R75558
5.5
7'( M)
N
°5 9'3
1" E
7.5
9'( M)
(A
SP
HA
LT
)(P
UB
LIC
)(2
9'±
PA
VE
ME
NT
W
ID
TH
XXXXXXXXXXXXXXX
XX
X
XX
X
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXXXX
X
XXX XXX
XXX
XXX
XXX
XXX
XXXXXXXXXXXXXXX
XXX XXX XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
"R
CP
CL
IV
"R
CP
CL
IV
12" RCP CL III
12" RCP CL III
12" RCP CL III
12" RCP
CL IV
"R
CP
CL
IV
ST
ST
ST
" R
CP
CL
II I
INV: 577.80
INV: 577.10
INV:578.14
INV: 575.80
18" RCP CL IV 18" RCP CL IV
15" RCP CL IV
15" RCP CL IV
6" HDPE
6" HDPE
10+00
11+0012+0013+00 14+00
10+0011+00
12+00
13+00
14+00
15+00
16+00 17+00
+9
N00°57'28"W 79.58'
N21°29'17"E 55.28'
L=156.70' R=400.00'
Δ=22°26'45"
L=197.05' R=250.00' Δ=45°09'42"
L=65.65' R=30.00'
Δ=125°22'38"
L=244.15' R=160.00' Δ=87°25'42"
N: 1153154.38 E: 2466363.57
INTX.
N: 1153403.16 E: 2466402.49
PI
STA.=10+64.77
OFF=12.000' RT
PC
STA.=12+41.50
OFF=-12.000' LT
PCC
STA.=13+16.29
OFF=-12.000' LT
PC: 10+79.58
N: 1153218.85 E: 2466362.49
PC: 12+91.56
N: 1153423.49 E: 2466410.49
PT: 12+36.28
N: 1153372.05 E: 2466390.24
PCC: 14+88.62
N: 1153615.45 E: 2466406.83
PCC: 15+54.26
N: 1153618.83 E: 2466353.63
PI
STA.=10+55.98
OFF=9.000' RT
PI
STA.=10+55.98
OFF=-9.000' LT
PI
STA.=10+64.77
OFF=-12.000' LT
PI
STA.=17+61.02
OFF=22.000' RT
PI
STA.=15+47.47
OFF=22.000' RT
PI
STA.=15+91.67
OFF=-22.000' LT
PCC
STA.=17+49.04
OFF=-12.000' LT
PCC
STA.=14+88.62
OFF=-12.000' LT
PCC
STA.=15+54.26
OFF=-12.000' LT
PI
STA.=17+11.63
OFF=-22.000' LT
SM1A
SM1B
90°
M1G
M1F
BM1
PC: 13+50.61
N: 1153986.90 E: 2466352.44
PT: 11+28.18
N: 1153764.47 E: 2466352.44
PRC: 10+10.70
N: 1153653.62 E: 2466385.96
M1A
M1B
M1C M1E M1H M1K
M1LM1IM1D
M1J
M1M
1153198.35 2466381.22
MARKER
SEC. MARKER LAYOUT CHART
NORTHING EASTING
1153386.20 2466415.56SM2B
SM1A
1153388.34 2466489.76
MONUMENT
MONUMENT LAYOUT CHART
NORTHING EASTING
1153387.40 2466437.77M1B M1A
BASELINE
BEARING [DEFINED BY]
S88° 58' 12.28"W [M1F TO M1G]BM1
1153340.34 2466490.51
1153339.41 2466438.52
M1C
1153292.35 2466491.38
M1D
1153291.42 2466439.38
M1E
1153290.48 2466387.39
M1F
1153244.36 2466492.24
M1G
1153243.43 2466440.25
M1H
1153242.49 2466388.26
M1I
1153196.37 2466493.10
M1J
1153195.43 2466441.11
M1K
1153194.50 2466389.12
M1L
M1M
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
SPRINGFIELD, ILLINOIS
Dwg. of 71
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CAMP BUTLER NATIONAL CEMETERY
GRAVESITE EXPANSION
806CM3028
Fil e P ath
\1
.16 8.8
.12 6\V
OL
1\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\06
\P
LA
NS
\C
S-
1.D W
G
DCW ATNJULY 25, 2022
BID DOCUMENTS
BID DOCUMENTS SUBMISSION
SITE AND UTILITY PLAN AREA 1
CS101
NORTH
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
GRAVESITE GRID MONUMENT (TYP.)
BURIAL SECTION MARKER (TYP.)
CONCRETE MOUNTABLE CURB (TYP.)
KEY NOTE LEGEND:
RIBBON CURB FLUSH WITH SIDEWALK
KEY NO. DESCRIPTION DETAIL/PG
GRAVEL SERVICE DRIVE
GRAPHIC LEGEND:
LIMITS OF DISTURBANCE
NEW INLET STRUCTURE
NEW STORM SEWER
ASPHALT PAVEMENT
GRAVEL PAVEMENT
HEADSTONE FACE DIRECTION
COLUMBARIUM (TYP.)
MEMORIAL WALL
ORNAMENTAL FENCE
x x x x x x CHAIN-LINK FENCE
ORNAMENTAL FENCE
SIDEWALK JOINTS
DT500
CHAIN LINK FENCE
11 FLOWER WATERING STATIONS (TYP.)
CURB TRANSITIONS
MOUNTABLE
CURB
TAPER
RIBBON
CURB
12 FENCE COLUMN (TYP.)
NKEY MAP
(NOT TO SCALE)
S H
EE
T
C S1
M
AT
C
H
LI
N E
13 TYPE A GUTTER ENTRANCE
14 SWING GATE
15 NOSE DOWN CURB
CI101
DT500
DT500
CI500
DT500
CI700
CI721
CI745
CI745
CI501/2
CI741
DT504
DT501
DT500
ENTRY GATE 1
CI74017
TYPE A GUTTER OUTLET 1
DT50418
FORMED FLOWLINE IN CONCRETE PAVEMENT 1
DT504
REVERSE CURB & GUTTER 3
DT500
MOUNTABLE
CURB
TRANSITION
TYPE A GUTTER
MOUNTABLE
CURB
TRANSITION
REVERSE CURB
CURB TAPER
CURB INLET 3
DT50120
MANHOLE (TYP.) 2
DT50121
END SECTION 1
DT50222
FLARED END SECTION 2
DT50423
DT500
DT500
CONCRETE ENTRANCE 7
DT500
DT500
WWWWW
W
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
N
°4 4'4
3" E
4.4
4'( R)
(M
S 00°00'41" W
452.11'
NO
RF
OL
K
SO
UT
HE
RN
RA
ILR
OA
D (W
ID
TH
VA
RI
ES
XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX
XXXXXXXXXXXXXXXXXXXXXXXXXXX
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX
194'R
206'R
SWM FACILITY # 1
TOP OF FACILITY = 578.00'
BOTTOM OF FACILITY = 575.50
5'
94'R
106'R
WWWWW
W
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
N
°4 4'4
3" E
4.4
4'( R)
(M
S 00°00'41" W
452.11'
NO
RF
OL
K
SO
UT
HE
RN
RA
ILR
OA
D (W
ID
TH
VA
RI
ES
XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX
12" RCP CL IV
15+00
16+0017+00
+0
+0
+5
PC: 15+76.83
N: 1154205.17 E: 2466298.96
PT: 14+88.95
N: 1154122.49 E: 2466328.75
PT: 17+97.21
N: 1154394.80 E: 2466357.91
PCC: 17+01.61
N: 1154327.87 E: 2466294.80
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
SPRINGFIELD, ILLINOIS
Dwg. of 71
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CAMP BUTLER NATIONAL CEMETERY
GRAVESITE EXPANSION
806CM3028
Fil e P ath
\1
.16 8.8
.12 6\V
OL
1\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\06
\P
LA
NS
\C
S-
1.D W
G
DCW ATNJULY 25, 2022
BID DOCUMENTS
BID DOCUMENTS SUBMISSION
SITE AND UTILITY PLAN AREA 2
CS102
NORTH
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
NKEY MAP
(NOT TO SCALE)
M
AT
C H
LI
N
E S
H
EE
T C
S1
NORTH
GRAVESITE GRID MONUMENT (TYP.)
BURIAL SECTION MARKER (TYP.)
CONCRETE MOUNTABLE CURB (TYP.)
KEY NOTE LEGEND:
RIBBON CURB FLUSH WITH SIDEWALK
KEY NO. DESCRIPTION DETAIL/PG
GRAVEL SERVICE DRIVE
GRAPHIC LEGEND:
LIMITS OF DISTURBANCE
NEW INLET STRUCTURE
NEW STORM SEWER
ASPHALT PAVEMENT
GRAVEL PAVEMENT
HEADSTONE FACE DIRECTION
COLUMBARIUM (TYP.)
MEMORIAL WALL
ORNAMENTAL FENCE
CHAIN-LINK FENCE
ORNAMENTAL FENCE
SIDEWALK JOINTS
DT500
CHAIN LINK FENCE
11 FLOWER WATERING STATIONS (TYP.)
CURB TRANSITIONS
MOUNTABLE
CURB
TAPER
RIBBON
CURB
12 FENCE COLUMN (TYP.)
13 TYPE A GUTTER ENTRANCE
14 SWING GATE
15 NOSE DOWN CURB
CI101
DT500
DT500
CI500
DT500
CI700
CI701
CI702
CI712
CI501/2
CI702
DT504
DT501
DT500
ENTRY GATE 1
CI70217
TYPE A GUTTER OUTLET 1
DT50418
FORMED FLOWLINE IN CONCRETE PAVEMENT 1
DT504
REVERSE CURB & GUTTER 3
DT500
MOUNTABLE
CURB
TRANSITION
TYPE A GUTTER
MOUNTABLE
CURB
TRANSITION
REVERSE CURB
CURB TAPER
CURB INLET 3
DT50120
MANHOLE 2
DT50121
END SECTION 1
DT50222
FLARED END SECTION 2
DT50423
DT500
DT500
DT500
NEW ROAD 'A'
SECTION 5
1,000 IN-GROUND CREMAIN
SITES (WITHIN 4'x4' PLOTS)
1 2 3 4 5 6 7 20 21 22 23 24 25 26
44 45 46 47 48 49 50 73 74 75 76 77 78 79
105 106 107 108 109 110 111 140 141 142 143 144 145 146 177 178 179 180 181 182 183 217 218 219 220 221 222 223 259 260 261 262 263 264 265 302 303 304 305 306 307 308 346 347 348 349 350 351 352 390 391 392 393 394 395 396 434 435 436 437 438 439 440 478 479 480 481 482 483 484 522 523 524 525 526 527 528 566 567 568 569 570 571 572 610 611 612 613 614 615 616 654 655 656 657 658 659 660 698 699 700 701 702 703 704 742 743 744 745 746 747 748 786 787 788 789 790 791 792 830 831 832 833 834 835 836 873 874 875 876 877 878 879
915 916 917 918 919 920 921 956 957 958 959 960 961 962
994 995 996 997 998 999 1000
18 19 41 42 69 70
101 102 136 137
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
SPRINGFIELD, ILLINOIS
Dwg. of 71
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CAMP BUTLER NATIONAL CEMETERY
GRAVESITE EXPANSION
806CM3028
Fil e P ath
\1
.16 8.8
.12 6\V
OL
1\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\06
\P
LA
NS
\C
S-
0.D W
G
DCW ATNJULY 25, 2022
BID DOCUMENTS
BID DOCUMENTS SUBMISSION
BURIAL SECTION 5 NUMBERING
PLAN
CS110
NORTH
GRAPHICAL SCALE: 1"=10'
10 5 0 10 20 30
GRAPHIC LEGEND:
WWW
WWWWWWWWWWW
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
EOHE
OHE
OHE
OHE
C
N
°5 4'5
9" W
2.2
7'( R)
(M
N
°5 4'5
9" W
7.5
9'( R)
(M
N 00°00'41" E 1262.04'(R)(M)
S 00°00'41" W
1367.26'(R)(M)
BR
A
SE
C
OR
PO
IN
T
OF
C
OM
ME
N
CA
MP
BU
TL
ER
(7
0'w )R
OA
D
SQUIRES
15-17.0-400-038
2007R40468
DAVIS
15-17.0-400-010
2002R75558
5.5
7'( M)
N
°5 9'3
1" E
7.5
9'( M)
(A
SP
HA
LT
)(P
UB
LIC
)(2
9'±
PA
VE
ME
NT
W
ID
TH
XXXXXXXXXXXXXXX
XX
X
XX
X
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXXXX
X
XXX XXX
XXX
XXX
XXX
XXX
XXXXXXXXXXXXXXX
XXX XXX XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXXXXXXXXXXXXXX
XX
X
XX
X
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXXXX
X
XXX XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXXXXXXXXXXXXXXXXX
XXX XXX XXX
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
NEW ROAD 'A'
NEW GRAVEL ROAD
xx
ST
ST
ST ST
ST
ST
SECTION 5
1,000 IN-GROUND CREMAIN
SITES (WITHIN 4'x4' PLOTS)
577578
578 98579 16
580 37
TC
579 82
579 37
580 15580 24
58119
581 43
581 02
58126
574 45
579 20
581 61
HP
579 90
LP
581 33
HP
570 69
FL
580 14
TC
579 99
TC580 06
TC
580 00
TC
580 60
TC
580 24
TC
580 40
TC
580 59
TC
580 33
TC
579 83
TC
580 33
TC
579 62
TC
579 60
TC
579 63
TC
579 00
TC
578 66
TC
574 72
TC
574 72
TC
574 59
TC
574 59
TC
57110
FL
573 27
570 64
FL
580 97
580 97
579 00
FL
579 24
FL
2.4%
2.4%
574 28
573 15
FL
574 08
FL
574 09
573 94
ST
ST
ST
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
SPRINGFIELD, ILLINOIS
Dwg. of 71
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CAMP BUTLER NATIONAL CEMETERY
GRAVESITE EXPANSION
806CM3028
Fil e P ath
\1
.16 8.8
.12 6\V
OL
1\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\06
\P
LA
NS
\C
G-
1.D W
G
DCW ATNJULY 25, 2022
BID DOCUMENTS
BID DOCUMENTS SUBMISSION
GRADING AND DRAINAGE PLAN 1
CG101
KEY NOTE LEGEND:
KEY NO. DESCRIPTION
RIBBON CURB
MOUNTABLE CURB & GUTTER
PROPOSED LIMITS OF DISTURBANCE (TYP.)
GRAPHIC LEGEND:
LIMITS OF DISTURBANCE
NEW STORM SEWER
SPOT ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
TC TOP OF CURB
GS GROUND ELEVATION
HP HIGH POINT
NORTH
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
NKEY MAP
(NOT TO SCALE)
S H
EE
T
C G
M
AT
C H
LI
N
E
CURB TRANSITION
MOUNTABLE
CURB
TAPER
RIBBON
CURB
GRADING & DRAINAGE NOTES:
4 MATCH EXISTING EDGE OF PAVEMENT
WWWWW
W
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
N
°4 4'4
3" E
4.4
4'( R)
(M
S 00°00'41" W
452.11'
NO
RF
OL
K
SO
UT
HE
RN
RA
ILR
OA
D (W
ID
TH
VA
RI
ES
XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX
XXXXXXXXXXXXXXXXXXXXXXXXXXX
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X
XX
X XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX
SWM FACILITY # 1
TOP OF FACILITY = 578.00'
BOTTOM OF FACILITY = 575.50
580 26
580 50
579 24
579 48 580 01
580 25
579 59 579 35
5 76 5 77
57757
570 00
FL
575 50
FL
5-YR WSE = 576.08
5 7 3 5 7 4
KEY NOTE LEGEND:
KEY NO. DESCRIPTION
GRADE TO PROVIDE POSITIVE DRAINAGE TO EAST
PROPOSED LIMITS OF DISTURBANCE (TYP.)
GRADING & DRAINAGE NOTES:
GRAPHIC LEGEND:
LIMITS OF DISTURBANCE
NEW STORM SEWER
SPOT ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
SPRINGFIELD, ILLINOIS
Dwg. of 71
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CAMP BUTLER NATIONAL CEMETERY
GRAVESITE EXPANSION
806CM3028
Fil e P ath
\1
.16 8.8
.12 6\V
OL
1\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\06
\P
LA
NS
\C
G-
1.D W
G
DCW ATNJULY 25, 2022
BID DOCUMENTS
BID DOCUMENTS SUBMISSION
GRADING AND DRAINAGE PLAN 2
CG102
NORTH
GRA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .